CO ERFO SNJUAN Final Plans_signed.pdf
PDF 30 MB Posted
- Attached to
- CO ERFO FS SNJUAN 2026-1(1) Fall Creek Road
- Solicitation number
- 6982AF26B000006
About this file
This is a final design plans document for the CO ERFO FS SNJUAN 2026-1(1) project, a multi-site road and infrastructure repair initiative in the San Juan National Forest located approximately 15 miles north of Pagosa Springs, Colorado in Archuleta and Mineral County. The project encompasses five damaged sites requiring embankment construction, riprap placement, box culvert installation, and bridge abutment scour repairs across Lower Piedra Campground Road, East Fork Road, Hatcher Road, Fall Creek Road, and the West Fork of San Juan River Bridge.
The design plans include detailed specifications for roadway improvements with typical sections ranging from 10 to 20 feet in traveled way width, embankment construction using reinforced soil slopes where applicable, Class 4 and Class 6 riprap placement for bank protection, concrete box culvert installation (16-foot span by 8-foot rise precast reinforced concrete), and terminal guardrail systems. Estimated work quantities include 4,000 cubic yards of embankment construction, 2,000 cubic yards of riprap, 500 tons of roadway aggregate, 70 linear feet of precast concrete box culvert, and 50 cubic yards of grout. The plans incorporate erosion control measures including seeding, mulching, rolled erosion control products, and temporary stream diversion. The anticipated contract award date is September 2026 with a Notice to Proceed expected thereafter and contract completion by July 30, 2027. The estimated project cost ranges from $2,000,000 to $5,000,000, with the solicitation set-aside for small business concerns under the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2026.06.25 16:33:41 -06'00'
:1
P
M
J u n e
S h e e t
I n d e x c p w w o r k c f l\ d m s \S h e e t
I n d e x .d g n
SHEET INDEX
PROJECT
NUMBER
SHEET
A.2
CO ERFO FS SNJUAN 2026-1(1)
BH
36 31
36 31
TP
E
N 1000
EL. 1234.56
SEC.
SEC.
W
RIP
CP GPS
JH
N
DI
TP
TP
Proposed)
Right-of-Way Line (Existing, Proposed)
Permanent Easement (Existing, Temporary Construction Easement
DI
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits (Limits of Disturbance)
Bottom of Ditch
Fence
Gate with Fence
Cattle Guard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineator
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Utility/Feature
Overhead or Above Ground
Underground Utility/Feature
Use, Support w/Anchor)
Poles (Power, Telephone, Joint
Miscellaneous Utility Features
Building
EXISTING PROPOSED
W = water
UD = underdrain
TV = CATV
T = telephone
STEAM = steam
SS = sanitary sewer
SD = storm drain
UP = transformer or junction box, WF = water fountain
EM = electric meter, TP = telephone pedestal, TV = CATV pedestal, Abbreviations
Utility/Feature Line
P = power
O = oil
IRR = irrigation
G = gas
FO = fiber optic
FM = force main
Street Light
Riprap diaphragmdiaph.
diagonaldiag.
design hourly volumeDHV diameter or Ø
D or dia.
expansion jointexp. jt.
excavationexc.
edge of travel wayETW equivalent single axle loadESAL equationEQ or eq.
edge of pavementEOP embankmentemb.
elevationelev.
elevation with numberEl. 94.066 each facee.f.
superelevation ratee eastE footingftg.
flangeflg.
fill facef.f.
galvanizedgalv.
gage (gauge)ga.
inside diameterID jointjt.
length/algebraic differenceK latitudelat.
length of curveL curve wideningCW leftLt or LT length of spiralLs lump sumLPSM longitudelong.
mile postMP monumentmon.
minimummin.
Midwest Guardrail SystemMGS normal crownNC northN ordinary high water markOHWM outside diameterOD out to outo.o.
other faceo.f.
on centero.c.
pavementpvmt.
point of tangent to curvePT point of spiral to tangentPST point of spiral to curvePSC point of tangent to spiralPS point on tangentPOT point on spiralPOS point of endingPOE point on curvePOC point of beginningPOB platepl.
point of intersectionPI point of curve to spiralPCS point of compound curvePCC point of curve to tangentPC rightRt or RT reinforcementreinf.
right-of-wayR/W rangeR.
radiusR spacing, spaces or spacedspa.
shouldershldr sectionsec.
point of spiral to curveSC seasonal average daily trafficSADT southS point of spiral to tangent spiralSTS stiffenerstiff.
stringerstgr.
standardstd.
stationsta.
point of spiral to tangentST stopping sight distanceSSD point of spiral to spiral (no curve)SS point of spiral to reverse spiralSRS typicaltyp.
tangent distance (spiraled curve)Ts point of tangent to spiralTS temporary construction easementTCE townshipT.
tangent lengthT vertical point of intersectionVPI vehicles per hourvph verticalvert.
vertical curveVC design speedV westW
NO SCALE
total central angle∆ approachappr.
amendmentAMEND aheadAH average daily trafficADT abutmentabut.
bearingbrg.
bridgebr.
balance pointBP bench markBM baselineBL backBK both facesb.f.
point of curve to spiralCS continuouscont.
construction jointconstr. jt.
connectionconn.
corrugated metal pipeCMP centerline or CL� center to centerc.c.
maximummax. National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Spot Elevation
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
Federal Agency Boundary
Wilderness Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Coordinate Grid Tick
Boulder; Well; Antenna; Grave
Control Point (Terrestrial and GPS); Jump Hub
North Arrow
Check Dam plan sheet.
Additional symbols may be shown in a legend on the appropriate
NOTE:
1.
