This document is a sealed set of technical drawings and specifications for the City of Roswell Water Treatment Plant (WTP) project. The construction project involves site preparation, erosion control, grading, utility installation, and the construction of concrete infrastructure including sidewalks, stairs, and a retaining curb system at the WTP facility located at 70 Mansell Court, Suite 200, Roswell, Georgia 30076. The project encompasses approximately 1,200 square feet of disturbance area (0.03 acres) and includes two alternate bid items: concrete stairs with handrail and a six-inch thick concrete sidewalk. Key site features identified in the drawings include the operations control building, chemical storage and unloading areas, flocculation/sedimentation basins, clearwell, high service pump station, lime building, and various stormwater management features including bioretention areas and porous paver sections. The general contractor is responsible for site demolition, utility coordination, field verification of existing utility locations and depths, compaction testing, erosion and sediment control implementation, and final grading and sodding of disturbed areas.

The technical specifications require 100 percent compaction of Standard Proctor per ASTM D-698 with field testing coordination by the geotechnical engineer, concrete treatment with Aquron or approved equivalent on all exposed concrete surfaces, and adherence to National Electrical Code standards for grounding systems and electrical installations. The contractor must verify clearances around existing electrical equipment, confirm water line depth and location to ensure a minimum of 3.0 feet clearance from proposed pad bottoms, and maintain existing drainage patterns. All concrete sidewalks must be four inches thick and broom finished with expansion joints at 60-foot intervals, and all disturbed areas must be sodded or hydroseeded. The document specifies that proposed and existing utility locations are schematic only and exact locations shall be determined during coordination with utility companies and field verification at groundbreak.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPERATIONS

CONTROL BLDG

CHEMICAL

UNLOADING AREA

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

FLOCCULATION/

SEDIMENTATION

BASINS

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

WRD YARD

BIORETENTION-F

BIORETENTION-D

POROUS PAVER-E

POROUS PAVER-C

FUTURE

BACKWASH

EQUALIZATION

HIGH

SERVICE

PUMP

STATION

OPERATIONS

CONTROL BLDG

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

HIGH

SERVICE

PUMP

STATION

COMPOST FILTER SOCKS

(SEE DETAIL THIS SHEET)

GC TO POT-HOLE FOR EXISTING WATER LINE

AND CONFIRM DEPTH AND LOCATION (SEE

C-4.0) PROTECT LINE DURING DEMO &

CONSTRUCTION

LO

D

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LO

D

LOD

LOD

LOD

LODLOD

LO

D

LOD

LIMITS OF DISTURBANCE

(1,200 S.F.) ±0.03 ACRES

PROTECT EXISTING STRUCTURE

AND CONDUIT DURING DEMO

AND CONSTRUCTION

ALL DISTURBED AREAS

TO BE SODDED

EX. EYE WASH STATION TO BE RELOCATED

IF STAIRS (ALTERNATE BID - SEE SITE PLAN)

ARE DESIRED.

N 10 105 0

1" = 10'

C-1.0

EROSION CONTROL PLAN

1" = 10'

C-1.0

LOCATION MAP

1" = 100'

SEE DETAIL THIS SHEET

CHEMICAL

BUILDING

OPERATIONS

BUILDING

GATED

ENTRANCE

EROSION CONTROL

C-1.0

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

EROSION AND SEDIMENT CONTROL

COMPOST FILTER SOCK

C-1.0

COMPOST FILTER SOCK DETAIL

NOT TO SCALE

CONTROL BLDG

CHEMICAL

UNLOADING AREA

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

FLOCCULATION/

SEDIMENTATION

BASINS

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

WRD YARD

BIORETENTION-F

BIORETENTION-D

POROUS PAVER-E

POROUS PAVER-C

FUTURE

BACKWASH

EQUALIZATION

HIGH

SERVICE

PUMP

STATION

OPERATIONS

CONTROL BLDG

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

HIGH

SERVICE

PUMP

STATION

30'-0"

14'-7"

5'-10" E

PROPOSED GENERATOR

(SEE ELECTRICAL DWG'S

& MANUFACTURER SPECS)

PROPOSED LOAD BANK

(SEE ELECTRICAL DWG'S

& MANUFACTURER SPECS)

8" WIDE CONCRETE RETAINING CURB

(SEE STRUCTURAL DWG'S &

C-3.0 FOR GRADING INFO)

36'-6"

CONCRETE STAIRS W/ HANDRAIL

(SEE DETAIL THIS SHEET)

TO BE BID AS ALTERNATE

6" THK. CONCRETE SIDEWALK

(SEE DETAIL THIS SHEET)

TO BE BID AS ALTERNATE

EX. ELECTRICAL BOX TO REMAIN

GC TO VERIFY CLEARANCES AND

USE CAUTION DURING EXCAVATION

NOT TO DISTURB STRUCTURE. CONTACT

ENGINEER W/ ANY DISCREPANCIES.

