Central Michigan Correctional Facility - HVAC Improvements - Phase 1 - CD Drawings 25362Part-2.pdf
PDF 13 MB Posted
- Solicitation number
- RFQ 171 260000000155 4
- Issued by
- Gogebic County, Michigan
About this file
This document comprises construction design drawings for Phase 1 HVAC improvements at Central Michigan Correctional Facility, prepared by the State of Michigan Department of Technology, Management and Budget, Facilities and Business Services Administration, Design and Construction Division. The project encompasses mechanical and electrical demolition and installation work across multiple facility buildings including the East Housing Unit Q-R, East Education Building, West Administration Building, West Food Service Building, and West Housing Units A-B, C-D, and G-H. The scope of work includes removal of existing boilers, heating piping systems, gas piping, controls, and associated accessories; installation of new boilers on 4-inch concrete pads with new piping, valves, pumps, and control systems; routing of combustion air and vent piping through new roof curbs and boots; and electrical connections including new disconnects, conduit, wire, and control systems. All work must conform to Michigan Department of Corrections (MDOC) standards, with coordination required between mechanical and electrical contractors regarding 24-volt control wiring, thermostat locations, and equipment installation per manufacturer specifications and service clearance requirements.
The contract drawings specify detailed mechanical requirements including condensate neutralizing kits, carbon monoxide sensors (Kidde M/N C3010-D or approved equivalent), boiler loop temperature sensors, and emergency power-off (EPO) switches connected across all boilers. Electrical work requires installation of new transformers, panelboards, disconnects, and breakers with updated panel schedules; removal of obsolete conduit and equipment; and compliance with National Electrical Code standards and MDOC security requirements including tamper-proof fasteners and two-hole straps for conduit support. The project mandates roof penetration patching to maintain existing warranties with verification from Versatile Roofing Systems, complete system flushing and treatment of hydronic loops, and restoration of disturbed areas with specified seeding schedules. All electrical outages are limited to two-hour windows maximum, with portable generator backup required for longer shutdowns, and all relocations must be completed within one day with verification of functionality prior to contractor departure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-407
M-407
DEMO NEW
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, PIPING, VALVES, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE COMMON VENT
THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS REQUIRED TO
MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
DISCONNECT, REMOVE, AND DEMO EXISTING INTAKE LOUVER ASSOCIATED
WITH BOILER BEING DEMOLISHED AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. CONTRACTOR TO PATCH, PRIME, AND PAINT WALL AS
REQUIRED TO MATCH EXISTING.
EXISTING INTAKE LOUVER THAT IS NOT ASSOCIATED WITH DEMOLISHED
BOILER TO REMAIN.
EXISTING SUPPLY AIR FAN TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.
5. DEMOLISH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL
NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
(2) X-L EXISTING LOUVER
ENCLOSURE
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-1" GAS
X-2" GAS
X-1 1/4" GAS
X-XT-1
X-B-1
X-10" FLUE
THRU ROOF
X-P-1D
X-AS-1
X-SERVER
RACK
X-FS
X-DWH X-T
MECHANICAL ROOM
H-04
X-1 1/2" HR
(STACKED)
X-P-1C X-P-1B
X-P-1A
X-1 1/2" HS
(STACKED)
X-1 1/2" HS
(STACKED)
X-1 1/2" HR
(STACKED)
(2) 36"x24" INTAKE
LOUVERS W/DAMPERS
M
X-SF-1
X-L
X-UH
X-BOILER EPO SWITCH
3 4
X-B-1 X-AS-1
X-SHOT FEEDER
X-3/4" CW
X-CT-1
X-1" CW
X-3/4" HR
X-2 1/2" HS
X-1 1/2" HS
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-CHECK VALVE (TYP.) X-FUNNEL
X-CONDENSATE
NEUTRALIZING
KIT (TYP.)
X-UNION (TYP.)
X-GAS COCK
(TYP.)
X-1-1/2" DRAIN VALVE
PIPE TO FLOOR DRAIN.
(TYP.)
X-DRIP LEG
(TYP.)
X-2" G X-2" GX-R
X-10" V
X-BUTTERFLY VALVE (TYP.)
X-THERMOMETER (TYP.)
VTR
X-BACKFLOW
PREVENTOR
(TYP.)
X-CBV
(TYP.)
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-TWO-WAY
CONTROL VALVE
(TYP.)
X-2 1/2" HR
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-1" GAS
X-2" GAS
X-XT-1
X-P-1D
X-SERVER
RACK
X-FS
X-DWH X-T
MECHANICAL ROOM
H-04
X-1 1/2" HR
(STACKED)
X-P-1C X-P-1B
X-P-1A
X-1 1/2" HS
(STACKED)
X-1 1/2" HS
(STACKED)
X-1 1/2" HR
(STACKED)
X-SF-1
X-L
X-UH
B-1QR
CONCRETE PAD
B-2QR
G
HR
4" CA & 6" V THRU
ROOF (TYP.2)
S
CARBON MONOXIDE
SENSOR
HS
X-L EXISTING LOUVER
ENCLOSURE
36"x24" INTAKE
LOUVER W/DAMPERS
M
BOILER EPO SWITCH3
4" CONCRETE
PAD
B-1QR
CONDENSATE
NEUTRALIZING
KIT (TYP.)
TO FLOOR DRAIN (TYP.)
UNION (TYP)
HRHR
G
HS
HR
B-2QR G
HS
HS
HR
HR
HR
HS HS
G
G
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P-1QR P-2QR
P/T (TYP.)
G
1 1
PIPE TO
FLOOR
(TYP.)
BOILER LOOP
TEMPERATURE
SENSOR
AS-1QR
" M
AX
2 2 1/2" HR
2"
X-SHOT FEEDER
X-3/4" CW
X-CT-1
X-1" CW
X-3/4" HR
X-1 1/2" HS
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-FUNNEL
X-2" G X-2" GX-R
X-BUTTERFLY VALVE (TYP.)
