Civil Plans.pdf

PDF 6 MB Posted

Attached to
File No. 751/17172. JBB - Western UP - Shooting Facility
Solicitation number
RFQ 171 210000000220 7
Issued by
Otsego County, Michigan

About this file

This is a set of construction plans for the Western Upper Peninsula Shooting Facility project submitted to the Michigan Department of Technology, Management & Budget, State Facilities Administration, Design and Construction Division, located in Ontonagon County, Michigan. The project encompasses civil, architectural, structural, mechanical, electrical, and plumbing design plans for an indoor range and clubhouse facility. The plans include a topographic survey, paving and grading plan, septic and water main infrastructure, septic absorption field design, access road cross sections, and water meter vault details. The project site is located at T.51 North, R.41 West in Ontonagon County, with coordinates of latitude 46.8344 and longitude -89.5345. The design underwent a 50% review phase on November 4, 2020, followed by a 90% review phase on January 13, 2020, with bid documents issued on March 11, 2021. The proposed indoor range/clubhouse has a finished floor elevation of 627.00 feet and includes ADA-compliant parking, concrete paving and sidewalk sections, a 1,250-gallon dual compartment septic tank, and coordination with the Village of Ontonagon for water main installation and natural gas services.

The construction plans detail substantial civil infrastructure improvements including heavy-duty HMA pavement sections, standard sanitary sewer cleanouts, gate valve schedules, and soil erosion control measures. Site access during construction is identified, and the plans include detailed specifications for materials such as crushed concrete or limestone meeting MDOT standard gradations for the aggregate access drive. All disturbed greenelt areas are to be restored with three inches of screened topsoil and hydroseed, with slopes exceeding 1:4 receiving mulch blankets for erosion protection. The project engineering is managed by NF Engineers (Contact: Steven Sutton, P.E., Pontiac, Michigan) with architectural services provided by OHM Advisors (Contact: Christopher Ozog, AIA, LEED A.P. BD+C, CDT, CSI, Livonia, Michigan). The construction plans contain coordination requirements with the Village of Ontonagon, MDOT, natural gas suppliers, and phone service contractors, with provisions for potential bedrock conditions and soil boring data review to inform construction sequencing and timing.

View the file

Other files

File Type Posted
Range Equipment - 2.pdf PDF
Addendum No. 1.pdf PDF
Range Equipment - 1.pdf PDF
Architectural Plans.pdf PDF
Addendum No. 4.pdf PDF
Addendum No. 2.pdf PDF
Civil Updates.pdf PDF
Advertisement.pdf PDF
J942 Photos with Captions.pdf PDF
Specifications.pdf PDF
Addendum No. 3.pdf PDF
Addendum 5 17172.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NF

N

Location Map

Site

T

TI

TL

E

SH

EE

T

CONSTRUCTION PLANS FOR

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET

T.51 North , R.41 West

ONTONAGON COUNTY, MICHIGAN

TITLE

SHEET INDEX

NO.

SHEET

PROJECT SITE

ONTONAGON COUNTY, MICHIGAN

Civil Engineer

3 WORKING DAYS

BEFORE YOU DIG

CALL MISS DIG

1-(800)-482-7171

For free location of public utility lines

R

OR R

Know what's below.

Call before you dig.

FILE NO.: 751 / 17172.JBB

NF Engineers 46777 Woodward Avenue Pontiac, MI 48342

Contact: Steven Sutton, P.E.

Phone: (248) 332-7931 Fax: (248) 332-8257 E-mail: swsutton@nfe-engr.com

NF

ENGINEERS

TITLE SHEETT

C1

Architect OHM Advisors 34000 Plymouth Rd.

Livonia, MI 48150

Contact: Christopher Ozog, AIA, LEED A.P. BD+C, CDT, CSI

Phone: (734) 522-6711 Fax: (734) 522-6427 E-mail: christopher.ozog@ohm-advisors.com

WESTERN UPPER PENINSULA

SHOOTING FACILITY

PROJECT PERMITS

C2

C3

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

PAVING / GRADING PLAN

SEPTIC / WATER MAIN AND PRIVATE SERVICES PLAN

SEPTIC ABSORPTION FIELD DESIGN AND DETAILS

DEVELOPMENT AREA TOPOGRAPHIC SURVEY

C4

G-101

S-002 STRUCTURAL STANDARDS

STRUCTURAL STANDARD DETAILS

CODE COMPLIANCE PLAN

S-003

A-001

A-002

A-101

TYPICAL DETAILS & WALL ASSEMBLIES

MAIN FLOOR PLAN

MAIN FLOOR FINISH PLAN

ARCHITECTURAL NOTES & SYMBOLS

AF101

ROOF PLANA-121

A-201

A-301

A-302

BUILDING SECTIONS

BUILDING SECTIONS

WALL SECTIONS

EXTERIOR ELEVATIONS

A-311

DOOR SCHEDULE & DETAILSA-601

A-602

P-001 GENERAL PLUMBING INFORMATION

PLUMBING PLAN

WINDOW SCHEDULE & DETAILS

P-101

MAIN FLOOR REFLECTED CEILING PLANA-111

FOUNDATION PLANSB101

INTERIOR ELEVATIONSA-451

CIVIL PLANS - SHEET INDEX

GENERAL ARCHITECTURAL PLANS - SHEET INDEX

TITLENO.

