CN-370000-HW558-DC03M.pdf
PDF 743 KB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW558, Task Assignment DC003M. The contract involves the FDEP's Bureau of Waste Cleanup Division and the contractor Earth Systems, with FDEP Contract Manager Killian Talley overseeing the work. The project site is Emerald Cleaners located at 868 Blanding Boulevard in Orange Park, Clay County, Florida (FDEP Site No. ERIC_4258). The task assignment authorizes Earth Systems to complete well abandonment activities at the contaminated site as part of the site deletion/closure phase.
The scope of work consists of two subtasks: Subtask 1 involves project management costs of $278.45 (2 labor hours), and Subtask 2 encompasses well abandonment and reporting activities costing $5,354.56 (25 labor hours). The total task assignment value is $5,633.01 with no retainage. The work includes supervision of the abandonment of ten monitoring wells (MW006-MW015) totaling 210 linear feet, removal of nine well pads and two manhole covers, restoration of affected areas, and preparation of a Well Abandonment Report. The primary deliverable is the Well Abandonment Report due July 30, 2021, with performance period execution through October 29, 2021. The task assignment is structured as a fixed price contract. Major subcontractor costs include $2,725.00 for drilling services from Preferred Drilling Solutions and additional costs for labor (including project management, senior technician field work, and administrative support), equipment, vehicle rental ($97.00), and field expendables ($32.50).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW558
D000 N/ADC003M
Earth Systems
Jim Paxton
850-245-8928Killian Talley
ERIC_4258
Emerald Cleaners
868 Blanding Boulevard, Orange Park, Clay
Deletion
Task Assignment authorizes Earth Systems to complete well abandonment activities at site in accordance with the attached scope of work, cost esimtate, and bid documentation.
Well Abandonment Report
07/30/2021
10/29/2021
5633.01 0 0 0
Killian Talley Digitally signed by Killian Talley Date: 2021.05.26 14:24:59 -04'00'
Killian Talley Digitally signed by Killian Talley Date: 2021.05.26 14:25:05 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.06.01 13:56:51 -04'00'
James Paxton Digitally signed by James Paxton DN: C=US, E=jpaxton@eathsys.net, O=Earth Systems Inc, CN=James Paxton Date: 2021.06.01 14:27:40-04'00'
5633.01
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Well Abandonment Report 07/30/2021
Subtasks 1-2: FDEP receipt and approval of Well Abandonment Report $ 5,633.01
$ 5,633.01
HW558
DC003M
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW558 Contract Negotiation File Emerald Cleaners Orange Park, Clay County
ERIC_4258
From: Killian Talley, Project Manager Date: May 26, 2021 Subject: Negotiation Summary
HW558 DC003M
Task Assignment authorizes Earth Systems to oversee abandonment of wells and generate a well abandonment report.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Well Abandonment & Reporting This subtask includes labor and related costs for oversight of monitoring well abandonment as required by the site rehabilitation completion order issued on May 24, 2021. Mobilization to site will not occur sooner than June 14th. Well abandonment will be completed by a licensed water well driller. As part of abandonment activities resulting areas will be restored to previous conditions as part of site restoration. Upon completion of all site activities Earth Systems will prepare a well abandonment report for review.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,633.01 with 27 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Earth Systems
Date: 26-May-21
Task #: SubTask 1 Project Management SubTask 6
Site: Emerald Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.62 (Paxton) Project Manager 0 2.3 $42.30 (Tumeo P.E.) Principal Manager 1 1 0 0 0 0 0 0 0 0 $31.25 Staff Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $40.62 (Paxton) Senior Engineer/Geologist/Scientist 10 10 0 0 0 0 0 0 0 0 $31.25 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $21.15 Staff Eng/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $26.15 Senior Technician/Field Geologist 0 0 0 0 0 0 0 0 0 0 $23.02 (Byrnes) Senior Technician/Field Geologist 12 12 0 0 0 0 0 0 0 0 $18.00 (Morse) Technician/Draftsperson II 1 1 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 (Meserve) Administrative Assistant 1 1 0 0 0 0 0 0 0 0 $10.75 General Office Clerk 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 27 2 25 0 0 0 0 0 0 0 0
