This document is a specification for the instrumentation and control requirements of an HVAC upgrade project for Columbia School District's elementary and high schools. The project will utilize Direct Digital Control (DDC) technology to provide the necessary control functions. The control system must accommodate simultaneous multiple user operation, with access limited by operator password, and allow each system to operate independently in the event of a network failure. The installer must have significant experience with the control system manufacturer and the control system. Submittals are required within 60 days of contract award, including equipment schedules, sequences of operation, system diagrams, and other detailed documentation. The control system will have a 12-month warranty period, and the Owner will take ownership of all project-developed hardware and software.
The acceptable manufacturers for the non-packaged HVAC equipment controllers are Johnson Controls, Honeywell, Alerton, Trane, and Siemens. The control system must include application-specific controllers, input/output interfaces, and auxiliary control devices as specified. The installation must comply with all relevant electrical and safety codes. Training for Owner personnel on system operation, programming, and maintenance is required as part of the project.
Text of this file
Columbia School Project No. 22521.00 Elementary and High School HVAC Upgrade October 2023 Bid Documents
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 1
SECTION 230900 – INSTRUMENTATION AND CONTROL FOR HVAC
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Products Furnished But Not Installed Under This Section.
B. Related Sections.
C. Description.
D. Quality Assurance.
E. System Performance.
F. Submittals.
G. Warranty.
H. Ownership of Proprietary Material.
1.2 PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION
A. Section 232113 - Hydronic Piping:
1. Control Valves
2. Flow Switches
3. Temperature Sensor Wells and Sockets
4. Flow Meters
B. Section 232300 - Refrigerant Piping:
1. Pressure and Temperature Sensor Wells and Sockets
C. Section 233300 - Duct Accessories:
1. Automatic Dampers
2. Air-flow Stations
3. Terminal Unit Controls
1.3 RELATED SECTIONS
A. The General Conditions of the Contract, Supplementary Conditions, and General Requirements are a part of these Specifications and shall be used in conjunction with this Section as a part of
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 2
the Contract Documents. Consult them for further instructions pertaining to this work. The Contractor is bound by the provisions of other Divisions.
B. Refer to other Division 23 Sections for related work.
1.4 DESCRIPTION
A. General: The control system shall be as indicated on the drawings and described in the specifications.
B. Direct Digital Control (DDC) technology shall be used to provide the functions necessary for control of mechanical systems on this project.
C. The control system shall accommodate simultaneous multiple user operation. Access to the control system data should be limited only by operator password. Multiple users shall have access to all valid system data. An operator shall be able to log onto any work-station on the control system and have access to all appropriate data.
D. The control system shall be designed such that each mechanical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall continue to independently operate under control.
E. Communication between the control panels and all work-stations shall be over a high speed network. All nodes on this network shall be peers. The operator shall not have to know the panel identifier or location to view or control an object. Application Specific Controllers shall be constantly scanned by the network controllers to update point information and alarm information.
F. The documentation is schematic in nature. The Contractor shall provide hardware and software necessary to implement the functions and sequences shown and operate the systems in a safe and stable manner.
1.5 QUALITY ASSURANCE
A. System Installer Qualifications
1. The Installer shall have an established working relationship with the Control System Manufacturer of not less than three years.
2. The Installer shall have successfully completed Control System Manufacturer's classes on the control system and have a minimum of five years experience in the design and installation of control systems. The Installer shall present for review the certification of completed training, including the hours of instruction and course outlines upon request.
3. The installer shall have an office within 75 miles of the project site and provide 24 hour response in the event of a customer call.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 3
B. Codes and Standards: Meet requirements of all applicable standards and codes, except when more detailed or stringent requirements are indicated by the Contract Documents, including requirements of this Section.
1. Underwriters Laboratories: Products shall be UL-916-PAZX listed.
2. National Electrical Code -- NFPA 70.
3. Federal Communications Commission -- Part J.
4. ASHRAE/ANSI 135-1995 (BACnet).
C. All products used in this installation shall be new, currently under manufacture, and shall be applied in similar installations for a minimum of 2 years. This installation shall not be used as a test site for any new products unless explicitly approved by the Owner's representative in writing prior to bid date. Spare parts shall be available for at least 5 years after completion of this contract.
1.6 SUBMITTALS
A. Contractor shall provide shop drawings and manufacturers’ standard specification data sheets on all hardware and software to be provided. No work may begin on any segment of this project until submittals have been reviewed by the Engineer and Owner for conformity with the plan and specifications. A minimum of six (6) copies are required. All shop drawings shall be done on AutoCAD, and provided to the Owner on a CD.
B. Quantities of items submitted shall be reviewed by the Engineer and Owner. Such review shall not relieve the contractor from furnishing quantities and specified functionality required for completion.
C. Provide the Engineer and Owner, any additional information or data which is deemed necessary to determine compliance with these specifications or which is deemed valuable in documenting the system to be installed.
D. Submit the following within 60 days of contract award:
1. A complete bill of materials of equipment to be used indicating quantity, manufacturer and model number.
2. A schedule of all control valves including the valve size, model number (including pattern and connections), flow, CV, pressure rating, and location.
