This document comprises construction design drawings for Phase 1 HVAC improvements at Central Michigan Correctional Facility, prepared by the State of Michigan Department of Technology, Management and Budget, Facilities and Business Services Administration, Design and Construction Division. The project encompasses mechanical and electrical demolition and installation work across multiple facility buildings including the East Housing Unit Q-R, East Education Building, West Administration Building, West Food Service Building, and West Housing Units A-B, C-D, and G-H. The scope of work includes removal of existing boilers, heating piping systems, gas piping, controls, and associated accessories; installation of new boilers on 4-inch concrete pads with new piping, valves, pumps, and control systems; routing of combustion air and vent piping through new roof curbs and boots; and electrical connections including new disconnects, conduit, wire, and control systems. All work must conform to Michigan Department of Corrections (MDOC) standards, with coordination required between mechanical and electrical contractors regarding 24-volt control wiring, thermostat locations, and equipment installation per manufacturer specifications and service clearance requirements.

The contract drawings specify detailed mechanical requirements including condensate neutralizing kits, carbon monoxide sensors (Kidde M/N C3010-D or approved equivalent), boiler loop temperature sensors, and emergency power-off (EPO) switches connected across all boilers. Electrical work requires installation of new transformers, panelboards, disconnects, and breakers with updated panel schedules; removal of obsolete conduit and equipment; and compliance with National Electrical Code standards and MDOC security requirements including tamper-proof fasteners and two-hole straps for conduit support. The project mandates roof penetration patching to maintain existing warranties with verification from Versatile Roofing Systems, complete system flushing and treatment of hydronic loops, and restoration of disturbed areas with specified seeding schedules. All electrical outages are limited to two-hour windows maximum, with portable generator backup required for longer shutdowns, and all relocations must be completed within one day with verification of functionality prior to contractor departure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-407

M-407

DEMO NEW

DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,

CONTROLS, CONTROL WIRING, PIPING, VALVES, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE COMMON VENT

THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS REQUIRED TO

MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH

EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF

WARRANTIES.

DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,

HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL

ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING

PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.

DISCONNECT, REMOVE, AND DEMO EXISTING INTAKE LOUVER ASSOCIATED

WITH BOILER BEING DEMOLISHED AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY. CONTRACTOR TO PATCH, PRIME, AND PAINT WALL AS

REQUIRED TO MATCH EXISTING.

EXISTING INTAKE LOUVER THAT IS NOT ASSOCIATED WITH DEMOLISHED

BOILER TO REMAIN.

EXISTING SUPPLY AIR FAN TO REMAIN.

DEMOLITION NOTES

GENERAL DEMOLITION NOTES

1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.

2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,

AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS

OTHERWISE NOTED.

3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL

WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER

DEMOLITION/NEW WORK IS COMPLETE.

4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.

5. DEMOLISH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL

NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.

6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.

(2) X-L EXISTING LOUVER

ENCLOSURE

SEE HYDRONIC

FOR CONTINUATION

SEE HYDRONIC

FOR CONTINUATION

X-1" GAS

X-2" GAS

X-1 1/4" GAS

X-XT-1

X-B-1

X-10" FLUE

THRU ROOF

X-P-1D

X-AS-1

X-SERVER

RACK

X-FS

X-DWH X-T

MECHANICAL ROOM

H-04

X-1 1/2" HR

(STACKED)

X-P-1C X-P-1B

X-P-1A

X-1 1/2" HS

(STACKED)

X-1 1/2" HS

(STACKED)

X-1 1/2" HR

(STACKED)

(2) 36"x24" INTAKE

LOUVERS W/DAMPERS

M

X-SF-1

X-L

X-UH

X-BOILER EPO SWITCH

3 4

X-B-1 X-AS-1

X-SHOT FEEDER

X-3/4" CW

X-CT-1

X-1" CW

X-3/4" HR

X-2 1/2" HS

X-1 1/2" HS

X-P-1A

X-P-1B

X-P-1C

X-P-1D

X-CHECK VALVE (TYP.) X-FUNNEL

X-CONDENSATE

NEUTRALIZING

KIT (TYP.)

X-UNION (TYP.)

X-GAS COCK

(TYP.)

X-1-1/2" DRAIN VALVE

PIPE TO FLOOR DRAIN.

(TYP.)

X-DRIP LEG

(TYP.)

X-2" G X-2" GX-R

X-10" V

X-BUTTERFLY VALVE (TYP.)

X-THERMOMETER (TYP.)

VTR

X-BACKFLOW

PREVENTOR

(TYP.)

X-CBV

(TYP.)

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HS

X-1 1/2" HS

X-1 1/2" HS

X-TWO-WAY

CONTROL VALVE

(TYP.)

X-2 1/2" HR

SEE HYDRONIC

FOR CONTINUATION

SEE HYDRONIC

FOR CONTINUATION

X-1" GAS

X-2" GAS

X-XT-1

X-P-1D

X-SERVER

RACK

X-FS

X-DWH X-T

MECHANICAL ROOM

H-04

X-1 1/2" HR

(STACKED)

X-P-1C X-P-1B

X-P-1A

X-1 1/2" HS

(STACKED)

X-1 1/2" HS

(STACKED)

X-1 1/2" HR

(STACKED)

X-SF-1

X-L

X-UH

B-1QR

CONCRETE PAD

B-2QR

G

HR

4" CA & 6" V THRU

ROOF (TYP.2)

S

CARBON MONOXIDE

SENSOR

HS

X-L EXISTING LOUVER

ENCLOSURE

36"x24" INTAKE

LOUVER W/DAMPERS

M

BOILER EPO SWITCH3

4" CONCRETE

PAD

B-1QR

CONDENSATE

NEUTRALIZING

KIT (TYP.)

TO FLOOR DRAIN (TYP.)

UNION (TYP)

HRHR

G

HS

HR

B-2QR G

HS

HS

HR

HR

HR

HS HS

G

G

GAS COCK (TYP)

1-1/2" DRAIN

VALVE PIPE TO

FLOOR DRAIN.

(TYP)

DRIP LEG (TYP)

PRESSURE RELIEF

VALVE (TYP)

THERMOMETER (TYP)

CHECK VALVE (TYP)

P-1QR P-2QR

P/T (TYP.)

G

1 1

PIPE TO

FLOOR

(TYP.)

BOILER LOOP

TEMPERATURE

SENSOR

AS-1QR

" M

AX

2 2 1/2" HR

2"

X-SHOT FEEDER

X-3/4" CW

X-CT-1

X-1" CW

X-3/4" HR

X-1 1/2" HS

X-P-1A

X-P-1B

X-P-1C

X-P-1D

X-FUNNEL

X-2" G X-2" GX-R

X-BUTTERFLY VALVE (TYP.)

X-THERMOMETER (TYP.)

X-BACKFLOW

PREVENTOR

(TYP.)

X-CBV

(TYP.)

