The document is a comprehensive bid package for the City of Scranton's 2025 Demolition Projects Round 3, issued by the Office of Community Development. The project involves demolition services for four specific properties located in Scranton, Pennsylvania: 221 Wheeler Avenue (Garage), 734 Theodore Street, 1409 Watson Street, and 1016 Stafford Avenue. Sealed bids will be received online through the City's e-Procurement Portal until 10:00 AM on Wednesday, November 26, 2025, with bid opening occurring in City Council Chambers and livestreamed on ECTV. Bidders are required to register on the e-Procurement Portal and follow the project to receive notifications and submit proposals. The work includes comprehensive demolition services such as asbestos abatement, structural demolition, utility capping and removal, site grading and restoration, and disposal of all demolition materials.
The bid package includes detailed asbestos inspection reports for each property, prepared by Quad Three Group, Inc., which indicate varying levels of potential hazardous materials. Most properties have minimal or no asbestos-containing materials, with only the 1409 Watson Street property showing a black mastic on the exterior concrete foundation that may require specialized removal. The project is funded through a grant from the Commonwealth Financing Authority, and contractors must comply with prevailing wage requirements, provide performance and payment bonds, and carry specific insurance coverages. Bidders are required to submit comprehensive documentation, including bid forms, bonds, contractor qualifications, and non-collusion affidavits. The contract term is set for 90 days from commencement, with liquidated damages of $150 per day for delays, and bidders can submit individual bids for each property or a combination thereof.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Documents and Specifications
FOR
Demolition of Hazardous Structures Fall 2025 Scranton, Lackawanna County, Pennsylvania
Owner:
City of Scranton, Office of Community Development 340 N. Washington Ave.
Scranton, PA 18503
Date: November 5, 2025 Project #: 1021122.000
Table of Contents
SECTION 000110 – TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT & CONTRACTING REQUIREMENTS
BIDDING INSTRUCTIONS
001116 Invitation to Bid
ADDITIONAL INFORMATION
003121 Photographic Information
003126 Existing Hazardous Materials
003126.13 Asbestos Reports
BIDDING DOCUMENTS
004113 Bid Form- Stipulated Sum
004313 Bid Bond (Sample AIA-310)
004597 Bid Submission
CONTRACTING REQUIREMENTS
005213 Agreement by Owner (Sample)
006113.13 Performance Bond (Sample AIA-312)
006113.16 Payment Bond (Sample AIA-312)
007343 Davis Bacon Wage Rates
008600 PA Tax Exempt Disclosure
009200 Verification of Contractor Eligibility Form
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary
011100 Summary of Work
012600 Contract Modifications Procedures
012900 Payment Procedures
013100 Project Management and Coordination
015000 Temporary Facilities
Table of Contents
017300 Execution
017700 Closeout Procedures
DIVISION 02 – EXISTING CONDITIONS
024116 Structure Demolition
028213 Asbestos Abatement
DIVISION 31 – EARTHWORK
312000 Earth Moving
DIVISION 32 – EXTERIOR IMPROVEMENTS
329200 Turf & Grasses
INVITATION TO BID 001116.21 - 1
SECTION 001116.21 – INVITATION TO BID
Notice is hereby given that the City of Scranton, Office of Economic and Community Development is seeking separate, sealed proposals for an individual or firm for the demolition of hazardous structures.
Proposals will be received online by the City of Scranton Controller via the City’s e-Procurement Portal
(https://secure.procurenow.com/portal/scrantonpa) until 10:00 AM, prevailing time on Wednesday, November 26, 2025, at which time such proposals will be opened in City Council Chambers, 2nd Floor and made available for public viewing on ECTV (www.youtube.com/user/electriccitytv570). Questions may be submitted to the City’s e-Procurement Portal until 5:00 PM, prevailing time on Wednesday, November 19, 2025. Responses will be provided via City’s e-Procurement Portal to all registered parties.