X-THERMOMETER (TYP.)
X-BACKFLOW
PREVENTOR
(TYP.)
X-CBV
(TYP.)
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
2-1/2"
SHUTOFF VALVE (TYP)
1-1/2"
VTR
CA
VTR
CA
V
STRAINER (TYP)
2-1/2"
2-1/2"
2-1/2"
2-1/2" 2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2" 1-1/2"
1-1/2"
2 1/2" HS
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE.
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF
WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE
COMBUSTION AIR AND VENT ROUTING WITH EXISTING
PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF
PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF
STRUCTURE.
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING
RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT TO NEW BOILERS.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:
C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE
SENOR TO MEET BOILER INSPECTION REQUIREMENTS.
M-407
EAST HOUSING UNIT Q-R -
FIRST FLOOR PLAN -
MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST HOUSING UNIT Q-R - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW
EAST HOUSING UNIT Q-R MECHANICAL ROOM -
MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
EAST HOUSING UNIT Q-R MECHANICAL ROOM BOILER
PIPING DIAGRAM - DEMOLITION
SCALE: NTS
EAST HOUSING UNITS Q-R MECHANICAL ROOM -
MECHANICAL NEW
SCALE: 1/4" = 1'-0"
EAST HOUSING UNIT Q-R MECHANICAL ROOM BOILER
PIPING DIAGRAM - NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
10510 4020
BRH
MTJ
M-408
M-408
DEMONEW
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, PIPING, VALVES, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE COMMON VENT
THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS REQUIRED TO
MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
DISCONNECT, REMOVE, AND DEMO EXISTING INTAKE LOUVER ASSOCIATED
WITH BOILER BEING DEMOLISHED AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. CONTRACTOR TO PATCH, PRIME, AND PAINT WALL AS
REQUIRED TO MATCH EXISTING.
DISCONNECT, REMOVE, AND RELOCATE EXISTING PUMP, CONTROLS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
EXISTING INTAKE LOUVER THAT IS NOT ASSOCIATED WITH DEMOLISHED
BOILER TO REMAIN.
EXISTING SUPPLY AIR FAN TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMP AND ALL CONTROLS ARE TO REMAIN.
5. DEMOLISH OR RELOCATE EXISTING PIPING AS REQUIRED TO ALLOW
SPACE TO INSTALL NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED
ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
X-EWH
X-B-1
X-P
X-2" GAS
X-1 1/4" GAS
X-1/2" HS/HR
X-UH
MECHANICAL ROOM
E-13
X-2" HR X-2" HS
X-10" FLUE
THRU ROOF
X-SERVER RACKX-FS
(2) X-L
EXISTING LOUVER
ENCLOSURE
(2) INTAKE LOUVERS
W/DAMPERS
M
X-SF-1
X-B-1
X-SHOT FEEDER
X-XT-1
X-3/4" CW
X-3/4" HR
X-2" HS
X-CHECK VALVE (TYP.)
X-FUNNEL
X-CONDENSATE
NEUTRALIZING KIT
(TYP.)
X-UNION (TYP.)
X-GAS COCK
(TYP.)
X-1-1/2" DRAIN VALVE
PIPE TO FLOOR DRAIN.
(TYP.)
X-DRIP LEG
(TYP.)
X-2" G X-2" GX-R
X-10" V
X-BUTTERFLY VALVE
(TYP.)
X-THERMOMETER (TYP.)
VTR
X-BACKFLOW
PREVENTOR
(TYP.)
X-2" HR
X-P
X-2" HSX-2" HS
X-EWH
X-2" GAS
X-1/2" HS/HR
X-UH
MECHANICAL ROOM
E-13
X-2" HR X-2" HS
X-SERVER RACKX-FS
X-SF-1
B-1ED
B-2ED
4" CA & 6" V
THRU ROOF
(TYP.2)
CONCRETE PAD 1
S
BOILER EPO SWITCH3
CARBON MONOXIDE
SENSOR
G
AS-1ED1
X-P
X-L
EXISTING LOUVER
ENCLOSUREM
X-SHOT FEEDER
X-XT-1
X-3/4" CW
X-3/4" HR
X-2" HS
X-FUNNEL
X-2" GX-R
X-BUTTERFLY VALVE
(TYP.)
X-BACKFLOW
PREVENTOR
(TYP.)
X-2" HR
4" CONCRETE
PAD
B-1ED
CONDENSATE
NEUTRALIZING
KIT (TYP.)
2"
TO FLOOR DRAIN (TYP.)
STRAINER (TYP)
UNION (TYP)
HRHR
G
HS
HS
HR
B-2ED G
HS
HS
HR
HR
HR
HS HS
G
G
2" 2"
2"
2" 2"
2"2"
2"
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
SHUTOFF VALVE
(TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P-1ED P-2ED
P/T (TYP.)
G 1-1/4"
1 1
2"
PIPE TO
FLOOR
(TYP.)
BOILER LOOP
TEMPERATURE
SENSOR
" M
AX
AS-1ED
X-P
2"
X-CHECK VALVE (TYP.)
X-BV (TYP.)
1-1/4" 1-1/4"VTR
V
CA
VTR
V
CA
2"
2"
3/4" CW
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY VERSATILE ROOFING
SYSTEMS (PHONE#: 231-834-9576).
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF
WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE
COMBUSTION AIR AND VENT ROUTING WITH EXISTING
PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF
PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF
STRUCTURE.
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING
RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT TO NEW BOILERS.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:
C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE
SENOR TO MEET BOILER INSPECTION REQUIREMENTS.
REINSTALL EXISTING PUMP, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES TO THE LOCATION SHOWN.