cubic yard(s)CUYD cubic foot (feet)CUFT thousand gallonMGAL linear foot (feet)LNFT square yardSQYD square footSQFT
ABBREVIATIONS
PLAN SYMBOLS AND
101-1
FP-24
FLH STANDARD
:0 u n e
S td
-1 p w w o rk c fl \d m s
\S Y
M .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
A.3
Scale in Miles
0 3 6
N
H ig h w a y
PAGOSA SPRINGS
High way 1
CHIMNEY ROCK
Highway 151
PIEDRA
±32 miles to
Durango m ile s to
S o u th
F o r k
CR 648
SAN JUAN NATIONAL FOREST
SAN JUAN NATIONAL FOREST
East Fork Road (667)
Fall Creek Road (039)
Hatcher Road (033)
Lower Piedra Campground (621)
S a n J u a n R iv e r
MINERAL COUNTY
ARCHULETTA COUNTY
HINDSDALE COUNTY
SOUTHERN UTE RESERVATION
CR 168
West Fork of San Juan River Bridge (648)
East Fork
San Juan River
Wolf
Creek
West Fork
San Juan River
:3
A u n e
S
IT
E M p w w o r k c f l\ d m s
\S T
E .d g n
VICINITY MAP
PROJECT
NUMBER
A.4CO ERFO FS SNJUAN 2026-1(1)
BYDATE
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
SS4/27/26Created1
:1
M a y
S u r v e y
C o n tr o l p w w o r k c f l\ d m s \C o n tr o l_
S h e e t(
D E
S I G
N C
O S
N J U
A N
.d g n
SURVEY CONTROL
PROJECT
A.5
Sheet and Description
B.2 B.3 B.4 B.5 K.2
LOWER
PIEDRA
CAMPGROUND
EAST FORK
ROAD
HATCHER
ROAD
FALL CREEK
ROAD
WEST FORK
OF SAN JUAN
RIVER BRIDGE
BID
SCHEDULE
A0100 15101-0000 MOBILIZATION LPSM ALL
A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0200 15720-0000 STORMWATER POLLUTION PREVENTION PLAN LPSM ALL
A0220 20101-0000 CLEARING AND GRUBBING ACRE 0.7 0.1 0.5 0.2 1.5
A0240 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM ALL
A0260 20401-0000 ROADWAY EXCAVATION CUYD 297 33 330
A0280 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1109 91 1200
A0300 20420-0000 EMBANKMENT CONSTRUCTION,(REINFORCED SOIL SLOPE) CUYD 3067 183 3250
A0320 25101-0400 PLACED RIPRAP, CLASS 4 CUYD 190 20 210
A0340 25101-0600 PLACED RIPRAP, CLASS 6 CUYD 1335 582 2920 102 100 261 5300
A0360 27001-0000 GROUT CUYD 3 1 4
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 240 30 145 32 20 33 500
A0400 57203-0000 REPAIR CONCRETE LPSM ALL
A0420 60103-0000 CONCRETE, HEADWALL,& WINGWALLS (CONCRETE BOX CULVERT) EACH 2 2
A0440 60220-4760 16 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 76 4 80
A0460 61702-1500 TERMINAL SYSTEM, TYPE MGS TANGENT EACH 2 2
A0480 61707-0000 STRUCTURE TRANSITION RAILING LNFT 27 27 Contract Quantity, A0500 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0520 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20
A0540 62201-3150 HYDRAULIC EXCAVATOR, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 20
A0560 62301-0000 GENERAL LABOR HOUR 40
A0580 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10
A0600 62402-0200 PROVIDING AND PLACING TOPSOIL, 3-INCH DEPTH ACRE 0.2 0.01 0.1 0.31
A0620 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.2 0.03 0.1 0.02 0.35
A0640 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.2 0.03 0.1 0.02 0.35
A0660 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL
A0680 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A SQYD 615 35 650
A0700 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4
A0720 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0740 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0760 63701-0000 FIELD OFFICE EACH 1
A0780 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL CUYD 40 5 45
PAY ITEM
NUMBER
LINE
ITEM
NO.
c:
\p w w o rk cf l\ d m s1 m w
-s u m m a ry
-q u a n ti ti es
-9
-2 xl sm
]S h ee t -J u n -2
:1 P
M
A M E N D
SUMMARY OF QUANTITIES
Milestone: 100 SOQ; Date Completed:
Remarks and/or Determination of Estimated Quantity
Estimated Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B.1CO ERFO FS SNJUAN 2026-1(1)
:5
J u n e
L o w e r P ie d r a C a m p g r o u n d S u m m a r ie s p w w o r k c f l\ d m s
\B
S h e e ts
.d g n
SUMMARIES
LOWER PIEDRA CAMPGROUND
PROJECT
B.2
:3 u n e
E a s t
F o r k
R o a d
S u m m a r p w w o r k c f l\ d m s
\B
S h e e ts
.d g n
EAST FORK ROAD SUMMARIES
PROJECT
B.3
:3
J u n e
H a tc h e r R o a d
S u m m a r p w w o r k c f l\ d m s
\B
S h e e ts
.d g n
HATCHER ROAD SUMMARIES
PROJECT
B.4
:4
J u n e
F a ll
C r e e k
R o a d
S u m m a r p w w o r k c f l\ d m s
\B
S h e e ts
.d g n
FALL CREEK ROAD SUMMARIES
PROJECT
B.5 for structural section details
See mainline typical section
L C
Method 2
3" Roadway Aggregate, L C
6" Roadway Aggregate, Method 2
See Detail A
L C
5" Roadway Aggregate, Method 2
See Detail A
L C
6" Roadway Aggregate, Method 2
Edge of existing channel
See 251-A
Class 6 Riprap
See 204-A
Reinforced Soil Slope
(top of aggregate)
Profile grade
Match existing
See Detail A from temporary repair
Loosely placed material
(to be removed)
Extents of temporary repair
Existing ground
L C
6" Roadway Aggregate, Method 2
See Detail A
(top of aggregate)
Profile grade
See 204-A
Class 6 Riprap
See 251-A
Class 6 Riprap
See 251-A
Class 6 Riprap
1:2 or flatter
1:2 or flatter
Ditch, 6" depth (min.)