CITY OF SCRANTON
Demolition of Hazardous Structures
Proposals shall be made upon the specifications included in the official Proposal Request which may be obtained by visiting the City of Scranton’s e-Procurement Portal, https://secure.procurenow.com/portal/scrantonpa. If you intend to submit a proposal, you shall register on the City’s e-Procurement Portal. If you intend to submit a proposal, you shall register on the City’s e-
Procurement Portal. Once registered, Companies may view and click "Follow" to be a prospective
Respondent for this solicitation and will appear on the Follower’s list. Companies that fail to Follow this project will not receive automatic addenda notifications, nor will they be able to draft a response in the
City’s e-Procurement Portal and therefore will be unable to participate or be considered for this RFP.
The work includes but is not limited to all labor, materials, tools, and oversight and permits required to abate existing asbestos as required and demolish the following properties in their entirety. The nature of the work includes asbestos abatement, structural demolition, capping and removal of existing utilities, site grading and restoration, and disposal of all demolition materials.
• 221 Wheeler Avenue (Garage), Scranton, PA 18510
• 734 Theodore Street, Scranton, PA 18508
• 1409 Watson Street, Scranton, PA 18504
• 1016 Stafford Avenue, Scranton, PA 18505
PHOTOGRAPHIC INFORMATION 003121
003121 – PHOTOGRAPHIC INFORMATION
221 Wheeler Garage
734 Theodore
1409 Watson
1016 Stafford
EXISTING HAZARDOUS MATERIAL INFORMATION 003126
SECITON 003126 - EXISTING HAZARDOUS MATERIAL INFORMATION
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting
Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing asbestos reports for individual houses have been prepared by Quad Three Group, Inc.
The reports of properties containing asbestos are herein attached for review and information.
LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION
Throughout:
1409 WATSON STREET
SCRANTON, PA 18504
Prepared for:
SCRANTON OFFICE OF ECOMONIC AND COMMUNITY DEVELOPMENT
340 NORTH WASHINGTON AVENUE (MUNICIPAL BUILDING),
SCRANTON, PA 18503
Attention:
Mr. Andrew Connors
Prepared by:
QUAD THREE GROUP, INC.
37 NORTH WASHINGTON STREET
WILKES-BARRE, PENNSYLVANIA 18701
PH. (570) 829 - 4200
FAX (570) 829 - 0302
PROJECT # 13030.04.39
SEPTEMBER 2025
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY…………………………………………….1.
II. INTRODUCTION……………………………………………………..1.
III. SURVEY AREA AND DISCUSSION……………………………....2.
IV. MATERIALS SAMPLING AND ANALYTICAL…………………...2.
V. INSPECTION FINDINGS AND RECOMMENDATIONS…………3.
VI. ASBESTOS CONTAINING MATERIALS ABATEMENT………..3.
COST
VII. INSPECTION DISCLAIMER………………………………………..4.
APPENDICES
APPENDIX A ASBESTOS ANALYSIS RESULTS
APPENDIX B SITE PHOTOS
APPENDIX C CERTIFICATIONS
Scranton Office of Economic and Community Development 340 North Washington Avenue (Municipal Building), I. EXECUTIVE SUMMARY
An Asbestos Containing Materials Inspection was conducted on September 12th, 2025 within the planned demolition site located at 1409 Watson Street, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.
As part of this asbestos inspection, the quantities and conditions of asbestos containing materials were identified. A total of six (6) layers of material samples were collected and analyzed.
Asbestos containing materials (ACM) were identified through lab analysis on the accessible areas of the structure located at 1409 Watson Street, Scranton, Pennsylvania.
The laboratory identified a black mastic on the exterior concrete foundation. This black mastic was not identified during the inspection and therefore could not be quantified. If during the demolition process a black mastic is identified and rendered friable it should be handled and removed following all Local, State, and Federal regulations by a certified abatement contractor.
Materials that were non-suspect or were sampled and through analysis found to not contain asbestos include concrete foundation. Descriptions of all the material samples collected can be found in Appendix A.
The conclusions presented in this report are the result of the coalition, compilation and analysis of samples and other information obtained during the inspection. The results presented in this report represent the conditions present at the time of the inspection. Quad Three Group has no control over conditions or events that occurred following the date of inspection.
II. INTRODUCTION
On September 12th, 2025 a limited asbestos inspection was performed within 1409 Watson Street, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey / inspection process included:
A. Inspecting the area to identify representative “suspected” asbestos-containing materials, types and sampling sites.
1.