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HR

X-1 1/2" HS

X-1 1/2" HS

X-1 1/2" HS

2-1/2"

SHUTOFF VALVE (TYP)

1-1/2"

VTR

CA

VTR

CA

V

STRAINER (TYP)

2-1/2"

2-1/2"

2-1/2"

2-1/2" 2-1/2"

2-1/2"

2-1/2"

2-1/2"

2-1/2" 1-1/2"

1-1/2"

2 1/2" HS

MECHANICAL KEY NOTES

GENERAL MECHANICAL NOTES

1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.

2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED

SERVICE CLEARANCES ARE MET.

3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER

TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW

WORK IS COMPLETE.

4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.

CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER

REQUIREMENTS.

5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.

1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,

COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND

ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER

ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL

DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH

NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH

EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF

WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE

COMBUSTION AIR AND VENT ROUTING WITH EXISTING

PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF

PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF

STRUCTURE.

INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS

PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING

RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED

ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS

REQUIRED FOR NEW CONNECTION.

INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND CONNECT TO NEW BOILERS.

INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:

C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED

ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE

SENOR TO MEET BOILER INSPECTION REQUIREMENTS.

M-407

EAST HOUSING UNIT Q-R -

FIRST FLOOR PLAN -

MECHANICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST HOUSING UNIT Q-R - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW

EAST HOUSING UNIT Q-R MECHANICAL ROOM -

MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

EAST HOUSING UNIT Q-R MECHANICAL ROOM BOILER

PIPING DIAGRAM - DEMOLITION

SCALE: NTS

EAST HOUSING UNITS Q-R MECHANICAL ROOM -

MECHANICAL NEW

SCALE: 1/4" = 1'-0"

EAST HOUSING UNIT Q-R MECHANICAL ROOM BOILER

PIPING DIAGRAM - NEW

SCALE: NTS

SCALE: 1/16" = 1'-0"

10510 4020

BRH

MTJ

M-408

M-408

DEMONEW

DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,

CONTROLS, CONTROL WIRING, PIPING, VALVES, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE COMMON VENT

THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS REQUIRED TO

MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH

EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF

WARRANTIES.

DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,

HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL

ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING

PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.

DISCONNECT, REMOVE, AND DEMO EXISTING INTAKE LOUVER ASSOCIATED

WITH BOILER BEING DEMOLISHED AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY. CONTRACTOR TO PATCH, PRIME, AND PAINT WALL AS

REQUIRED TO MATCH EXISTING.

DISCONNECT, REMOVE, AND RELOCATE EXISTING PUMP, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.

EXISTING INTAKE LOUVER THAT IS NOT ASSOCIATED WITH DEMOLISHED

BOILER TO REMAIN.

EXISTING SUPPLY AIR FAN TO REMAIN.

DEMOLITION NOTES

GENERAL DEMOLITION NOTES

1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.

2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,

AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS

OTHERWISE NOTED.

3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL

WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER

DEMOLITION/NEW WORK IS COMPLETE.

4. EXISTING ZONE PUMP AND ALL CONTROLS ARE TO REMAIN.

5. DEMOLISH OR RELOCATE EXISTING PIPING AS REQUIRED TO ALLOW

SPACE TO INSTALL NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED

ACCESSORIES.

6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.

X-EWH

X-B-1

X-P

X-2" GAS

X-1 1/4" GAS

X-1/2" HS/HR

X-UH

MECHANICAL ROOM

E-13

X-2" HR X-2" HS

X-10" FLUE

THRU ROOF

X-SERVER RACKX-FS

(2) X-L

EXISTING LOUVER

ENCLOSURE

(2) INTAKE LOUVERS

W/DAMPERS

M

X-SF-1

X-B-1

X-SHOT FEEDER

X-XT-1

X-3/4" CW

X-3/4" HR

X-2" HS

X-CHECK VALVE (TYP.)

X-FUNNEL

X-CONDENSATE

NEUTRALIZING KIT

(TYP.)

X-UNION (TYP.)

X-GAS COCK

(TYP.)

X-1-1/2" DRAIN VALVE

PIPE TO FLOOR DRAIN.

(TYP.)

X-DRIP LEG

(TYP.)

X-2" G X-2" GX-R

X-10" V

X-BUTTERFLY VALVE

(TYP.)

X-THERMOMETER (TYP.)

VTR

X-BACKFLOW

PREVENTOR

(TYP.)

X-2" HR

X-P

X-2" HSX-2" HS

X-EWH

X-2" GAS

X-1/2" HS/HR

X-UH

MECHANICAL ROOM

E-13

X-2" HR X-2" HS

X-SERVER RACKX-FS

X-SF-1

B-1ED

B-2ED

4" CA & 6" V

THRU ROOF

(TYP.2)

CONCRETE PAD 1

S

BOILER EPO SWITCH3

CARBON MONOXIDE

SENSOR

G

AS-1ED1

X-P

X-L

EXISTING LOUVER

ENCLOSUREM

X-SHOT FEEDER

X-XT-1

X-3/4" CW

X-3/4" HR

X-2" HS

X-FUNNEL

X-2" GX-R

X-BUTTERFLY VALVE

(TYP.)

X-BACKFLOW

PREVENTOR

(TYP.)

X-2" HR

4" CONCRETE

PAD

B-1ED

CONDENSATE

NEUTRALIZING

KIT (TYP.)

2"

TO FLOOR DRAIN (TYP.)

STRAINER (TYP)

UNION (TYP)

HRHR

G

HS

HS

HR

B-2ED G

HS

HS

HR

HR

HR

HS HS

G

G

2" 2"

2"

2" 2"

2"2"

2"

GAS COCK (TYP)

1-1/2" DRAIN

VALVE PIPE TO

FLOOR DRAIN.

(TYP)

DRIP LEG (TYP)

SHUTOFF VALVE

(TYP)

PRESSURE RELIEF

VALVE (TYP)

THERMOMETER (TYP)

CHECK VALVE (TYP)

P-1ED P-2ED

P/T (TYP.)

G 1-1/4"

1 1

2"

PIPE TO

FLOOR

(TYP.)

BOILER LOOP

TEMPERATURE

SENSOR

" M

AX

AS-1ED

X-P

2"

X-CHECK VALVE (TYP.)

X-BV (TYP.)

1-1/4" 1-1/4"VTR

V

CA

VTR

V

CA

2"

2"

3/4" CW

MECHANICAL KEY NOTES

GENERAL MECHANICAL NOTES

1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.

2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED

SERVICE CLEARANCES ARE MET.

3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER

TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW

WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY VERSATILE ROOFING

SYSTEMS (PHONE#: 231-834-9576).

4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.

CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER

REQUIREMENTS.

5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.

1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,

COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND

ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER

ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL

DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH

NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH

EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF

WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE

COMBUSTION AIR AND VENT ROUTING WITH EXISTING

PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF

PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF

STRUCTURE.

INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS

PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING

RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED

ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS

REQUIRED FOR NEW CONNECTION.

INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND CONNECT TO NEW BOILERS.

INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:

C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED

ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE

SENOR TO MEET BOILER INSPECTION REQUIREMENTS.

REINSTALL EXISTING PUMP, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES TO THE LOCATION SHOWN.

M-408

EAST EDUCATION BUILDING

- FIRST FLOOR PLAN -

MECHANICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST EDUCATION BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW

EAST EDUCATION BUILDING MECHANICAL ROOM -

MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

EAST EDUCATION BUILDING MECHANICAL ROOM BOILER

PIPING DIAGRAM - DEMOLITION

SCALE: NTS

EAST EDUCATION BUILDING MECHANICAL ROOM -

MECHANICAL NEW

SCALE: 1/4" = 1'-0"

EAST EDUCATION BUILDING MECHANICAL ROOM BOILER

PIPING DIAGRAM - NEW

SCALE: NTS

BRH

MTJ

SCALE: 1/8" = 1'-0"

0 1 5 10 20

12" DEEP 4,000 PSI W/6-8% AIR INTRADMENT LIMESTONE MIX

4.5 TO 6.5 SLUMP FIBER MESH CONCRETE PAD WITH #4 REBAR

TOP OF CONCRETE PAD TO BE MINIMUM 4" ABOVE GRADE

1" BY 1"

CHAMFER

(ALL ROUND)

GRADE

HOUSE KEEPING PADS SIZED AS

SHOWN ON NEW PLANS AND PROVIDE A

1" X 1" CHAMFER AROUND ALL EDGES.

(TYP.)

12"

4"

GRADE

CONCRETE

1. CONCRETE MATERIAL SHALL BE:

1.1. ASTM C150 - TYPE 1 PORTLAND, COLOR SHALL MATCH EXISTING.

1.2. FINE AND COARSE AGGREGATES: ASTM C33, FINE MDOT DESIGNATED 2NS, COARSE MDOT

DESIGNATED 6AA.

1.3. WATER: CLEAN AND NOT DETRIMENTAL TO CONCRETE.

1.4. MIX CONCRETE IN ACCORDANCE WITH ASTM C94. MIXTURE SHALL BE HIGH-EARLY IN

ACCORDANCE WITH MDOT CONCRETE P-NC PER MDOT STANDARD SPECIFCATIONS FOR

CONSTRUCTION 2012, SECTION 603 AND 801.

2. THE CONCRETE DEPTH IS INDICATED ON THE DETAILS.

3. GRANULAR BASE SHALL BE 4" 21AA CRUSHED LIMESTONE.

4. ADMIXTURES:

4.1. AIR ENTRAINMENT ASTM C260

4.2. CHEMICAL ASTM C494, TYPE B AND D ONLY, TYPE B - RETARDING TYPE D - WATER REDUCING

AND TESTING.

5. REINFORCEMENT SHALL BE GRADE 60 #4 REBAR.

6. FORMED JOINTS:

6.1. PLACE EXPANSION JOINT FILLER BETWEEN PAVING COMPENTS, AND BUILDING OR OTHER

APPURTENANCES, EXCEPT WHERE SIDEWALK ABUTS BITUMINOUS PAVEMENT. RECESS TOP

OF FILLER 1/2 INCH.

7. PSI OF THE CONCRETE SHALL BE A MINIMUM OF 4,000 W/6-8% AIR INTRADEMENT LIMESTONE MIX

4.5 TO 6.5 SLUMP FIBER MESH CONCRETE.

8. SITE PREPARATION

8.1. REMOVE EXISTING MATERIAL 4" BELOW GRADE AND INFILL WITH GRANULAR BASE

9. PLACING CONCRETE:

9.1. IN ACCORDANCE WITH ACI 301

9.2. ENSURE REINFORCEMENT, INSERTS, EMBEDDED PARTS AND FORMED JOINTS ARE NOT

DISTURBED DURING CONCRETE PLACEMENT.

9.3. POOR CONTINUOUSLY BETWEEN PREDETERMINED CONSTRUCTION JOINTS. DO NOT BREAK

OR INTERRUPT SUCCESSIVE POURS SUCH THAT COLD JOINTS OCCUR.

9.4. RESTORE GRADE AND PLANT GRASS TO MATCH EXISTING GRADE.

10. SEALER:

10.1. PROVIDE AND INSTALL A PENETRATING SEALING COMPOUND ON BASES EQUAL TO PENTREAT

244-100.

10.1.1. DESIGN TO LIMIT THE INTRUSION OF MOISTURE AND CHLORIDES INTO THE SUBSTRATE.

10.1.2. REDUCES SPALLING.

10.1.3. PENETRATES DEEPLY FOR MAXIMUM PROTECTION.

10.1.4. MINIMIZES PENETRATION FROM DE-ICING CHEMICALS, SALT, WATER THAT MIGHT

DAMAGE CONCRETE SURFACES.

10.1.5. SEALS PORES AND CAPILLARIES OF SUBSTRATE, PREVENTING LIQUID ABSORPTION

WHILE ALLOWING EXCELLENT VAPOR TRANSMISSION.

10.1.6. LEAVES NO RESIDUE AND REQUIRES NO CLEANING AFTER APPLICATION.

11. AFTER CONSTRUCTION IS COMPLETED REFER TO SEEDING SCHEDULE TO PLANT GRASS.

1 CONCRETE PAD DETAIL

SCALE: NTS

SEEDING SCHEDULE

CONTRACTOR TO SUPPLY 6" OF TOPSOIL OVER ALL

DISTURBED AREAS. SEED ALL DISTURBED AREAS

WITH THE FOLLOWING SEED MIX:

40% KENTUCKY BLUEGRASS

25% CREEPING FESCUE

20% PERENNIAL RYEGRASS

15% CHEWING FESCUE

APPLY AT A RATE OF 8 LBS PER 1,000 SQUARE FEET

OR 350 LBS PER ACRE.

2 INSULATION HANGER DETAIL

SCALE: NTS

14 GAUGE ZINC

COATED SHEET

STEEL SADDLE, AT

LEAST 12" LONG

PIPE

INSULATION

THERMAL HANGERS

SHIELD INSERTS

(360-DEG)

3 GRADE MOUNTED AHU-2 DETAIL

SCALE: NTS

1ST FLOOR

X-AHU-2

X-RA

X-

RA

CEILING

DEMOLITION ELEVATION

X-UNION

X-DIRT LEG

X-G

X-GAS REGULATOR

EXISTING CONCRETE PAD

EXISTING ROOF CURB

X-POWERED

EXHAUST

X-GAS COCK

1ST FLOOR RA

X-

RA

FLEXIBLE CONNECTOR

CEILING

X-UNION

X-DIRT LEG

X-G

X-GAS REGULATOR

EXISTING CONCRETE PAD

NEW POWERED

EXHAUST

X-GAS COCK

NEW ELEVATION

AHU-2

NEW ROOF CURB

NEW CONCRETE PADDUCT SUPPORT, TYP. BASED ON

MIRO 8-DS OR APPROVED EQUAL

FOR SUPPLY AND RETURN

DUCTWORK

FRAME

VANED ELBOW

LOCKING LUG

2-1/4"R

4-1/2"R

TURNING VANE

NOTES:

1. LOCKING LUGS INTEGRAL WITH VANE

2. MAXIMUM UNSUPPORTED VANE LENGTH 48"

3. FRAMES - BOLTED OR RIVETED TO ELBOW

4. VANES AND FRAMES - SAME GAUGE AS ELBOW

2 1 /4"

3 1 /2"

TURNING VANES FOR

SQUARE ELBOW DETAIL

SCALE: NTS

NOTES:

1. CONFIGURATION SHOWN FOR AHU-2

2. GRADE MOUNTED STANDARD ROOF CURB

3. SEE NEW MECHANICAL PRINTS FOR SUPPLY AIR DUCT SIZES.

4. INSTALL MIRO SUPPORTS UNDER SUPPLY AIR DUCTWORK AS

WELL PER NOTE IN DIAGRAM.

1-1/4" G

M-800

MECHANICAL DETAILS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

M-900

MECHANICAL SCHEDULES

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

TVSS

VFD

TRANSIENT VOLTAGE SURGE SUPPRESSION

VARIABLE FREQUENCY DRIVEDUPLEX RECEPTACLE

DOCK LIGHT FIXTURE

TELEPHONE / DATA OUTLET

ELECTRICAL SYMBOLS LEGEND

J

SINGLE RECEPTACLE (120 VOLT)

EMERGENCY RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

FLUSH FLOOR BOX

SURFACE FLOOR BOX

SPECIAL EQUIPMENT RECEPTACLE

TELEPHONE OUTLET

DATA OUTLET

POWER POLE

JUNCTION BOX

WALL JUNCTION BOX

PULL (JUNCTION) BOX

UNDERFLOOR JUNCTION BOX

OUTLETS

LIGHT FIXTURE

STRIP FIXTURE

IN-GRADE LIGHT FIXTURE

SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)

WALL MOUNT LIGHT FIXTURE

CEILING LIGHT FIXTURE

TRACK & FIXTURE

STREET TYPE POLE FIXTURE

POLE MOUNTED LIGHT FIXTURE

EXTERIOR WALL MOUNT LIGHT FIXTURE

WALLPACK LIGHT FIXTURE

SPECIAL PURPOSE LIGHT FIXTURE

HIGH BAY LIGHT FIXTURE

EMERGENCY EGRESS LIGHT FIXTURE

(number of heads shown)

EMERGENCY LIGHT FIXTURE

FIXTURES

CIRCUITRY and RACEWAYS

UNDERFLOOR DUCT

BUS DUCT

PLUGMOLD AS SPECIFIED

WIREMOLD AS SPECIFIED

FLEXIBLE PIGTAILS/CONNECTIONS

"CONDUIT RUN CONTINUES" INDICATION

END OF CONDUIT RUN, CAP AND STAKE

END OF CONDUIT RUN

HOME RUN (with circuit numbers)

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT INSTALLED

CONDUIT INSTALLED

SOUND and SIGNAL

SERVICE and EQUIPMENT

THERMOSTAT

CAPACITOR

ENCLOSED CIRCUIT BREAKER

TRANSFER SWITCH

WIREWAY

GROUND CONNECTION PER N.E.C.

TELEPHONE TERMINAL BOARD

GENERATOR, KW SHOWN

CURRENT TRANSFORMERS

UTILITY METER, AS REQUIRED

WEATHERHEAD

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

COMB. STARTER

MAGNETIC STARTER

DISCONNECT SWITCH

TRANSFORMER

CONTROL

xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt

LIGHTING CONTACTOR

CONTROL TRANSFORMER

buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)

PHOTOCELL (voltage as required)

HUMIDISTAT

(by E.C.)

(by others)

TT

G

WW

PC

CT

TS

T

H

TC

IC

T

1,3

OR

PM

WM

BD

UFD

F S

J

J

PP

J

CEILING MOUNTED WIFI

DIGITAL EQUIPMENT METER, AS REQUIRED

POLE

PUMP

PANEL

P

PNL

PVC

PRV-

P-

PB

POLY VINYL CLORIDE

POWER ROOF VENTILATOR

PULL BOX

GENERAL CONTRACTOR

GROUND

HUMIDIFIERH-

GND

GFI

GC

GROUND FAULT INTERUPTER

ABBREVIATIONS LEGEND

POWER

SWITCH

RECEPT

SF-

SWBD

TCC

SPEC

SW

RGC

RTU-

PWR

VOLTS

WATTS

UF

V

W

UL

VL

UNO

UH-

TS

TYP

TR

ROOF TOP UNIT

RECEPTACLE

SWITCHBOARD

UNDER FLOOR

SPECIFICATIONS

RIGID GALVANIZED STEEL CONDUIT

UNLESS NOTED OTHERWISE

UNDERWRITERS' LABORATORIES, INC.

TAMPER PROOF RECEPTACLE

TAMPER PROOF SWITCH

TEMPERATURE CONTROL CONTRACTOR

VERIFY LOCATION WITH OWNER

TYPICAL

UNIT HEATER

SUPPLY FAN

WITH

WITHOUT

W/

XFMR

W/O

WP

TRANSFORMER

WEATHER PROOF

HOUR

LIGHT

JUNCTION BOX

LIGHT CONTROL

ISOLATED GROUND

HORSEPOWER

MINIMUM

MOUNT

MAKE-UP AIR UNIT

MOTOR CONTROL CENTER

MAIN LUG ONLY

MOUNTED

MOUNTING

MAXIMUM

LIGHTING

LT FLEX

MTD

MUAU-

MTG

MLO

MIN

MT

MC

MAX

MCC

LTG

IG

LC

LT

IMC

JB

HR

HVAC

HOA

HP

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NIGHT LIGHTNL

NTS

NO

NIC

NC

HAND-OFF-AUTO SELECTOR SWITCH

HEATING/VENTILATING/AIR CONDITIONING

INTERMEDIATE METAL CONDUIT

LIQUID TIGHT FLEXIBLE METAL CONDUIT

MECHANICAL CONTRACTOR

HID HIGH INTENSITY DISCHARGE

A

AC

AFF

ACU-

AHJ

AHU-

AS

B-

BC

AIC

ATS

BLDG

CHLR-

CND (C)

CKT BKR

CKT

CUH-

CU-

DISC

DFU-

EF-

EC

DWH-

EBB-

DWG

CT-

EXIST (E)

EWC

FLEX

FLA

FLR

FSES

FLUOR

EMT

ABOVE FINISHED FLOOR

AIR CONDITIONING UNIT

AMPS

ABOVE COUNTER

AIR HANDLING UNIT

AUTOMATIC TRANSFER SWITCH

AMPS INTERUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE SHELF

BOILER

BUILDING

BELOW COUNTER

CHILLER

DOMESTIC WATER HEATER

CABINET UNIT HEATER

CIRCUIT

CIRCUIT BREAKER

CONDUIT

CONDENSING UNIT

COOLING TOWER

DUCT FURNACE

DRAWING

DISCONNECT

FOOD SERVICE EQUIP. SUPPLIER

ELECTRIC WATER COOLER

ELECTRICAL CONTRACTOR

ELECTRIC BASEBOARD

ELECTRICAL METALLIC TUBING

EXISTING

EXHAUST FAN

FLOOR

FLUORESCENT

FLEXIBLE CONDUIT

FULL LOAD AMPS

EM EMERGENCY

F/S FIRE/SMOKE

FU- FURNACE

SSCP

COCCTV

SECURITY SYSTEM CONTROL PANEL

CAMERA

DATA RACK

RACK MOUNTED UPS

BRACKET MOUNTED UPS

WALL MOUNTED UPS

POLE

POLE

HOW HIGH ON WALL

DR

RUPS

FUPS

WUPS

P

C

X

X

X ADDENDUM NOTE

PLAN NOTE

DEMOLITION NOTE

SWITCHES

SINGLE-POLE SWITCH

DIMMER SWITCH

TIME SWITCH

KEY SWITCH

MANUAL MOTOR SWITCH

THERMAL OVERLOAD SWITCH

SWITCH WITH PILOT LIGHT

FOUR-WAY SWITCH

THREE-WAY SWITCH

DESIGNATIONS

D

PLUG STRIP (PDU)

120V-1Ø TO 20 AMP

1 POLE BREAKER IN

PANEL

120V-1Ø TO 20 AMP

1 POLE BREAKER IN

PANEL

BOILER (B-1)

120V-1Ø TO 20 AMP

1 POLE BREAKER IN

PANEL

BOILER (B-2)

REPO

BUTTON(S)

PROVIDE A (N) POLE CONTACTOR

1 BOILER EMERGENCY OFF SWITCH

SCALE: N.T.S.

BOILER (B-N)

GENERAL ELECTRICAL NOTES

1. ALL NON-FIRE RATED WALLS ARE TO BE PATCHED WITH LIKE

MATERIAL TO MAINTAIN ORIGINAL RATING.

2. ALL WALL AND FLOOR PENETRATIONS THROUGH FIRE RATED WALLS

ARE TO BE SEALED WITH FIRE CAULK TO MAINTAIN ORIGINAL

RATING. EXISTING PENETRATIONS IN THE AREA OF WORK THAT ARE

NOT PROPERLY SEALED ARE TO BE SEALED TO MATCH THE RATING

OF THE WALL.

3. ALL CONDUITS SHALL BE FIELD ROUTED ALONG EXISTING PIPING

AND STRUCTURAL STEEL. CONDUITS SHALL BE INSTALLED

STRAIGHT, LEVEL, AND PARALLEL OR PERPENDICULAR TO THE

BUILDING LINES.

4. CONTRACTORS SHALL VISIT THE PROJECT SITE DURING PRE-BID

WALK THROUGH TO DETERMINE THE EXACT EXTENT OF THE WORK

REQUIRED BEFORE BIDDING THE PROJECT.

5. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE, AND

EQUIPMENT NOT TO BE RE-USED WHERE WORK IS BEING DONE

EXCEPT ITEMS NOTED OTHERWISE.

6. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF

OLD WORK, SURFACES SHALL BE PATCHED AND PAINTED TO MATCH

ADJACENT.

7. EXISTING WORK, WHICH IS PRESENTLY CONCEALED, WHICH WILL

REMAIN CONCEALED, AND DOES NOT INTERFERE WITH ANY NEW

WORK OF ANY TRADE NEED NOT BE REMOVED. HOWEVER, ALL

CONDUIT SHALL BE CAPPED BELOW FINISH SURFACE AND THEN

PATCHED AND PAINTED TO MATCH, OR AS NOTED.

8. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE

MODIFIED OR ENLARGED TO SUIT THE NEW SYSTEMS AS REQUIRED.

PROVIDE ALL REQUIRED CUTTING AND PATCHING.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING

WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE

MOUNTED EQUIPMENT.

10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AND LOADS

PRIOR TO INSTALLING SERVICE TO EQUIPMENT.

11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENTS AND

CASUAL FIELD OBSERVATION. REPORT ANY DISCREPANCIES TO

ENGINEER FOR CLARIFICATION.

12. CONDUITS AND BOXES:

12.1. 3/4" MINIMUM TRADE SIZE.

12.2. EMT TYPE CONDUIT IS APPROVED WITH COMPRESSION

FITTINGS.

12.3. NO PVC ALLOWED INSIDE OF BUILDINGS.

12.4. CONDUITS SHALL BE ATTACHED WITH TWO-HOLE STRAPS.

SINGLE HOLE STRAPS ARE NOT PERMITTED.

12.5. NO SET SCREWS ARE ALLOWED.

12.6. TAMPER-PROOF SCREWS REQUIRED FOR EXPOSED CONDUIT

AND BOXES MOUNTED BELOW TEN FEET.

12.7. DRIVE PIN ANCHORS USED ON MASONARY OR CONCRETE

WALLS/CEILINGS.

13. MINIMUM RACEWAY SIZE; 3/4" TRADE SIZE. ALL FLEXIBLE CONDUIT

RACEWAYS SHALL BE LIQUID TITE, MAXIMUM 36" LENGTH AND MUST

BE APPROVED BY PSC AND MDOC PROJECT MANAGER. REFER TO

SPECIFICATION 260533 - RACEWAY AND BOXES FOR ELECTRICAL

SYSTEMS.

14. INSTALLATION OF ANY NEW OR REWORKED CONDUIT, FITTINGS, AND

STRAPS SHALL FOLLOW CURRENT NEC AND MDOC STANDARDS.

15. CONDUIT, CONDUIT INSTALLATION, AND BOXES BEING REUSED

SHALL BE BROUGHT UP TO CURRENT MDOC STANDARDS.

16. ALL CONDUIT AND BOXES ABOVE 10 FOOT OR IN

MECHANICAL/ELECTRICAL ROOMS, SHALL MEET THE FOLLOWING

REQUIREMENTS:

16.1. STRAP DISTANCE: 5 FEET.

16.2. FASTENERS: 2 HOLE.

16.3. CONDUIT” INTERIOR EMT, EXTERIOR EXPOSED/CONCEALED-

GRC.

16.4. FITTINGS: COMPRESSION.

16.5. BOXES: STANDARD BOXES FOR ENVIORNMENT INSTALLED TO

MEET N.E.C.

16.6. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND

ENCLOSURES.

17. ALL CONDUIT AND BOXES 10 FOOT AND BELOW SHALL MEET THE

FOLLOWING REQUIREMENTS:

17.1. STRAP DISTANCE: 3 FEET.

17.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.

17.3. SECURITY HARDWARE:

17.3.1. TORX T-25 WITH CENTER REJECTION PIN.

17.3.2. HEX HEAD CONCRETE SCREWS WITH NO SCREWDRIVER

SLOT.