SHEET

ARCHITECTURAL PLANS - SHEET INDEX

TITLENO.

SHEET

PLUMBING PLANS - SHEET INDEX

TITLENO.

SHEET

STRUCTURAL PLANS - SHEET INDEX

S-001 STRUCTURAL NOTES AND SYMBOLS

STRUCTURAL FRAMING PLANSF101

ROOF FRAMING PLANSF111

VICINITY MAP

M-001 MECHANICAL NOTES AND SYMBOLS

MECHANICAL PLANM-101

ELECTRICAL NOTES AND SYMBOLSE-001

E-101

E-102 FLOOR 1 LIGHTING PLAN

FLOOR 1 POWER PLAN

TITLENO.

SHEET

MECHANICAL AND ELECTRICAL PLANS - SHEET INDEX

WALL SECTIONSA-312

WALL SECTIONSA-313

A-303 BUILDING SECTIONS

MECHANICAL SCHEDULESM-401

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DIAGRAMS

E-601 ELECTRICAL SCHEDULE

NOTES AND DETAILS PLANC5

ACCESS ROAD CROSS SECTIONSC7

LATITUDE = 46.8344

LONGITUDE = -89.5345

WATER METER VAULT DETAILSC6

.35

.31

.11

.40

.03

.78

.63

.85

.43

.54

.96

.32

.92

.28

.65

.05

.58612

.25

.49612

.41

.12

.77

.42608 .59

.37

.13

.70

.99

.16

.85

.70611

.38

.32

.19

.02 612

.74

.41

.54

.37

.12

.28

.65

.03

.54

.96

.76

.30

.31

.17

.83

.53 617

.29

.81

.94

.98

.77

.11

.85

.69

.88

.84610

.88

.81

.83 610

.78

.05

.96

.05610

.46

.52

.66

.35

.38

.35

.84

.22

.05

.51

.86

.13

.63

.88

.72610

.67610 .58

.51

.44

.50

.82 610

.85

.43

.87

.19

.20610

.33610 .17

.15

.73

.19

.52

.95

.79

.58

.54

.68

.30

.30

.95

.04

.94

.73

.81

.58

.09

.65

.20

.46

.48

.74

.22

.12

.31607

.45

.65606 .36

.61606

.49

.58

.58

.20

.94

.60

.69 610

.75 610 .80

.68

.32

.80

.45

.85

.77

.49

.72

.96

.63

.01

.87

.70

.74

.28

.91

.34

.16

.79

.90

.51

.13610

.29

.93

.53

.27

.88

.08

.01

.67

.53

.38

.15

.76

.45

.42

.33

.92

.08

.22

.22

.19

.56

.55

.93

.81

.37

.33

.17

.91

.58

.67

.47

.78

.74

.67

.58

.65

.66

.26

.83

.68

.56

.75

.07

.94

.08

.88

.96 627

.64

.34

.35

.71

.46

.91

.52

.17

.31

.53

.96

.18

.26

.65

.74

.86

.81

.93

.69

.07

.76

.18

.93

.49

.46

.34

.66

.08

.77

.56

.30

.40

.74

.78

.31

.30

.46

.34

.76

.24

.69

.15

.76

.96

.36

.84

.88

.55

.52

.01

.86

.41

.48

.94

.14

.17

.74

.57

.09

.32

.31

.61

.61

.22

.18

.60

.60

.65

.39

.08

0.0

.36

.33

BENCHMARK

MI HWY M-64

GALE ROAD

NF

N

EW

S

C1

TO

PO

G

R

AP

H

IC

S U

R

VE

Y

JC

/E N

G B

Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

TOPO NOTES

LEGEND

EXISTING FEATURES LEGEND

REGULATED WETLANDS

BORING LEGEND

SB-1

SITE ACCESS DURING CONSTRUCTION

PT-1

.31

.11

.40

.03

.78

.63

.85

.43

.54

.96

.32

.92

.28

.65

.05

.58612

.25

.49612

.41

.12

.77

.42608 .59

.37

.13

.70

.99

.16

.85

.70611

.38

.32

.19

.02 612

.74

.41

.54

.37

.12

.28

.65

.03

.54

.96

.76

.30

.31

.17

.83

.53 617

.29

.81

.94

.98

.77

.11

.85

.69

.88

.84610

.88

.81

.83 610

.78

.05

.96

.05610

.46

.52

.66

.35

.38

.35

.84

.22

.05

.51

.86

.13

.63

.88

.72610

.67610 .58

.51

.44

.50

.82 610 .85

.43

.87

