CN-370000-PL513-T305.pdf

PDF 277 KB Posted

Attached to
Master Agreement FL|PL513|6a741daf4000c898ad5cb3cdacc6cf50
Contract number
PL513
Issued by
Florida

About this file

This is a Task Assignment Notification Form under DEP Contract No. PL513 issued by the Florida Department of Environmental Protection to Florida State University's Florida Natural Areas Inventory (FNAI) in collaboration with the University of Florida Center for Landscape Conservation Planning (CLCP). The task assignment is numbered 305 and was executed on October 29, 2024, with Frank Price serving as the Contractor's Contract Manager and Sine Murray as the DEP Contract Manager.

The contract calls for updates and enhancements to the Florida Ecological Greenways Network (FEGN) to support the Florida Forever program, with a total task assignment value of $86,560.00 under a fixed price arrangement. Key deliverables include refinement of Florida Forever Strategic Priorities (FFSP), quarterly GIS data layer updates, and review and boundary updates for FEGN priorities. Three invoices are scheduled: FFSP Q1 and Q2 update due January 6, 2025 ($34,624), FFSP Annual/Q3 update due April 7, 2025 ($25,968), and FFSP Q4 update with FEGN Priorities update due June 6, 2025 ($25,968). The budget is composed of FNAI Direct Costs ($33,542), UF Subcontract ($39,320), Off-campus Rent ($5,829), and Indirect costs at 10% ($7,869). The task assignment term runs from October 29, 2024 through June 15, 2025, funded through Florida Department of Environmental Protection Org Code 37102400000 under Object Code QH 139900.

View the file

Other files

File Type Posted
CN-370000-PL513-T103.pdf PDF
CN-370000-PL513-T108.pdf PDF
CN-370000-PL513-T202CO3.pdf PDF
CN-370000-PL513-T203.pdf PDF
CN-370000-PL513-T204CO2.pdf PDF
CN-370000-PL513-T208.pdf PDF
CN-370000-PL513-T303.pdf PDF
CN-370000-PL513-T404.pdf PDF
CN-370000-PL513-T405.pdf PDF
CN-370000-PL513.pdf PDF
CN-370000-PL513-T105.pdf PDF
CN-370000-PL513-T106.pdf PDF
CN-370000-PL513-T107.pdf PDF
CN-370000-PL513-T203CO1.pdf PDF
CN-370000-PL513-T204CO1.pdf PDF
CN-370000-PL513-T207.pdf PDF
CN-370000-PL513-T301.pdf PDF
CN-370000-PL513-T302CO1.pdf PDF
CN-370000-PL513-T405CO1.pdf PDF
CN-370000-PL513-T406.pdf PDF
CN-370000-PL513-GMC1.pdf PDF
CN-370000-PL513-T102.pdf PDF
CN-370000-PL513-T104.pdf PDF
CN-370000-PL513-T104CO1.pdf PDF
CN-370000-PL513-T109.pdf PDF
CN-370000-PL513-T202.pdf PDF
CN-370000-PL513-T204.pdf PDF
CN-370000-PL513-T209.pdf PDF
CN-370000-PL513-T304.pdf PDF
CN-370000-PL513-T401.pdf PDF
CN-370000-PL513-T101.pdf PDF
CN-370000-PL513-T201.pdf PDF
CN-370000-PL513-T202CO1.pdf PDF
CN-370000-PL513-T202CO2.pdf PDF
CN-370000-PL513-T202CO4.pdf PDF
CN-370000-PL513-T205.pdf PDF
CN-370000-PL513-T206.pdf PDF
CN-370000-PL513-T302.pdf PDF
CN-370000-PL513-T306.pdf PDF
CN-370000-PL513-T401.pdf.crdownload CRDOWNLOAD file
CN-370000-PL513-T402.pdf PDF
CN-370000-PL513-T403.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL TASK ASSIGNMENT VALUE:

Org Code EO Object Code Fund Category Year Grant # Module/OCA Project # Amount

FLORIDA DEPARTMENT OF ENVIRONMENTAL

PROTECTION

Date

CONTRACTOR

Contract Manager

Contractual Authority

Date

Contract Manager

APPROVED:

Task Manager

Budget Representative

Contractual Authority

TASK ASSIGNMENT NOTIFICATION FORM

DEP CONTRACT NO. PL513

FEE SCHEDULE FIXED PRICE TOTAL TASK ASSIGNMENT VALUE

Task Assignment Number: _______________________________________ Date: _____________________

Contractor: ___________________________________________________________________________________

Contractor Contract Manager: __________________ __ Phone Number:

DEP Contract Manager: ______________________________________ Phone Number: __________________

Task Description (Use additional sheets if necessary): _________________________________________________

Final Deliverables and Due Dates: _________________________________________ ______________________

Performance Measures: ______________ ________________________________________________

