Addendum 5 17172.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ 171 210000000220 7
- Issued by
- Otsego County, Michigan
About this file
This Construction Bid Addendum No. 5 is issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Western Upper Peninsula Shooting Facility project (File Number 751/17172.JBB). The addendum was issued on April 23, 2021, with a bid opening date of April 28, 2021. The professional managing the project is NFE Engineers, with Jeff Barsch serving as Project Director. The addendum addresses modifications to the bidding documents, specifically clarifying that sheet SB101 note "4" should be changed to reference equipment slabs per civil drawings rather than describing concrete apron slab specifications. Additionally, the addendum provides responses to bidder questions regarding equipment baffles in room 112 (the shooting range), confirming these components are range equipment covered under specification 116723.2.6 for Safety Baffles and Ballistic Barriers. Bidders are required to acknowledge receipt of this addendum in the Bid Summary and Bid Form, as failure to do so may result in bid rejection.
The addendum documents two substitution requests during the bidding phase: Substitution Request 4 for Range Equipment was approved, while Substitution Request 5 for Resinous Flooring was rejected. Bidders proposing substitutions must provide supporting documentation including drawings, design data, performance specifications, test data, warranty information, maintenance service details, and evidence that proposed products are equal or superior to specified materials. All substitution requests received required evaluation for compliance with contract document requirements and project schedule adherence. The addendum was approved by Project Director Jeff Barsch on April 23, 2021, and all addenda automatically become part of the contract documents upon incorporation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Range Equipment - 2.pdf | ||
| Addendum No. 1.pdf | ||
| Civil Plans.pdf | ||
| Range Equipment - 1.pdf | ||
| Architectural Plans.pdf | ||
| Addendum No. 4.pdf | ||
| Addendum No. 2.pdf | ||
| Civil Updates.pdf | ||
| Advertisement.pdf | ||
| J942 Photos with Captions.pdf | ||
| Specifications.pdf | ||
| Addendum No. 3.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 5
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
4/23/2021
PROJECT NAME
Western Upper Peninsula Shooting Facility
FILE NUMBER
751/17172.JBB
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Jeff Barsch
BID OPENING DATE:
4/28/2021
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Sheet SB101 change note “4" CONC APRON SLAB W/ 6x6 W1.4xW1.4 WWF ON OVER 8" COMPACTED GRANULAR FILL.
THICKENED EDGE W/ REINFORCING” to “EQUIPMENT SLAB, REFER TO CIVIL DRAWINGS”.
2. Bidder questions following the posting of Addenda #4 are outlined on the following pages.
3. Substitution Requests during Bidding Phase:
a. Substitution Request 4: Range Equipment; Approved, See attached
b. Substitution Request 5: Resinous Flooring; Rejected, See attached
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
Steve Sutton
PROFESSIONAL: DATE: 4/23/2021
APPROVED BY:
PROJECT DIRECTOR: Jeff Barsch DATE: 4/23/2021
Bidder Question
On the reflected ceiling plan, room 112 shooting range, there is a note of equipment baffles, is this part of the range equipment or ceiling work? there is no specification for these baffles.
• Yes, they are range equipment and included in specification 116723.2.6 SAFETY BAFFLES AND BALLISTIC
BARRIERS.
圏 SUBSTITUTION
’ REQUEST
也e Bid(亜n
Substi請ion Req
耳重oⅢ :
est Nu皿be重:
Date‥ 十臆臆音 曲臆I 臆臆_
A偲H句e飯Nu皿ber:
CoⅡ壮ac書雷or:
s。。亀。n: 0
Desc垂〕寄o孤:
P夢やOSed Slめs亀
Manll患c京町er:
T重ade N彊ne:
Attached data Of也e重e叩e垂読認諾謹話 Attac心ed data also includes a descri
怨霊諾龍藷聾S, Photograp血s, and perfemance and test data adequate for evaluaton tion of changes to the Co血act Docunentsぬat tbe proposed substitutio皿will require for its I)raper
珊e Unde重si王事ed ce轟薗憐こ
. Prqposed substifu橿onhasbeen
・ Same waJranty wi11 be fumishe
Same皿aintenance service and s
Prqposed §心魔t血on読11 have
Prqposed軸bs宙血○ロdoes not
Pay皿e競演H be皿ade允で血 sl】bs宜t皿もon.
ly investigated狐d detemined to be equal or sxperier in all respects to apec脆ed product.
urce of r錐)laceme旗parts, as apPheal)le, is available.
O adverse e鯨油on other廿ades and will not a鱈ect or delay progress schedule.
ges to hilding desigr㌧ including A偲design, detailing’and constn|Ction costs caused by也e
S櫨bmi耽d by;
Si印ed by:
FiⅡⅡ :
Ad(正ess :
Telepho皿e :
Subs血ution approved as noted
Substitution r匂ected - Use spec臆
Sl血stil鵬ion Request received too d皿ate心血s.
ate - U§e §PeCified materials.
Suppo血g Data Attached: □ Dra 血gs セ左。鳳D砲口sa車S □T軸 □Repo地 口
口
4/23/2021
4/20/2021
File details come from the government source that posted it. Updated .