17.3.3. EXPANSION POUND-IN ANCHORSWITH NO SCREWDRIVER

SLOT THAT DO NOT REQUIRE TO BE EXPLOSIVELY DRIVEN.

17.3.4. PRE-APPROVED HARDWARE.

17.4. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED -

GRC.

17.5. FITTINGS: COMPRESSION

17.6. BOXES:

17.6.1. SURFACE MOUNTED:

17.6.1.1. BELL BOX: FS TYPE, WITH SQUARE HEAD KO SEAL.

17.6.1.2. NO KNOCKOUTS - DRILL AS REQUIRED.

17.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND

ENCLOSURES.

18. ALL EXPOSED WIRING SHALL BE IN CONDUIT. OPEN LOW VOLTAGE

WIRING ABOVE ACCESIBLE CEILINGS IS ACCEPTABLE.

18.1. ALL EXPOSED WIRING ABOVE CEILINGS SHALL BE INSTALLED

WITH J-HOOKS. DO NOT CONNECT TO EXISTING CEILING TIE

WIRES.

19. ALL WALLS THAT ARE ACCESSIBLE SHALL BE FISHED AND DEVICE

CUT INTO WALL.

20. ALL LOCATIONS WHERE THE WALLS CAN NOT BE FISHED SHALL BE

SURFACE MOUNTED CONDUIT FOLLOWING NOTES 14 THROUGH 15

ABOVE.

21. ALL EXTERIOR CONCEALED CONDUIT UNDERGROUND SHALL BE

RNC/HDPE SCHEDULE 40. ALL EXTERIOR ABOVE GROUND CONDUIT

SHALL BE RGC. PROVIDE UL LISTED #12 COPPER TRACER WIRE TO

ALL UNDERGROUND CONDUITS INSTALLED FOR LOW VOLTAGE.

22. ALL ELECTRICAL OUTAGES SHALL NOT LAST OVER 2-HOURS. IF A

WINDOW OF GREATER THAN 2 HOURS FOR AN ELECTRICAL SHUT

DOWN OR CUT OVER IS REQUIRED, THEN A PORTABLE GENERATOR

SHALL BE USED TO REPLACE POWER TO ALL PERIMETER DETCTION,

VIDEO MANAGEMENT, LINE SAFTEY, AND ANY OTHER ELECTRICAL

SERVICE REQUIRED. ALL OUTAGES AND CUT OVERS SHALL BE

COORDINATED A MINIMUM OF 2-WEEKS PRIOR TO WORK, INCLUDING

AN HOUR BY HOUR SCHEDULE, MUST BE SUBMITTED TO MDOC

LEADERSHIP AND THE FACILITY FOR REVIEW.

23. WHEN RELOCATING ANY ELECTRICAL DEVICE, CONTRACTOR SHALL

COMPLETE THE RELOCATION IN ONE DAY AND VERIFY THAT ALL

DEVICES RELOCATED ARE WORKING PROPERLY PRIOR TO LEAVING

THE SITE.

24. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED

COMPONENTS, RACEWAYS, WIRE, AND HARDWARE, AS INDICATED

ON DRAWINGS.

25. CONTRACTOR SHALL PROVIDE UPDATED PANEL SCHEDULES FOR

ALL PANELS AFFECTED BY THIS PROJECT. UPDATED SCHEDULES

SHALL BE PRINTED AND INSTALLED ON THE INSIDE COVER OF THE

PANEL.

26. ALL WORK COMPLETED WITHOUT APPROVED SHOP DRAWINGS IS AT

CONTRACTOR'S RISK.

27. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF

ALL 24V CONTROL WIRING AS REQUIRED TO LOCALLY CONTROL ALL

HVAC & PLUMBING IN ACCORDANCE WITH THE SEQUENCE OF

OPERATIONS. REFER TO THE MECHANICAL DRAWINGS FOR ALL

LOCAL THERMOSTAT LOCATIONS AND MECHANICAL SPECIFICATIONS

FOR INSTALLATION REQUIREMENTS. COORDINATE IN FIELD WITH

MECHANICAL CONTRACTOR AS REQUIRED. ELECTRICAL

CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONDUIT, WIRE,

AND HARDWARE AS REQUIRED IN ACCORDANCE WITH ELECTRICAL

SPECIFICATIONS. REFER TO SHEET E-100 DETAIL 1 FOR ADDITIONAL

INFORMATION.

28. CONTRACTOR SHALL NOTIFY PSC OF ANY EXISTING INSTALLATIONS

NOT MEETING THESE STANDARDS PRIOR TO STARTING WORK IN THE

AREA.

29. UPON RELOCATING LIGHTS AND CAMERAS CONTRACTORS SHALL

VERIFY THAT THE LIGHTS AND CAMERAS ARE WORKING PROPERLY

PRIOR TO LEAVING THE SITE.

30. CONTRACTOR SHALL USE MDOC APPROVED POLES AND FIXTURES,

NO ALTERNATES WILL BE ALLOWED. ALL OTHER STATE OF MICHIGAN

AGENCY SPECIFICATIONS DO NOT APPLY.

31. CONTRACTOR SHALL NOT ADD MORE THAN 20% CAPACITY TO ANY

PANEL.

32. ARC FLASH LABELS TO BE PROVIDED FOR ALL NEW PANELBOARDS.

33. NEW PRINTED CIRCUIT DIRECTORIES SHALL BE PROVIDED FOR ALL

NEW AND REVISED PANELBOARDS.

34. CONTRACTOR SHALL SUBMIT AN RFI FOR ANY NON-CODE

COMPLIANT ELECTRICAL EQUIPMENT OR ELECTRICAL INSTALLATION.

AN RFI RESPONSE WILL BE PROVIDED GIVING DIRECTION ON HOW

TO PROCEED.

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

JFS

SGS

EXISTING EQUIPMENT TO REMAIN.

EXISTING EQUIPMENT TO BE REMOVED. REMOVE ASSOCIATED CONDUIT &

WIRE BACK TO SOURCE.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. REMOVE ASSOCIATED CONDUIT & WIRE BACK

TO SOURCE.

ELECTRICAL DEVICE TO BE REMOVED. EXISTING CONDUIT AND WIRE TO

REMAIN FOR NEW RECEPTACLE.

EXISTING EQUIPMENT TO BE REMOVED, ASSOCIATED CONDUIT AND WIRE

TO REMAIN.