Financial Consequences: _______ _______________________________________________________________

Term of Task Assignment: _ _____________________________________________________________________

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Date

Date

Date

Date

305 10/29/2024

Florida State University/ Florida Natural Areas Inventory

Frank Price 850-224-8207

Sine Murray 850-245-2773

Florida Forever Measures

See attached Details for 305

See attached Details for 305

See attached Details for 305

10/29/2024 through 6/15/2025

$ 86,560.00

37102400000 QH 139900 423001 084108 23 $ 86,560.00

Digitally signed by Frank Price Date: 2024.11.06 17:08:06 -05'00'

Kathy Pennington for Stacey Patterson

Digitally signed by Kathy Pennington for Stacey Patterson Date: 2024.11.22 16:01:17 -05'00'

Digitally signed by Sine A Murray Date: 2024.10.28 16:07:34 -04'00'

Digitally signed by Sine A Murray Date: 2024.10.28 16:07:47 -04'00'

Jill Buckley Digitally signed by Jill Buckley Date: 2024.10.28 16:12:38 -04'00'

Callie DeHaven Digitally signed by Callie DeHaven Date: 2024.10.28 16:44:07 -04'00'

PL513 - Task Assignment 305 - Updates and Enhancements to the Florida Ecological Greenways Network

The FSU Florida Natural Areas Inventory (FNAI) proposes to continue work on enhancements and updates to the Florida Ecological Greenways Network (FEGN) to support prioritization and decision-making in the Florida Forever program. This work will include both one-time activities to be accomplished in the current fiscal year, and ongoing activities that are expected to continue beyond this year, as noted further below. FNAI will subcontract and collaborate with the University of Florida Center for Landscape Conservation Planning (CLCP) in this effort and accomplish the following activities:

1. Refine FEGN Florida Forever Strategic Priorities (FFSP) - In collaboration with CLCP, FNAI will further refine the Florida Forever Strategic Priorities first developed in the 2021 FEGN update. The FFSP represents strategic conservation priorities (within the overall FEGN priorities 1-3) that are relevant to Florida Forever acquisitions. This will include:

Consideration of additional wide-ranging species or landscape-level natural community connectivity needs to inform corridor bottlenecks;

Landscape priorities focused on under-represented upland natural communities, including scrub, sandhill, upland pine and dry prairie.

A comprehensive threats analysis that may include land use conversion, climate change, and management considerations (e.g. smokesheds).

Refinement of Florida Forever Strategic Priorities is proposed to be an ongoing Activity that will be completed annually.

2. Quarterly Updates of Florida Forever Strategic Priorities - FNAI will provide DEP with a GIS data layer quarterly for updates of the Florida Forever Strategic Priorities data layer. These updates primarily will address priorities affected by changes to conservation lands boundaries due to additional land acquisitions as well as significant land use changes. No changes will be made to overall FEGN priorities in these updates; updates will solely be made to strategic priorities within existing FEGN priority classes. This is proposed to be an ongoing activity that will be completed quarterly in future years as well.

3. Review and update FEGN model and conduct boundary updates for priorities in the vicinity of Florida Forever projects and conservation lands –

a) The Center for Landscape Conservation Planning (CLCP), as a subcontract with FNAI will review and refine statewide FEGN base boundary and priorities. Analyses focused on FEGN Priority 4 in fiscal year 2024 will be broadened to all FEGN priorities in fiscal year 2025 to serve as an additional strategic planning aid for Florida Forever. This work will involve refinement of methods developed in 2024, which assesses intrinsic and landscape priorities within specific corridor project areas delineated by current FEGN priority levels. The most current conservation and land cover data will be used for these assessments as well as additional spatial prioritization methods if warranted. This work will ensure that Florida Forever evaluations of individual land acquisition projects are based on current contributions to landscape connectivity. Specific tasks will include:

i. Assess functional ecological connectivity opportunities within the Peace and Myakka watersheds associated with the southwest Florida mining district and potential ecological connectivity to adjacent watersheds and the Lake Wales Ridge using the Bureau of Mine Reclamation Integrated Habitat Network and other readily available data and readily feasible GIS analyses.

ii. Finalize corrections to FEGN priorities for unacquired inholdings within conservation lands.

Schedule and budget

Deliverable Submission date

Invoice due date

Invoice amount

FFSP Q1 and Q2 update Jan 6, 2025 Jan 13, 2025 $34,624

FFSP Annual/Q3 update April 7, 2025 April 14, 2025 $25,968

FFSP Q4 update & FEGN Priorities update June 6, 2025 June 1, 2025

$25,968

BUDGET SUMMARY

FNAI Direct Costs $33,542 UF Subcontract $39,320 Off-campus Rent $5,829 Indirect @10% $7,869

TOTAL $86,560 This will result in a new assessment of Florida Forever project in the regions based on this analysis.

File details come from the government source that posted it. Updated .