Task Assignment DC007L Summary
This Task Assignment Notification (DC007L) is issued under Florida Department of Environmental Protection (FDEP) Contract HW558 between the State of Florida and Earth Systems, Inc. for environmental consulting services at the Professional Cleaners site (ERIC_4548) located at 6826 Old Kings Road, Jacksonville, Duval County, Florida. Crystal Posey serves as the FDEP Project Manager, while Jim Paxton represents Earth Systems as the Contractor Representative. The task assignment was authorized on February 27, 2020, with a final completion date of October 30, 2020.
Earth Systems will conduct an annual Monitoring of Natural Attenuation (MNA) sampling event consisting of two subtasks: Project Management and Annual MNA Sampling and Reporting. The scope of work includes collecting water level data from two monitoring wells (MW005 and MW013) and groundwater samples from ten additional wells (MW004, MW008, MW010, MW015, MW016, MW023, MW024, MW025, MW026, and MW027), plus one trip blank, with analysis for Volatile Organic Hydrocarbons (VOHs) using EPA Method 8260. Earth Systems will prepare a comprehensive Annual Monitoring of Natural Attenuation Report including updated tables, figures, laboratory analytical data, and recommendations for additional work. The total fixed-price cost for this task assignment is $5,176.93, consisting of $444.27 for Project Management (Subtask 1) and $4,732.66 for Annual MNA Sampling and Reporting (Subtask 2). Final deliverables, including the Annual Monitoring of Natural Attenuation Report, are due August 30, 2020, with invoicing contingent upon submittal and FDEP approval of the report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW558 Task Assignment #: DC007L
Deliverables:
Deliverable Deliverable Due Date
Annual Monitoring of Natural Attenuation Report - Subtask 1 & 2 30-Aug-20
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced Submittal and FDEP approval of Annual Monitoring of Natural Attenuation Report - Subtask 1 & 2 $5,176.93
TOTAL COST $5,176.93
BWC TAFORM 01/18
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 3
2399-2400
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW558 Contract File
Crystal Posey, Project Manager
Professional Cleaners
ERIC_4548
HW558
DC007L
Task Assignment
2/27/2020
This Task Assignment (TA) authorizes Earth Systems to conduct an annual groundwater sampling event. Water level data will be collected from 6 wells (MW005 and MW013). Groundwater samples will be collected from 6 wells (MW004, MW008, MW010, MW015, MW016, MW023, MW024, MW025, MW026, and MW027) and one trip blank to be analyzed for VOHs using EPA Method 8260.
Earth Systems will provide an Annual Monitoring of Natural Attenuation Report, which will include updated tables and figures, the laboratory analytical data, and recommendations for additional work. The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment (TA), total task amount is $5,176.93.
The final task completion date is October 30th, 2020.
FDEP COST ESTIMATEContractor: Earth Systems
Date: 2/27/2020
Task #: SubTask 1 Project Management SubTask 6
Site: Professional Cleaners ERIC_4548 SubTask 2 Annual MNA Sampling 2020 SubTask 7
Activity/Phase: Annual MNA - 2020 SubTask 3 SubTask 8
Project Manager: Crystal Posey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.30 Project Manager (Beardall) 4 3.6 $42.30 Principal Manager (Beardall) 2 2 0 0 0 0 0 0 0 0 $30.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $42.30 Senior Engineer (Marshall) 0 0 0 0 0 0 0 0 0 0 $40.62 Project Manager (J. Paxton) 18 18 0 0 0 0 0 0 0 0 $26.16 Staff Geologist (L. Russell) 1 1.0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (T. Byrnes) 13 13 0 0 0 0 0 0 0 0 $17.60 Eng./Geologist/Scientist Technician 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (K. Morse) 3 3 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (S. Meserve) 1 1 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 42 4 38.0 0 0 0 0 0 0 0 0
Direct Labor $1,363.70 $151.52 $1,212.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $859.13 $95.46 $763.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $886.41 $98.49 $787.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $463.66 $51.52 $412.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,572.90 $396.99 $3,175.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $68.19 $7.58 $60.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Cost Estimate
FDEP COST ESTIMATEContractor: Earth Systems
Date: 2/27/2020
Task #: SubTask 1 Project Management SubTask 6
Site: Professional Cleaners ERIC_4548 SubTask 2 Annual MNA Sampling 2020 SubTask 7
Activity/Phase: Annual MNA - 2020 SubTask 3 SubTask 8
Project Manager: Crystal Posey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $726.00 $726.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $726.00 $726.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,819.64 $404.57 $4,415.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $357.29 $39.70 $317.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,176.93 $444.27 $4,732.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Professional - ERIC_4548 SUBTASK: Annual MNA 2020
DATE: 2/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Terry Byrnes - Sr. Tech. Travel time to and from site 1 WLs (MW013 & MW005) & GW samples (MW004, 008, 010, 015, 016, 023, 024, 025, 026, and 02 12 plus Trip Blank. Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.