3. A schedule of all control dampers. This shall include the damper size, pressure drop, manufacturer and model number.
4. Provide manufacturers cut sheets for major system components. When manufacturer's cut sheets apply to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted or clearly indicated by other means. Each submitted piece of literature and drawings shall clearly reference the specification and/or drawing that the submittal is being submitted to cover. Include:
a. Building Controllers
b. Custom Application Controllers
c. Application Specific Controllers
d. Operator Interface Computer
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 4
e. Portable Operator Workstation
f. Auxiliary Control Devices
g. Proposed control system riser diagram showing system configuration, device locations, addresses, and cabling.
h. Detailed termination drawings showing all required field and factory terminations.
Terminal numbers shall be clearly labeled.
i. Points list showing all system objects and the proposed English language object names.
j. Sequence of operations for each system under control. This sequence shall be specific for the use of the Control System being provided for this project.
k. Provide a BACnet Product Implementation Conformance Statement (PICS) for each BACnet device type in the submittal.
l. Color prints of proposed graphics with a list of points for display.
E. Project Record Documents: Upon completion of installation submit three (3) copies of record (as-built) documents. The documents shall be submitted for approval prior to final completion and include:
1. Project Record Drawings - These shall be as-built versions of the submittal shop drawings. One set of magnetic media including CAD .DWG or .DXF drawing files shall also be provided.
2. Testing and Commissioning Reports and Checklists.
3. Operating and Maintenance (O & M) Manual - These shall be as-built versions of the submittal product data. In addition to that required for the submittals, the O & M manual shall include:
a. Names, address and 24-hour telephone numbers of Contractors installing equipment, and the control systems and service representative of each.
b. Operators Manual with procedures of operating the control systems including logging on/off, alarm handling, producing point reports, trending data, overriding computer control, and changing set points and other variables.
c. Programming Manual with a description of the programming language including syntax, statement descriptions including algorithms and calculations used, point database creation and modification, program creation and modification, and use of the editor.
d. Engineering, Installation and Maintenance Manuals that explains how to design and install new points, panels, and other hardware; preventative maintenance and calibration procedures; how to debug hardware problems; and how to repair or replace hardware.
e. A listing and documentation of all custom software created using the programming language including the point database. One set of magnetic media containing files of the software and database shall also be provided
f. One set of magnetic media containing files of all color-graphic screens created for the project.
g. A list of recommended spare parts with part numbers and supplier.
h. Complete original issue documentation, installation and maintenance information for all third party hardware provided including computer equipment and sensors.
i. Complete original issue CD for all software provided including operating systems, programming language, operator work-station software, and graphics software.
j. Licenses, Guarantee, and Warrantee documents for all equipment and systems.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 5
k. Recommended preventive maintenance procedures for all system components including a schedule of tasks (inspection, cleaning, calibration, etc.), time between tasks, and task descriptions.
F. Training Manuals: The Contractor shall provide a course outline and training manuals for all training classes at least six weeks prior to the first class. The Owner reserves the right to modify any or all of the training course outline and training materials. Review and approval by Owner and Engineer and shall be completed at least 3 weeks prior to first class.
1.7 WARRANTY
A. Warrant all work as follows:
1. Labor & materials for control system specified shall be warranted free from defects for a period of twelve (12) months after final completion acceptance by the Owner. Control System failures during the warranty period shall be adjusted, repaired, or replaced at no charge or reduction in service to the Owner. The Contractor shall respond to the Owner's request for warranty service within 24 hours during customary business hours.
2. At the end of the final start-up/testing, if equipment and systems are operating satisfactorily to the Owner and Engineer, the Owner shall sign certificates certifying that the control system's operation has been tested and accepted in accordance with the terms of this specification. The date of Owner's acceptance shall be the start of warranty.
3. Operator work-station software, project specific software, graphics, database, and firmware updates shall be provided to the Owner at no charge during the warranty period.
Written authorization by Owner must, however, be granted prior to the installation of such changes.
1.8 OWNERSHIP OF PROPRIETARY MATERIAL
A. All project developed hardware and software shall become the property of the Owner. These include but are not limited to:
1. Project graphic images,
2. Record drawings,
3. Project database,
4. Job-specific application programming code,
5. All documentation.
PART 2 - PRODUCTS
2.1 SECTION INCLUDES
A. Acceptable Manufacturers.
B. Operator Interface.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 6
C. System Software.
D. Building Controllers.
E. Custom Application Controllers.
F. Application Specific Controllers.
G. Communications.
H. Input/Output Interface.
I. Auxiliary Control Devices.
2.2 ACCEPTABLE MANUFACTURERS
A. Existing System: Open N4 Software System.
1. New unit controllers shall be tied into the existing N4 software system.
B. Packaged equipment shall be provided with a controller by the unit manufacturer.
C. For non-packaged equipment, controllers shall be supplied from any of the following manufacturers:
1. Johnson Controls, Metasys.
2. Honeywell, Excel 5000.
3. Alerton Technologies, Inc.
4. Trane, Tracer
5. Seimens
D. The Contractor shall use only listed manufacturer’s products as shown in section 1 of this division. When a product or component is referred to by manufacturer's name and/or model number, the Contractor shall use only that product.
2.3 OPERATOR INTERFACE
2.4 APPLICATION SPECIFIC CONTROLLERS
A. General. Application specific controllers (ASC) are microprocessor-based DDC controllers which through hardware or firmware design are dedicated to control a specific piece of equipment. They are not fully user programmable, but are customized for operation within the confines of the equipment they are designed to serve.