M-408
EAST EDUCATION BUILDING
- FIRST FLOOR PLAN -
MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST EDUCATION BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW
EAST EDUCATION BUILDING MECHANICAL ROOM -
MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
EAST EDUCATION BUILDING MECHANICAL ROOM BOILER
PIPING DIAGRAM - DEMOLITION
SCALE: NTS
EAST EDUCATION BUILDING MECHANICAL ROOM -
MECHANICAL NEW
SCALE: 1/4" = 1'-0"
EAST EDUCATION BUILDING MECHANICAL ROOM BOILER
PIPING DIAGRAM - NEW
SCALE: NTS
BRH
MTJ
SCALE: 1/8" = 1'-0"
0 1 5 10 20
12" DEEP 4,000 PSI W/6-8% AIR INTRADMENT LIMESTONE MIX
4.5 TO 6.5 SLUMP FIBER MESH CONCRETE PAD WITH #4 REBAR
TOP OF CONCRETE PAD TO BE MINIMUM 4" ABOVE GRADE
1" BY 1"
CHAMFER
(ALL ROUND)
GRADE
HOUSE KEEPING PADS SIZED AS
SHOWN ON NEW PLANS AND PROVIDE A
1" X 1" CHAMFER AROUND ALL EDGES.
(TYP.)
12"
4"
GRADE
CONCRETE
1. CONCRETE MATERIAL SHALL BE:
1.1. ASTM C150 - TYPE 1 PORTLAND, COLOR SHALL MATCH EXISTING.
1.2. FINE AND COARSE AGGREGATES: ASTM C33, FINE MDOT DESIGNATED 2NS, COARSE MDOT
DESIGNATED 6AA.
1.3. WATER: CLEAN AND NOT DETRIMENTAL TO CONCRETE.
1.4. MIX CONCRETE IN ACCORDANCE WITH ASTM C94. MIXTURE SHALL BE HIGH-EARLY IN
ACCORDANCE WITH MDOT CONCRETE P-NC PER MDOT STANDARD SPECIFCATIONS FOR
CONSTRUCTION 2012, SECTION 603 AND 801.
2. THE CONCRETE DEPTH IS INDICATED ON THE DETAILS.
3. GRANULAR BASE SHALL BE 4" 21AA CRUSHED LIMESTONE.
4. ADMIXTURES:
4.1. AIR ENTRAINMENT ASTM C260
4.2. CHEMICAL ASTM C494, TYPE B AND D ONLY, TYPE B - RETARDING TYPE D - WATER REDUCING
AND TESTING.
5. REINFORCEMENT SHALL BE GRADE 60 #4 REBAR.
6. FORMED JOINTS:
6.1. PLACE EXPANSION JOINT FILLER BETWEEN PAVING COMPENTS, AND BUILDING OR OTHER
APPURTENANCES, EXCEPT WHERE SIDEWALK ABUTS BITUMINOUS PAVEMENT. RECESS TOP
OF FILLER 1/2 INCH.
7. PSI OF THE CONCRETE SHALL BE A MINIMUM OF 4,000 W/6-8% AIR INTRADEMENT LIMESTONE MIX
4.5 TO 6.5 SLUMP FIBER MESH CONCRETE.
8. SITE PREPARATION
8.1. REMOVE EXISTING MATERIAL 4" BELOW GRADE AND INFILL WITH GRANULAR BASE
9. PLACING CONCRETE:
9.1. IN ACCORDANCE WITH ACI 301
9.2. ENSURE REINFORCEMENT, INSERTS, EMBEDDED PARTS AND FORMED JOINTS ARE NOT
DISTURBED DURING CONCRETE PLACEMENT.
9.3. POOR CONTINUOUSLY BETWEEN PREDETERMINED CONSTRUCTION JOINTS. DO NOT BREAK
OR INTERRUPT SUCCESSIVE POURS SUCH THAT COLD JOINTS OCCUR.
9.4. RESTORE GRADE AND PLANT GRASS TO MATCH EXISTING GRADE.
10. SEALER:
10.1. PROVIDE AND INSTALL A PENETRATING SEALING COMPOUND ON BASES EQUAL TO PENTREAT
244-100.
10.1.1. DESIGN TO LIMIT THE INTRUSION OF MOISTURE AND CHLORIDES INTO THE SUBSTRATE.
10.1.2. REDUCES SPALLING.
10.1.3. PENETRATES DEEPLY FOR MAXIMUM PROTECTION.
10.1.4. MINIMIZES PENETRATION FROM DE-ICING CHEMICALS, SALT, WATER THAT MIGHT
DAMAGE CONCRETE SURFACES.
10.1.5. SEALS PORES AND CAPILLARIES OF SUBSTRATE, PREVENTING LIQUID ABSORPTION
WHILE ALLOWING EXCELLENT VAPOR TRANSMISSION.
10.1.6. LEAVES NO RESIDUE AND REQUIRES NO CLEANING AFTER APPLICATION.
11. AFTER CONSTRUCTION IS COMPLETED REFER TO SEEDING SCHEDULE TO PLANT GRASS.
1 CONCRETE PAD DETAIL
SCALE: NTS
SEEDING SCHEDULE
CONTRACTOR TO SUPPLY 6" OF TOPSOIL OVER ALL
DISTURBED AREAS. SEED ALL DISTURBED AREAS
WITH THE FOLLOWING SEED MIX:
40% KENTUCKY BLUEGRASS
25% CREEPING FESCUE
20% PERENNIAL RYEGRASS
15% CHEWING FESCUE
APPLY AT A RATE OF 8 LBS PER 1,000 SQUARE FEET
OR 350 LBS PER ACRE.
