CN-370000-HW558-DC022K.pdf
PDF 485 KB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW558 with Earth Systems, an environmental engineering contractor. The task assignment, designated as DC022K, authorizes Earth Systems to conduct annual groundwater monitoring activities at the South Beach Cleaners site located at 3956 South 3rd Street, Jacksonville, Duval County, Florida (ERIC Site #4551). The work is being overseen by FDEP Project Manager Killian Talley and executed under the monitoring phase of the contract.
The task assignment authorizes Earth Systems to perform annual Monitoring of Natural Attenuation (MNA) sampling and reporting, comprised of two subtasks: Project Management (Subtask 1) costing $494.20 and Annual MNA Sampling and Reporting (Subtask 2) costing $5,668.11, for a total task assignment value of $6,162.31. The scope of work includes collection of groundwater samples from 13 monitoring wells, measurement of water levels and geochemical data, and analysis of 13 groundwater samples for volatile organic compounds via EPA Method 8260B, along with one trip blank sample. Upon receipt of analytical results, Earth Systems will prepare a comprehensive Natural Attenuation Monitoring Report including updated tables, figures, laboratory analytical data, and recommendations. The work encompasses 48 total labor hours, with the deliverable due on August 16, 2021, and final task completion by November 30, 2021. Invoicing is contingent upon FDEP receipt and approval of the Natural Attenuation Monitoring Report and GIS/ADaPT database updates, with the full contract amount payable upon completion and acceptance of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93)
Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW558
D000 N/ADC022K
Earth Systems
Jim Paxton
850-245-8928Killian Talley
ERIC_4551
South Beach Cleaners
3956 South 3rd Street, Jacksonville, Duval
Monitoring
This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.
Natural Attenuation Monitoring Report; GIS/ADaPT
08/16/2021
11/30/2021
6162.31 0 0 0
Killian Talley Digitally signed by Killian Talley Date: 2021.01.11 08:37:09 -05'00'
Killian Talley Digitally signed by Killian Talley Date: 2021.01.11 08:37:17 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.01.11 13:48:00 -05'00'
James Paxton Digitally signed by James Paxton DN: C=US, E=jpaxton@eathsys.net, O=Earth Systems Inc, CN=James Paxton Date: 2021.01.14 09:46:59-05'00'
6162.31
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 08/16/2021
Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;
GIS/ADaPT $ 6,162.31
$ 6,162.31
HW558
DC022K
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW558 Contract Negotiation File South Beach Cleaners Jacksonville, Duval County
ERIC_4551
From: Killian Talley, Project Manager Date: January 11, 2021 Subject: Negotiation Summary
HW558 DC022K
Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the South Beach Cleaners site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and thirteen (13) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate a Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,162.31 with 48 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATE
Contractor: Earth Systems
Date: 11-Jan-21
Task #: SubTask 1 Project Management SubTask 6
Site: South Beach Cleaners SubTask 2 MNA GWS 2021 SubTask 7
Activity/Phase: Annual MNA 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.62 Project Manager (Paxton) 0 4.1 $0.00 Principal Manager 0 0 0 0 0 0 0 0 0 0
$42.30 Principal Manager (Tumeo) 2 2.0 0 0 0 0 0 0 0 0 $40.62 Project Manager (Paxton) 18 18 0 0 0 0 0 0 0 0 $28.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $26.15 Field Geologist (L. Russell) 2 2.0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (Byrnes) 17 17.0 0 0 0 0 0 0 0 0 $17.60 Eng./Geologist/Scientist Technician 0 0 0 0 0 0 0 0 0 0 $17.50 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (Morse) 4 4 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 1 1 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 48 4 44.0 0.0 0.0 0.0 0 0 0 0 0
Direct Labor $1,516.95 $168.55 $1,348.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $955.68 $106.19 $849.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $986.02 $109.56 $876.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $515.77 $57.31 $458.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,974.42 $441.61 $3,532.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $75.85 $8.43 $67.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
FDEP COST ESTI MATE
Contractor: Earth Systems
Date: 11-Jan-21
Task #: SubTask 1 Project Management SubTask 6
Site: South Beach Cleaners SubTask 2 MNA GWS 2021 SubTask 7
Activity/Phase: Annual MNA 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Contract Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $924.00 $924.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $924.00 $924.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $596.60 $596.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,764.87 $450.04 $5,314.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $397.44 $44.16 $353.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $6,162.31 $494.20 $5,668.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : South Beach Cleaners
SUBTASK: MNA GWS 2021
DATE: 1/11/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Technician - T. Byrnes Travel time to and from site (2 days) 1
IW001, IW002, DW001, Analyses VOHs via 8260 plus Trip Blank
Purge water treated and disposed on-site as non-haz per generator's knowledge.
Report:
M. Tumeo - Principal Manager Annual MNA report review 2
J Paxton- Project Manager Annual MNA report preparation 18
L. Russell - Field Geologist ADaPT (10 mins/well * 13 wells) 2
S Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 1
Kath Morse - Drafting Figures 1-4 4
TOTAL LABOR 44.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow GW sampling kit $208.55 day 2 $417.10
Expendables $32.50 day 2 $65.00
Portable Compressor $48.50 day 1 $48.50
Portable Generator $66.00 day 1 $66.00
TOTAL EQUIPMEN $596.60
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Aqueous VOH by 8260B samples plus trip blank $66.00 13 1 $924.00
TOTAL LAB $924.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
GW samples MW001,MW002, MW003, MW004, MW007, MW008, MW011, MW012, MW013, MW
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey
January 7, 2021
Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal to Conduct Annual MNA Sampling - 2021
South Beach Cleaners 3956 South 3rd Street, Jacksonville Beach, Duval County, Florida
ERIC_4551
Dear Mr. Talley:
Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
In June 2021, Earth Systems will mobilize a senior technician to the site to collect groundwater samples (with water level data) from 13 wells (MW001, MW002, MW003, MW004, MW007, MW008, MW011, MW012, MW013, MW014, IW001, IW002, DW001).
The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical.
After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Annual Groundwater Monitoring Proposal - 2021 South Beach Cleaners, Jacksonville Beach, FL
ERIC_4551
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $494.20
October 15, 2021
Subtask 2 – Conduct June 2021 MNA sampling and prepare MNA Report
$5,668.11 August 16, 2021 Annual MNA Report, Total/Completion Date $6,162.31
October 15, 2021
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, James Paxton Operations Manager
Figure 3A
0 4020
( SCALE IN FEET )
GROUNDWATER
ANALYTICAL RESULTS -
SHALLOW ZONE
(2015 - 2020)
BOLD
PCE
5.293.7
488141
15.6 90.5
7.437.1
12.04.4
39.9 23.7
19.4
15.354.0
3.845.1 5.0
32.5 28.1 12.9
7.4
3.6
3.5 6.0 4.9
13.5 4.9
22.913.9 21.7
10.2 7.3 20.9 22.8
13.272.3
59.1 25.3 16.7
41.5 12.0
4.0
3.7
4.9
TCE
| x.pdf |
| Cost Estimate |
| LOE WORKSHEET |
| x.pdf |
| Cost Estimate |
| LOE SubTask 2 |
File details come from the government source that posted it. Updated .