1. Each ASC shall be capable of stand-alone operation and shall continue to provide control functions without being connected to the network.
2. Each ASC will contain sufficient I/O capacity to control the target system.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 7
B. Environment. The hardware shall be suitable for the anticipated ambient conditions.
1. Controllers used outdoors and/or in wet ambient shall be mounted within NEMA 4 Type waterproof enclosures, and shall be rated for operation at -40 C to 65 C.
2. Controller used in conditioned ambient shall be mounted in NEMA 1 Type rated enclosures, and shall be rated for operation at 0 C to 50 C.
C. Serviceability. Provide diagnostic LEDs for power, and communications. All wiring connections shall be made to field removable, modular terminal strips or to a termination card connected by a ribbon cable.
D. Memory. The Application Specific Controller shall maintain all BIOS and programming information in the event of a power loss for at least 90 days.
E. Immunity to Power and noise. Controller shall be able to operate at 90% to 110% of nominal voltage rating and shall perform an orderly shut-down below 80%.
F. Transformer. Power supply for the ASC must be rated at minimum of 125% of ASC power consumption, and shall be fused or current limiting type.
2.5 INPUT/OUTPUT INTERFACE
A. Hard-wired inputs and outputs may tie into the system through Building, Custom, or Application Specific Controllers.
B. All input points and output points shall be protected such that shorting of the point to itself, another point, or ground will cause no damage to the controller. All input and output points shall be protected from voltage up to 24V of any duration, such that contact with this voltage will cause no damage to the controller.
C. Binary inputs shall allow the monitoring of on/off signals from remote devices. The binary inputs shall provide a wetting current of at least 12 ma to be compatible with commonly available control devices.
D. Pulse accumulation input points. This type of point shall conform to all the requirements of Binary Input points, and also accept up to 2 pulses per second for pulse accumulation, and shall be protected against effects of contact bounce and noise.
E. Analog inputs shall allow the monitoring of low voltage (0-10 Vdc), current (4-20 ma), or resistance signals (thermistor, RTD). Analog inputs shall be compatible with, and field configurable to commonly available sensing devices.
F. Binary outputs shall provide for on/off operation, or a pulsed low voltage signal for pulse width modulation control. Binary outputs on custom and building controllers shall have 3-position (on/off/auto) override switches and status lights. Outputs shall be selectable for either normally open or normally closed operation.
G. Analog outputs shall provide a modulating signal for the control of end devices. Outputs shall provide either a 0-10 Vdc or a 4-20 ma signal as required to provide proper control of the
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 8
output device. Analog outputs on building or custom programmable controllers shall have status lights and a 2-position (auto/manual) switch and manually adjustable potentiometer for manual override.
2.6 AUXILIARY CONTROL DEVICES
A. Electronic valve actuators.
1. The actuator shall have electronic overload or digital rotation sensing circuitry to prevent damage to the actuator throughout the rotation of the actuator.
2. Where shown, for power-failure/safety applications, an internal mechanical, spring return mechanism shall be built into the actuator housing.
3. All rotary spring return actuators shall be capable of both clockwise or counter clockwise spring return operation. Linear actuators shall spring return to the retracted position.
4. Proportional actuators shall accept a 0-10 VDC or 0-20 ma control signal and provide a 2-10 VDC or 4-20 ma operating range.
5. All 24 VAC/DC actuators shall operate on Class 2 wiring and shall not require more than 10 VA for AC or more than 8 W for DC applications. Actuators operating on 120 VAC or 230 VAC shall not required more than 11 VA.
6. All non-spring return actuators shall have an external manual gear release to allow manual positioning of the damper when the actuator is not powered. Spring return actuators with more than 60 in-lb. torque capacity shall have a manual crank for this purpose.
7. All modulating actuators shall have an external, built-in switch to allow the reversing of direction of rotation
8. Actuators shall be provided with a conduit fitting and a minimum 1m electrical cable and shall be pre-wired to eliminate the necessity of opening the actuator housing to make electrical connections.
9. Actuators shall be Underwriters Laboratories Standard 873 listed.
10. Actuators shall be designed for a minimum of 60,000 full stroke cycles at the actuator's rated torque.
B. Control Valves
1. Control valves shall be two-way or three-way type for two-position or modulating service as scheduled or shown.
2. Close-off (differential) Pressure Rating: Valve actuator and trim shall be furnished to provide the following minimum close-off pressure ratings:
a. Water Valves:
1) Two-way: 150% of total system (pump) head.
2) Three-way: 300% of pressure differential between ports A and B at design flow or 100% of total system (pump) head.
3. Water Valves:
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 9
a. Body and trim style and materials shall be per manufacturer's recommendations for design conditions and service shown, with equal percentage ports for modulating service.
b. Sizing Criteria:
1) Two-position service: Line size.
2) Two-way modulating service: Pressure drop shall be equal to the greater of twice the pressure drop through heat exchanger (load) or 50% of the pressure difference between supply and return mains but not greater than 5 psi unless noted otherwise.
3) Three-way Modulating Service: Pressure drop equal to twice the pressure drop through the coil exchanger (load), 4 psi maximum.