2 INSULATION HANGER DETAIL
SCALE: NTS
14 GAUGE ZINC
COATED SHEET
STEEL SADDLE, AT
LEAST 12" LONG
PIPE
INSULATION
THERMAL HANGERS
SHIELD INSERTS
(360-DEG)
3 GRADE MOUNTED AHU-2 DETAIL
SCALE: NTS
1ST FLOOR
X-AHU-2
X-RA
X-
RA
CEILING
DEMOLITION ELEVATION
X-UNION
X-DIRT LEG
X-G
X-GAS REGULATOR
EXISTING CONCRETE PAD
EXISTING ROOF CURB
X-POWERED
EXHAUST
X-GAS COCK
1ST FLOOR RA
X-
RA
FLEXIBLE CONNECTOR
CEILING
X-UNION
X-DIRT LEG
X-G
X-GAS REGULATOR
EXISTING CONCRETE PAD
NEW POWERED
EXHAUST
X-GAS COCK
NEW ELEVATION
AHU-2
NEW ROOF CURB
NEW CONCRETE PADDUCT SUPPORT, TYP. BASED ON
MIRO 8-DS OR APPROVED EQUAL
FOR SUPPLY AND RETURN
DUCTWORK
FRAME
VANED ELBOW
LOCKING LUG
2-1/4"R
4-1/2"R
TURNING VANE
NOTES:
1. LOCKING LUGS INTEGRAL WITH VANE
2. MAXIMUM UNSUPPORTED VANE LENGTH 48"
3. FRAMES - BOLTED OR RIVETED TO ELBOW
4. VANES AND FRAMES - SAME GAUGE AS ELBOW
2 1 /4"
3 1 /2"
TURNING VANES FOR
SQUARE ELBOW DETAIL
SCALE: NTS
NOTES:
1. CONFIGURATION SHOWN FOR AHU-2
2. GRADE MOUNTED STANDARD ROOF CURB
3. SEE NEW MECHANICAL PRINTS FOR SUPPLY AIR DUCT SIZES.
4. INSTALL MIRO SUPPORTS UNDER SUPPLY AIR DUCTWORK AS
WELL PER NOTE IN DIAGRAM.
1-1/4" G
M-800
MECHANICAL DETAILS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
M-900
MECHANICAL SCHEDULES
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVEDUPLEX RECEPTACLE
DOCK LIGHT FIXTURE
TELEPHONE / DATA OUTLET
ELECTRICAL SYMBOLS LEGEND
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
SOUND and SIGNAL
SERVICE and EQUIPMENT
THERMOSTAT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
DISCONNECT SWITCH
TRANSFORMER
CONTROL
xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt
LIGHTING CONTACTOR
CONTROL TRANSFORMER
buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)
PHOTOCELL (voltage as required)
HUMIDISTAT
(by E.C.)
(by others)
TT
G
WW
PC
CT
TS
T
H
TC
IC
T
1,3
OR
PM
WM
BD
UFD
F S
J
J
PP
J
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST (E)
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
SSCP
COCCTV
SECURITY SYSTEM CONTROL PANEL
CAMERA
DATA RACK
RACK MOUNTED UPS
BRACKET MOUNTED UPS
WALL MOUNTED UPS
POLE
POLE
HOW HIGH ON WALL
DR
RUPS
FUPS
WUPS
P
C
X
X
X ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
DESIGNATIONS
D
PLUG STRIP (PDU)
120V-1Ø TO 20 AMP
1 POLE BREAKER IN
PANEL
120V-1Ø TO 20 AMP
1 POLE BREAKER IN
PANEL
BOILER (B-1)
120V-1Ø TO 20 AMP
1 POLE BREAKER IN
PANEL
BOILER (B-2)
REPO
BUTTON(S)
PROVIDE A (N) POLE CONTACTOR
1 BOILER EMERGENCY OFF SWITCH
SCALE: N.T.S.
BOILER (B-N)
GENERAL ELECTRICAL NOTES
1. ALL NON-FIRE RATED WALLS ARE TO BE PATCHED WITH LIKE
MATERIAL TO MAINTAIN ORIGINAL RATING.
2. ALL WALL AND FLOOR PENETRATIONS THROUGH FIRE RATED WALLS
ARE TO BE SEALED WITH FIRE CAULK TO MAINTAIN ORIGINAL
RATING. EXISTING PENETRATIONS IN THE AREA OF WORK THAT ARE
NOT PROPERLY SEALED ARE TO BE SEALED TO MATCH THE RATING
OF THE WALL.
3. ALL CONDUITS SHALL BE FIELD ROUTED ALONG EXISTING PIPING
AND STRUCTURAL STEEL. CONDUITS SHALL BE INSTALLED
STRAIGHT, LEVEL, AND PARALLEL OR PERPENDICULAR TO THE
BUILDING LINES.
4. CONTRACTORS SHALL VISIT THE PROJECT SITE DURING PRE-BID
WALK THROUGH TO DETERMINE THE EXACT EXTENT OF THE WORK
REQUIRED BEFORE BIDDING THE PROJECT.
5. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE, AND
EQUIPMENT NOT TO BE RE-USED WHERE WORK IS BEING DONE
EXCEPT ITEMS NOTED OTHERWISE.
6. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF
OLD WORK, SURFACES SHALL BE PATCHED AND PAINTED TO MATCH
ADJACENT.
7. EXISTING WORK, WHICH IS PRESENTLY CONCEALED, WHICH WILL
REMAIN CONCEALED, AND DOES NOT INTERFERE WITH ANY NEW
WORK OF ANY TRADE NEED NOT BE REMOVED. HOWEVER, ALL
CONDUIT SHALL BE CAPPED BELOW FINISH SURFACE AND THEN
PATCHED AND PAINTED TO MATCH, OR AS NOTED.
8. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE
MODIFIED OR ENLARGED TO SUIT THE NEW SYSTEMS AS REQUIRED.
PROVIDE ALL REQUIRED CUTTING AND PATCHING.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING
WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE
MOUNTED EQUIPMENT.
10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AND LOADS
PRIOR TO INSTALLING SERVICE TO EQUIPMENT.
11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENTS AND
CASUAL FIELD OBSERVATION. REPORT ANY DISCREPANCIES TO
ENGINEER FOR CLARIFICATION.
12. CONDUITS AND BOXES:
12.1. 3/4" MINIMUM TRADE SIZE.
12.2. EMT TYPE CONDUIT IS APPROVED WITH COMPRESSION
FITTINGS.
