About this file

Document Summary

This is a Task Assignment Change Order Form (Change Order No. 4) issued by the Florida Department of Environmental Protection (FDEP) to Dewberry Engineers Inc. for the St. Andrews Park Improvement project located in St. Andrews State Park, Florida. The change order extends the project timeline and adds design services related to Hurricane Michael repairs and site improvements. The contract is managed by FDEP's Bureau of Design and Construction, with Joshua Baxley, PE serving as the consultant representative and Alyssa Skehan as the FDEP Contract Manager.

The change order increases the task amount by $1,164.45 in fixed fees and $0.00 in reimbursable costs, bringing the total task amount to $57,256.17. The services include geotechnical engineering investigations, coastal construction control line (CCCL) permitting, project documentation, site surveys, 60% and 100% construction plans, pre-construction meetings, and construction administration services. The project end date is extended from December 31, 2019 to December 31, 2022 (365 days extension). Key subtasks include geotechnical field investigations and laboratory testing ($19,878.82), 60% design plans ($3,464.07), 100% plans update ($1,164.45), and FDEP CCCL permitting ($2,096.16). Payment is made upon FDEP approval of deliverables for each subtask. The overall project cost totals $57,540.69, with reimbursable costs limited to $600.00 for permit fees.

View the file

Other files

File Type Posted
CN-370000-CN220-A1.pdf PDF
CN-370000-CN220-CMC2.pdf PDF
CN-370000-CN220-T14CO1.pdf PDF
CN-370000-CN220-T16CO1.pdf PDF
CN-370000-CN220-T16CO3.pdf PDF
CN-370000-CN220-T17CO5.pdf PDF
CN-370000-CN220-T1CO1.pdf PDF
CN-370000-CN220-T1CO3.pdf PDF
CN-370000-CN220-T1CO4.pdf PDF
CN-370000-CN220-T21CO2.pdf PDF
CN-370000-CN220-T22.pdf PDF
CN-370000-GC822-CO1.pdf PDF
CN-370000-CN220-CMC3.pdf PDF
CN-370000-CN220-T1.pdf PDF
CN-370000-CN220-T13CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN220-T14.pdf PDF
CN-370000-CN220-T15CO2.pdf PDF
CN-370000-CN220-T16CO2.pdf PDF
CN-370000-CN220-T18.pdf PDF
CN-370000-CN220-T20CO1.pdf PDF
CN-370000-CN220-T24.pdf PDF
CN-370000-CN220-T2CO1.pdf PDF
CN-370000-CN220-T3CO1.pdf PDF
CN-370000-CN220-T4.pdf PDF
CN-370000-CN220-T7CO2.pdf PDF
CN-370000-CN220-T8.pdf PDF
CN-370000-CN220-CMC1.pdf PDF
CN-370000-CN220-CMC5.pdf PDF
CN-370000-CN220-T11.pdf PDF
CN-370000-CN220-T12.pdf PDF
CN-370000-CN220-T13CO3.pdf PDF
CN-370000-CN220-T15.pdf PDF
CN-370000-CN220-T16.pdf PDF
CN-370000-CN220-T19.pdf PDF
CN-370000-CN220-T19CO1.pdf PDF
CN-370000-CN220-T20CO2.pdf PDF
CN-370000-CN220-T20CO4.pdf PDF
CN-370000-CN220-T21.pdf PDF
CN-370000-CN220-T23CO2.pdf PDF
CN-370000-CN220-T25CO1.pdf PDF
CN-370000-CN220-T26.pdf PDF
CN-370000-CN220-T3.pdf PDF
CN-370000-CN220-T4CO1.pdf PDF
CN-370000-CN220-T4CO2.pdf PDF
CN-370000-CN220-T5.pdf PDF
CN-370000-CN220-T5CO1.pdf PDF
CN-370000-CN220-T6CO1.pdf PDF
CN-370000-CN220-T8CO1.pdf PDF
CN-370000-CN220-T9CO1.pdf PDF
CN-370000-CN220-TA7.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michael W.

Foster Jr.

Digitally signed by Michael W.

Foster Jr.

Date: 2021.10.11 10:50:59 -04'00'

Richard Rowe St. Andrews Park Improvement October 4, 2021 (Revised)

Reimbursable Cost: NA Total for Subtask 18: $ 1,164.45

Proiect Schedule:

Acth·ity

Subtask 1 & 11: Project Initiation & Project Documentation FDEP Review Subtask 2 & 12: Survey Subtask 3 & 13: Geotechnical Engineering Subtask 4 & 14: 60% Plans FDEPReview Subtask 5: Permitting Northwest Florida Subtask 6 & 15: 100% plans FDEPReview

Subtask 7: Bid Phase Subtask 8 & 16: Construction Administration:

Pre-Construction Meetinl!

Subtask 9 & 17: Construction Administration:

Site Visits and Completion Subtask 10: Permitting-FDEP CCCL Permitting

Summary of Fees:

Suhtask

ORIGINAL PROPOSAL

Subtask 1:Project Initiation & Project Documentation Subtask 2: Survey Subtask 3: Geotechnical Engineering Subtask 4: 60% Plans Subtask 5: Permitting Northwest Florida Water Management District

Subtask 6: 100% plans

Subtask 7: Bid Phase

Subtask 8: Construction Administration:

Pre-Construction Meeting:

Subtask 9: Construction Administration:

Site Visits and Completion Subtask 9A:

Subtask 9B:

Subtask 9C:

Duration (Calendar Days) Dates

14 days after Agreement Execution

14 days after submittal of subtask 1 28 days after Agreement Execution 28 days after submittal of subtask 2 21 days after Task3 14 days after submittal of subtask4 30 days after Subtask 4 21 days after FDEP Review 14 days after submittal of subtasks rrBD rI'BD lrBD

45 days after Task 4

Subtask Fixed Suhtask Price Cost Rcimhursahle

$1,435.92 $4,011.48

$0.00 $4761.87

$100 $1,048.08

$4207.08

$1,048.08

$2,131.98

0.00

$1,086.57 $69�.54

$1,959.96 11 I Page

Richard Rowe St. Andrews Park Improvement October 4 2021 /Revised)

COt

Subtask 10: Permitting-FDEP CCCL $2,096.16

$500.00 Permittine:

Subtask 11: Project Initiation & Project $1,366.17

Documentation

Subtask 12: Survey (CCCL) $1,371.63

Subtask 13: Geotechnical Engineering $19,878.82

Subtask 14: 60% Plans $3,464.07

Subtask 15: 100% Plans $2,778.05

Subtask 16: Pre-Construction Meeting $500.94

Subtask 17: Construction Administration $1,335.84

Subtask 18: 100% Plans - Update $1,164-45

Total Reimbursable Cost: $ 600.00

Overall Total Cost: $57,540.69

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

12 I Page