1:4
DETAIL A
(applies to both sides of roadway, except at East Fork)
FALL CREEK ROAD
TYPICAL SECTION
STA 6+65 to 7+60
3%
(top of aggregate)
Profile grade
Traveled way
18'
Existing ground
1:4 and topsoil limits Turf establishment
HATCHER ROAD
TYPICAL SECTION
STA 5+65 to 7+85
Traveled way
20'
Existing ground
14'
1:2
:1 or flatter
Clearing and Construction limits
5'
EAST FORK ROAD
TYPICAL SECTION
STA 1+60 to 2+65
10'
:1 .5
Existing ground
LOWER PIEDRA CAMPGROUND
TYPICAL SECTION
STA 8+50 to 12+80
(top of aggregate)
Profile grade
Traveled way
10'
14'
Clearing and Construction limits
Existing ground
5'
1:1.5
1:
2 1:2
1:4
7' 7' and topsoil limits Turf establishment
9' and topsoil limits Turf establishment and topsoil limits Turf establishment
:1 .5 and topsoil limits Turf establishment Turf establishment
Clearing and Construction limits
5'
3%
Match existing
3%
HATCHER ROAD
TYPICAL SECTION
STA 5+40 to 5+65
& 7+85 to 8+00
Traveled way
Existing ground
14'
1:2
:1 .5 or flatter
Clearing and Construction limits
5' and topsoil limits Turf establishment and topsoil limits Turf establishment
3%
5'
Clearing and Construction limits
1:2 or flatter
10'
NO SCALE
:2
J u n e
T y p ic a l
S e c ti o n
M a in li n e
F D
R p w w o rk c fl
\d m s
\T Y
P
C O
E R
F O
N F
S N
J U
A N
-1 (1 d g n
TYPICAL SECTIONS
PROJECT
C.1
7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50
6,542 6,542
6,544 6,544
6,546 6,546
6,548 6,548
6,550 6,550
6,552 6,552
6,554 6,554
6,556 6,556
6,558 6,558
6,560 6,560
6,562 6,562
,5
.6
+0.36%
+1.86
+0.36%
+1.86
.5
.0
' VC150
100K =
36 IN CMP
36 OUT CMP
S T
O N
E H
E A
D W
A L L
N O C
A M
P I N
G H
E R
E
W O
O D
BARBED W
IRE
J H4 2 6
D
S
E T
B A
R B E
D W
IR
E
J H4 3 6
D
S
E T
100'50'0
Scale in Feet
AND ROAD RECONSTRUCTION
CAMPGROUND REPAIR SITE
BEGIN LOWER PIEDRA
RECONSTRUCTION
CAMPGROUND ROAD
END LOWER PIEDRA
Existing Ground
Proposed Grade
CAMPGROUND REPAIR SITE
END LOWER PIEDRA
Riprap
Do not disturb existing culvert
Do not disturb fence
N31°25'26"E
N41°30'49"E
N04° 53'2
1"W
N06°54'39"E
PI 7+68.36
Δ = 10°05'23" (RT)
R = 200.00' T = 17.66' L = 35.22'
PI 11+78.71
Δ = 11°48'00" (RT)
R = 150.00' T = 15.50' L = 30.89'
PI 9+47.57
Δ = 46°24'10" (LT)
R = 150.00' T = 64.29' L = 121.48'
PI 12+47.06
Δ = 11°48'00" (LT)
R = 150.00' T = 15.50' L = 30.89'
P C
.2
P T
.7
P C
.5
P T
.4
P C
.7
P T
.9
P C
.2
P T
.1
0 1
0 1
STA 8+50.00
E= 2463232.00 N= 1210492.75
STA 12+80.00
E= 2463281.79 N= 1210904.08
STA 13+20.00
End Schedule A
PLAN & PROFILE - 621 LOWER PIEDRA CAMPGROUND
See 251-A
:0 u n e
P
N P
L o w e r P ie d ra
P N
P L o w e r
P ie d ra
P la n
S h e t] p w w o rk c fl \d m s
\P L
N
L o w e r P ie d ra C a m p g ro u n d
S
N J U
A N
-1 (1 d g n
PROJECT
D.1
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © Mapbox
CP
FHWA AC
Y T I L I T U
D E I R U B
G N I N R A W
NATURAL GAS
CP
FHWA_AC2001
RECONSTRUCTION
BEGIN EAST FORK ROAD
RECONSTRUCTION
END EAST FORK ROAD
100'50'0
Scale in Feet
Proposed Grade
Existing Ground
REPAIR SITE
BEGIN EAST FORK ROAD
REPAIR SITE
END EAST FORK ROAD
PI 1+45.74
Δ = 06°41'11" (RT)
R = 600.00' T = 35.05' L = 70.02'
PI 2+38.24
Δ = 10°34'03" (RT)
R = 250.00' T = 23.12' L = 46.11'
PI 5+71.22
Δ = 45°05'39" (RT)
R = 200.00'
T = 83.04'
L = 157.41'
PI 3+78.27
Δ = 19°30'06" (LT)
R = 400.00'
T = 68.74'
L = 136.15'
N64°53'5 6"E
N71°35'07"E N82°09'09"E N62°39
'04"E
P C
.5
P T
.6
P C
.6
P T
.7
P C
.1
P T
.2
P C
.1
PT
.5
P O
B
.0
0 1
0 5
-1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00
7,820 7,820
7,822 7,822
7,824 7,824
7,826 7,826
7,828 7,828
7,830 7,830
7,832 7,832
7,834 7,834
7,836 7,836
7,838 7,838
7,840 7,840
+1.72%
+2.90
.4
.1
' VC50
43K =
,8
.4
STA 1+60.00
E= 2605155.13 N= 1263582.73
STA 2+65.00
E= 2605255.89 N= 1263611.45
STA 1+30.00
Begin Schedule A
STA 3+00.00
End Schedule A
PLAN & PROFILE - 667 EAST FORK ROAD
Riprap - See 251-A
:4 u n e
E a s t F o rk
P N
P
E a s t F o rk
P N
P
P la n S h e p w w o rk c fl \d m s \P
L N
E a s t F o rk
R o a d S
N J U
A N
-1
(1 d g n
PROJECT
D.2
C
PF
H
W A
A C
JH
D N
A
IL
JH
D N
A
IL
C
PF
H
W A A
C
C
PF
H
W A
A C
JH
D N
A
IL
JH
D N
A
IL
C
PF
H
W A A
C
See 251-A
100'50'0
Scale in Feet
RECONSTRUCTION
BEGIN HATCHER ROAD RECONSTRUCTION
END HATCHER ROAD
REPAIR SITE
BEGIN HATCHER ROAD
REPAIR SITE
END HATCHER ROAD
PI 6+14.65
Δ = 30°34'29" (RT)R = 300.00'
T = 82.00' L = 160.09'
N41°4 9'09
"W
N11°14'40"W
N28°36'27"W
N11°44'12"W
PI 10+34.50
Δ = 16°52'15" (RT)
R = 200.00' T = 29.66' L = 58.89'
PI 7+92.19
Δ = 17°21'47" (LT)
R = 400.00' T = 61.08' L = 121.22'
P C
.4
P T
.2
P C
.1
PT
.3
P C
.6
P T
.7
PC
.8
P T
.7
0 6
3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50
7,912 7,912
7,914 7,914
7,916 7,916
7,918 7,918
7,920 7,920
7,922 7,922
7,924 7,924
7,926 7,926
7,928 7,928
7,930 7,930
7,932 7,932
7,934 7,934
,9
.2
-3.70%
-3.70%
-8.80%
.8
.2
' VC100
20K =
'262SSD =
STA 5+40.00
E= 2591135.26 N= 1286949.11
STA 8+00.00
E= 2591042.77 N= 1287188.82
BEGIN SCHEDULE A
STA 4+60
END SCHEDULE A
STA 8+50.00
RSS & Riprap - See 204-A
PLAN & PROFILE - 033 HATCHER ROAD
Riprap - See 251-A Riprap
:5
J u n e
H a tc h e r P
N P
H a tc h e r P
N P
P la n
S h e p w w o rk c fl \d m s
\P L
N
H a tc h e r
R o a d
S
N J U
A N
-1 (1 d g n
PROJECT
D.3
4X4 X4
4X4 X4
4X4 X4
4X4 X4
CP
FHW
A
AC
JH
FHW
A_
AC
8+00 8+50
9,616
9,618
9,620
9,622
9,624
9,626
9,628
9,630
9,632
9,634
9,636
9,638
9,640
1:
3'
18'
C L
1:4
Existing
Match
Headwalls and Wingwalls Lt. & Rt.
