CGC SPENCER FY26 DS1-Price Schedule .xlsx

XLSX spreadsheet 20 KB Posted

Attached to
CGC SPENCER FY26 DS1
Solicitation number
70Z08026QMECP0018
Issued by

About this file

This is a pricing schedule for dockside repair and maintenance services for the USCGC SPENCER (WMEC-905), a 270-foot Medium Endurance Cutter operated by the U.S. Coast Guard. The contract period of performance runs from approximately August 31, 2026 through October 25, 2026. The pricing schedule itemizes 14 definite line items and 10 optional line items covering essential shipboard systems maintenance and repairs, including seawater heat exchanger cleaning and hydro testing, chill water system servicing, potable water tank inspection, sewage and grey water system maintenance, deck plating renewal, engine room fan controller replacement, and liferail renewal. Labor and material costs are organized by job-based pricing for most items, with one composite labor rate line item (O-00A) specified in hours and a five-day layday provision (O-00Z).

The schedule includes provisions for over and above/growth work pricing, with contractors required to submit composite labor rates by the hour and material markup/handling fees as percentages to be applied throughout the contract lifecycle if additional work is authorized via contract modification. A GFP (Government Furnished Property) reporting requirement and travel and per diem reimbursement are included as definite items. All unit prices, quantities, and extended prices must be completed by the responding contractor. The total evaluated price incorporates both definite and optional items, with the over and above/growth work estimated at 586 hours of labor and $22,608.00 in material handling fees based on the submitted rates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SPENCER (WMEC-905) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
O-001Seawater Heat Exchangers, Clean, Inspect And Hydro (OPTIONAL)JOB1
D-002Chill Water System, Clean and FlushJOB1
D-003Potable Water Pneumatic Tanks, Clean and InspectJOB1
O-004Sewage Discharge and Transfer Pumps, Renew (OPTIONAL)JOB1
D-005Grey Water Holding Tanks, Clean and InspectJOB1
D-006Sewage Holding Tanks, Clean and InspectJOB1
D-007Sewage Piping, Clean and FlushJOB1
O-008Tanks, Grey Water Holding, Preserve, Partial (OPTIONAL)JOB1
O-009Tanks (Sewage Holding), Preserve, Partial (OPTIONAL)JOB1
D-010Temporary Services, Heating and CoolingJOB1
D-011Engine Room Fan Controllers, RenewJOB1
D-012Liferail, RenewJOB1
D-013Hot Water Accumulator Tank, ReplaceJOB1
D-014Deck Plating, RenewJOB1
O-00AComposite Labor RateHour0
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB
O-00ZLaydaysDay5
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour586$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$22,608.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00