Report:
G. Beardall - Principal Manager Annual MNA report review 2 Jim Paxton Project Manager Annual MNA report preparation 18 L. Russell - Field Geologist ADaPT (8 mins/well * 10 wells) 1 S Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 1 Kath Morse - Drafting Figures 1-4 3
TOTAL LABOR 38.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow GW sampling kit $208.55 day 1 $208.55 Portable Compressor $48.50 day 1 $48.50 Expendables $32.50 day 1 $32.50 Portable Generator $66.00 day 1 $66.00
TOTAL EQUIPMENT $355.55
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
10 MWs, 1 TB, VOH by 8260B $66.00 10 1 $726.00
TOTAL LAB $726.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LOE WORKSHEET
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey`
February 7, 2020
Ms. Crystal Posey Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal to Conduct Annual MNA Sampling - 2020 Professional Cleaners 6826 Old Kings Road, Jacksonville, Duval County, Florida
ERIC_4548
Dear Ms. Posey
Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
Earth Systems will mobilize a senior technician to the site to collect water level data from 2 wells (MW005 and MW013) and groundwater samples (with water level data) from 8 additional wells (MW004, MW008, MW010, MW015, MW016, MW023, MW024, MW025, MW026, and MW027). Note that the change from the previous sampling schedule (adding well MW025) was requested in an October 22, 2019 memorandum from FDEP (attached).
The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical or Accutest.
After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Proposal to Conduct Annual MNA Sampling – 2020 Professional Cleaners, Jacksonville, Florida
ERIC_4548
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $444.27
October 30, 2020
Subtask 2 – Conduct 2020 MNA sampling and prepare MNA Report
$4,732.66
August 30, 2020 Groundwater sampling documentation, Laboratory Report, Annual MNA Report, GIS Tables, ADaPT Deliverables
Total/Completion Date $5,176.93
October 30, 2020
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, EARTH SYSTEMS
James Paxton Operations Manager
GROUNDWATER
ANALYTICAL RESULTS
(MAY 2009 - JULY 2019)
Figure 2
0 16080
( SCALE IN FEET )
15.2
11.2 3.2
34.9 17.3
8.4
BOLD
ESTIMATED EXTENT OF
DISSOLVED IMPACTS
ABOVE GCTLs
16.7 8.1
6.7
71.5 19.4
27.4 27.2
5.8 9.0
59 73
9.312 3.5
9.920
5.6 3.2
9.3
9.9 6.4
4.4
5.6
63.0 33.8
29.0 11.9
9.0 3.2
5.0
65.2 13.3
3.9
26.8 11.0
6.6
34.8 22.3
3.9
67.6 11.6
1.9
36.0 15.3
8.6
11.9 4.6
69.7
5.5 6.3
47.5 28.0
1.2
31.7 5.6
27.8 11.8
4.1
19.4 12.7
4.2 4.5
52.0 12.8
4.82
9.08
5.83 3.24
15.0 8.04
12.1 8.9
7.7
3.4
3.8
6.0
45.0 18.0
25.4 4.8
23.8
7.0 4.0
1.8
42.0 14.9
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
Dear Mr. Paxton:
The Department has reviewed the 2019 Annual Natural Attenuation Monitoring (NAM) report, dated September 6, 2019, prepared and submitted by Earth Systems. Inc., under contract number HW558.
The Department concurs with Earth Systems' conclusions and recommendations to continue NAM activities annually. The following wells should be sampled in the upcoming NAM sampling event:
MW004, MW008, MW010, MW015, MW016, MW023, MW024, MW025, MW026, and MW027. All deliverables for Task Assignment DC007K have been submitted for invoicing.
If you have any questions regarding this letter, please contact me at (850) 245-8851
Sincerely, Crystal Posey Project Manager Waste Site Cleanup Section Bureau of Waste Cleanup
Mr. Jim Paxton, Operations Manager Earth Systems. Inc.
223 12th Avenue North Jacksonville Beach, Florida 32250
Crystal Posey, Project Manager
Professional Cleaners ERIC_4548
HW558 DC007K
Annual Natural Attenuation Monitoring Report
October 22, 2019
| Task Assignment Notification |
| Deliverable & Invoice Schedule |
| Copy of Professional MNA 2020 CEF.pdf |
| Cost Estimate |
| LOE WORKSHEET |