Single 16' Span x 8' Rise Concrete Box Culvert Toe wall Toe wall
STA 7+11.00
ELEVATION
76' Concrete Box Culvert
3.9% Channel Bottom
Proposed
8'
20'
'9616.5'
9620'
9623'
9619.5'
Scale in Feet
50' 100'
END FALL CREEK ROAD
BEGIN FALL CREEK ROAD
Existing Ground
Proposed Grade
Existing
Match
Provide geotextile according to Subsection 714.01(c)
Match existing channel elevation to Subsection 714.01(c)
Provide geotextile according
1:4
1:2
Class 4 riprap
Class 6 riprap
Wingwall footing channel elevation
Match existing
6+00 6+50 7+00 7+50
9,616
9,618
9,620
9,622
9,624
9,626
9,628
9,630
9,632
9,634
9,636
9,638
9,640
+0.92%
+2.8 5%
.7
.0
' VC50
26K =
,6
.2
PLAN VIEW
NOTE:
for infill detail.647-A2. See Special may be varied by the CO.
1. Dimensions shown are approximate and
2.5' thick
1' thick material
Streambed
PROFILE VIEW
END SCHEDULE A
STA 7+60.00
E= 2606185.07
N= 1297746.97
BEGIN SCHEDULE A
STA 6+65.00
E= 2606098.11
N= 1297785.21 for structural section
See typical sections
H e a d w a ll
R t/ L t
I n s ta ll x x
C
B C
:4
J u n e
P
L A
N A
N D
P R
O F
IL
E
F a ll
C re e k R o a d p w w o rk c fl
\d m s \P
L N
F a ll
C re e k R o a d S
N J U
A N
-1
(1 d g n
CREEK ROAD
PLAN AND PROFILE - 039 FALL
PROJECT
NUMBER
SHEET
D.4CO ERFO FS SNJUAN 2026-1(1)
2% min.
Slope to drain
Geocomposite sheet drain
Collector Pipe
Perforated soil
Native
Embankment
Geocomposite sheet drain
OUTLET PIPE DETAIL
GEOCOMPOSITE SHEET DRAIN
GEOCOMPOSITE SHEET DRAIN
TYPICAL ELEVATION
Flow m in m a x
Or Stapled
Min. Unless Sewn
Overlap 3"
Or Stapled
Min. Unless Sewn
Overlap 3" m in m a x
Collector Pipe
Perforated
OUTLET PIPE
OUTLET PIPE
Collector Pipe.
8" Diameter Perforated
See Note 3 as appropriate).
(Skew in the direction of flow
Pipe Drain to Outboard Slope
8" Diameter Non Perforated Outlet
Not e se e
3'
M in
Not e se e
Min. Gradient = 2.0%
(Geotextile and Core)
Sheet Drain
Geocomposite lift of embankment benching.
achieve 30% +/- 5% coverage area on excavation backslope. Install on each
Place Geocomposite Sheet Drains in 3' (min.) wide strips with a spacing to of subsection 708.04.
Provide drainage collector pipe, outlet pipe & fittings meeting the requirements
Provide geocomposite sheet drain meeting requirements of subsection 714.02.
Secure the screen with standard coupling bands or by other approved means.
Cover the end of the outlet pipe with screen according to Subsection 605.03.
Provide granular backfill meeting the requirements of subsection 703.03(a).
outlet points between lifts.
Outlet underdrains at low points and at 50' (max) spacing. Stagger
SHEET DRAIN AND OUTLET NOTES:
REINFORCED SOIL SLOPE HATCHER ROAD DETAIL
1' (typ.)
3%
14' alignment and profile grade
Match existing centerline
Reinforcement Length = 0.7H
2%(typ.)
Hinge point for structural section details
See mainline typical section
Existing ground
RSS NOTES:
Type 5.A turf reinforcement mat
Rolled Erosion Control Product
4' (typ.)
4' (typ.)
5.
4.
3.
2.
1.
D e p th
Outlet away from RSS slope
RSS Geocomposite Sheetdrains, Rock Embankment Length = 30' to approx. edge of excavation.
Reinforement Geosynthetic, Type 1
Extend top five layers of
Fa ce S lo p e (1
V :1
H m a x.)
R o c k E m b a n k m e n t
R S
S H e ig h t
H m a x
Geosynthetic, Type 1
Reinforcement
Reseed
See note 5 See 714.01(c) Geotextile filter, embankment.
Wrap bottom, back and top of rock grade is not steeper than 1V:1.5H.
Place Class 6 Riprap so that the finished turf reinforcment mat on all disturbed soil.
Place Rolled Erosion Control Product, Type 5.A according to Section 207.
Place Reinforcement Geosynthetic, Type 1 at the bottom of each lift, terminate on both ends. Place Geotextile
1V:1H.
verified by the CO. Construct repair fill slope to match the existing slopes. Construct fill slope to a maximum of
Perform the work according to Section 261. Remove material unsuitable for use in repair. Limits of repair to be
NO SCALE
Class 6 riprap
Streambed
Fa ce S lo p e (1
V :1 .5
H m a x.)
Geotextile Filter. See 714.01 (c)Geotextile Filter. See 714.01(c)
Geotextile Filter. See 714.01(c)Geotextile Filter. See 714.01 (c)
6.
5.
4.
3.
2.
1.
embedment
5' scour
Bench width = 5'
:5
J u n e
R e in f o r c e d
S o il S lo p e s
R S
S p w w o r k c f l\ d m s
\S P
A
.d g n
SPECIAL
REINFORCED SOIL SLOPES (RSS)
204-A
PROJECT
H.1
NO SCALE
LC
Existing ground
Typical benching pattern minimum bench width and
Bench into existing slope as necessary to meet 2.
flatter.
Benching is not required for ground sloped at 1V:3H or 1.
Existing ground
Proposed cut slope shown in the plans
Slope rounding as
NOTE:
See note 2
Height varies
EMBANKMENT BENCHING
P ro p o s e d e m b a n k m e n t s lo p e
Top of subgrade bench height (typ.)
FURROW DITCH
8'
12' min.
12-foot
8-foot bench height.
