This is a Critical Finding Inspection Report from the USDA Forest Service documenting structural deficiencies identified during an inspection of the W Fork of San Juan River bridge on Route 648 in Colorado (Structure Number 021306000001024).
The bridge, located 13.7 miles northeast of Pagosa Springs at mile point 2.50, was inspected on April 8, 2026, by Team Lead Benjamin Glenn and reviewed by Jason Hefter. The overall structure condition is rated as Fair (F). A critical finding was initially documented on October 22, 2025, following the 2025 Colorado October 10-13 Four Corners Monsoon Storms event, with the finding status remaining RO-Active as of the April 2026 inspection. The critical issue involves abutment undermining on the right abutment caused by scour from flooding and rain events. The CF Criterion requires immediate correction of scour or hydraulic problems. Initial actions included closing the bridge and placing temporary riprap to divert flow toward the channel center on October 22, 2025. As of April 6, 2026, the bridge remained closed. Riprap has been installed under and around the entire right abutment including wing walls; however, the scour hole persists and has grown significantly (50%) at one measurement location. Future corrective actions required include underpinning or replacing the abutment and adding scour countermeasures and stream training measures. Condition summary ratings are: B.C.01 - 6, B.C.02 - 7, B.C.03 - 6, B.C.04 - N, B.C.09 - 2, and B.C.11 - 1. The report includes extensive photographic documentation of scour conditions, riprap installation, abutment damage, guard rail damage, and deck-abutment joint gaps.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE NUMBER- 021306000001024 TEAM LEADER- Benjamin Glenn
INSPECTION DATE- 04/08/2026 STRUCTURE CONDITION- F - Fair
CRITICAL FINDING INSPECTION REPORT
Structure Name W FORK OF SAN
JUAN RIVER
Route Number 648
Structure Mile Point 2.50
Admin Org 021306
State 8 - Colorado
County 08079
Latitude 37.44988333333333
Longitude -106.91113611111112
Inspection Team Lead
Inspection Reviewer
Benjamin Glenn, 04/13/2026
Jason Hefter, 04/13/2026
© OpenStreetMap contributors
Location: 13.7 MI NNE OF PAGOSA SPG
37.44988, -106.91114
MAP PAGE
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER Route Number: 648, Mile Point: 2.50
Structure Number: #021306000001024 / Critical Finding
CRITICAL FINDINGS
Critical Finding ID:
Forest Specific Event Name: 2025 CO Oct10-13 FS Four Corners Monsoon Storms
CF Status: RO-Active
CF Inspection Date: 10/22/2025
CF Inspection Interval: 3
CF Found Date: 10/22/2025
Event Description/Cause (B4):
Rain
CF Criterion (B5): A - Immediate correction of scour or hydraulic problems needed
If Other (B5A):
Event Type/Cause (B12): B - Flood If Other (B12A):
Deterioration (B13): Other - Please explain If Other (B13A): Abutment undermining
Detailed Deficiency (B14): Other - Please explain If Other (B14A): Abutment undermining
CF Results (B15): D - Settlement or loss of support If Other (B15A):
Initial Actions (B17): Close bridge, place temporary riprap to divert flow to center of channel
10/22/2025
Resolved Actions (B19):
Future Actions (B20): Underpin or replace abutment, add scour countermeasures and stream training measures
CF Remarks:
--Bridge closure in place as of 10/23/2025 (10/22/2025).-- Rip rap has been installed under and around the entire right abutment, including wing walls. Scour hole persists and at one measurement location has grown significantly (50%).
Closure should remain in effect until undermining can be permanently fixed. (4/6/2026)
Condition Summary: B.C.01 - 6 B.C.02 - 7 B.C.03 - 6 B.C.04 - N B.C.09 - 2 B.C.11 - 1
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER nbibridges_31395_Top down view right abutment nbibridges-Side profile right abutment
Left abutment- Post 9 Cross section-Post 8
PHOTOS
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Cross section-Post 7 Cross section-Post 6
Cross section-Post 5 Cross section-Post 4
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Cross section-Post 3 Cross section-Post 2
Cross section-Right abutment-Post 1 Right abutment
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Right abutment measurement on top of toe 3 ft top of toe at 1 foot downstream of center right abutmnet
2 ft from top of toe at center of right abutmnet 4 ft from top of toe at upstream wing wall corner
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Upstream right abutment wing wall scour hole Upstream right abutment toe corner
Right abutment looking upstream Downstream right wing wall, rip rap installation
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Channel looking upstream Photo looking upstream at right abutment
Measurement reference with 12ft rod Center scour hole. 4 ft behind abutment wall. 6 foot from foot toe face
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Upstream right wing wall measurement from top of footer. Three 4' lengths Channel looking downstream
Right abutment Looking downstream measurement from top of footer Upstream right guard rail damage
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Downstream deck abutment joint gap Upstream deck abutment joint gap
Guard rail tree strike right abutment Downstream deck abutment joint gap
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER
Upstream deck, abutment joint gap Channel downstream photo
Channel upstream photo
Team Lead: Benjamin Glenn, Inspection Date: 04/08/2026
Bridge Name: W FORK OF SAN JUAN RIVER