4) Valves 1/2" through 2" shall be bronze body or cast brass ANSI Class 250, spring loaded, Teflon packing, quick opening for two-position service.
Two-way valves to have replaceable composition disc, or stainless steel ball.
5) 2-1/2" valves and larger shall be cast iron ANSI Class 125 with guided plug and Teflon packing.
c. Water valves shall fail normally open or closed as indicated in the sequence of operation as follows:
1) Heating coils in air handlers - normally open.
2) Other applications - as scheduled or as required by sequence of operation.
d. Zone valves shall be sized to meet the control application and they shall maintain their last position in the event of a power failure.
C. Temperature Sensors
1. Temperature sensors shall be Resistance Temperature Device (RTD) or Thermistor.
2. Duct sensors shall be rigid or averaging as shown. Averaging sensors shall be a minimum of 5 feet in length.
3. Immersion sensors shall be provided with a separable stainless steel well. Pressure rating of well is to be consistent with the system pressure in which it is to be installed.
4. Space sensors shall be equipped with override switch and communication port. Provide adjustable feature and display where indicated in the sequence of operation.
5. Provide matched temperature sensors for differential temperature measurement.
Differential accuracy shall be within 0.2 F.
D. Humidity Sensors
1. Duct and room sensors shall have a sensing range of 20% to 80% with accuracy of ±5%
RH
2. Duct sensors shall be provided with a sampling chamber.
3. Outdoor air humidity sensors shall have a sensing range of 20% to 95% RH. It shall be suitable for ambient conditions of -40 F to 170 F.
4. Humidity sensor's drift shall not exceed 1% of full scale per year.
E. Static Pressure Sensors
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 10
1. Sensor shall have linear output signal. Zero and span shall be field-adjustable.
2. Sensor sensing elements shall withstand continuous operating conditions plus or minus
50% greater than calibrated span without damage.
3. Water pressure sensor shall have stainless steel diaphragm construction, proof pressure of
150 psi minimum. Sensor shall be complete with 4-20 ma output, required mounting brackets, and block and bleed valves. Mount in location accessible for service.
4. Water differential pressure sensor shall have stainless steel diaphragm construction, proof pressure of 150 psi minimum. Over-range limit (DP) and maximum static pressure shall be 3,000 psi. Transmitter shall be complete with 4-20 ma output, required mounting brackets, and five-valve manifold. Mount in a location accessible for service.
F. Low Limit Thermostats
1. Safety low limit thermostats shall be vapor pressure type with an element 20 ft. minimum length. Element shall respond to the lowest temperature sensed by any one foot section.
2. Low limit shall be manual reset only.
G. Indoor Air Quality Sensors
1. Indoor air quality sensors shall measure both total percentage VOCs and CO2 in PPM.
Sensors shall be duct or space mounted.
H. Flow Switches
1. Flow-proving switches shall be either paddle or differential pressure type.
2. Differential pressure type switches (air or water service) shall be UL listed, SPDT snap-acting, pilot duty rated (125 VA minimum), NEMA 1 Type enclosure, with scale range and differential suitable for intended application, or as specified.
3. Current sensing relays may be used for flow sensing or terminal devices.
I. Relays
1. Control relays shall be UL listed plug-in type with dust cover. Contact rating, configuration, and coil voltage suitable for application.
2. Time delay relays shall be UL listed solid-state plug-in type with adjustable time delay.
Delay shall be adjustable plus or minus 200% (minimum) from set-point shown on plans.
Contact rating, configuration, and coil voltage suitable for application. Provide NEMA 1 Type enclosure when not installed in local control panel.
J. Transformers and Power Supplies
1. Control transformers shall be UL listed, Class 2 current-limiting type, or shall be furnished with over-current protection in both primary and secondary circuits for Class 2 service.
2. Unit output shall match the required output current and voltage requirements. Current output shall allow for a 50% safety factor. Output ripple shall be 3.0 mV maximum Peak-to-Peak. Regulation shall be 0.10% line and load combined, with 50 microsecond response time for 50% load changes. Unit shall have built-in over-voltage protection.
3. Unit shall operate between 0 C and 50 C.
4. Unit shall be UL recognized.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 11
K. Current Switches
1. Current-operated switches shall be self-powered, solid state with adjustable trip current.
The switches shall be selected to match the current of the application and output requirements of the DDC system.
PART 3 - EXECUTION
3.1 EXAMINATION
A. The project plans shall be thoroughly examined for control device and equipment locations, and any discrepancies, conflicts, or omissions shall be reported to the Architect/Engineer for resolution before rough-in work is started.
B. The contractor shall inspect the site to verify that equipment is installable as shown, and any discrepancies, conflicts, or omissions shall be reported to the Architect/Engineer for resolution before rough-in work is started.
3.2 GENERAL WORKMANSHIP
A. Install equipment, piping, wiring/conduit parallel to building lines (i.e. horizontal, vertical, and parallel to walls) wherever possible.
B. Provide sufficient slack and flexible connections to allow for vibration of piping and equipment.
C. Install all equipment in readily accessible location as defined by chapter 1 article 100 part A of the NEC. Control panels shall be attached to structural walls unless mounted in equipment enclosure specifically designed for that purpose. Panels shall be mounted to allow for unobstructed access for service.
