About this file

This is a test hole report sheet prepared by VacX Utility Coordination Services documenting subsurface utility investigations conducted for the City of Beaverton on July 17-18, 2025, along SW Hart Road and at the intersection of SW Hart Road and SW Sorrento Road. The document contains seven detailed test hole reports (TH #ZP-1 through TH #ZP-7) identifying the locations, depths, and specifications of underground utilities including Ziply Fiber communications concrete encasements, NW Natural gas lines, and City of Beaverton water infrastructure. The investigations document pavement core thicknesses ranging from 6 to 9 inches of asphalt concrete, utility cover depths, and horizontal/vertical distance measurements from established reference points. All pothole investigations were completed in mid-July 2025 in support of CIP 4211, the SW Hart Road Traffic Circle Public Waterline Improvements project, which involves installation of approximately 1,800 linear feet of zinc-coated ductile iron potable water pipe in sizes ranging from 4 to 12 inches. No utility tell-tales were set during any of the test holes, and all measurements were documented with elevation data referenced to storm crossing points. The work was prepared by Jason Jones from VacX, with contact information provided for utility coordination services.

The test hole data provides essential subsurface information necessary for the safe execution of waterline installation work along SW Hart Road. These utility locates identify existing communications infrastructure, gas lines, and water utilities that contractors must avoid or coordinate around during construction activities. The pothole investigations document specific depths and locations where utilities cross the project alignment, with particular complexity noted at test hole ZP-5, located at the intersection of SW Hart Road and SW Sorrento Road, where multiple utilities (communications, gas, and water) converge. The documentation indicates that some pothole locations were relocated in the field based on the locates conducted, reflecting adjustments made during the planning phase. This utility coordination information is critical for contractors bidding on or executing the CIP 4211 waterline improvements project, as it informs traffic control planning, excavation sequencing, and coordination requirements with existing utility operators.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TH # ZP-1

VacX # V25-11092 Utility Owner/operator: Ziply Fiber

Customer: Ziply Fiber Utility type: Comm, Concrete Encasement.

Date: 7/17/2025 Pothole Location: SW Hart Rd, Beaverton.

Pvmt. Core

Thickness: 8" A.C Concrete. Est Ht: 2.25 ft Remarks: P.K is 2.00 ft South of North curbface.

Set utility tell-tale? NO Est width: Unknown. We found the North edge of the encasement. All

6.50' South of VacX P.K. measurements were taken from the North edge.

Sketch apparent X-section of structure:

Approximate station location: 2+47 Lt

-3.47 ft.

(Est) -5.72 ft.

0.03

-3.50 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

3.95 7.42 -3.47 2.00 7.42 -5.42 216.39 214.47 210.97

Rod Grnd Rod Util. Dist.

3.92 7.42 -3.50

Vertical dist P.K to grnd surface:

X-section looking WEST Cover depth over utility:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set at 90 degrees to utility.

Vertical dist P.K to top of utility:

Util. material:

Horiz dist P.K to util. structure:

SW Hart Rd C/L.

VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement.

Runs E/W.

#ZP-1 - Concrete Encasement Communications.

Runs E/W.

VacX P.K

Facing South.Facing South.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105

(541) 517-0754 Cell Email: JJ@Vacx.com

TH # ZP-3

VacX # V25-11092 Utility Owner/operator: Ziply Fiber

Customer: Ziply Fiber Utility type: Comm, Concrete Encasement.

Date: 7/17/2025 Pothole Location: SW Hart Rd, Beaverton.

Pvmt. Core

Thickness: 7" A.C Concrete. Est Ht: 2.20 ft Remarks: P.K is 2.00 ft South of North curbface.

Set utility tell-tale? NO Est width: Unknown. We found the South edge of the encasement. All

2.55' South of VacX P.K. measurements were taken from the South edge.

Sketch apparent X-section of structure:

Approximate station location: 2+68 Lt

-3.36 ft.

(Est) -5.56 ft.

0.09

-3.45 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

2.87 6.23 -3.36 2.00 6.23 -4.23 216.39 215.61 212.16

Rod Grnd Rod Util. Dist.

2.78 6.23 -3.45

Horiz dist P.K to util. structure:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set at 90 degrees to utility.

Vertical dist P.K to top of utility:

Util. material:

Vertical dist P.K to grnd surface:

X-section looking WEST Cover depth over utility:

SW Hart Rd C/L.

VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement.

Runs E/W.

#ZP-3 - Concrete Encasement Communications.

Runs E/W.

VacX P.K

Facing South.Facing South.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105

TH # ZP-4

VacX # V25-11092 Utility Owner/operator: Ziply Fiber

Customer: Ziply Fiber Utility type: Comm, Concrete Encasement.

Date: 7/17/2025 Pothole Location: SW Hart Rd, Beaverton.

Pvmt. Core

Thickness: 9" A.C Concrete. Est Ht: Unknown. Remarks: P.K is 2.00 ft North of South curbface.

Set utility tell-tale? NO Est width: Unknown. We found the South edge of the encasement. All

6.30' South of VacX P.K. measurements were taken from the South edge.

Sketch apparent X-section of structure:

We were told we just needed

Approximate station location: 2+41 Rt the top on this one.

-2.24 ft.

(Est) Unknown ft.

0.21

-2.45 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

4.52 6.76 -2.24 2.00 6.76 -4.76 216.39 214.08 211.63

Rod Grnd Rod Util. Dist.