B. Collecting representative samples from any suspect material in order to identify all
Asbestos Containing Materials (ACM). Examples of these materials include Pipe insulation, plaster, sheet-rock, floor tiles, linoleum, etc.
C. Sampling was performed by experienced, licensed personnel utilizing semi -destructive sampling techniques in an attempt to locate asbestos containing materials.
D. Laboratory analysis of the materials sampled was performed at an accredited laboratory using the EPA recommended method of polarized light microscopy (PLM) for friable samples.
III. SURVEY AREA DISCUSSION
The property was comprised of a single structure at 1409 Watson Street The interior of the structures offered limited access at the time of the inspection due to unknown structural concerns. Debris throughout the property blocked safe entrance and exits to the remaining areas of the structure. The Inspection was limited to the accessible areas of the exterior of the structure. Major structural components include concrete, brick, stone, block, and wood.
IV. MATERIALS SAMPLING AND ANALYTICAL METHODOLOGY
The building inspection was conducted by an inspector, qualified by experience, education and training in the recognition of suspect asbestos-containing materials (ACM). An initial walk through was conducted to identify suspect asbestos containing materials and to group them into homogeneous sampling areas.
Following the walkthrough, the number of samples required to determine the presence of ACM in the study areas was determined. Sample collection was performed with the intent to identify and locate asbestos containing materials and to group them into homogeneous material categories. This grouping allowed the inspectors to identify like materials within the facility to avoid over sampling or mischaracterization of an asbestos containing material.
The majority of the ACM samples were located utilizing non-destructive techniques. Some areas of ACM may still exist in areas that could not be accessed until complete interior demolition is completed.
Representative samples of each “suspect asbestos containing material” were collected utilizing approved federal and state methods. When samples were collected, the locations were noted. Measurements were taken to determine the approximate quantity of suspect material. The condition of the material was also documented at that time.
All material samples were analyzed via Polarized Light Microscopy (PLM) as per EPA/600R- 93-116, July 1993.
The analytical results and locations for all samples collected can be found in Appendix A.
2.
The samples were analyzed by EMSL Analytical of Cinnaminson, New Jersey. E M S L has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.
Asbestos is present if the material analyzed is greater than one percent (>1.0%) by weight.
This stipulation is outlined in the EPA Publication EPA 500/5-85-024, Section 2.2.2.2.
V. INSPECTION FINDINGS AND RECOMMENDATIONS
The laboratory identified a black mastic on the exterior concrete foundation. This black mastic was not identified during the inspection and therefore could not be quantified. If during the demolition process a black mastic is identified and rendered friable it should be handled and removed following all Local, State, and Federal regulations by a certified abatement contractor.
Asbestos containing materials are categorized as containing asbestos concentrations greater than one percent (>1.0%) by weight. Asbestos fiber concentrations less than one percent (<1.0%) by weight are still regulated under OSHA standard 1926.1101.
Below are the results of the building inspection. The results indicate the sample location, sample numbers, material and condition. Some of the materials were homogenized for sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire homogeneous material was classified as asbestos containing in accordance with Environmental Protection Agency Guidelines.
The conditions of the materials are designated as good, damaged or significantly damaged.
The following materials were found to contain more than one percent (>1.0%) asbestos by weight:
The laboratory identified a black mastic on the exterior concrete foundation. This black mastic was not identified during the inspection and therefore could not be quantified. If during the demolition process a black mastic is identified and rendered friable it should be handled and removed following all Local, State, and Federal regulations by a certified abatement contractor.
Analytical results for the materials sampled are located in Appendix A.
Friable materials are materials that can be crushed by applying hand pressure. Non-friable materials are materials that typically cannot be crushed by hand pressure (floor tiles/mastics). If grinding or pulverization were to occur during demolition, non-friable materials can be rendered friable.
Asbestos containing materials (friable and non-friable) located on the interior / exterior of a building, which will be disturbed during renovations / demolition, must be removed and disposed of by a licensed asbestos abatement contractor.
3.
VI. ASBESTOS CONTAINING MATERIAL ABATEMENT COSTS
As part of this report, cost estimates have been provided to help assist the Scranton Office of Economic and Community Development to evaluate the costs associated with a renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should independently verify the quantities of materials when preparing a cost estimate for removal.