D. Verify integrity of all wiring to ensure continuity and freedom from shorts and grounds.
E. All equipment, installation, and wiring shall comply with acceptable industry specifications and standards for performance, reliability, and compatibility and be executed in strict adherence to local codes and standard practices.
3.3 WIRING
A. All control and interlock wiring shall comply with the national and local electrical codes and Division 26 of these specifications. Where the requirements of this section differ with those in Division 26, the requirements of this section shall take precedence.
B. Install all Class 2 wires in conduit in the following locations:
1. Mechanical spaces.
2. Concealed inaccessible walls, chassis, ceiling, etc.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 12
C. Where Class 2 wires are in concealed and accessible locations including ceiling return air plenums, approved cables not in raceway may be used provided that:
1. Circuits meet NEC Class 2 (current-limited) requirements. (Low-voltage power circuits shall be sub-fused when required to meet Class 2 current-limit.)
2. All cables shall be UL listed for application, i.e. cables used in ceiling plenums shall be UL listed specifically for that purpose.
D. Do not install Class 2 wiring in conduit containing Class 1 wiring. Boxes and panels containing high voltage may not be used for low voltage wiring except for the purpose of interfacing the two (e.g. relays and transformers).
E. Where class 2 wiring is run exposed, wiring shall be run parallel along a surface or perpendicular to it, and bundled, using approved wire ties at no greater than 10 ft intervals.
Such bundled cable shall be fastened to the structure, using specified fasteners, at 5 ft intervals or more often to achieve a neat and workmanlike result.
F. All wire-to-device connections shall be made at a terminal blocks or terminal strip. All wire-to-wire connections shall be at a terminal block, or with a crimped connector. All wiring within enclosures shall be neatly bundled and anchored to permit access and prevent restriction to devices and terminals.
G. Maximum allowable voltage for control wiring shall be 120V. If only higher voltages are available, the Control System Contractor shall provide step down transformers.
H. All wiring shall be installed as continuous lengths, where possible. Any required splices shall be made only within an approved junction box or other approved protective device.
I. Install plenum wiring in sleeves where it passes through walls and floors. Maintain fire rating at all penetrations in accordance with other sections of this specification and local codes.
J. Size of conduit and size and type of wire shall be the design responsibility of the Control System Contractor, in keeping with the manufacturer's recommendation and NEC.
K. Control and status relays are to be located in designated enclosures only. These relays may also be located within packaged equipment control panel enclosures. These relays shall not be located within Class 1 starter enclosures.
L. Follow manufacturer's installation recommendations for all communication and network cabling. Network or communication cabling shall be run separately from other wiring.
M. Adhere to Division 26 requirements for installation of raceway.
N. This Contractor shall terminate all control and/or interlock wiring and shall maintain updated (as-built) wiring diagrams with termination’s identified at the job site.
O. Flexible metal conduits and liquid-tight, flexible metal conduits shall not exceed 3' in length and shall be supported at each end. Flexible metal conduit less than 1/2" electrical trade size shall not be used. In areas exposed to moisture, including chiller and boiler rooms, liquid-tight, flexible metal conduits shall be used.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 13
3.4 FIBER OPTIC CABLE SYSTEM
A. All cabling shall be installed in a neat and workmanlike manner. Minimum cable and unjacketed fibber bend radii as specified by cable manufacturer shall be maintained.
B. Maximum pulling tensions as specified by the cable manufacturer shall not be exceeded during installation. Post installation residual cable tension shall be within cable manufacture's specifications.
C. Fiber optic cabinets, hardware, and cable entering the cabinet shall be installed in accordance with manufacturers' instructions. Minimum cable and unjacketed fiber bend radii as specified by cable manufacturer shall be maintained.
3.5 INSTALLATION OF SENSORS
A. Install sensors in accordance with the manufacturer's recommendations.
B. Mount sensors rigidly and adequate for the environment within which the sensor operates.
C. Room temperature sensors shall be installed on concealed junction boxes properly supported by the wall framing.
D. All wires attached to sensors shall be air sealed in their conduits or in the wall to stop air transmitted from other areas affecting sensor readings.
E. Install duct static pressure tap with tube end facing directly down-stream of air flow.
F. Sensors used in mixing plenums, and hot and cold decks shall be of the averaging type.
Averaging sensors shall be installed in a serpentine manner horizontally across duct. Each bend shall be supported with a capillary clip.
G. All pipe mounted temperature sensors shall be installed in wells. Install all liquid temperature sensors with heat conducting fluid in thermal wells.
H. Wiring for space sensors shall be concealed in building walls. EMT conduit is acceptable within mechanical and service rooms.
I. Install outdoor air temperature sensors on north wall complete with sun shield at designated location.
3.6 FLOW SWITCH INSTALLATION
A. Install using a thread-o-let in steel pipe. In copper pipe use C x C x F Tee, no pipe extensions or substitutions allowed.
B. Mount a minimum of 5 pipe diameters up stream and 5 pipe diameters downstream or 2 feet which ever is greater, from fittings and other obstructions.
C. Install in accordance with manufacturers instructions.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 14
D. Assure correct flow direction and alignment.
E. Mount in horizontal piping - flow switch on top of the pipe.
3.7 ACTUATORS
A. Mount and link control damper actuators per manufacturer's instructions.
B. To compress seals when spring return actuators are used on normally closed dampers, power actuator to approximately 5° open position, manually close the damper, and then tighten the linkage.