3.0'3.0'

3.0'

SITE PLAN

C-2.0

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

C-2.0

SITE PLAN

1" = 10'

C-2.0

LOCATION MAP

1" = 100'

SEE DETAIL THIS SHEET

CHEMICAL

BUILDING

OPERATIONS

BUILDING

GATED

ENTRANCE

N 10 105 0

1" = 10'

R1"

6" ADJUST THIS DIMENSION FOR

EVEN TILE OR PAVER COURSE 6"

VARIES - SEE SITE PLANS

10"

4"

2"

4" 4,000 PSI CONC.

W/ FIBERMESH

PLAN VIEW

SECTION VIEW

EXPANSION JOINT AT 60' INTERVALS

2" BITUMINOUS MATERIALS

C-2.0

CONCRETE SIDEWALK DETAIL

NOT TO SCALE

#3 NOSING BAR (TYP.)

DRILL AND EPOXY #4 x

1'-6" LONG @ 12" W/

6" MIN. EMBED. INTO

SIDEWALK SLAB (TYP.)

1"

CONCRETE STOOP

STAINLESS STEEL

HANDRAIL

2" O.D. STEEL PIPE

RAIL

1'-0"

1'-6"

STAIR HANDRAIL DETAIL

T/SLAB

12"

VARIES - SEE SITE PLANS

36"

1'-0"

RETURN

6" RISE

CONCRETE

SIDEWALK

T/SLAB

#4 @ 12" O.C.

EACH WAY

1'-4"

C-2.0

CONCRETE STAIRS W/ HANDRAIL DETAIL

NOT TO SCALE

TO BE BID AS ALTERNATE

GENERAL NOTES:

1. PROPOSED AND EXISTING UTILITIES ARE SHOWN IN SCHEMATIC

ONLY. EXACT LOCATIONS SHALL BE DETERMINED TO ALLOW FOR

THE MOST ECONOMICAL INSTALLATION.

2. THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITY

COMPANIES TO DETERMINE EXACT POINT OF SERVICE

CONNECTION AT EXISTING UTILITY. REFER TO THE BUILDING

ELECTRICAL AND PLUMBING DRAWINGS FOR UTILITY SERVICE

ENTRANCE LOCATIONS, SIZED, AND CIRCUITING.

3. ALL ELEVATIONS SHOWN ARE FROM PROPOSED LINEWORK

PROVIDED BY THE TENANT AND MUST BE VERIFIED BY THE

GENERAL CONTRACTOR AT GROUNDBREAK.

4. FINISH WALK AND CURB ELEVATIONS SHALL BE 6" ABOVE FINISH

PAVEMENT, UNLESS OTHERWISE NOTED.

5. ALL LANDSCAPE AREAS SHALL BE ROUGH GRADED TO 6" BELOW

TOP OF ALL WALKS AND CURBS. FINISH GRADING,

LANDSCAPING, AND SPRINKLER SYSTEMS ARE BY THE

OWNER/OPERATOR.

6. ALL CONCRETE SIDEWALKS TO BE 4" THICK AND BROOM FINISHED.

7. BASES, ANCHOR BOLTS, CONDUIT, AND WIRING FOR ALL OTHER

SIGNS ARE BY THE GENERAL CONTRACTOR.

8. ALL EXPOSED CONCRETE CORNERS TO BE CHAMFERED AND/OR

TO HAVE RADII.

9. ALL EXPOSED CONCRETE CURBS, SIDEWALK, SLABS, PAVEMENT

AND FOUNDATIONS SHALL BE TREATED WITH AN AQURON

CONCRETE TREATMENT AS MANUFACTURED BY AQURON OR

APPROVED EQUIVALENT.

10. THE COMPACTION REQUIREMENTS FOR ALL FILL MATERIAL(S)

PALCED ANYWHERE ON PROPERTY SHALL BE 100% OF THE

STANDARD PROCTOR (ASTM D-698) PER GEOTECHNICAL REPORT.

GC IS RESPONSIBLE FOR FIELD TESTING COMPACTION AND

COORDINATING WITH THE GEOTECHNICAL ENGINEER.

11. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF

ANY REMAINING SITE IMPROVEMENTS PRIOR TO CONSTRUCTION.

12. ALL JOINTS WHERE NEW PAVEMENT ADJOINS EXISTING PAVEMENT

SHALL BE SAW CUT, TO INSURE A STRAIGHT CLEAN LINE, OR WILL

BE CARRIED TO THE NEXT EXPANSION JOINT ON DOT R.O.W.

WHERE FEASIBLE.

13. ALL CURB RADII 5' UNLESS NOTED OTHERWISE.

14. ALL CURB FACES AND PAVEMENT ELEVATIONS SHALL MATCH

ADJOINING CURBING AND PAVEMENT EXACTLY.

15. STABILIZE AND GRASS ALL SLOPES TO PREVENT EROSION, AND

SOD OR HYDRO-SEED SLOPES OVER 2:1 UNLESS OTHERWISE

SPECIFIED. SEE GRADING PLAN.

16. CONTRACTOR TO USE TOPOGRAPHIC SURVEY IN CONJUNCTION

WITH THIS SITE PLAN FOR LOCATION AND SIZES OF EXISTING

FEATURES.