The following applies:
The laboratory identified a black mastic on the exterior concrete foundation. This black mastic was not identified during the inspection and therefore could not be quantified. If during the demolition process a black mastic is identified and rendered friable it should be handled and removed following all Local, State, and Federal regulations by a certified abatement contractor.
VII. INSPECTION DISCLAIMER
Data and other information in this report are only valid for the prevailing conditions identified during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.
The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The burden for financial or health consequences for action or lack of action taken by the client or the client's agent is the responsibility of the client.
Dated : 11/22/2016 3:17:57 PM Page 7 of 11
4.
APPENDIX A
EMSL Analytical, Inc.
200 Route 130 North Cinnaminson, NJ 08077
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042518870EMSL Order:
Customer ID: QUAD30
Customer PO:
Project ID:
Attention: Phone:William Sterling (570) 829-4200
Fax:Quad 3 Group, Inc. (570) 829-0302
Received Date:37 N. Washington Street 09/19/2025 9:30 AM
Analysis Date:Wilkes Barre, PA 18701 09/22/2025
Collected Date: 09/12/2025
Project: 1409 Watson Street, Scranton
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
001-Concrete
042518870-0001
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior Foundation -
Concrete
001-Mastic
042518870-0001A
7% ChrysotileNon-fibrous (Other)93%Black
Non-Fibrous
Homogeneous
Exterior Foundation -
Concrete
001-Concrete 2
042518870-0001B
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior Foundation -
Concrete
002-Concrete
042518870-0002
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior Foundation -
Concrete
002-Mastic
042518870-0002A
Positive Stop (Not Analyzed)Exterior Foundation -
Concrete
002-Concrete 2
042518870-0002B
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior Foundation -
Concrete
Analyst(s)
Hunter Kelly (2)
Trinh Tran (3)
Samantha Sweeney, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 09/23/2025 02:16:46
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 9/23/2025 2:16 AM
APPENDIX B
PHOTOS
APPENDIX C
1016 STAFFORD AVENUE
SCRANTON, PA 18505
Mr. Andrew Conners
WILKES-BARRE, PENNSYLVANIA 18701
PROJECT # 13030.04.41
OCTOBER 2025
An Asbestos Containing Materials Inspection was conducted on June 13th, 2025 and reviewed on October 16th, 2025 within the planned demolition site located at 1016 Stafford Avenue, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.
materials were identified. A total of five (5) multiple layered bulk material samples were collected and analyzed.
Asbestos containing materials (ACM) were not identified on the accessible areas of the structure located at 1016 Stafford Avenue, Scranton, Pennsylvania asbestos include exterior foundation skim coat. Descriptions of all the material samples collected can be found in Appendix A.
presented in this report represent the conditions present at the time of the inspection. Quad
On June 13 th, 2025, a limited asbestos inspection was performed within 1016 Stafford Avenue, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, The property was comprised of a two story structure at 1016 Stafford Avenue. Access to the interior of the structure was limited at the time of the inspection due to structural concerns caused by collapsing foundations / stairs / roof in the front of the structure, and large amounts of debris blocking safe entrances / exits to the structure. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.
identify and locate asbestos containing materials and to group them into homogeneous
The samples were analyzed by EMSL Analytical Inc. of Cinnaminson New Jersey. EMSL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.
Asbestos containing materials have not been identified on the accessible areas of the structure.
sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:
ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE
AREAS OF THE STRUCTURE LOCATED AT 1016 STAFFORD AVENUE, SCRANTON,
PA.
renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should
ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE
AREAS OF THE STRUCTURE LOCATED AT 1016 STAFFORD AVENUE, SCRANTON,
PA.
during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.