C. Check operation of damper/actuator combination to confirm that actuator modulates damper smoothly throughout stroke to both open and closed positions.
D. Valves - Actuators shall be mounted on valves with adapters approved by the actuator manufacturer. Actuators and adapters shall be mounted following manufacturer's recommendations.
3.8 WARNING LABELS
A. Affix plastic labels on each starter and equipment automatically controlled through the Control System. Label shall indicate the following:
C A U T I O N This equipment is operating under automatic control and may start at any time without warning.
3.9 IDENTIFICATION OF HARDWARE AND WIRING
A. All wiring and cabling, including that within factory-fabricated panels, shall be labeled at each end within 2" of termination with a cable identifier and other descriptive information.
B. Permanently label or code each point of field terminal strips to show the instrument or item served.
C. Identify control panels with minimum 1 cm letters on laminated plastic nameplates.
D. Identify all other control components with permanent labels. Identifiers shall match record documents. All plug-in components shall be labeled such that removal of the component does not remove the label.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 15
3.10 CONTROLLERS
A. Provide a separate Controller for each major piece of HVAC equipment. Package equipment shall be provided with a controller by the manufacturer. Non-Packaged equipment shall be provided with an open-source, BACnet compatible controller that meets all points and sequences described in the drawings. Points used for control loop reset such as outside air or space temperature are exempt from this requirement.
B. Building Controllers and Custom Application Controllers shall be selected to provide a minimum of 15% spare I/O point capacity for each point type found at each location. If input points are not universal, 15% of each type is required. If outputs are not universal, 15% of each type is required. A minimum of one spare is required for each type of point used.
C. Future use of spare capacity shall require providing the field device, field wiring, point database definition, and custom software. No additional Controller boards or point modules shall be required to implement use of these spare points.
3.11 PROGRAMMING
A. Provide sufficient internal memory for the specified control sequences and trend logging.
There shall be a minimum of 25% of available memory free for future use.
B. Point Naming: System point names shall be modular in design, allowing easy operator interface without the use of a written point index.
C. Software Programming
1. Provide programming for the system as per specifications and adhere to the strategy algorithms provided. All other system programming necessary for the operation of the system but not specified in this document shall also be provided by the Control System Contractor. Imbed into the control program sufficient comment statements to clearly describe each section of the program. The comment statements shall reflect the language used in the sequence of operations.
D. Operators' Interface
1. Standard Graphics. Provide graphics for each major piece of equipment and floor plan in the building. This includes each Chiller, Air Handler, HVAC Unit, VAV Terminal, Fan Coil, Boiler, Heat Exchanger and Cooling Tower. These standard graphics shall show all points dynamically as specified in the points list.
2. The controls contractor shall provide all the labor necessary to install, initialize, start-up, and trouble-shoot all operator interface software and their functions as described in this section. This includes any operating system software, the operator interface data base, and any third party software installation and integration required for successful operation of the operator interface.
3. As part of this execution phase, the controls contractor will perform a complete test of the operator interface. Test duration shall be a minimum of 16 hours on-site. Tests shall be made in the presence of the Owner or Owner's representative.
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 16
E. Demonstration: A complete demonstration and readout of the capabilities of the monitoring and control system shall be performed. The contractor shall dedicate a minimum of 24 hours on-site with the Owner and his representatives for a complete functional demonstration of all the system requirements. This demonstration constitutes a joint acceptance inspection, and permits acceptance of the delivered system for on-line operation.
F. Adjustments: Provide up to 4 additional site visits during the first year of operation to adjust systems and provide owner instruction as required for seasonal adjustments.
3.12 CLEANING
A. This contractor shall clean up all debris resulting from his or her activities daily. The contractor shall remove all cartons, containers, crates, etc. under his control as soon as their contents have been removed. Waste shall be collected and placed in a location designated by the Construction Manager or General Contractor.
B. At the completion of work in any area, the Contractor shall clean all of his/her work, equipment, etc., making it free from dust, dirt and debris, etc.
C. At the completion of work, all equipment furnished under this Section shall be checked for paint damage, and any factory finished paint that has been damaged shall be repaired to match the adjacent areas. Any metal cabinet or enclosure that has been deformed shall be replaced with new material and repainted to match the adjacent areas.
3.13 PROTECTION
A. The Contractor shall protect all work and material from damage by his/her work or workers, and shall be liable for all damage thus caused.
B. The Contractor shall be responsible for his/her work and equipment until finally inspected, tested, and accepted. The Contractor shall protect his/her work against theft or damage, and shall carefully store material and equipment received on site that is not immediately installed.
The Contractor shall close all open ends of work with temporary covers or plugs during storage and construction to prevent entry of foreign objects.
3.14 TRAINING
A. Provide a minimum of 3 classroom training sessions, 8 hours each, throughout the contract period for personnel designated by the Owner. Computer based training may be substituted for up to 24 hours of hands on training.
B. Train the designated staff of Owner's representative and Owner to enable them to proficiently operate the system; create, modify and delete programming; add, remove and modify physical points for the system; add additional panels when required.
C. These objectives will be divided into three logical groupings; participants may attend one or more of these, depending on level of knowledge required:
INSTRUMENTATION AND CONTROL FOR HVAC 230900 - 17
1. Day-to-day Operators
2. System Troubleshooter
3. System Manager: parts
D. Provide course outline and materials as per Part 1 of this Section. The instructor(s) shall provide one copy of training material per student.
E. The instructor(s) shall be factory-trained instructors experienced in presenting this material.
F. Classroom training shall be done using a network of working controllers representative of the installed hardware or at the customers site.
3.15 FIELD QUALITY CONTROL
A. All work, materials and equipment shall comply with the rules and regulations of applicable local, state, and federal codes and ordinances as identified in Part 1 of this Section.
B. Contractor shall continually monitor the field installation for code compliance and quality of workmanship. All visible piping and or wiring runs shall be installed parallel to building lines and properly supported.
C. Contractor shall arrange for field inspections by local and/or state authorities having jurisdiction over the work.
3.16 ACCEPTANCE
A. The control systems will not be accepted as meeting the requirements of Completion until all tests described in this specification have been performed to the satisfaction of both the Engineer and Owner. Any tests that cannot be performed due to circumstances beyond the control of the Contractor may be exempt from the Completion requirements if stated as such in writing by the Owner's representative. Such tests shall then be performed as part of the warranty.
END OF SECTION 230900
| PART 1 - GENERAL |
| 1.1 SECTION INCLUDES |
| A. Products Furnished But Not Installed Under This Section. |
| B. Related Sections. |
| C. Description. |
| D. Quality Assurance. |
| E. System Performance. |
| F. Submittals. |
| G. Warranty. |
| H. Ownership of Proprietary Material. |
| 1.2 PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION |
| A. Section 232113 - Hydronic Piping: |
| 1. Control Valves |
| 2. Flow Switches |
| 3. Temperature Sensor Wells and Sockets |
| 4. Flow Meters |
| B. Section 232300 - Refrigerant Piping: |
| 1. Pressure and Temperature Sensor Wells and Sockets |
| C. Section 233300 - Duct Accessories: |
| 1. Automatic Dampers |
| 2. Air-flow Stations |
| 3. Terminal Unit Controls |
| 1.3 RELATED SECTIONS |
| A. The General Conditions of the Contract, Supplementary Conditions, and General Requirements are a part of these Specifications and shall be used in conjunction with this Section as a part of the Contract Documents. Consult them for further instruct... |
| B. Refer to other Division 23 Sections for related work. |
| 1.4 DESCRIPTION |
| A. General: The control system shall be as indicated on the drawings and described in the specifications. |
| B. Direct Digital Control (DDC) technology shall be used to provide the functions necessary for control of mechanical systems on this project. |
| C. The control system shall accommodate simultaneous multiple user operation. Access to the control system data should be limited only by operator password. Multiple users shall have access to all valid system data. An operator shall be able to log... |
| D. The control system shall be designed such that each mechanical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall contin... |
| E. Communication between the control panels and all work-stations shall be over a high speed network. All nodes on this network shall be peers. The operator shall not have to know the panel identifier or location to view or control an object. Appli... |
| F. The documentation is schematic in nature. The Contractor shall provide hardware and software necessary to implement the functions and sequences shown and operate the systems in a safe and stable manner. |
| 1.5 QUALITY ASSURANCE |
| A. System Installer Qualifications |
| 1. The Installer shall have an established working relationship with the Control System Manufacturer of not less than three years. |
| 2. The Installer shall have successfully completed Control System Manufacturer's classes on the control system and have a minimum of five years experience in the design and installation of control systems. The Installer shall present for review the c... |
| 3. The installer shall have an office within 75 miles of the project site and provide 24 hour response in the event of a customer call. |
| B. Codes and Standards: Meet requirements of all applicable standards and codes, except when more detailed or stringent requirements are indicated by the Contract Documents, including requirements of this Section. |
| 1. Underwriters Laboratories: Products shall be UL-916-PAZX listed. |
| 2. National Electrical Code -- NFPA 70. |
| 3. Federal Communications Commission -- Part J. |
| 4. ASHRAE/ANSI 135-1995 (BACnet). |
C. All products used in this installation shall be new, currently under manufacture, and shall be applied in similar installations for a minimum of 2 years. This installation shall not be used as a test site for any new products unless explicitly app...