.19

.20610

.33610 .17

.15

.73

.19

.52

.95

.79

.58

.54

.68

.30

.30

.95

.04

.94

.73

.81

.58

.09

.65

.20

.46

.48

.74

.22

.12

.31607

.45

.65606 .36

.61606

.49

.58

.58

.20

.94

.60

.69 610

.75 610 .80

.68

.32

.80

.45

.85

.77

.49

.72

.96

.63

.01

.87

.70

.74

.28

.91

.34

.16

.79

.90

.51

.13610

.29

.93

.53

.27

.88

.08

.45

.42

.33

.92

.08

.22

.22

.19

.56

.55

.93

.81

.37

.33

.17

.91

.58

.67

.47

.78

.74

.67

.58

.65

.66

.26

.83

.68

.56

.75

.07

.94

.08

.88

.96 627

.64

.34

.71

.46

.91

.52

.17

.31

.53

.96

.18

.26

.65

.86

.81

.76

.18620

.34

.66

.77

.56

.30

.40

.31

.30

.46

.34

.96

.36

.84

.88

.55

.52

.94

.14

.17

.74

.57

.09

.32

.31

.61

.61

.22

.18

.60

.60

.65

.39

.08

0.0

1SB-

3SB-

2SB-

5SB-

4SB-

PROPOSED INDOOR

RANGE / CLUBHOUSE

FINISH FLOOR 627.00

BENCHMARK

MI HWY M-64

GALE ROAD

1PT-

2PT-

3PT-

4PT-

NF

N

EW

S

C2

PA

VI

N

G

G R

AD

IN

G P

LA

N

EXISTING LEGEND

PAVING LEGEND

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

4" CONCRETE SIDEWALK SECTION 6" CONCRETE SECTION ADA PARKING SLAB END DETAILSILT FENCE DETAIL

SECTION A-A

FRONT VIEW

PLAN VIEW

SECTION B-B

TEMPORARY CRUSHED CONCRETE

CONSTRUCTION ACCESS ROAD

R O

AD

W

AY PROPOSED LEGEND

BARRIER FREE PARKING SIGNAGE DETAIL

CONCRETE BUMPER DETAIL HEAVY DUTY HMA PAVEMENT SECTION

ADA PARKING LAYOUT

GRAVEL PAVING SECTION

SIGN POST DETAIL

8" CONCRETE SECTION

PROJECT RESOTRATION

.31

1SB-

3SB-

2SB-

5SB-

4SB-

PROPOSED INDOOR

RANGE / CLUBHOUSE

FINISH FLOOR 627.00

BENCHMARK

MI HWY M-64

1 2

GALE ROAD

1PT-

2PT-

3PT-

4PT-

C3

SE

PT

IC

W

AT

ER

M

AI

N A

N D

PR

IV

AT

E

SE

R

VI

C

ES

P

LA

N

LEGEND

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

STANDARD SANITARY SEWER CLEANOUT

GATE VALVE SCHEDULE

1 2

NATURAL GAS SERVICE

CONTRACTOR SHALL COORDINATE WITH THE NG SUPPLIER

PHONE SERVICE

CONTRACTOR SHALL COORDINATE

PROPOSED LEGEND

SAN. STRUCTURE SCHEDULE

1 2

WATER MAIN INSTALLATION

CONTRACTOR SHALL COORDINATE

LIGHT POLE BASE DETAIL

VALVE / BLOW-OFF DETAIL

NF

N

EW

S

5SB-

1 2

GALE ROAD

GALE ROAD

1PT-

2PT-

3PT-

4PT-

C4

SE

PT

IC

A

BS

O R

PT

IO

N F

IE

LD

D

ES

IG

N

A N

D D

ET

AI

LS

LEGEND

SEPTIC FIELD CONSTRUCTION SEQUENCE SEPTIC SYSTEM NOTESBED SEPTIC SYSTEM BASIS OF DESIGN

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

A

A

A A

BORING LEGEND

SB-1

PT-1

INSPECTION WELL DETAIL

NF

N

EW

S

MOUND SEPTIC FIELD LAYOUT MOUND SEPTIC FIELD LAYOUT

.13

.16

.70

.94

.98

.77

.11

.85

.69

.88

.84

.88

.8161

0.8

.78

.05

.05

.46

.52

.66

.35

.35

.84

.05

.51

.13

.63

.88

.72

.67610

.58

.51

.44

.43

.87

.19

.20610

.56

.33

.17610 .22

.12

.31607

.45606 .65606

.36

.58

.60

.69

.75

.80

.68

.80

.85

.77

.49

.72

.96

.01

.87

.70

.74

.51

.29

.53

.28

.27

.88

.08

.09

.65

.44

.22

606.51

.13