Direct Labor $854.71 $94.97 $759.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $538.47 $59.83 $478.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $555.56 $61.73 $493.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $290.60 $32.29 $258.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,239.34 $248.82 $1,990.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $42.74 $4.75 $37.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTI MATEContractor: Earth Systems
Date: 26-May-21
Task #: SubTask 1 Project Management SubTask 6
Site: Emerald Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $2,725.00 $2,725.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,725.00 $2,725.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $272.50 $272.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,997.50 $2,997.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,409.08 $253.57 $5,155.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $223.93 $24.88 $199.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,633.01 $278.45 $5,354.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$278.45
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Emerald Cleaners SUBTASK-2: Well Abandonment
DATE: 5/26/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Jim Paxton - Project Manager Well Abandonment Reporting 10 M Tumeo - Principal Manager Report Review 1 Terry Byrnes - Senior Tech. mobe/demobe (2 hr) Fieldwork: Supervise the abandonment of 210' of wells. 12
MW006, MW007, MW008, MW009, MW010, MW011, MW012, DW013, MW014, DW015, and SVE004 Manhole Kath Morse - Drafting Edit figure 1 Shannon Meserve- Admin Scanning, copying, mailing, and invoice 1
TOTAL LABOR 25.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $32.50 day 1 $32.50
TOTAL EQUIPMENT $32.50
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Preferred Drillling Solutions Well Abandonment 1 $2,725.00 $2,725.00
TOTAL $2,725.00
FINAL --7/24/96
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey
March 11, 2021
Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal to Conduct Well Abandonment
Emerald Cleaners 868 Blanding Boulevard #136, Orange Park, Florida FDEP Facility No. ERIC_4258
Dear Mr. Talley:
Earth Systems has prepared this proposal for conducting well abandonment activities at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Well Abandonment and Reporting
Earth Systems will mobilize a staff scientist to the site to supervise Preferred Drilling Solutions (PDS) during the abandonment of monitoring wells MW006, MW007, MW008, MW009, MW010, MW011, MW012, DW013, MW014, and DW015 (total of 210 feet).
Following the well abandonment activities, manholes and well pads will be removed and patched with concrete along with the manhole for SVE004. After well abandonment, Earth Systems will provide a Well Abandonment Report.
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $278.45
July 30, 2021
Proposal to Conduct Well Abandonment Celebrity Cleaners Gainesville, FL
ERIC_3990
Subtask 2 – Conduct Well Abandonment Activities
$5,354.56 May 31, 2021 Well Abandonment Report
Total/Completion Date $5,633.01 July 30, 2021
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, EARTH SYSTEMS
James Paxton Operations Manager
E
M
E
R
A
L
D
C
L
E
A
N
E
R
S
Figure 1
0 4020
( SCALE IN FEET )
SITE PLAN
AutoCAD SHX Text
CHILLER UNIT
AutoCAD SHX Text
PARKING FOR DRY CLEANERS
AutoCAD SHX Text
ROOF OVERHANG
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
4"PVC
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
4"PVC
AutoCAD SHX Text
ROOF OVERHANG
AutoCAD SHX Text
6'CHAIN LINK FENCE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
CATCH
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
WATER
AutoCAD SHX Text
METER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
METER
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
3"METAL POLE
AutoCAD SHX Text
4'HIGH (TYPICAL)
AutoCAD SHX Text
EIGHT PROPANE GAS
AutoCAD SHX Text
CYLINDERS IN THIS AREA
AutoCAD SHX Text
LANDSCAPED AREA
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
PIZZA HUT
AutoCAD SHX Text
RESTAURANT
AutoCAD SHX Text
Z-BEST RENTAL
AutoCAD SHX Text
DOLLAR
AutoCAD SHX Text
DISCOUNT
AutoCAD SHX Text
APPROXIMATE LOCATION OF FORMER PCE DRYCLEANER MACHINE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