| 1.6 SUBMITTALS |
| A. Contractor shall provide shop drawings and manufacturers’ standard specification data sheets on all hardware and software to be provided. No work may begin on any segment of this project until submittals have been reviewed by the Engineer and Owne... |
| B. Quantities of items submitted shall be reviewed by the Engineer and Owner. Such review shall not relieve the contractor from furnishing quantities and specified functionality required for completion. |
| C. Provide the Engineer and Owner, any additional information or data which is deemed necessary to determine compliance with these specifications or which is deemed valuable in documenting the system to be installed. |
| D. Submit the following within 60 days of contract award: |
| 1. A complete bill of materials of equipment to be used indicating quantity, manufacturer and model number. |
| 2. A schedule of all control valves including the valve size, model number (including pattern and connections), flow, CV, pressure rating, and location. |
| 3. A schedule of all control dampers. This shall include the damper size, pressure drop, manufacturer and model number. |
| 4. Provide manufacturers cut sheets for major system components. When manufacturer's cut sheets apply to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted or clearly indicated by oth... |
| a. Building Controllers |
| b. Custom Application Controllers |
| c. Application Specific Controllers |
| d. Operator Interface Computer |
| e. Portable Operator Workstation |
| f. Auxiliary Control Devices |
| g. Proposed control system riser diagram showing system configuration, device locations, addresses, and cabling. |
| h. Detailed termination drawings showing all required field and factory terminations. Terminal numbers shall be clearly labeled. |
| i. Points list showing all system objects and the proposed English language object names. |
| j. Sequence of operations for each system under control. This sequence shall be specific for the use of the Control System being provided for this project. |
| k. Provide a BACnet Product Implementation Conformance Statement (PICS) for each BACnet device type in the submittal. |
| l. Color prints of proposed graphics with a list of points for display. |
| E. Project Record Documents: Upon completion of installation submit three (3) copies of record (as-built) documents. The documents shall be submitted for approval prior to final completion and include: |
| 1. Project Record Drawings - These shall be as-built versions of the submittal shop drawings. One set of magnetic media including CAD .DWG or .DXF drawing files shall also be provided. |
| 2. Testing and Commissioning Reports and Checklists. |
| 3. Operating and Maintenance (O & M) Manual - These shall be as-built versions of the submittal product data. In addition to that required for the submittals, the O & M manual shall include: |
| a. Names, address and 24-hour telephone numbers of Contractors installing equipment, and the control systems and service representative of each. |
| b. Operators Manual with procedures of operating the control systems including logging on/off, alarm handling, producing point reports, trending data, overriding computer control, and changing set points and other variables. |
| c. Programming Manual with a description of the programming language including syntax, statement descriptions including algorithms and calculations used, point database creation and modification, program creation and modification, and use of the editor. |
| d. Engineering, Installation and Maintenance Manuals that explains how to design and install new points, panels, and other hardware; preventative maintenance and calibration procedures; how to debug hardware problems; and how to repair or replace hard... |
| e. A listing and documentation of all custom software created using the programming language including the point database. One set of magnetic media containing files of the software and database shall also be provided |
| f. One set of magnetic media containing files of all color-graphic screens created for the project. |
| g. A list of recommended spare parts with part numbers and supplier. |
| h. Complete original issue documentation, installation and maintenance information for all third party hardware provided including computer equipment and sensors. |
| i. Complete original issue CD for all software provided including operating systems, programming language, operator work-station software, and graphics software. |
| j. Licenses, Guarantee, and Warrantee documents for all equipment and systems. |
| k. Recommended preventive maintenance procedures for all system components including a schedule of tasks (inspection, cleaning, calibration, etc.), time between tasks, and task descriptions. |
F. Training Manuals: The Contractor shall provide a course outline and training manuals for all training classes at least six weeks prior to the first class. The Owner reserves the right to modify any or all of the training course outline and traini...
| 1.7 WARRANTY |
| A. Warrant all work as follows: |
| 1. Labor & materials for control system specified shall be warranted free from defects for a period of twelve (12) months after final completion acceptance by the Owner. Control System failures during the warranty period shall be adjusted, repaired, ... |
| 2. At the end of the final start-up/testing, if equipment and systems are operating satisfactorily to the Owner and Engineer, the Owner shall sign certificates certifying that the control system's operation has been tested and accepted in accordance w... |
| 3. Operator work-station software, project specific software, graphics, database, and firmware updates shall be provided to the Owner at no charge during the warranty period. Written authorization by Owner must, however, be granted prior to the insta... |
| 1.8 OWNERSHIP OF PROPRIETARY MATERIAL |
| A. All project developed hardware and software shall become the property of the Owner. These include but are not limited to: |
| 1. Project graphic images, |
| 2. Record drawings, |
| 3. Project database, |
| 4. Job-specific application programming code, |
| 5. All documentation. |
| PART 2 - PRODUCTS |
| 2.1 SECTION INCLUDES |
| A. Acceptable Manufacturers. |
| B. Operator Interface. |
| C. System Software. |
| D. Building Controllers. |
| E. Custom Application Controllers. |
| F. Application Specific Controllers. |
| G. Communications. |
| H. Input/Output Interface. |
| I. Auxiliary Control Devices. |
| 2.2 ACCEPTABLE MANUFACTURERS |
| A. Existing System: Open N4 Software System. |
| 1. New unit controllers shall be tied into the existing N4 software system. |
| B. Packaged equipment shall be provided with a controller by the unit manufacturer. |
| C. For non-packaged equipment, controllers shall be supplied from any of the following manufacturers: |
| 1. Johnson Controls, Metasys. |
| 2. Honeywell, Excel 5000. |
| 3. Alerton Technologies, Inc. |
| 4. Trane, Tracer |
| 5. Seimens |
D. The Contractor shall use only listed manufacturer’s products as shown in section 1 of this division. When a product or component is referred to by manufacturer's name and/or model number, the Contractor shall use only that product.
| 2.3 OPERATOR INTERFACE |
| 2.4 APPLICATION SPECIFIC CONTROLLERS |
| A. General. Application specific controllers (ASC) are microprocessor-based DDC controllers which through hardware or firmware design are dedicated to control a specific piece of equipment. They are not fully user programmable, but are customized fo... |
This is the start of the file's text. The full file is on GovTribe.
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .