70Z08026QMECP0018P0002 Q_A.pdf
PDF 147 KB Posted
- Attached to
- CGC SPENCER FY26 DS1
- Solicitation number
- 70Z08026QMECP0018
About this file
This is an Amendment 2 Questions and Answers document for federal contract 70Z08026QMECP00180002 addressing clarifications on vessel maintenance and repair work items.
The document resolves six key inquiries regarding contract execution. Question 1 clarifies that when grey water and sewage systems are disrupted, the contractor must provide sanitary facilities within a five-minute walking distance from the vessel, including shower stalls with privacy screens, sinks with hot and cold water, GFI electrical receptacles per NFPA 70, toilets with doors or privacy dividers, and lockable lockers. Question 2 directs contractors to reference drawings called out in Work Item 14 regarding fuel tanks below the auxiliary machine room deck that may impact deck plating replacement. Question 3 establishes normal working hours as 0800-1600, with flexibility for alternate schedules to be negotiated at the post-award arrival conference. Question 4 confirms that overtime is not authorized; additional hours or work outside the original firm fixed-rate bid requires a Change/Contract Modification Request (CFR) and Contracting Officer approval. Question 5 indicates that while Dbids access may be acceptable, US Coast Guard Base Portsmouth requires vendor-specific forms to be completed prior to contract start; these forms will be provided post-award. Question 6 confirms the intent to flush and clean the complete sewage piping system throughout the ship using Coast Guard Drawings 905 WMEC 593-004, 593-005, 593-006, and 593-007 as guidance, while coordinating with related optional work items to avoid duplication.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QMECP001800003 Q_A.pdf | ||
| 70Z08026QMECP00180003 Signed.pdf | ||
| CGC SPENCER FY26 DS1-REV 1 Specification.pdf | ||
| 70Z08026QMECP00180002.pdf | ||
| 70Z08026QMECP00180001.pdf | ||
| 70Z08026QMECP001800001 Q_A.pdf | ||
| CGC SPENCER FY26 DS1-Price Schedule .xlsx | XLSX spreadsheet | |
| 70Z08026QMECP0018.pdf | ||
| CGC SPENCER FY26 DS1-REV 0 Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70Z08026QMECP00180002
AMENDMENT 2 Q&A
1. In regard to the temporary services provided when grey water is disrupted in work item 5, does the customer require shower and head facilities together or will portable heads be sufficient?
A: If showers or toilets are to be disrupted the contractor is to provide as per referenced: STD SPEC 0000, para 3.2.11.1 Sanitary facilities for vessel-person-nel – due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor must provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table 2 (Sanitary Facility Amenities). Ensure the following:
Shower stalls are equipped with privacy screens.
Sinks are provided with fresh hot and cold water.
Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.
Toilets have doors or privacy dividers.
Lockers are capable of being locked.
2. Are there fuel tanks located below the deck of the aux machine room space that will impact the deck plating replacement PER para 3.4.1 and 3.4.2?
A: Please reference drawings called out in WI 14 of Spec.
3. What are the established work hours for the ship?
A: Normal Working hours are from 0800-1600, however this will be discussed and alternat schedules can be agreed to during the post-award arrival conference.
4. Is Overtime Authorized on the project?
A: No. Additional hours/work per work item outside of the original bid (firm fixed rate) will need to be requested via CFR and approved by the Contracting Officer.
5. Will the KTR be required to get additional access to the US Coast Guard Yard or will Dbids (NNSY, NOB) access be acceptable?
A: Yes, US Coast Guard Base Portsmouth has its own forms that will need to be filled out prior to start of contract for each vendor/person who will be onboard.
These forms will be provided once project is awarded.
6. Work item 7 for Sewage pipe cleaning does not provide a specific portion of the system to flush. Is it the customers intent to flush and clean the complete sewage piping system throughout the ship?
70Z08026QMECP00180002
AMENDMENT 2 Q&A
A: Yes. It is the intent to flush all sewage system piping as called out in the work item 7 see below:
INTENT: This work item describes the requirements for the Contractor to clean the sewage piping system.
NOTE:
Coordinate scope of work with “Sewage Discharge and Transfer Pumps, Renew (OPTIONAL)” and “Sewage Holding Tanks, Clean and Inspect” work items in order to avoid duplicating efforts.
And para 3.6 Clean and flush. The Contractor must clean and flush all sewage system piping, using Coast Guard Drawings 905 WMEC 593-004, 905 WMEC 593-005, 905 WMEC 593-006, and 905 WMEC 593-007 as guidance.