The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042511815EMSL Order:
Customer ID: QUAD30
Customer PO:
Project ID:
Attention: Phone:William Sterling (570) 829-4200
Fax:Quad 3 Group, Inc. (570) 829-0302
Received Date:37 N. Washington Street 06/17/2025 9:05 AM
Analysis Date:Wilkes Barre, PA 18701 06/18/2025 - 06/19/2025
Collected Date: 06/13/2025
Project: 13030.04.35 1016 Stafford Ave
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
001-Skim Coat
042511815-0001
None DetectedNon-fibrous (Other)100%Gray/Tan/White
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
001-Concrete
042511815-0001A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
002-Skim Coat
042511815-0002
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
002-Concrete
042511815-0002A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
003-Skim Coat
042511815-0003
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
003-Concrete
042511815-0003A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
004-Skim Coat
042511815-0004
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
004-Concrete
042511815-0004A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
042511815-0005
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior - Concrete
Foundation Skim
Coat
Analyst(s)
Alex Francois (8)
Brett Teixeira (1)
Samantha Rundstrom, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 06/19/2025 15:30:26
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 6/19/2025 3:30 PM
734 THEODORE STREET
SCRANTON, PA 18508
WILKES-BARRE, PENNSYLVANIA 18701
PROJECT # 13030.04.42
An Asbestos Containing Materials Inspection was conducted on October 16th, 2025 within the planned demolition site located at 734 Theodore Street, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.
materials were identified. A total of two (2) multiple layered bulk material samples were collected and analyzed.
structure located at 734 Theodore Street, Scranton, Pennsylvania asbestos include exterior shingle siding. Descriptions of all the material samples collected can be found in Appendix A.
presented in this report represent the conditions present at the time of the inspection. Quad
On October 16 th, 2025, a limited asbestos inspection was performed within 734 Theodore Street, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, The property was comprised of a two story structure at 734 Theodore Street. Access to the interior of the structure was limited at the time of the inspection due to structural concerns caused by collapsing foundations and caved in basement supports as well as gross interior microbial growth. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.
identify and locate asbestos containing materials and to group them into homogeneous
The samples were analyzed by EMSL Analytical Inc. of Cinnaminson New Jersey. EMSL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:
AREAS OF THE STRUCTURE LOCATED AT 734 THEODORE STREET, SCRANTON, PA.
renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should
AREAS OF THE STRUCTURE LOCATED AT 734 THEODORE STREET, SCRANTON, PA.
during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.
The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042520896EMSL Order:
Customer ID: QUAD30
Customer PO:
Project ID:
Attention: Phone:William Sterling (570) 829-4200
Fax:Quad 3 Group, Inc. (570) 829-0302
Received Date:37 N. Washington Street 10/17/2025 9:20 AM
Analysis Date:Wilkes Barre, PA 18701 10/18/2025
Collected Date: 10/16/2025
Project: 734 Theodore Street
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
001-Shingle
042520896-0001
None DetectedNon-fibrous (Other)90%Cellulose10%Black
Fibrous
Homogeneous
Exterior Shingle
Siding - Shingle
Siding
001-Insulation
042520896-0001A
None DetectedNon-fibrous (Other)10%Cellulose90%Gray/Tan
Fibrous
Homogeneous
Exterior Shingle
Siding - Insulation
002-Shingle
042520896-0002
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Exterior Shingle
Siding - Shingle
Siding
002-Insulation
042520896-0002A
None DetectedNon-fibrous (Other)20%Cellulose80%Tan
Fibrous
Homogeneous
Exterior Shingle
Siding - Insulation
Analyst(s)
Brian Napper II (2)
Jannat Fareen (2)
Samantha Sweeney, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 10/18/2025 14:28:37
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 10/18/2025 2:28 PM
221 WHEELER AVENUE
SCRANTON, PA 18510
WILKES-BARRE, PENNSYLVANIA 18701
PROJECT # 13030.04.43
An Asbestos Containing Materials Inspection was conducted on October 16th, 2025 within the planned demolition site located at 221 Wheeler Avenue, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the garage structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the materials were identified. A total of two (2) bulk material samples were collected and analyzed.
garage structure located at 801 South Webster Avenue, Scranton, Pennsylvania asbestos include exterior shingle roofing. Descriptions of all the material samples collected can be found in Appendix A.
presented in this report represent the conditions present at the time of the inspection. Quad
On October 16 th, 2025, a limited asbestos inspection was performed within garage located at 221 Wheeler Avenue, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey / inspection process included:
The property was comprised of a single story garage structure at 221 Wheeler Avenue.