AND FURROW DITCH
EMBANKMENT BENCHING
C204-50
FP-24, FP-14
06/2024
CFLHD DETAIL
:5
M a y
D e t
C p w w o r k c f l\ d m s
\C
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
H.2
Geotextile filter 714.01(c)
Top of bank
Max slope 1.5H:1V
Geotextile filter 714.01(c)
Existing ground
Existing ground
Flow
PLAN
SECTION A-A'
:1 .5
:1 .5 b x t
A
A
T oe o f sl op e d
Thalweg elevation
SECTION B-B'
B
B
9353.56033 Hatcher Road (See Note 2)
9373.56621 Lower Piedra Road
9353.5 (See Note 1)6667 East Fork Road b - Riprap Key Bottom Extent (ft)x - Riprap Key Thickness (ft)d - Minimum Embedment (ft)t - Minimum Riprap Thickness (ft)Riprap ClassSite t
NO SCALE
1:
4 o r f lat ter
7+85-8+85.
2. Applies to Hatcher Road Stations 4+65-5+65 and place riprap.
1. Remove existing temporary repair material and
NOTES:
:5
J u n e
R ip r a p b a n k p r o te c ti o n w it h t e r m in l k y in p w w o r k c f l\ d m s
\2
A
.d g n
SPECIAL
KEY-INS
PROTECTION WITH TERMINAL
RIPRAP BANK 251-A
PROJECT
I.1
N
EXISTING BRIDGE PLAN
EXISTING BRIDGE ELEVATION
B. ROBINSON 1"= 10'-0"
S a n J u a n R iv e r
W e s t
F o r k
C Rdwy.L
Bridge Length = 52'-10"
2'-5"8 spa. @ 6'-0"= 48'-0"2'-5"
Begin Bridge End Bridge
Rail post spa. (typ. both sides)
EXP. FIX
SOUTH ABUT.
NORTH ABUT.
Drawing No. Description
BRIDGE DRAWING INDEX
GENERAL NOTES & ESTIMATE
ABUTMENT SCOUR REPAIR
RG3327-A
RG3327-B
RG3327-C
RG3327-D
BRIDGE PLAN & ELEVATION
STRUCTURE TRANSITION RAILING
A
@ wingwalls B & C). See RG3327-D.
New structure transition railing (typ.
be removed
Timber debris to on geotextile filter
Proposed class 6 riprap
WINGWALL B
WINGWALL A
WINGWALL C
WINGWALL D
approximate length = 40'
Remove existing approach guardrail approximate length = 25'
Remove existing approach guardrail approximate length = 40'
Remove existing approach guardrail approximate length = 25'
Remove existing approach guardrail railing.
w-beam (weathering steel) bridge
Existing nested (double section) side.
cable, downstream utility conduit & telephone ground at C Rdwy.
Approximate location of
L
To US160
K.1
10'-0"
10'-0"
R ty p
(typ.)
Extend riprap to existing bank on geotextile filter
Approximate limits of class 6 riprap slope2
Toe of 1 : 1
SECTION A-A
10'-0" on geotextile filter
Proposed class 6 riprap
A A
Approx.
ground at C Rdwy.
Approximate location of
L
See RG3327-C.
Grout voids under footing.
N. BARNETTK. EIKERMANN
El. 7933.92
El. 7933.92
El. 7934.0El. 7934.0
El. 7933.92
El. 7933.92
Gutterline ground @ south abut.
Approximate existing full abutment width.
with Roadway Aggregate placed
Repair embankment settlement
25'-0"
El. 7931.10
Approx. low chord abutment has been completed.
loads until scour repair @ south
Note: Do not cross bridge with vehicular
EL. 7922.0
upstream bridge face.
maximum values in the bridge opening, reported at the
Note: Water surface elevations (WSE) and velocities (V) are wingwalls A & D). See RG3327-D.
W-Beam End Section (typ. @
See Rdwy. plans for details.
Object marker (typ. @ all four corners).
See Standard 617-20.
Tangent. (typ. @ Wingwalls B & C)
New terminal system, Type MGS
RG3327-JUNE 2026
STATE
CO
PROJECT
2026-1(1) FALL CREEK ROAD
CO ERFO FS SNJUAN
NO.
/2
/2
N
C O
\E R
F O
F S
S N
J U
A N
-1
(1
F a ll
C re e k R d \B ri d g e \R
G \C
A D
D F il e s \D
G N
F il e s \R
G p e .d g n
KARL EIKERMANN
BRIDGE PLAN & ELEVATION
WEST FORK OF SAN JUAN RIVER BRIDGE OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
RG / BRP NO.DATEBRIDGE PLAN SHEETSCALEPROJECT TEAM LEADCHECKED BYDRAWN BYDESIGNED BY of 4
REVISIONSBYDATENO.
STRUCTURE NO.
STRUCTURE NAME FEATURES INTERSECTED LOCATION
WEST FORK OF SAN JUAN RIVER
MINERAL COUNTY, COLORADO
SAN JUAN NATIONAL FOREST
RG3327-JUNE 2026
STATE
CO
PROJECT
2026-1(1) FALL CREEK ROAD
CO ERFO FS SNJUAN
/2
N
C O
\E R
F O
F S
S N
J U
A N
-1 (1
F a ll
C re e k
R d
\B ri d g e \R
G
\C
A D
D F il e s \D
G N
F il e s \R
G g n .d g n
KARL EIKERMANN
Item Quantity: Unit: Notes:
ESTIMATE
Item No.
ESTIMATE NOTES:
of Roads and Bridges on Federal Highway Projects, FP-24.
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction
DESIGN: AASHTO LRFD Bridge Design Specifications, 9th Edition 2020.
EXISTING BRIDGE:
25101-0600
30202-2000
LPSM
TON
CUYD
20304-1000
20Roadway Aggregate, Method 2
Removal of structures and obstructions
(4)
(3)
(2)
(1)
Placed riprap, class 6
Includes cost of geotextile filter. Approximate quantity = 90 square yards.
designated by CO.
cost of salvaging existing boulders and placing upstream/ downstream of proposed riprap as
Includes removal of guardrail (approx. 130' lnft.), and removal of stream debris. Also includes
Also includes cost of two w-beam end sections.
Includes cost of furnishing and installing posts, blocks, rail elements and installation hardware.
Contract Quantity
Forest Service and dated July 7, 1953.
For existing bridge plans, see R-293 "West Fork of San Juan River Bridge" prepared by U.S. Department of Agriculture, GENERAL NOTES:
SPECIFICATIONS:
GENERAL NOTES
NONE
27001-0000 CUYD
All req'd
B. ROBINSON B
K.2
(3)
(4)
LNFT61707-0000 Structure Transition Railing 27 (1)(2)
62801-0000 LPSMTemporary Stream Diversion All req'd
Grout 3
K. EIKERMANN N. BARNETT
63308-3000 Object Marker, Type 3 EACH4
61702-1500 Terminal System, Type MGS Tangent 2 EACH
WEST FORK OF SAN JUAN RIVER BRIDGE OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Begin Bridge
7. See Special Contract Requirements Section 270 for additional requirements.
subsidiary to the pay item for grout.