DEMOLITION NOTES

X-AHU-2

X-AHU-1

T EX PNL

EA

MECHANICAL

A13

1EX E-XMFR DISCONNECT

EX PNL

ADP

EX

E-XMFR

EX-IT RACK

EX-IT RACK

EX-IT RACK

EX-CU

EX-CU

EX-AC

EX-SECURITY

CONTROLLER EX-CONTROL

PANEL

EX-CD PUMP

EX-PNL UPS PP

EX UPS-PP DISCONNECT

EX EMERGENCY DISCONNECT

E-300

WEST ADMINISTRATION

BUILDING - FIRST FLOOR

PLAN - ELECTRICAL

DEMOLITION

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

JFS

SGS

1 ELECTRICAL A48 ENALRGED DEMO

SCALE:1/2"-=1'

AHU-2

480V-3Ø, 40.1FLA

1 ADP-4

EX PNL

ADP

MECHANICAL A13

WP

GFI

WP

T EX PNL

EA

EX XMFR DISCONNECT

NEW 45KVA E-XMFR

E500 PNL EB DISCONNECT

WP

POWERED

EXHAUST

480V-3Ø, 3.2FLA

ELECTRICAL KEY NOTES

CONTRACTOR SHALL CONNECT TO EXISTING AHU-2 CIRCUIT. PROVIDE AND

INSTALL NEW DISCONNECT AND FUSES. INSTALL NEW (3) #6 WIRE, AND (1)

#10 GROUND WIRE IN 1" CONDUIT. CONTRACTOR TO PROVIDE NEW 60A 3P

BREAKER. REPLACE EXISTING 50A AHU-2 BREAKER IN PANEL ADP.

CONTRACTOR SHALL CONNECT TO EXISTING AIR HANDLER SERVICE

RECEPTACLE CIRCUIT. MODIFY CONDUIT AND WIRE AS REQUIRED.

2FROM

CU-2

FROM

CU-1

CU-2

208V-1Ø,18.5A

CU-1

208V-1Ø,18.5A

AC-1

208V-1Ø,18.5A

AC-2

208V-1Ø,18.5A

EX PNL UPS-PP

EX UPS-PP DISSCONNECT

EX EMERGENCY DISCONNECT

EX-IT RACK

EX-IT RACK

EX-IT RACK

EX-CU

EX-SECURITY

CONTROLLER EX-CONTROL

PANEL

EX-CD PUMP

EB-1,3

EB-2,4 EB-5

WPWP

WP

GFI

PNL EB

PANEL

NEW

EB

208/120V 3Ø, 4W

60A MCB

TO EXISTING 60A/60AF/3P

SWITCH IN EXISTING PANEL

EMDP IN MAINTENANCE

BUILDING

NEW TRANSFORMER

45KVA

120/208V-3Ø

SECONDARY

EXISTING

(3) #6,

(1) #6 GRD.

(1) 2" CND.

(4) #4

(1) #8 GND

(1) 1-1/4" CND

2 REPLACED TRANSFORMER (PARTIAL ONE LINE DIAGRAM)

SCALE: N.T.S.

480V

PANEL

EXISTING

EA

208/120V 3Ø, 4W

100A MCB

(4) #2 AWG

(1) #8 GND

(1) 1-1/4" CND

EXISTING

60A/3P

60A/3P

3PH 4W

NEMA 1

FUSED

60A FUSES

(4) #4

(1) #8 GND

(1) 1-1/4" CND

E-500

WEST ADMINISTRATION

BUILDING - FIRST FLOOR

PLAN - MECHANICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL NEW

SCALE: 1/8" = 1'-0"

0 1 5 10 20

JFS

SGS

1 ELECTRICAL A48 ENLARGED NEW

SCALE:1/2" = 1'0"

EXISTING EQUIPMENT TO REMAIN

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT, CONDUIT AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

E-501

E-501

DEMONEW

X-GUH-3

X-MAU-1

X-P-12

X-P-8

X-P-11 X-P-10

X-AHU-1

X-AHU-2

X-P-9

X-AS-5

X-STEAM BOILER

X-B-4

X-B-5

EX. MCC DD-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

EX. ED-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

X-T1

X-DWH1

EX. PNL EDA

120/208V-3Ø

30A MCB

EX. MCC DD-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

EX. ED-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

X-GUH-3

X-MAU-1

X-P-12

X-P-8

X-AHU-1

X-AHU-2

X-P-9

X-AS-5

X-STEAM BOILER

EX. MCC DD-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

EX. ED-DP

480V-3Ø, 3W 600A

SEC. 1 - 600A

SEC. 2 - 300A

X-T

X-DWH

B-1FS

120V-1Ø, 8 FLA

P-1FS

120V-1Ø, 5.6 FLA

P-2FS

120V-1Ø, 5.6 FLA

P-3FS

120V-1Ø, 5.6 FLA

B-2FS

120V-1Ø, 8 FLA

B-3FS

120V-1Ø, 8 FLA

EPO

EPO

EX. PNL EDA

120/208V-3Ø

30A MCB TEB

NEW PNL EDB

120/208V-3Ø

100A MCB

NEW 30 KVA

XFMR

EDB-1

EDB-3

EDB-5

EDB-6

EDB-4

EDB-2

ELECTRICAL KEY NOTES

CONNECT ALL NEW AND EXISTING BOILERS TO EPO SYSTEM.

CONTRACTOR SHALL PROVIDE AND INSTALL NEW 60A SWITCH AND 50A

FUSES IN EXISTING CUTLER HAMMER MCC ED-DP.

PARTIAL ELECTRICAL RISER DIAGRAM

SCALE: N.T.S

KVA

T #8

EB

PANEL

NEW

EDB

120/208V 3Ø, 4W

100A, MCB

EX ED-DP

480-3Ø 3W, 600A MCB

(4) #2

#8 GND

1-1/4" CND

(3) #6

#10 GND

1" CND

EXISTING FEED

60A/3P

50A2

E-501

WEST FOOD SERVICE

BUILDING - FIRST FLOOR

PLAN - ELECTRICAL

DEMOLITION/NEW

SGS

JFS

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST FOOD SERVICE BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

WEST FOOD SERVICE BUILDING MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

WEST FOOD SERVICE BUILDING MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-502

E-502

DEMO NEW

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

X-B-1

X-GUH

X-SF-1

EX PNL EJ

X-P 1A-1D

(STACKED)

X-DWH 1

X-P-17 2

T

EX XFMR1

X-SERVER

RACK

X-T

EX PUMP STARTERS1

X-GUH

X-SF-1

EX PNL EJ

120/208V-3Ø,100A

X-P 1A-1D

(STACKED)

X-DWH

T

EX XFMR

X-SERVER

RACK

X-T

EX PUMP STARTERS

B-1AB

120V-1Ø, 6 FLA

B-2AB

120V-1Ø, 6 FLA

P-1AB

120V-1Ø, 2.6 FLA

P-2AB

120V-1Ø, 2.6 FLA

EPO

EJ-15

EJ-16

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND

MOTOR STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS NEW EPO SYSTEM.

E-502

WEST HOUSING UNITS

A-B - FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST HOUSING UNITS A-B - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

WEST HOUSING UNITS A-B MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

WEST HOUSING UNITS A-B MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-503

E-503

DEMO NEW

X-B-1

X-GUH

X-SF-1

EX PNL EG

X-P 1A-1D

(STACKED)

X-DWH 1

X-P 2

T

EX XFMR1

X-SERVER

RACK

X-T

EX PUMP STARTERS1

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

X-GUH

X-SF-1

EX PNL EG

120/208V-3Ø,100A

X-P 1A-1D

(STACKED)

X-DWH

T

EX XFMR

X-SERVER

RACK

X-T

EX PUMP STARTERS B-1CD

120V-1Ø, 6 FLA

B-2CD

120V-1Ø, 6 FLA

P-1CD

120V-1Ø, 2.6 FLA

P-2CD

120V-1Ø, 2.6 FLA

EPO

EG-15

EG-16

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND

MOTOR STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.