The interior of the structure offered very limited access at the time of the inspection due to unknown structural concerns caused by the collapsing roof of the garage structure. The Inspection was limited to the accessible areas of the exterior of the structure. Major structural components include concrete, brick, stone, block, and wood. Two cars are located within the collapsing structure.
identify and locate asbestos containing materials and to group them into homogeneous
The samples were analyzed by EMSL Analytical, Inc. of Cinniminson, New Jersey. EMSL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP. EMSL has developed and implemented an intra sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:
ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE
AREAS OF THE GARAGE STRUCTURE LOCATED AT 221 WHEELER AVENUE,
SCRANTON, PA.
renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should
AREAS OF THE GARAGE STRUCTURE LOCATED AT 221 WHEELER AVENUE,
SCRANTON, PA.
during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.
The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042520919EMSL Order:
Customer ID: QUAD30
Customer PO:
Project ID:
Attention: Phone:William Sterling (570) 829-4200
Fax:Quad 3 Group, Inc. (570) 829-0302
Received Date:37 N. Washington Street 10/17/2025 9:00 AM
Analysis Date:Wilkes Barre, PA 18701 10/18/2025
Collected Date: 10/16/2025
Project: 221 Wheeler Ave Garage
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
042520919-0001
None DetectedNon-fibrous (Other)85%Cellulose15%Black
Fibrous
Homogeneous
Exterior Roof -
Shingle Material
042520919-0002
None DetectedNon-fibrous (Other)75%Cellulose25%Black
Fibrous
Homogeneous
Exterior Roof -
Shingle Material
Analyst(s)
Brian Napper II (1)
Jannat Fareen (1)
Samantha Sweeney, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 10/18/2025 14:31:28
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 10/18/2025 2:31 PM
BID FORM – STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113
SECTION 004113 – BID FORM
TO: City of Scranton FROM:
Office of Community Development
340 N. Washington Avenue Bidder’s Name
Address
Phone Number
Email Address
State of Incorporation
I, the undersigned, having familiarized (him/herself) (itself) (themselves) with the existing conditions of the project areas affecting the cost of the work and with the "Contract Documents,” including the Agreement on file in the office of the Engineer, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment and services, including utility, transportation services, and traffic control, required to perform and complete this contract, all in accordance with the Contract Documents, including addenda (if required), for the following lump sum prices.
In submitting this Bid, Bidder represents, as more fully set forth in the agreement, that Bidder has examined and carefully studied the Bidding Documents and Drawings and has observed the site conditions.
Contractor shall be completely familiarized with all contract documents. By submitting a cost proposal to complete the work, the contractor represents that they are familiar with the conditions under which the work will be performed.
BASE BID – NO. 1 “221 WHEELER AVENUE GARAGE”:
To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris, including junk vehicles, at 221 Wheeler Avenue (Garage), Scranton, PA 18510; for the sum of:
___________________________________________________Dollars $___________________________
(written) (numbers)
BASE BID – NO. 2 “734 THEODORE STREET”:
To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 734 Theodore Street, Scranton, PA 18508; for the sum of:
__________________________________________________Dollars $____________________________
BASE BID – NO. 3 “1409 WATSON STREET”:
To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 1409 Watson Street, Scranton, PA 18504, Scranton, PA; for the sum of:
_________________________________________________Dollars $______________________________
BASE BID – NO. 4 “1016 STAFFORD AVENUE”:
To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 1016 Stafford Avenue, Scranton, PA 18505, Scranton, PA; for the sum of:
_________________________________________________Dollars $______________________________
I hereby acknowledge receipt of:
Addendum No._________dated______________ Addendum No._________dated______________ Addendum No._________dated______________
The Owner retains the right to award any or all of the Base Bids based upon the best interest of the Owner.
Signature:
Title:
Date:
Sealed Bids due via the City of Scranton’s OpenGov Procurement, on or before the date and time set forth in the Advertisement. Bids must be firm for 60 days from the date due for receipt of bids.
mcalvert Pen
BID SUBMITTAL CHECKLIST 004597
SECTION 004597 – BID SUBMISSION
The following represents a list of those documents and materials, which will be required in connection with the project. Certain items will be required at the time of the bid submission; failure to submit them will render the bid nonresponsive, which may result in the rejection of the bid by the Owner in accordance with
Pennsylvania law; other items will be required after award of the contract but no later than time set for the contract execution. Specific review should be made of bidding documents contained in the Project Manual to ascertain what those documents are and when they are required to be submitted.
Submissions required with the bid:
- Bid Form (via opengov procurement)
- Bid Bond
- Contactor’s Qualification Statement
- Consent of Surety
- Non-Collusion Affidavit
- Verification of Contractor Eligibility Form
- Additional requirements listed on (via opengov procurement)
Once again, this reminder list is submitted to the bidders strictly as courtesy and is not to be binding on the
Owner. Responsibility for ascertaining and submitting the documents needed for consideration of the bid, and at appropriate time, falls upon each and every bidder.
How to Submit:
a) Upload bids to the opengov procurement site.
When to Submit:
- All submissions are due in the drop box by the date and time listed in the advertisement.:
- All on-time submissions will be opened by the City of Scranton Controller in the City of Scranton
Council Chambers.
Provide a copy of any checks or bid bonds in the uploaded submission.
CONTRACT BETWEEN THE OFFICE OF ECONOMIC AND COMMUNITY
DEVELOPMENT OF THE CITY OF SCRANTON AND CONTRACTOR TO
PROVIDE CONSTRUCTION SERVICES FOR THE PROJECT
This CONTRACT is entered into this ____ day of __________, 2025, for the construction services for the Project within the City of Scranton, by and between the OFFICE of
COMMUNITY and ECONOMIC DEVELOPMENT of the CITY of SCRANTON, 340 N.
Washington Avenue, Scranton, PA 18503 (“City”) and ______________ (“Contractor”).
WHEREAS, the City entered into a __________ Grant Contract with the Commonwealth of Pennsylvania Commonwealth Financing Authority on or about _____, wherein the City received
__________ to be used in accordance with the terms and conditions set forth within said contract;
WHEREAS, now wishes to use said funds towards a project and requires the Contractor to perform certain work and services in accordance with the terms and conditions hereinafter set forth;
WHEREAS the City sought bids for the work and services to be performed by the
Contractor;
WHEREAS the Contractor was the successful bidder and has demonstrated that it is ready, willing, and able to perform such work and services;
NOW THEREFORE, in consideration of the promises contained herein, the parties do agree and intend to be legally bound as follows:
ARTICLE 1 – SCOPE OF WORK AND SERVICES
1) Contractor shall perform all the necessary services provided under this Agreement in connection with and respecting the following project:
2) To furnish the OECD with:
All services and agrees to render and provide work, labor and/or materials to be completed as set forth in the Bid Proposal and/or Bid Specifications, Project Manual, Blueprints and/or
Addendum(s) which are all attached hereto, made a part hereof, and are incorporated herein by reference jointly as Exhibit “A”. The Bid Proposal and/or Bid Specifications, Project Manual, Blueprints and/or Addendum(s) define specifically the services to be provided by the
CONTRACTOR.
ARTICLE 2 – COMPENSATION
OECD shall pay the CONTRACTOR upon submission and review of invoices, compensation in an amount not to exceed _____________ for the construction services including concrete curbing, concrete sidewalks and paving contemplated in the Bid Proposal and Bid
Specifications. Such amounts reference the lowest responsible bid received from the CONTRACTOR in accordance with the Bids received on or before _________________. When submitting invoices to OECD, refer to project at _______________________.
The CONTRACTOR shall not submit additional invoices for additional compensation without first receiving prior written approval of additional scope of work beyond this agreement from the City of Scranton’s (OECD) representative. This prior written approval shall be required as documentation for a Change Order that must be approved by all parties.
ARTICLE 3: TIME OF PERFORMANCE
The services of the CONTRACTOR shall be undertaken and completed in such sequence as to assure expeditious completion in the light of the purposes of this Agreement. Performance of services by CONTRACTOR shall commence within thirty (30) days of signing this Agreement. All performance of services shall be completed within ninety (90) days of commencement. Reasonable extensions may be granted by the City as needed. Failure to complete the project within the reasonable timeframe agreed is in violation of the Agreement. Beyond that time Liquidated Damages will apply at the Value of $150.00 per day.