12.3. NO PVC ALLOWED INSIDE OF BUILDINGS.
12.4. CONDUITS SHALL BE ATTACHED WITH TWO-HOLE STRAPS.
SINGLE HOLE STRAPS ARE NOT PERMITTED.
12.5. NO SET SCREWS ARE ALLOWED.
12.6. TAMPER-PROOF SCREWS REQUIRED FOR EXPOSED CONDUIT
AND BOXES MOUNTED BELOW TEN FEET.
12.7. DRIVE PIN ANCHORS USED ON MASONARY OR CONCRETE
WALLS/CEILINGS.
13. MINIMUM RACEWAY SIZE; 3/4" TRADE SIZE. ALL FLEXIBLE CONDUIT
RACEWAYS SHALL BE LIQUID TITE, MAXIMUM 36" LENGTH AND MUST
BE APPROVED BY PSC AND MDOC PROJECT MANAGER. REFER TO
SPECIFICATION 260533 - RACEWAY AND BOXES FOR ELECTRICAL
SYSTEMS.
14. INSTALLATION OF ANY NEW OR REWORKED CONDUIT, FITTINGS, AND
STRAPS SHALL FOLLOW CURRENT NEC AND MDOC STANDARDS.
15. CONDUIT, CONDUIT INSTALLATION, AND BOXES BEING REUSED
SHALL BE BROUGHT UP TO CURRENT MDOC STANDARDS.
16. ALL CONDUIT AND BOXES ABOVE 10 FOOT OR IN
MECHANICAL/ELECTRICAL ROOMS, SHALL MEET THE FOLLOWING
REQUIREMENTS:
16.1. STRAP DISTANCE: 5 FEET.
16.2. FASTENERS: 2 HOLE.
16.3. CONDUIT” INTERIOR EMT, EXTERIOR EXPOSED/CONCEALED-
GRC.
16.4. FITTINGS: COMPRESSION.
16.5. BOXES: STANDARD BOXES FOR ENVIORNMENT INSTALLED TO
MEET N.E.C.
16.6. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND
ENCLOSURES.
17. ALL CONDUIT AND BOXES 10 FOOT AND BELOW SHALL MEET THE
FOLLOWING REQUIREMENTS:
17.1. STRAP DISTANCE: 3 FEET.
17.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.
17.3. SECURITY HARDWARE:
17.3.1. TORX T-25 WITH CENTER REJECTION PIN.
17.3.2. HEX HEAD CONCRETE SCREWS WITH NO SCREWDRIVER
SLOT.
17.3.3. EXPANSION POUND-IN ANCHORSWITH NO SCREWDRIVER
SLOT THAT DO NOT REQUIRE TO BE EXPLOSIVELY DRIVEN.
17.3.4. PRE-APPROVED HARDWARE.
17.4. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED -
GRC.
17.5. FITTINGS: COMPRESSION
17.6. BOXES:
17.6.1. SURFACE MOUNTED:
17.6.1.1. BELL BOX: FS TYPE, WITH SQUARE HEAD KO SEAL.
17.6.1.2. NO KNOCKOUTS - DRILL AS REQUIRED.
17.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND
ENCLOSURES.
18. ALL EXPOSED WIRING SHALL BE IN CONDUIT. OPEN LOW VOLTAGE
WIRING ABOVE ACCESIBLE CEILINGS IS ACCEPTABLE.
18.1. ALL EXPOSED WIRING ABOVE CEILINGS SHALL BE INSTALLED
WITH J-HOOKS. DO NOT CONNECT TO EXISTING CEILING TIE
WIRES.
19. ALL WALLS THAT ARE ACCESSIBLE SHALL BE FISHED AND DEVICE
CUT INTO WALL.
20. ALL LOCATIONS WHERE THE WALLS CAN NOT BE FISHED SHALL BE
SURFACE MOUNTED CONDUIT FOLLOWING NOTES 14 THROUGH 15
ABOVE.
21. ALL EXTERIOR CONCEALED CONDUIT UNDERGROUND SHALL BE
RNC/HDPE SCHEDULE 40. ALL EXTERIOR ABOVE GROUND CONDUIT
SHALL BE RGC. PROVIDE UL LISTED #12 COPPER TRACER WIRE TO
ALL UNDERGROUND CONDUITS INSTALLED FOR LOW VOLTAGE.
22. ALL ELECTRICAL OUTAGES SHALL NOT LAST OVER 2-HOURS. IF A
WINDOW OF GREATER THAN 2 HOURS FOR AN ELECTRICAL SHUT
DOWN OR CUT OVER IS REQUIRED, THEN A PORTABLE GENERATOR
SHALL BE USED TO REPLACE POWER TO ALL PERIMETER DETCTION,
VIDEO MANAGEMENT, LINE SAFTEY, AND ANY OTHER ELECTRICAL
SERVICE REQUIRED. ALL OUTAGES AND CUT OVERS SHALL BE
COORDINATED A MINIMUM OF 2-WEEKS PRIOR TO WORK, INCLUDING
AN HOUR BY HOUR SCHEDULE, MUST BE SUBMITTED TO MDOC
LEADERSHIP AND THE FACILITY FOR REVIEW.
23. WHEN RELOCATING ANY ELECTRICAL DEVICE, CONTRACTOR SHALL
COMPLETE THE RELOCATION IN ONE DAY AND VERIFY THAT ALL
DEVICES RELOCATED ARE WORKING PROPERLY PRIOR TO LEAVING
THE SITE.
24. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED
COMPONENTS, RACEWAYS, WIRE, AND HARDWARE, AS INDICATED
ON DRAWINGS.
25. CONTRACTOR SHALL PROVIDE UPDATED PANEL SCHEDULES FOR
ALL PANELS AFFECTED BY THIS PROJECT. UPDATED SCHEDULES
SHALL BE PRINTED AND INSTALLED ON THE INSIDE COVER OF THE
PANEL.
26. ALL WORK COMPLETED WITHOUT APPROVED SHOP DRAWINGS IS AT
CONTRACTOR'S RISK.
27. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF
ALL 24V CONTROL WIRING AS REQUIRED TO LOCALLY CONTROL ALL
HVAC & PLUMBING IN ACCORDANCE WITH THE SEQUENCE OF
OPERATIONS. REFER TO THE MECHANICAL DRAWINGS FOR ALL
LOCAL THERMOSTAT LOCATIONS AND MECHANICAL SPECIFICATIONS
FOR INSTALLATION REQUIREMENTS. COORDINATE IN FIELD WITH
MECHANICAL CONTRACTOR AS REQUIRED. ELECTRICAL
CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONDUIT, WIRE,
AND HARDWARE AS REQUIRED IN ACCORDANCE WITH ELECTRICAL
SPECIFICATIONS. REFER TO SHEET E-100 DETAIL 1 FOR ADDITIONAL
INFORMATION.
28. CONTRACTOR SHALL NOTIFY PSC OF ANY EXISTING INSTALLATIONS
NOT MEETING THESE STANDARDS PRIOR TO STARTING WORK IN THE
AREA.
29. UPON RELOCATING LIGHTS AND CAMERAS CONTRACTORS SHALL
VERIFY THAT THE LIGHTS AND CAMERAS ARE WORKING PROPERLY
PRIOR TO LEAVING THE SITE.
30. CONTRACTOR SHALL USE MDOC APPROVED POLES AND FIXTURES,
NO ALTERNATES WILL BE ALLOWED. ALL OTHER STATE OF MICHIGAN
AGENCY SPECIFICATIONS DO NOT APPLY.
31. CONTRACTOR SHALL NOT ADD MORE THAN 20% CAPACITY TO ANY
PANEL.
32. ARC FLASH LABELS TO BE PROVIDED FOR ALL NEW PANELBOARDS.
33. NEW PRINTED CIRCUIT DIRECTORIES SHALL BE PROVIDED FOR ALL
NEW AND REVISED PANELBOARDS.
34. CONTRACTOR SHALL SUBMIT AN RFI FOR ANY NON-CODE
COMPLIANT ELECTRICAL EQUIPMENT OR ELECTRICAL INSTALLATION.
AN RFI RESPONSE WILL BE PROVIDED GIVING DIRECTION ON HOW
TO PROCEED.
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
JFS
SGS
EXISTING EQUIPMENT TO REMAIN.
EXISTING EQUIPMENT TO BE REMOVED. REMOVE ASSOCIATED CONDUIT &
WIRE BACK TO SOURCE.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. REMOVE ASSOCIATED CONDUIT & WIRE BACK
TO SOURCE.
ELECTRICAL DEVICE TO BE REMOVED. EXISTING CONDUIT AND WIRE TO
REMAIN FOR NEW RECEPTACLE.
EXISTING EQUIPMENT TO BE REMOVED, ASSOCIATED CONDUIT AND WIRE
TO REMAIN.
DEMOLITION NOTES
X-AHU-2
X-AHU-1
T EX PNL
EA
MECHANICAL
A13
1EX E-XMFR DISCONNECT
EX PNL
ADP
EX
E-XMFR
EX-IT RACK
EX-IT RACK
EX-IT RACK
EX-CU
EX-CU
EX-AC
EX-SECURITY
CONTROLLER EX-CONTROL
PANEL
EX-CD PUMP
EX-PNL UPS PP
EX UPS-PP DISCONNECT
EX EMERGENCY DISCONNECT
E-300
WEST ADMINISTRATION
BUILDING - FIRST FLOOR
PLAN - ELECTRICAL
DEMOLITION
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/8" = 1'-0"
0 1 5 10 20
JFS
SGS
1 ELECTRICAL A48 ENALRGED DEMO
SCALE:1/2"-=1'
AHU-2
480V-3Ø, 40.1FLA
1 ADP-4
EX PNL
ADP
MECHANICAL A13
WP
GFI
WP
T EX PNL
EA
EX XMFR DISCONNECT
NEW 45KVA E-XMFR
E500 PNL EB DISCONNECT
WP
POWERED
EXHAUST
480V-3Ø, 3.2FLA
ELECTRICAL KEY NOTES
CONTRACTOR SHALL CONNECT TO EXISTING AHU-2 CIRCUIT. PROVIDE AND
INSTALL NEW DISCONNECT AND FUSES. INSTALL NEW (3) #6 WIRE, AND (1)
#10 GROUND WIRE IN 1" CONDUIT. CONTRACTOR TO PROVIDE NEW 60A 3P
BREAKER. REPLACE EXISTING 50A AHU-2 BREAKER IN PANEL ADP.
CONTRACTOR SHALL CONNECT TO EXISTING AIR HANDLER SERVICE
RECEPTACLE CIRCUIT. MODIFY CONDUIT AND WIRE AS REQUIRED.
2FROM
CU-2
FROM
CU-1
CU-2
208V-1Ø,18.5A
CU-1
208V-1Ø,18.5A
AC-1
208V-1Ø,18.5A
AC-2
208V-1Ø,18.5A
EX PNL UPS-PP
EX UPS-PP DISSCONNECT
EX EMERGENCY DISCONNECT
EX-IT RACK
EX-IT RACK
EX-IT RACK
EX-CU
EX-SECURITY
CONTROLLER EX-CONTROL
PANEL
EX-CD PUMP
EB-1,3
EB-2,4 EB-5
WPWP
WP
GFI
PNL EB
PANEL
NEW
EB
208/120V 3Ø, 4W
60A MCB
TO EXISTING 60A/60AF/3P
SWITCH IN EXISTING PANEL
EMDP IN MAINTENANCE
BUILDING
NEW TRANSFORMER
45KVA
120/208V-3Ø
SECONDARY
EXISTING
(3) #6,
(1) #6 GRD.
(1) 2" CND.
(4) #4
(1) #8 GND
(1) 1-1/4" CND
2 REPLACED TRANSFORMER (PARTIAL ONE LINE DIAGRAM)
SCALE: N.T.S.