6. Excavation of material or removal of debris to allow for proper installation of formwork is filling with grout.
5. If possible, clean out unstable material along the bottom of the undermined area prior to the amount of mixing of the grout and the water to be displaced.
4. It is important to keep the nozzle buried in the grout during the pumping. This Is to reduce spacing of the vent/fill pipes is recommended.
must be able to escape when it is displaced by the grout pumped into the cavity. A 4' maximum
3. Adequate venting of the water to be displaced in the undermined area is important. The water face of footing after the pumping operation is complete.
grout appears in the top of adjacent vent pipes. Cut or remove the vent /fill pipes flush with
2. Once the vent /fill pipes have been installed pump the grout into the undermined area until
1. Divert stream from perimeter as necessary to construct formwork and perform grouting operation.
GENERAL NOTES:
or cut pipe flush with face of footing.
cavity below footing remove pipe at 4'-0" max. spacing. After filling
Temporary 4" min. dia. PVC pipe stream bottom
Approximate existing Fill cavity below footing with grout
(temporary riprap)
Remove existing boulders
SOUTH ABUTMENT PLAN
Existing footing
B. ROBINSON "4
= 1'-0"
ABUTMENT SCOUR REPAIR
(ty p
'-3
(typ.)"+ 2
7'-5
4'-5"1'-4"2'-3"
SECTION A-A
Begin Bridge
V a r ie s
°(ty p
(t y p
A
A
(TYPICAL SCOUR REPAIR, SIMILAR AT WINGWALLS)
Abut. fill face
Varies
K. EIKERMANN
"y""x"Point
CAVITY DIMENSIONS
A 1'1'
B 1'3'
C 1'2'-6"
D 1'2'-6"
E 2'3'
F 2'3'
G 2'-6"6'
H 2'4'
I 6"4'
J 6"1'-6"
K 6"1'-6"
L 6"1'-6"
M 6"1'-6"
A
B
C
D
E F G H I
J
K
L
M
"x" y and shall be verified by contractor prior to ordering materials.
Inspection Reports performed 10/27/2025 and 4/08/2026
Note: Dimensions are approximate per Critical Findings
K.3 gaps between it and the streambed the scour cavity and so there are no
Place watertight formwork for extent of
C
Stream diversion per Section 628.
N. BARNETT RG3327-JUNE 2026
STATE
CO
PROJECT
2026-1(1) FALL CREEK ROAD
CO ERFO FS SNJUAN
/2
N
C O
\E R
F O
F S
S N
J U
A N
-1 (1
F a ll
C re e k
R d
\B ri d g e \R
G
\C
A D
D F il e s \D
G N
F il e s \R
G a b u t s c o u r.
d g n
KARL EIKERMANN 3
WEST FORK OF SAN JUAN RIVER BRIDGE OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL ELEVATION VIEW @ WINGWALL B & C
3 Spaces 3'-1 ½"
W-Beam
6'-3"
A
3'-11 ½"
Rail Section of Splice
Center line
10'- 2 ½"
Direction of Traffic
8"
6"
CL
⅜
W6 x 8.5
W6 X 9.0 or
4 ¼
1"
STEEL POST & BLOCK
(Showing Standard Block)
SECTION A-A
(6"x 8"x 14" Nom) Standard Block
Low Speed Transition
GENERAL NOTES
Existing Bridge
Bridge
NONE
Existing Bridge Railing
End Bridge Begin or
13'-4" Pay Length for Stucture Transition Railing See Roadway Plans for Approach Railing
6. Fabricate and construct railing to the horizontal and vertical alignment of the roadway.
5. Posts shall not be set in concrete, of any depth.
4. Material for steel posts shall conform to ASTM A36, and shall be galvanized after fabrication.
galvanized.
Washers shall conform to ASTM F436, Type 1. All attachment hardware shall be
3. Button head bolts shall conform to ASTM A307. Nuts shall conform to ASTM A563.
" double recessed nuts.8 5" with 4
1" x 18 5 Button head "splice" bolts are thickness of the nut and the washer and not more than 1" beyond it.
2. Button head "post" bolts shall be of sufficient length to extend through the full
1. Rail elements shall meet the requirements of AASHTO M180, Type I, Class B.
B. ROBINSONK. EIKERMANN N. BARNETT D
K.4
TYPICAL ELEVATION VIEW @ WINGWALL A & D
Existing Bridge
Existing Bridge Railing
End Bridge Begin or
TYPICAL ELEVATION VIEW @ WINGWALL B & C
2'-3"
"4
"4 14"4
142"
W-BEAMS END SECTION (FLARED)
No Scale (2 Req'd.)
post bolt slots "2
1"x 24 3C slots (typ.)
"8
1"x 132 29 C
L
L
See detail.
W-beam end section (flared).
RG3327-JUNE 2026
STATE
CO
PROJECT
2026-1(1) FALL CREEK ROAD
CO ERFO FS SNJUAN
/2
N
C O
\E R
F O
F S
S N
J U
A N
-1 (1
F a ll
C re e k R d \B ri d g e
\R G
\C A
D D
F ile s \D
G N
F ile s \R
G r a il.
d g n
KARL EIKERMANN
STRUCTURE TRANSITION RAILING
WEST FORK OF SAN JUAN RIVER BRIDGE OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
1'-0"
#4 bars (6 tot.)
#4 @ 12" headwall reinforcement into
Extend longitudinal box
H e a d w a ll L e n g th
1'-0"
(6 tot.)
#4 bars
#4 @ 18" toe wall reinforcement into
Extend longitudinal box
2 (max.)
c l.
8" 0-10
4'-6"
1-7
L
0-8
1'-0" 1'-6" 1'-0"
1'-0" to wall) perpendicular
(measured
H m a x
#4 @ 12"
#5 @ 6"
#5 @ 12"
#4 bars (9 tot.)
#4 @ 12" b.f.
#4 @ 12"
#5 @ 6" recommendations install per manufacturer's
Geocomposite sheet drain
@ 8'-0" (max.) o.c.
slope 2% to drain sheet drain manufacturer.
recommended by
Provide drain grate as
Backfill material limits
#4 @ 6"
NOTES:
footing) and headwall (above filler between wingwall
" expansion joint2
Finished slope
See Headwall Detail
See Toe Wall Detail culvert
Concrete box Toe Wall
Other face of wingwall footing bars splice to longitudinal
2-#4 bars b.f.
longitudinal footing bars
#4 bars splice to footing & toe wall bars splice to longitudinal
4-#4 bars
Concrete box culvert
Face of headwall
See Fall Creek Road Repair Sheet filler (nail in place)
" expansion joint2
3" cl.