E-503

WEST HOUSING UNITS

C-D - FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST HOUSING UNITS C-D - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

WEST HOUSING UNITS C-D MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0" 2

WEST HOUSING UNITS C-D MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-505

E-505

DEMO NEW

X-B-1

X-GUH

X-SF-1

EX PNL EK

X-P 1A-1D

(STACKED)

X-DWH 1

X-P 2

T

EX XFMR1

X-SERVER

RACK

X-T

EX PUMP STARTERS1

X-GUH

X-SF-1

EX PNL EK

120/208V-3Ø,100A

X-P 1A-1D

(STACKED)

X-DWH

T

EX XFMR

X-SERVER

RACK

X-T

EX PUMP STARTERS B-1GH

120V-1Ø, 6 FLA

B-2GH

120V-1Ø, 6 FLA

P-1GH

120V-1Ø, 2.6 FLA

P-2GH

120V-1Ø, 2.6 FLA

EPO

EK-15

EK-16

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND

MOTOR STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.

E-504

WEST HOUSING UNITS G-H -

FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N WEST HOUSING UNITS G-H - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

WEST HOUSING UNITS G-H MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

WEST HOUSING UNITS G-H MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-507

E-507

DEMO NEW

X-B-1

X-P-1-D

X-P-1-C

X-P-1-A

X-P-1-B

1 X-DWH

X-SERVER

RACK 1

X-T 1

EX PNL EH1

T

EX XFMR1

EX PUMP STARTERS1

1 X-P-1-D

X-P-1-C

X-P-1-A X-P-1-B

X-DWH

X-SERVER

RACK

X-T

EX PNL EH

120/208V-3Ø,100A

T

EX XFMR

EX PUMP STARTERS B-1LM

120V-1Ø, 6 FLA

B-2LM

120V-1Ø, 6 FLA

P-1LM

120V-1Ø, 2.6 FLA

P-2LM

120V-1Ø, 2.6 FLA

2EH-22

1EH-16

EPO3

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR

STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.

E-505

EAST HOUSING UNITS L-M -

FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

MTJ

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST HOUSING UNITS L-M - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

EAST HOUSING UNITS L-M MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

EAST HOUSING UNITS L-M MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-508

E-508

DEMO NEW

X-B-1

X-P-1-D

X-P-1-C

X-P-1-A

X-P-1-B

1 X-DWH

X-SERVER

RACK 1

X-T 1

EX PNL EJ1

T

EX XFMR1

EX PUMP STARTERS1

1 X-P-1-D

X-P-1-C

X-P-1-A X-P-1-B

X-DWH

X-SERVER

RACK

X-T

EX PNL EH

120/208V-3Ø,100A

T

EX XFMR

EX PUMP STARTERS B-1NP

120V-1Ø, 6 FLA

B-2NP

120V-1Ø, 6 FLA

P-1NP

120V-1Ø, 2.6 FLA

P-2NP

120V-1Ø, 2.6 FLA

2EJ-22

1EJ-16

EPO3

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR

STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.

E-506

EAST HOUSING UNITS N-P -

FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST HOUSING UNITS N-P - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

EAST HOUSING UNITS N-P MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

EAST HOUSING UNITS N-P MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

E-509

E-509

DEMO NEW

X-B-1

X-P-1-D

X-P-1-C

X-P-1-A

X-P-1-B

1 X-DWH

X-SERVER

RACK 1

X-T 1

EX PNL EK1

T

EX XFMR1

EX PUMP STARTERS1

1 X-P-1-D

X-P-1-C

X-P-1-A X-P-1-B

X-DWH

X-SERVER

RACK

X-T

EX PNL EK

120/208V-3Ø,100A

T

EX XFMR

EX PUMP STARTERS B-1QR

120V-1Ø, 6 FLA

B-2QR

120V-1Ø, 6 FLA

P-1QR

120V-1Ø, 2.6 FLA

P-2QR

120V-1Ø, 2.6 FLA

2EK-26

1EK-16

EPO3

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR

STARTER SWITCHES.

CONNECT ALL NEW AND EXISTING BOILERS AND TO NEW EPO SYSTEM.

E-507

EAST HOUSING UNITS Q-R -

FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST HOUSING UNITS Q-R - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

EAST HOUSING UNITS Q-R MECHANICAL ROOM -

POWER DEMOLITION

SCALE: 1/4" = 1'-0"

EAST HOUSING UNITS Q-R MECHANICAL ROOM -

POWER NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/16" = 1'-0"

10510 4020

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE

ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT

AND WIRE BACK TO SOURCE.

DEMOLITION NOTES

ELECTRICAL KEY NOTES

CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,

AND MOTOR STARTER SWITCHES.

CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND

MOTOR STARTER SWITCHES.

CONNECT ALL NEW BOILERS NEW EPO SYSTEM.

E-408

E-408

DEMONEW

X-EWH 1

X-UH

X-SERVER

RACK

X-B-1

X-P 2

T T

EX. PNL "CB"

EX. PNL "CDP"

EX. XFMR "CDP"

EX. XFMR "EC"

EX. PNL "EC"

EX. XFMR EC DISC.

EX. HEAT PUMP

DISC.

X-EWH X-UH

B-1ED

120V-1Ø, 4 FLA

B-2ED

120V-1Ø, 4 FLA

P-1ED

120V-1Ø, 2.6 FLA

P-2ED

120V-1Ø, 2.6 FLA

2EC-8

1EC-28

EPO

X-SERVER

RACK

T T

EX. PNL "CB"

EX. PNL "CDP"

EX. XFMR "CDP"

EX. XFMR "EC"

EX. PNL "EC"

EX. XFMR EC DISC.

EX. HEAT PUMP

DISC.

EX. XFMR CDP DISC.

E-508

EAST HOUSING UNITS Q-R -

FIRST FLOOR PLAN -

ELECTRICAL

DEMOLITION/NEW

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

N EAST EDUCATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW

1 EAST EDUCATION BUILDING MECHANICAL ROOM - ELECTRICAL DEMOLITION

SCALE: 1/4" = 1'-0" 2 EAST EDUCATION BUILDING MECHANICAL ROOM - ELECTRICAL NEW

SCALE: 1/4" = 1'-0"

SCALE: 1/8" = 1'-0"

0 1 5 10 20

E-900

ELECTRICAL PANEL

SCHEDULES

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

E-901

ELECTRICAL PANEL

SCHEDULES

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

250689.00

M a t r ix

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

472/25362.CTS

funding code sheet description

CD Set 02/12/2026

File details come from the government source that posted it. Updated .