.70

.99

.16

.85

.70 611

.38

.11

.88

.84

.88

.81

.83

.78

.96

.35

.38

.22

.05

.86

.13

.88

.72

.67610

.58

.51

.44

.50

.82 610

.85

.31

.61606

.49

.58

.58

.20

.94

.60

.69

.75

.80

.68

.32

.80

.45

.85

.77

.96

.63

.01

.87

.51

.13610

.29

.93

.53

.32

.39

MI HWY M-64

BENCHMARK

GALE ROAD

C5 N

O

TE

S

AN

D D

ET

AI

LS

P

LA

N

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

M-64 RIGHT-OF WAY IMPROVEMENTS

CONSTRUCTION SEQUENCE / TIMING SCHEDULE

SOIL EROSION CONTROL -

SOIL EROSION CONTROL

SOIL DATA

NOTES

BUTT JOINT DETAIL

SANITARY SEWER TRENCH DETAILS

NOT TO SCALE

WATER MAIN TRENCH DETAILS

NOT TO SCALE

SECTION A - A

PLAN VIEW

A

STONE RIP-RAP

B "D"

C

SECTION B - B

SECTION C - C

B

"E " "F

C

A

"D" "F""E" SY

PIPE

DIA.

EXISTING LEGEND

PAVING LEGEND

PROPOSED LEGEND

LANE CLOSURES

Potential Bedrock Conditions

SEPTIC TANK DETAIL

1,250 GALLON DUAL COMPARTMENT SEPTIC TANK

DNR PROVIDED GATE

APPROACH PAVING SECTION

C6 W

AT

ER

M

ET

ER

V

AU

LT

D

ET

AI

LS

JC

/E

N G

B Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

CONCRETE VAULT DETAILS

PLAN VIEW

SIDE VIEW

END VIEW

DAMAGE TO PRIVATE PROPERTY

VILLAGE OF ONTONAGON COORDINATION

VAULT / METER / VALVE FABRICATION DRAWING

C7

JC

/E N

G B

Y

FI

LE

N O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

N F

E N

G

IN

E E

R S

C iv il E n g in e e r s La n d

S u r v e y o r s La n d

P la n n e r s

W o o d w a r d

A v e n u e

P o n t ia c

M

I

2-

T e l.

2-

Fa x

2-

C

IV

IL

E

N G

IN

EE

R

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

-0

SW

S

M

AW

M

AW

O N

TO

N

AG

AN

M

IC

H

IG

AN

W

ES

TE

R

N U

PP

ER

P

EN

IN

SU

LA

SH

O O

TI

N

G F

AC

IL

IT

Y

R

EV

IE

W

D

AT

E

Ph as e

R ev ie w

-1

1-

1/

2.

JB

B

Ph as e

R ev ie w

-0

1-

Bi d

D oc um en ts

-0

3-

AGGREGATE ACCESS DRIVE WIDENING

SECTION A-A

SOIL BORING DATA

REVIEW THE SOIL BORINGS FOR EXISTING PAVEMENT DEPTHS, UNDERLYING

SOIL TYPES, GROUND WATER ELEVATIONS, ETC. ASSOCIATED WITH THE

PROJECT.

MDOT 21AA

ALL PROPOSED 21AA SHALL BE CRUSHED CONCRETE OR LIMESTOEN MEETING

MDOT STANDARD GRADATIONS.

CLEARING

ALL ADJACENT CLEARING OF TREES, BRUSH, AND OTHER VEGETATION SHALL BE

INCLUDED AS PART OF THE INSTALLATION OF OVERALL PROJECT.

RESTORATION

ALL DISTURBED GREETBELT AREAS SHALL BE RESTORED WITH 3" SCREENED

TOPSOIL AND HYDROSEED. ALL SLOPES EXCEEDING 1:4 SHALL ALSO RECEIVE A

MULCH BLANKET FOR EROSION PROTECTION.

AGGREGATE ACCESS DRIVE WIDENING

SECTION B-B

AC

C

ES

S

R O

AD

C

R O

SS

S

EC

TI

O N

S D

ET

AI

L

AN

D N

O

TE

S

N.T.S.

N.T.S.

AGGREGATE ACCESS DRIVE

SECTION C-C

N.T.S.

J942-SIT-C00-TITLE
J942-SIT-C01-TOPO
J942-SIT-C02-SITE
J942-SIT-C03-UTILITY
J942-SIT-C04-SEPTIC
J942-SIT-C05-NOTES AND DETAILS
J942-SIT-C06-METER VAULT
J942-SIT-C07-ROAD CROSS SECTIONS

File details come from the government source that posted it. Updated .