4.31 6.76 -2.45

Vertical dist P.K to grnd surface:

X-section looking WEST Cover depth over utility:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set at 90 degrees to utility.

Vertical dist P.K to top of utility:

Util. material:

Horiz dist P.K to util. structure:

SW Hart Rd C/L.VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement.

Runs E/W.

#ZP-4 - Concrete Encasement Communications.

Runs E/W.

VacX P.K

Facing North.Facing North.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105

TH # ZP-5

Utility Owner/operator: Ziply Fiber/NW Natural/COB

VacX # V25-11092 Utility type: Comm, Concrete Encasement.

Customer: Ziply Fiber Gas, 2" Epoxy Steel.

Date: 7/18/2025 Water, 4" Cast Iron.

Pothole Location: SW Hart Rd & Sorrento, Beaverton.

Pvmt. Core

Thickness: 6" A.C Concrete. Est Ht: 3.45 ft Remarks: P.K is inline with North curbline of SW Hart Rd.

Set utility tell-tale? NO Est width: Unknown. We found the South edge of the encasement. All

7.40' South of VacX P.K. measurements were taken from the South edge.

Sketch apparent X-section of structure:

Potholes were relocated

Approximate station location: 3+35 in the field based on the locates.

-4.96 ft.

(Est) -8.41 ft.

Vertical dist P.K to top of 2" Gas= -3.29 ft

0.12 Vertical dist P.K to top of 4" Water= -4.16 ft

Vertical dist P.K to top of Encasement= -4.96 ft

-5.08 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

3.99 8.95 -4.96 2.00 8.95 -6.95 216.39 214.52 209.44

Rod Grnd Rod Util. Dist.

3.87 8.95 -5.08

Vertical dist P.K to grnd surface:

X-section looking EAST Cover depth over utility:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set inline with 2" Gas line.

Vertical dist P.K to top of utility:

Util. material:

Horiz dist P.K to util. structure:

SW Hart Rd C/L.

VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement. Runs N/S.

Gas, 2" Epoxy Steel. Runs N/S.

Water, 4" Cast Iron. Runs E/W.

#ZP-5 - Concrete Encasement Communications. Runs N/S.

2" Epoxy Steel Gas. Runs N/S.

4" Cast Iron Water. Euns E/W.

VacX P.K

Facing South.Facing South.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105

TH # ZP-6

VacX # V25-11092 Utility Owner/operator: Ziply Fiber

Customer: Ziply Fiber Utility type: Comm, Concrete Encasement.

Date: 7/17/2025 Pothole Location: SW Hart Rd, Beaverton.

Pvmt. Core

Thickness: 9" A.C Concrete. Est Ht: 3.00 ft Remarks: P.K is 2.00 ft South of North curbface.

Set utility tell-tale? NO Est width: Unknown. We found the South edge of the encasement. All

13.60' South of VacX P.K. measurements were taken from the South edge.

Sketch apparent X-section of structure:

ZP-6 was moved to fit field

Approximate station location: 2+67 conditions.

-3.58 ft.

(Est) -6.58 ft.

-0.03

-3.55 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

3.00 6.58 -3.58 2.00 6.58 -4.58 216.39 215.36 211.81

Rod Grnd Rod Util. Dist.

3.03 6.58 -3.55

Vertical dist P.K to grnd surface:

X-section looking WEST Cover depth over utility:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set at 90 degrees to utility.

Vertical dist P.K to top of utility:

Util. material:

Horiz dist P.K to util. structure:

SW Hart Rd C/L.

VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement.

Runs E/W.

#ZP-6 - Concrete Encasement Communications.

Runs E/W.

VacX P.K

Facing South.Facing South.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105

TH # ZP-7

VacX # V25-11092 Utility Owner/operator: Ziply Fiber

Customer: Ziply Fiber Utility type: Comm, Concrete Encasement.

Date: 7/17/2025 Pothole Location: SW Hart Rd, Beaverton.

Pvmt. Core

Thickness: 6" A.C Concrete. Est Ht: 3.45 ft Remarks: P.K is 2.00 ft South of North curbface.

Set utility tell-tale? NO Est width: Unknown. We found the South edge of the encasement. All

0.30' South of VacX P.K. measurements were taken from the South edge.

Sketch apparent X-section of structure:

Potholes were relocated

Approximate station location: 3+02 Lt in the field based on the locates.

-4.13 ft.

(Est) -7.58 ft.

-0.01

-4.12 ft.

ADDITIONAL MEASURMENT FROM STORM CROSSING P.K (ele 216.39):

Rod P.K Rod Util. Dist. Rod Stm Rod Util. Dist. Elev P.K Elev Grnd Elev Utility

4.00 8.13 -4.13 2.00 8.13 -6.13 216.39 214.38 210.26

Rod Grnd Rod Util. Dist.

4.01 8.13 -4.12

Vertical dist P.K to grnd surface:

X-section looking WEST Cover depth over utility:

TEST HOLE REPORT SHEET

Vertical dist P.K to btm of utility:

VacX P.K is set at 90 degrees to utility.

Vertical dist P.K to top of utility:

Util. material:

Horiz dist P.K to util. structure:

SW Hart Rd C/L.

VacX P.K

Utility Coordination Service

(541) 505-5074

Comm, Concrete Encasement.

Runs E/W.

#ZP-7 - Concrete Encasement Communications.

Runs E/W.

VacX P.K

Facing South.Facing South.

Prepared by: Jason Jones, VacX

(541) 505-5074 ext 105