1'-10" min. splice
W ingwall Length
@ 8'-0" (max.) o.c.
TYPICAL HEADWALL / WINGWALL PLAN DETAIL
Foundation fill
WING ELEVATION
HEADWALL DETAIL
TOE WALL DETAIL
WINGWALL TYPICAL SECTION
shown on the wingwall typical section.
10. Provide backfill material conforming to subsection 704.03. Limits are construction.
9. The contractor is responsible for the stability of the structure during
8. Include geocomposite sheet drains in the cost of 60220 Pay Items.
7. Clean all construction joints thoroughly before concrete is poured.
between concrete and soil = 0.65.
height of soil, heq = 2 feet. For sliding, nominal coefficient of friction fluid unit weight = 35 lbs. per cubic foot. Live load surcharge = equivalent bearing resistance, q =5.0 ksf. Lateral earth pressure equivalent to a
AASHTO LRFD Bridge Design Specifications 9th Edition, 2020 . Factored
6. Design Data:
28-day compressive strength f'c = 4000 psi.
5. Concrete will conform to Section 601 in the SCRs, with a minimum the face of any bar of 2", unless shown otherwise on the plans.
M322, Grade 60 deformed. Use a minimum concrete covering to
4. Use reinforcing steel meeting the requirements of AASHTO M31 or shown on the Fall Creek Road Repair Sheet.
3. Dimensions, elevations and angles for wingwalls and headwalls are included in the unit cost of 60220 Pay Items.
2. Provide expansion joint material conforming to AASHTO M213. Payment
".4
1. Chamfer all exposed concrete corners b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
:4
M a y
B
O X
C U
L V
E
T
H E
A D
W A
L L
S A
N D
W
IN
G W
A L
L p w w o r k c f l\ d m s
\6
A
.d g n
SPECIAL
HEADWALLS AND WINGWALLS
BOX CULVERT
601-A
PROJECT
L.1
5.
4.
3.
2.
1.
embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the
Varies by manufacturer end of terminal not shown.
Terminal posts and
Varies by manufacturer end of terminal not shown.
Terminal posts and terminal.
Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper
Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.
necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the
For design purposes, the length of need is assumed to site limitations, use the alternative grading layout.
directed to fit site constraints. If necessary because of are provided, use the preferred grading layout or as staking notes or model. If no staking notes or model
Construct the terminal grading layout as shown in the other details.
recommendations. See manufacturer's drawings for
Install tangent terminal according to the manufacturer's
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1 H
Front of rail face
PLAN
PREFERRED GRADING
Post section
Standard
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1
H
Hinge point line
See Note 3
Length of Need
Guardrail system
Pay limits
Pay limits terminal system type tangent or type MGS tangent
Back of post
Back of post
Front of rail face
Hinge point line
PLAN
ALTERNATIVE GRADING
post section
Standard
Guardrail system
Pay limits
Pay limits terminal system type tangent or type MGS tangent
See Note 3
Length of Need
12'-6"
(min.)
10'-0" m in m in m in
12'-6" m in
TEST LEVEL
L
NOTE:
NO SCALE
50 (for MGS)
37.5 or 50 (for G4)
(FT)
3 (> 45 mph)
2 (≤ 45 mph)
AND GRADING
TYPE TANGENT TERMINAL
W-BEAM GUARDRAIL
MGS AND G4
617-20
8/2025
:3
M a y
S td
-2 p w w o rk c fl \d m s
\S td
-2
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
N.1
6" min. overlap
4" min. edge overlap
3' max. c-c
6" x 6" trench
12" max. c-c
12" max. c-c
12" max. c-c
3'
Slope stake
6" x 6" trench
See Note 1 Fastener Spacing
12" spacing
Fastener
12" spacing
Fasteners
FLOW PERSPECTIVE VIEW
Fastener
Erosion control blanket
Blanket edge
Fastener (typ.)
Blanket ends
NOTE:
Fastener
NO SCALE
native soil
Compacted
Toe of slope
Erosion control blanket
Compacted native soil blanket control
Erosion
AT TOP OF SLOPE
ANCHOR TRENCH
DETAIL A
AT TOE OF SLOPE
ANCHOR TRENCH
DETAIL B
SHINGLE SPLICE
DETAIL C
See Detail B at toe of slope
Anchor trench
See Detail C
Shingle splice
See Detail A at top of slope
Anchor trench
2.
1.
Overlap in the direction of the prevailing wind.
recommendations.
Install fasteners according to the manufacturer's
Se e
Not e
Pr ev ail in g wi nd
6"
6"
PRODUCT ON SLOPES
ROLLED EROSION CONTROL
629-50C
06/2024
CFL STANDARD
:3
M a y
D e t
C p w w o r k c f l\ d m s
\C
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
O.1
(typ.)
Black stripes
Yellow stripes
(typ).
retroreflective
0.093" Min
Optional
AA
See Detail A
METAL POST DETAIL
Metal post to be as shown except that minor variations in design and dimensions will be permitted to meet manufacturer's standards.
SECTION A-A
DETAIL A
32" holes
16" 2 716"
1 116"
16"
16"
16"3 116"
16"
16"
16"
OM3-ROM3-L
NOTE:
Obstruction Obstruction
TYPE 3 (OM3)
OBJECT MARKER
State or local standards may be submitted for approval.
sheeting conforming to Subsection 718.01.
Install steel or aluminum posts. Apply yellow reflective the same distance from the edge of pavement.
Place Type 2 object markers on a section of roadway or as directed.
marker in-line with the inside edge of the Obstruction, towards traffic flow, with the inside edge of the
Install Type 3 markers 6'-0" (typ.) in front of object
4.
3.
2.
1.
(max.)
10'
(max.)
10'
Lt. Edge of Traveled way Rt. Edge of Traveled way
E d g e o f P a v e m e n t
TYPICAL INSTALLATION
V a r type 2
Object marker, 8' max.
2' min.
6' desired
:2 u n e
O B
J E
C T
M A
R K
E p w w o r k c f l\ d m s
\S P
A
.d g n
SPECIAL
OBJECT MARKERS
633-A
PROJECT
Q.1
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD NAME
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
WORK
ROAD
AHEAD
xx
MPH
ROAD NAME
ROAD WORK
END
WORK
ROAD
xxxxxxx
ROAD WORK
END
xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o d
C
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).
name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
Maintain two-way traffic during all non-work hours except as approved.
Ensure all sign supports exposed to traffic are crashworthy.
construction area.
needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.
signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.
and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be
Erect all project advance warning signs before starting construction work.
State standards may be used as an alternative if approved.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.
at each end of the project. Show the distance on the G20-1 sign to the
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs
Sign Spacing Table.