CONTROL BLDG

CHEMICAL

UNLOADING AREA

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

FLOCCULATION/

SEDIMENTATION

BASINS

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

WRD YARD

BIORETENTION-F

BIORETENTION-D

POROUS PAVER-E

POROUS PAVER-C

FUTURE

BACKWASH

EQUALIZATION

HIGH

SERVICE

PUMP

STATION

OPERATIONS

CONTROL BLDG

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

HIGH

SERVICE

PUMP

STATION

FFE 1008.5

FFE 1011.50

FFE 1008

BTM 1000.50

1008.42 MAINTAIN EXISTING DRAINAGE

PATTERN DIVERTING FLOWS AROUND

PROPOSED RETAINING CURB

EXTEND CURB UNTIL SMOOTH

TRANSITION IN GRADE IS

ACCOMPLISHED

TC:±1007.00

PAD:1006.12

TC:±1006.42

PAD:1006.12

1007.80

1007.92 1007.42

1006.85

PAD:

1006.00

PAD:

1006.00

E

1006.35

1007.35

1007.42

GRADING PLAN

C-3.0

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

C-3.0

GRADING PLAN

1" = 10'

C-3.0

LOCATION MAP

1" = 100'

SEE DETAIL THIS SHEET

CHEMICAL

BUILDING

OPERATIONS

BUILDING

GATED

ENTRANCE

N 10 105 0

1" = 10'

CONTROL BLDG

CHEMICAL

UNLOADING AREA

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

FLOCCULATION/

SEDIMENTATION

BASINS

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

WRD YARD

BIORETENTION-F

BIORETENTION-D

POROUS PAVER-E

POROUS PAVER-C

FUTURE

BACKWASH

EQUALIZATION

HIGH

SERVICE

PUMP

STATION

OPERATIONS

CONTROL BLDG

CHEMICAL

STORAGE

CHEMICAL/FUEL

UNLOADING AREA

CLEARWELL

CHEMICAL

BUILDING

LIME

BUILDING

HIGH

SERVICE

PUMP

STATION PLAN

CLEARWELL

LIME

BUILDING

F-501-05

CP202

PLAN

D-101-90

FILTER

CU501

HIGH SERVICE

±4.0'

CLEARANCE TO BE

VERIFIED IN FIELD

EXISTING WATER LINE DEPTH TO

BE FIELD VERIFIED. CONFIRM DEPTH

IS GREATER THAN 3.0' FROM

PROPOSED PAD BOTTOM

UNDERGROUND ELECTRICAL CONDUIT

TO EXISTING TERMINALS TO BLDG

(SEE ELECTRICAL DWG'S)

E

UTILITY PLAN

C-4.0

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

C-4.0

UTILITY PLAN

1" = 10'

C-4.0

LOCATION MAP

1" = 100'

SEE DETAIL THIS SHEET

CHEMICAL

BUILDING

OPERATIONS

BUILDING

GATED

ENTRANCE

N 10 105 0

1" = 10'

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4 an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4 an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

¾”

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

E

Michael Oduselu axisCompanies846676GA.cdr

EE

E

E

E

M an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4 an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

ARC FLASH

an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

INTERSYSTEM BONDING TERMINATION

BUS, PER NEC 250.94, BONDED WITH

MINIMUM #6 AWG CU.

HAND HOLE FOR

INSPECTION.

FINISHED GRADE

GROUND CLAMP ON EFFECTIVELY

GROUNDED METALLIC WATER MAIN, PER

N.E.C. ART. 250-52.A.1

GROUND BUS

HAND HOLE FOR

INSPECTION.

BOLTED TYPE CONNECTION OR

EXOTHERMIC WELD.

NONMETALLIC PROTECTIVE SLEEVE

GROUNDING ELECTRODES SHALL BE PROVIDED IN ACCORDANCE WITH

NEC SECTION 250. ALL GROUNDING ELECTRODE CONDUCTORS SIZED AS

INDICATED ON POWER RISER DIAGRAM. ALL METHODS OF CREATING THE

GROUNDING SYSTEM MAY NOT BE REQUIRED OR AVAILABLE.

20' MIN.

3/4"Ø X 8'-0" MIN.

CU GROUND

ROD DRIVEN TO

±6" BELOW

FINISH GRADE.

GROUNDING ELECTRODE CONDUCTORS SIZED

AS INDICATED ON POWER RISER DIAGRAM.

SERVICE ENTRANCE EQUIP.

NEUTRAL BUS

EXOTHERMIC WELD TO EFFECTIVELY

GROUNDED BUILDING STEEL WHERE

AVAILABLE, PER N.E.C. ART. 250-52.A.2

CONCRETE ENCASED ELECTRODE PER

N.E.C. ART. 250-52.A.3. 1/2" REBAR OR #4

BARE COPPER (MINIMUM).

an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

M

ATCH LINE - SEE SHEET

E2.2 an se ll Ct

St e.

Ro sw el l, Ge or gi a

Ph on e:

.3

.4

Scale: NTS

MCC-5 FRONT ELEVATION

M

AT

CH

L

IN

E

- S

EE

S

HE

ET

E2

.1

Scale: NTS

SB-5 FRONT ELEVATION