ARTICLE 4: CONDITION PRECEDENT
As a condition precedent to the execution of this Contract the CONTRACTOR must comply with the Pennsylvania Public Works Contractor's Bond Law of 1967, 8 P.S. § 191 and deliver to OECD its Performance Bond and Payment Bond for materials and labor each in the amount of one hundred percent (100%) of the Agreement.
ARTICLE 5: NON-DISCRIMINATION CLAUSE
The CONTRACTOR may not, under any program or activity to which the regulations of this part may apply, directly or through contractual or other arrangements, on the grounds of race, color, national origin, or sex:
A. Deny any individual any facilities, services, financial aid, or other benefits provided under the program or activity.
B. Provide any facilities, services, financial aid, or other benefits which are different than those provided to others under the program or activity.
C. Subject any individual to segregated or separate treatment in any facility, or in any matter of process related to receipt of any service or benefit under the program or activity.
D. Restrict any individual in any way in access to, or in the enjoyment of, any advantage or privilege enjoyed by others in connection with facilities, services, financial aid or other benefits under the program or activity.
E. Treat any individual differently from others in determining whether the individual satisfies any admission, enrollment, eligibility, membership, or other requirement or condition which the individual must meet in order to be provided any facilities, services or other benefit provided under the program or activity.
F. Deny any individual an opportunity to participate in a program or activity as an employee.
The CONTRACTOR may not use criteria or methods of administration which have the effect of subjecting persons to discrimination on the basis of race, color, national origin, or sex, or have the effect of defeating or substantially impairing accomplishment of the objectives of the program or activity with respect to persons of a particular race, color, national origin, or sex.
The CITY may cancel or terminate this Agreement and all money due or to become due under this Agreement may be forfeited for a violation of the terms and conditions of this
Nondiscrimination/Sexual Harassment Clause.
ARTICLE 6: INSURANCE & LIABILITY
A. Indemnification. The CONTRACTOR shall indemnify, defend and hold harmless OECD and the City of Scranton and the COMMONWEALTH FINANCING AUTHORITY from all claims, liabilities, suits or action at law or equity of any kind whatsoever arising out of, connected with or caused by any operation or matter relating to the project because of any act of omission, neglect or misconduct of the CONTRACTOR, including among other things, injury to property and injury to and sickness and death of each and every person or persons whatsoever, including without limitations , members of the public and employees of the CONTRACTOR or any Sub-Contractor.
B. Public Liability and Property Damage Insurance. The CONTRACTOR shall take out and maintain during the life of this Agreement such public claims for damages for personal injury, including accidental death as well as from claims for property damages, which may arise from operations connected with or caused by any operation or matter related to this Agreement, whether such operations be by the CONTRACTOR or by anyone directly or indirectly employed by any of them. Said insurance shall also cover as additional insured the indemnity liability of OECD, the City of Scranton, and the COMMONWEALTH FINANCING AUTHORITY, as their interests are present.
C. CONTRACTOR represents that it now carries, and agrees it will continue during the term of this Contract to carry, at a minimum: Worker’s Compensation, Comprehensive General and Contractual Liability and Professional Liability Insurance in the following amounts:
TYPE OF INSURANCE LIMITS OF LIABILITY
Worker’s Compensation Statutory
Employer’s Liability $500,000.00/per incident/$500,000 per employee $500,000 policy limit
Professional Liability $1,000.000 each occurrence $1,000,000 aggregate
Comprehensive General Liability (including Blanket Contractual Liability Insurance)
Bodily Injury $1,000,000 each person
$1,000,000 each occurrence
$2,000,000 aggregate
Property Damage $ 500,000 each occurrence
Personal Injury $ 500,000
Comprehensive Automobile Liability:
Bodily Injury $500,000 each person
$500,000 each occurrence
Property Damage $ 1,000,000 each occurrence
Umbrella Policy $1,000,000 per occurrence/ $1,000,000 aggregate
D. Certificates of all insurance provided by the CONTRACTOR shall be available for OECD’s review and will be furnished to OECD if requested.