When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.
Expressway / Freeway
NO SCALE
SIGNS IN FEET
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
2/2024
:1 a y
S td p w w o rk c fl \d m s
\S td
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
R.1
Traffic flow
Traffic flow not the advisory speed.
Approach speed based on the regulatory posted speed, *
Device spacing
Spacing Table)
(See Length and Channelizing devices
(optional)
BUFFER SPACE
Flagger location
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
WORK
ROAD
AHEAD
See Note 4
W20-1
ONE LANE
ROAD
AHEAD
xx
MPH
W20-4
(optional)
W13-1P xxx
FEET
W20-7
W16-2P
Flagger location
WORK SPACE
TERMINATION AREA
ROAD WORK
END
See Note 4
G20-2 stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD display the name of the Contractor on the pilot car.
sign at a conspicuous location on the rear of vehicle. Prominently
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) conditions as approved.
Final location and spacing of devices may be changed to fit field to those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar
6.
5.
4.
3.
2.
1.
(optional)(optional)
NOTE:
SIGN SPACING TABLE
LENGTH AND SPACING TABLE
50' - 100' 50' - 100'
See Note 5
10' min.
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
FEET
SPACING IN FEET
MPH
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-6
:1 a y
S td p w w o r k c f l\ d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
R.2 not the advisory speed.
Approach speed based on the regulatory posted speed, *
Traffic flow
Traffic flow
YIELD
TO
ONCOMING
TRAFFIC
xx
MPH
xxx
FEET
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
Type B warning light (optional) light (optional)
Type B warning
See Note 5
10' min.
15'
50' - 100' 50' - 100'
NOTE:LENGTH AND SPACING TABLE
SIGN SPACING TABLE
(optional) (optional)
ABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 3
W20-1 W20-4 W3-2 R1-2
See Note 3
G20-2
WORK SPACE
R1-2aP (optional)
W13-1P
(optional)
W16-2P
BUFFER SPACETAPER AREA
(See Length and Spacing Table) VARIABLE TERMINATION AREA
BUFFER SPACE TAPER AREA A
W1-4R
See Note 3
G20-2
See Note 4
(optional)
YIELD LINE
Channelizing devices Spacing Table)
(See Length and
Device spacing BA
(optional)
W13-1P
W20-4
See Note 3
W20-1
If the surface is paved, install yield lines that comply with the MUTCD.
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD conditions as approved.
Final location and spacing of devices may be changed to fit field see approaching traffic through and beyond the work site.
traffic that must yield, and if drivers from both directions are able to
Use this layout only if sufficient gaps in oncoming traffic exist for
6.
5.
4.
3.
2.
1.
stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
SPACING IN FEET
FEET
MPH
(WITH YIELD SIGN)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-7
:1 a y
S td p w w o r k c f l\ d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
R.3
PROCEED
WHEN
CLEAR
NO SCALE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
Traffic flow
Traffic flow
7.
6.
5.
4.
3.
2.
1.
the MUTCD.
If the roadway surface is paved, install stop lines that comply with
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
ROAD WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the conditions as approved.
Final location and spacing of devices may be changed to fit field to those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar and have sufficient visibility of approaching vehicles.
see approaching vehicular traffic through and beyond the work site
Use this layout only if road users from both directions are able to stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or
Device spacing
Spacing Table)
(See Length and
W1-4R
Special sign
R1-1
See Note 4
G20-2
BUFFER SPACE TAPER AREA A
(See Length and Spacing Table) VARIABLE TERMINATION AREA
WORK SPACE
(optional)(optional)
BUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 4
W20-1
(optional)
W13-1P
W20-4 W3-1
(optional)
W16-2P Special sign
R1-1
PROCEED
WHEN
CLEAR
ROAD WORK
END
PROCEED
WHEN
CLEARxxx
FEET
ONE LANE
ROAD
AHEAD
xx
MPH
WORK
ROAD
AHEAD
Type B warning light (optional)
See Note 6
STOP LINE
See Note 6
STOP LINEChannelizing devices
" black border2
50' - 100' 50' - 100'
NOTE:LENGTH AND SPACING TABLE
SIGN SPACING TABLE
white background retroreflective
Black lettering on
SPECIAL SIGN
STOP
STOP
SIGNS IN FEET
D
D
D
R
24"
15'
165' - 230'
See Note 5
10' min.
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
ROAD TYPE
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
MPH
FEET
SPACING IN FEET
(WITH STOP SIGNS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-8
:1 a y
S td p w w o r k c f l\ d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
R.4
See post detail (typ.)
Breakaway holes
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.
Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.
use 7 ft minimum mounting height for main sign
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
bolts per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
State standards may be used as an alternative if approved.
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
635-14
:1 a y
S td p w w o rk c fl \d m s
\S td
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
R.5
LC
Concrete box culvert
Streambed material 6" min. depth low-flow channel
Riprap Class 4
Note:
See sheet D.4 for Fall Creek plan and profile.1.
Embedment
Total 3.5'
Min
2.5'
1.0'
4.5'
2.5' 2.5'
16'
:2
:2
:4 u n e
B o x C u lv e r t
I n f il l D e ta il p w w o r k c f l\ d m s \B o x C u lv e r t
I n f il l D e ta il .d g n
SPECIAL
BOX CULVERT INFILL DETAIL
647-A
PROJECT
T.1
| A-Sheets |
| TTL |
| Sheet Index |
| SYM |
| STE |
| Control_Sheet(DESIGN)_CO_SNJUAN_2026-1(1) |
| B.1 |
| B-Sheets |
| B_Sheets |
| B_Sheets |
| B_Sheets |
| B_Sheets |
| B_Sheets |
| C-Sheets |
| TYP_CO ERFO NF SNJUAN 2026-1(1) |
| D-Sheets |
| PLN_Lower Piedra Campground_SNJUAN 2026-1(1) |
| PLN_East Fork Road_SNJUAN 2026-1(1) |
| PLN_Hatcher Road_SNJUAN 2026-1(1) |
| PLN_Fall Creek Road_SNJUAN 2026-1(1) |
| H-Sheets |
| SP204-A |
| C204-50 |
| I-Sheets |
| 251-A |
| K-Sheets |
| RG3327 pe |
| RG3327 gn |
| RG3327 abut scour |
| RG3327 rail |
| L-Sheets |
| 601-A |
| N-Sheets |
| Std617-20 |
| O-Sheets |
| Q-sheets |
| SP633-A |
| R-Sheets |
| Std635-1 |
| Std635-6 |
| Std635-7 |
| Std635-8 |
| Std635-14 |
| T-Sheets |
| Box Culvert Infill Detail |
File details come from the government source that posted it. Updated .