480V
PANEL
EXISTING
EA
208/120V 3Ø, 4W
100A MCB
(4) #2 AWG
(1) #8 GND
(1) 1-1/4" CND
EXISTING
60A/3P
60A/3P
3PH 4W
NEMA 1
FUSED
60A FUSES
(4) #4
(1) #8 GND
(1) 1-1/4" CND
E-500
WEST ADMINISTRATION
BUILDING - FIRST FLOOR
PLAN - MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
JFS
SGS
1 ELECTRICAL A48 ENLARGED NEW
SCALE:1/2" = 1'0"
EXISTING EQUIPMENT TO REMAIN
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT, CONDUIT AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
E-501
E-501
DEMONEW
X-GUH-3
X-MAU-1
X-P-12
X-P-8
X-P-11 X-P-10
X-AHU-1
X-AHU-2
X-P-9
X-AS-5
X-STEAM BOILER
X-B-4
X-B-5
EX. MCC DD-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
EX. ED-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
X-T1
X-DWH1
EX. PNL EDA
120/208V-3Ø
30A MCB
EX. MCC DD-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
EX. ED-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
X-GUH-3
X-MAU-1
X-P-12
X-P-8
X-AHU-1
X-AHU-2
X-P-9
X-AS-5
X-STEAM BOILER
EX. MCC DD-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
EX. ED-DP
480V-3Ø, 3W 600A
SEC. 1 - 600A
SEC. 2 - 300A
X-T
X-DWH
B-1FS
120V-1Ø, 8 FLA
P-1FS
120V-1Ø, 5.6 FLA
P-2FS
120V-1Ø, 5.6 FLA
P-3FS
120V-1Ø, 5.6 FLA
B-2FS
120V-1Ø, 8 FLA
B-3FS
120V-1Ø, 8 FLA
EPO
EPO
EX. PNL EDA
120/208V-3Ø
30A MCB TEB
NEW PNL EDB
120/208V-3Ø
100A MCB
NEW 30 KVA
XFMR
EDB-1
EDB-3
EDB-5
EDB-6
EDB-4
EDB-2
ELECTRICAL KEY NOTES
CONNECT ALL NEW AND EXISTING BOILERS TO EPO SYSTEM.
CONTRACTOR SHALL PROVIDE AND INSTALL NEW 60A SWITCH AND 50A
FUSES IN EXISTING CUTLER HAMMER MCC ED-DP.
PARTIAL ELECTRICAL RISER DIAGRAM
SCALE: N.T.S
KVA
T #8
EB
PANEL
NEW
EDB
120/208V 3Ø, 4W
100A, MCB
EX ED-DP
480-3Ø 3W, 600A MCB
(4) #2
#8 GND
1-1/4" CND
(3) #6
#10 GND
1" CND
EXISTING FEED
60A/3P
50A2
E-501
WEST FOOD SERVICE
BUILDING - FIRST FLOOR
PLAN - ELECTRICAL
DEMOLITION/NEW
SGS
JFS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST FOOD SERVICE BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
WEST FOOD SERVICE BUILDING MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
WEST FOOD SERVICE BUILDING MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-502
E-502
DEMO NEW
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
X-B-1
X-GUH
X-SF-1
EX PNL EJ
X-P 1A-1D
(STACKED)
X-DWH 1
X-P-17 2
T
EX XFMR1
X-SERVER
RACK
X-T
EX PUMP STARTERS1
X-GUH
X-SF-1
EX PNL EJ
120/208V-3Ø,100A
X-P 1A-1D
(STACKED)
X-DWH
T
EX XFMR
X-SERVER
RACK
X-T
EX PUMP STARTERS
B-1AB
120V-1Ø, 6 FLA
B-2AB
120V-1Ø, 6 FLA
P-1AB
120V-1Ø, 2.6 FLA
P-2AB
120V-1Ø, 2.6 FLA
EPO
EJ-15
EJ-16
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND
MOTOR STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS NEW EPO SYSTEM.
E-502
WEST HOUSING UNITS
A-B - FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST HOUSING UNITS A-B - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
WEST HOUSING UNITS A-B MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
WEST HOUSING UNITS A-B MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-503
E-503
DEMO NEW
X-B-1
X-GUH
X-SF-1
EX PNL EG
X-P 1A-1D
(STACKED)
X-DWH 1
X-P 2
T
EX XFMR1
X-SERVER
RACK
X-T
EX PUMP STARTERS1
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
X-GUH
X-SF-1
EX PNL EG
120/208V-3Ø,100A
X-P 1A-1D
(STACKED)
X-DWH
T
EX XFMR
X-SERVER
RACK
X-T
EX PUMP STARTERS B-1CD
120V-1Ø, 6 FLA
B-2CD
120V-1Ø, 6 FLA
P-1CD
120V-1Ø, 2.6 FLA
P-2CD
120V-1Ø, 2.6 FLA
EPO
EG-15
EG-16
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND
MOTOR STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.
E-503
WEST HOUSING UNITS
C-D - FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST HOUSING UNITS C-D - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
WEST HOUSING UNITS C-D MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0" 2
WEST HOUSING UNITS C-D MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-505
E-505
DEMO NEW
X-B-1
X-GUH
X-SF-1
EX PNL EK
X-P 1A-1D
(STACKED)
X-DWH 1
X-P 2
T
EX XFMR1
X-SERVER
RACK
X-T
EX PUMP STARTERS1
X-GUH
X-SF-1
EX PNL EK
120/208V-3Ø,100A
X-P 1A-1D
(STACKED)
X-DWH
T
EX XFMR
X-SERVER
RACK
X-T
EX PUMP STARTERS B-1GH
120V-1Ø, 6 FLA
B-2GH
120V-1Ø, 6 FLA
P-1GH
120V-1Ø, 2.6 FLA
P-2GH
120V-1Ø, 2.6 FLA
EPO
EK-15
EK-16
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND
MOTOR STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.