EXISTING POWER DROP 3-PAHSE SERVICE
AutoCAD SHX Text
07/18 FIG1
AutoCAD SHX Text 868 Blanding Boulevard #136
AutoCAD SHX Text Emerald Cleaners
AutoCAD SHX Text Orange Park, Florida
AutoCAD SHX Text
SKID-MOUNTED
AutoCAD SHX Text
REMEDIATION
AutoCAD SHX Text SYSTEM (6'x8')
AutoCAD SHX Text
ACCESS FOR WELLS MW004 & MW005
AutoCAD SHX Text
ONE-STORY CONCRETE BLOCK (BOILER ROOM)
AutoCAD SHX Text
DW013
AutoCAD SHX Text
MW012
AutoCAD SHX Text
MW011
AutoCAD SHX Text
MW003
AutoCAD SHX Text
MW009
AutoCAD SHX Text
MW010
AutoCAD SHX Text
(GONE)
AutoCAD SHX Text
MW001
AutoCAD SHX Text
(GONE)
AutoCAD SHX Text
MW002
AutoCAD SHX Text
(GONE)
AutoCAD SHX Text
MW008
AutoCAD SHX Text
MW006
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW004
AutoCAD SHX Text
SVW001
AutoCAD SHX Text
SVW002
AutoCAD SHX Text
SVW003
AutoCAD SHX Text
SVW004
AutoCAD SHX Text
MW007
AutoCAD SHX Text
DW015
AutoCAD SHX Text
MW014
AutoCAD SHX Text
ASPHALT PARKING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
BASIN
AutoCAD SHX Text
CATCH
AutoCAD SHX Text
BASIN
AutoCAD SHX Text
SHALLOW MONITORING WELL LOCATION
AutoCAD SHX Text
SVE WELL LOCATION
AutoCAD SHX Text %%uLEGEND
AutoCAD SHX Text
DEEP MONITORING WELL LOCATION
AutoCAD SHX Text N
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Consultant Name: Earth Systems
Site Name & Location: Emerald Cleaners Date: 3/9/21 FAC ID#:
868 Blanding Blvd, Orange Park, FL
PROPOSED SCOPE OF WORK:
Abandon 10-1" MW's totaliing 195' and 1-1.5' MW 15' in depth, remove pads and manholes restore grade
Remove manhole lids and steel rings at 2 SVE locations, restore grade with concrete
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____ Sonic_____ Other_____
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Recovery Well Diameter: 4-6" per foot $0.00 Double Cased Wells $0.00
6" Surface Casing per foot $0.00 8" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $6.00 210 $1,260.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $85.00 9 $765.00
Mobilization roundtrip $400.00 1 $400.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $0.00 SVE Manhole Lid and Steel Ring remova, and Restoration each $150.00 2 $300.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $2,725.00
Days to Complete Scope of Work: 1 Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Kevin Bonacum, Estimator Date: 3/9/21
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Earth Systems, Emerald Cleaners, Orange Park
Sonic Auger DPT Horizontal Directional Drilling
DATE: 2/25/2021
ESTIMATE #: 221050
ID QTY Unit Rate TOTAL
1 1 ls 600.00$ 600.00$
2 Per Diem 0 night 200.00$ -$
3 1" Well Abandonment (Total 195') 195 foot 6.00$ 1,170.00$
4 1.5" Well Abandonment 15 foot 6.00$ 90.00$
5 Removal of 2' x 2' Pad w/8" BD Flush Completion 5 each 95.00$ 475.00$
6 Removal of 2' x 2' Pad w/8" BD Flush Completion (Grass) 4 each 75.00$ 300.00$
7 Removal of Lid & Manhole Ring fill w/Concrete 2 each 50.00$ 100.00$
8 Drums (Soil) (As Needed) 0 each 55.00$ -$
9 Drums (Water) (As Needed) 0 each 55.00$ -$
10 Offsite Disposal of Concrete and Manhole Debris 1 each 250.00$ Included
11 Permits (Clay County-Permit Required/No Fee) -$
Completion: 1/2 day Subtotal 2,735.00$
Todd Hodgson
Todd Hodgson TOTAL 2,735.00$
Partner
PROJECT
Emerald Cleaners 868 Blanding Blvd.
CUSTOMER
Luke Russell Earth Systems
Well Abandonments
DESCRIPTION
Mobilization
THANK YOU FOR YOUR BUSINESS!
Project Description:
(9) 1" Well Abandonments (195' total) w/Removal of 2' x 2' Pad and 8" Flush Manhole
***Damage to utilities on private property during borehole clearance are the responsibility of the client***
"Actual quantities used and days onsite will be invoiced"
(904) 247-0740
***Utility Locates on Private Property are the responsibility of the client***
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
Jacksonville Beach, Florida 32250 Orange Park, Florida223 12th Ave North
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
(1) 1.5" Well Abandonments (15' total) w/Removal of 2' x 2' Pad and 8" Flush Manhole
(2) Removal of Manhole Lid and Ring and Fill w/concrete patch (trench area)
(5 Locations in Aspalt (Concrete Patch), (4) Locations in Grass (existing surface patch), (2) in Trench Remove Lid and Ring and fill w/Concrete to match existing
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586 mailto:Mike@amrc-environmental.com mailto:Mike@amrc-environmental.com mailto:Mike@amrc-environmental.com
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .