CLPUD Equipment Cutsheet.pdf
PDF 687 KB Posted
- Solicitation number
- S-63400-00007615
- Issued by
- Klamath County, Oregon
About this file
The provided document is an equipment cutsheet for the Central Lincoln People's Utility District (CLPUD) related to the ITB 10088 Utility System Improvements at Beverly Beach State Park contract opportunity in Oregon. The cutsheet details the required materials and specifications for the ground rods, cable labels, ground sleeves, conductor, connectors, and other electrical equipment needed for the project. The contract opportunity involves site preparation, demolition, and construction of water, sewer, and electrical utilities at the Beverly Beach State Park, with Lincoln County and Newberg City as the jurisdictions involved.
The pricing terms, set asides, funding requirements, and other financial details are not included in the provided documentation. The contract duration and any renewal options are also not specified.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200.16 above finished grade
8'
Rod @
10· ®
"CJ
50•/ g• -+-' C 0L
10· Min
16· Min.
J ----- so· Min. -----
Notes=
1. Maintain minimum clearance from bottom outside edge of hand hole to ground loop.
2. Install both ground rods in undisturbed earth
® •Primary conduit elbow location @ •Secondary conduit elbow location
3. Leave 6' of ground wire in ground sleeve for future connection to transformer.
4. Ground loop is one continuous loop clamped to both ground rods beginning and ending at the ground rod in the ground sleeve.
ITEM
A
B
C
D
E
F
CENTRAL� □
LIN CC> LN �
STOCK
11466
11746
11839
12254
99022
99029
DESCRIPTION QTY
GND ROD 5/8" X 8' GALV 2
CBL LBLS UG "FLAG TAG"-SPECIFY COLOR 1
GND SLV (PE-42) BDY 42"X 38"X 20" 1
CON DCTR 1/0-7 STR SOFT DRAWN CU 35
CNCTR FARGO #6 SOL TO 4/0 STR 1
GND ROD CLAMP 5/8" & 3/4" 3
QNDSLV 421N X 381N W/0 LID SHRUBLN XFMR
200.16
EFFECTIVE
DATE
DESIGNED BY APPROV. BY REV. NO. D Hand Hole 9/20
A COMMUNITY - C>VVNED ELECTRIC UTILITY
ENGINEERING ASSEMBLY W.t 9/20 8JQ 9/20 1 fl/21 REV. DESCR. 11:WED AN> ADOEI) N01E8 otLY
CLPUD Equipment cutsheet
File details come from the government source that posted it. Updated .