E-504
WEST HOUSING UNITS G-H -
FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST HOUSING UNITS G-H - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
WEST HOUSING UNITS G-H MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
WEST HOUSING UNITS G-H MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-507
E-507
DEMO NEW
X-B-1
X-P-1-D
X-P-1-C
X-P-1-A
X-P-1-B
1 X-DWH
X-SERVER
RACK 1
X-T 1
EX PNL EH1
T
EX XFMR1
EX PUMP STARTERS1
1 X-P-1-D
X-P-1-C
X-P-1-A X-P-1-B
X-DWH
X-SERVER
RACK
X-T
EX PNL EH
120/208V-3Ø,100A
T
EX XFMR
EX PUMP STARTERS B-1LM
120V-1Ø, 6 FLA
B-2LM
120V-1Ø, 6 FLA
P-1LM
120V-1Ø, 2.6 FLA
P-2LM
120V-1Ø, 2.6 FLA
2EH-22
1EH-16
EPO3
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR
STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.
E-505
EAST HOUSING UNITS L-M -
FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
MTJ
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST HOUSING UNITS L-M - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
EAST HOUSING UNITS L-M MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
EAST HOUSING UNITS L-M MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-508
E-508
DEMO NEW
X-B-1
X-P-1-D
X-P-1-C
X-P-1-A
X-P-1-B
1 X-DWH
X-SERVER
RACK 1
X-T 1
EX PNL EJ1
T
EX XFMR1
EX PUMP STARTERS1
1 X-P-1-D
X-P-1-C
X-P-1-A X-P-1-B
X-DWH
X-SERVER
RACK
X-T
EX PNL EH
120/208V-3Ø,100A
T
EX XFMR
EX PUMP STARTERS B-1NP
120V-1Ø, 6 FLA
B-2NP
120V-1Ø, 6 FLA
P-1NP
120V-1Ø, 2.6 FLA
P-2NP
120V-1Ø, 2.6 FLA
2EJ-22
1EJ-16
EPO3
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR
STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS TO NEW EPO SYSTEM.
E-506
EAST HOUSING UNITS N-P -
FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST HOUSING UNITS N-P - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
EAST HOUSING UNITS N-P MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
EAST HOUSING UNITS N-P MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
E-509
E-509
DEMO NEW
X-B-1
X-P-1-D
X-P-1-C
X-P-1-A
X-P-1-B
1 X-DWH
X-SERVER
RACK 1
X-T 1
EX PNL EK1
T
EX XFMR1
EX PUMP STARTERS1
1 X-P-1-D
X-P-1-C
X-P-1-A X-P-1-B
X-DWH
X-SERVER
RACK
X-T
EX PNL EK
120/208V-3Ø,100A
T
EX XFMR
EX PUMP STARTERS B-1QR
120V-1Ø, 6 FLA
B-2QR
120V-1Ø, 6 FLA
P-1QR
120V-1Ø, 2.6 FLA
P-2QR
120V-1Ø, 2.6 FLA
2EK-26
1EK-16
EPO3
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
PROVIDE NEW 20A-1P BREAKER. PROVIDE NEW CONDUIT, WIRE, AND MOTOR
STARTER SWITCHES.
CONNECT ALL NEW AND EXISTING BOILERS AND TO NEW EPO SYSTEM.
E-507
EAST HOUSING UNITS Q-R -
FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST HOUSING UNITS Q-R - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
EAST HOUSING UNITS Q-R MECHANICAL ROOM -
POWER DEMOLITION
SCALE: 1/4" = 1'-0"
EAST HOUSING UNITS Q-R MECHANICAL ROOM -
POWER NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/16" = 1'-0"
10510 4020
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EXISTING EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE
ASSOCIATED DISCONNECT. DISCONNECT AND REMOVE EXISTING CONDUIT
AND WIRE BACK TO SOURCE.
DEMOLITION NOTES
ELECTRICAL KEY NOTES
CONNECT TO REMOVED BOILER CIRCUIT. PROVIDE NEW CONDUIT, WIRE,
AND MOTOR STARTER SWITCHES.
CONNECT TO REMOVED PUMP CIRCUIT. PROVIDE NEW CONDUIT, WIRE, AND
MOTOR STARTER SWITCHES.
CONNECT ALL NEW BOILERS NEW EPO SYSTEM.
E-408
E-408
DEMONEW
X-EWH 1
X-UH
X-SERVER
RACK
X-B-1
X-P 2
T T
EX. PNL "CB"
EX. PNL "CDP"
EX. XFMR "CDP"
EX. XFMR "EC"
EX. PNL "EC"
EX. XFMR EC DISC.
EX. HEAT PUMP
DISC.
X-EWH X-UH
B-1ED
120V-1Ø, 4 FLA
B-2ED
120V-1Ø, 4 FLA
P-1ED
120V-1Ø, 2.6 FLA
P-2ED
120V-1Ø, 2.6 FLA
2EC-8
1EC-28
EPO
X-SERVER
RACK
T T
EX. PNL "CB"
EX. PNL "CDP"
EX. XFMR "CDP"
EX. XFMR "EC"
EX. PNL "EC"
EX. XFMR EC DISC.
EX. HEAT PUMP
DISC.
EX. XFMR CDP DISC.
E-508
EAST HOUSING UNITS Q-R -
FIRST FLOOR PLAN -
ELECTRICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N EAST EDUCATION BUILDING - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION/NEW
1 EAST EDUCATION BUILDING MECHANICAL ROOM - ELECTRICAL DEMOLITION
SCALE: 1/4" = 1'-0" 2 EAST EDUCATION BUILDING MECHANICAL ROOM - ELECTRICAL NEW
SCALE: 1/4" = 1'-0"
SCALE: 1/8" = 1'-0"
0 1 5 10 20
E-900
ELECTRICAL PANEL
SCHEDULES
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
E-901
ELECTRICAL PANEL
SCHEDULES
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026