Central Michigan Correctional Facility - HVAC Improvements - Phase 1 - CD Drawings 25362Part-1.pdf
PDF 14 MB Posted
- Solicitation number
- RFQ 171 260000000155 4
- Issued by
- Gogebic County, Michigan
About this file
This document comprises construction drawings and specifications for HVAC improvements at Central Michigan Correctional Facility, prepared by the State of Michigan Department of Technology, Management and Budget for the Department of Corrections. The project encompasses Phase 1 mechanical, electrical, and HVAC system upgrades across multiple facility buildings including West Administration, West Food Service, West Housing Units A-B, C-D, and G-H, and East Housing Units L-M and N-P. The scope includes replacement of boilers, installation of new air handling units, ductwork modifications, piping systems, controls integration, and condensing units. Work is divided into priority phases with the West Administration Building designated as highest priority, followed by East Education, West Food Service, and housing unit buildings. The drawings specify that boiler replacements must occur between May 15 and September 30, with all heating equipment fully operational by October 1; the contractor bears responsibility for temporary heating if this deadline is not met. Equipment must be in hand prior to demolition commencement, and the contractor must conduct pre-construction and post-construction testing and balancing of air handling units and associated terminal units.
The contractor is required to attend 6-month and 11-month post-construction warranty meetings with the engineer and owner, track and document recycled materials throughout the project, and provide two facility escorts during work. All work must conform to Michigan Department of Corrections standards and applicable codes including the Michigan Mechanical Code. The contractor shall install tamperproof fasteners in all inmate-accessible areas and coordinate boiler alarm connections to the facility's StarNet 2 system through a designated IT contact. Roof penetrations require new curbs and boots with water-tight sealing to maintain existing roof warranties held by Precision Roofing. The project requires coordination with existing building automation systems and future integration capabilities for all equipment. Specific mechanical notes address piping slopes, condensate drainage, equipment clearances, wall and ceiling patching and painting, and the installation of new equipment per manufacturer specifications to ensure service accessibility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL DRAWING INDEX
320 HUBBARD STREET
ST. LOUIS, MI 48880
FILE NUMBER: 472/25362.CTS
MATRIX PROJECT NUMBER: 250689.00MECHANICAL/ELECTRICAL ENGINEER
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF CORRECTIONS
CENTRAL MICHIGAN CORRECTIONAL FACILITY - HVAC IMPROVEMENTS PHASE 1
N SITE MAP
MECHANICAL DRAWING INDEX
WEST HOUSING UNIT E-F
WEST HOUSING UNIT G-H
WEST FOOD SERVICE
WEST ADMINISTRATION
EAST HOUSING UNIT L-M
EAST HOUSING UNIT N-P
EAST HOUSING UNIT J-K
EAST HOUSING UNIT Q-R
WEST HOUSING UNIT C-D
WEST HOUSING UNIT A-B
EAST EDUCATION
T-000
TITLE SHEET
BRH
MTJ
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
GENERAL HVAC NOTES
1. LOCATE EXHAUST OUTLETS OF COMBUSTION EQUIPMENT
STACKS VENTS AT LEAST 10 FEET FROM OUTDOOR AIR
INTAKES.
2. ALL EXISTING SYSTEMS (INCLUDING EXHAUST FANS; AIR
HANDLING UNITS; PUMPS) THAT SERVES AREAS BEING
RENOVATED SHALL BE REBALANCED AS REQUIRED.
CONTRACTOR TO CONDUCT PRE-CONSTRUCTION TAB TO
VERIFY EXISTING AIR FLOWS AND HYDRONIC FLOW RATES ON
EXISTING WEST ADMINISTRATION AREA SERVED BY GROUND
MOUNTED AHU-2. CONTRACTOR ALSO TO CONDUCT
POST-CONSTRUCTION TAB TO VERIFY NEW AIR FLOWS AND
HYDRONIC FLOW RATES.
3. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
4. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
5. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
6. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT
ALL HIGH POINTS.
7. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
8. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT
MAY AFFECT THE WORK.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
10. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
11. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
12. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
13. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA
AIR GAP.
14. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
15. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
16. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER
TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.
17. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
18. CONTRACTOR WILL HAVE 2 ESCORTS TO WORK WITH
THROUGH AT THE PROJECT.
19. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING
WALLS/CEILINGS AS NEEDED TO MATCH EXISTING WHERE
DEMOLITION AND/OR NEW WORK IS COMPLETED.
20. FIELD VERIFY EXISTING SIZE OF ALL DAMPER
ACTUATORS/CONTROL VALVES AND EQUIPMENT PRIOR TO
ORDERING.
21. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN
ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER TO
DISABLE THE FIRE ALARM.
22. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL
USE TAMPERPROOF SCREWS.
23. COMBUSTION AIR AND VENT ROOF PENETRATIONS TO INCLUDE
A CURB AND ROOF CURB BOOT. PATCH AND SEAL ROOF
PENETRATIONS TO BE WATER TIGHT. ALL ROOF
PENETRATIONS SHALL BE SEALED WATER TIGHT AND SHALL
MAINTAIN ALL EXISTING WARRANTIES.
24. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR POWERING
AND INSTALLATION OF ALL 24 VOLT CONTROL WIRING AND
CONTROL PANELS AS REQUIRED TO LOCALLY CONTROL ALL
HVAC AND PLUMBING EQUIPMENT PER THE SEQUENCE OF
OPERATIONS. ALL EQUIPMENT AND ACCESSORIES SHALL BE
CAPABLE OF CONNECTING TO A FACILITY WIDE BUILDING
AUTOMATION SYSTEM IN THE FUTURE. REFER TO MECHANICAL
SPECIFICATIONS AND COORDINATE WITH MECHANICAL
CONTRACTOR. ELECTRICAL CONTRACTOR IS RESPONSIBLE
FOR INSTALLING WIRING AND RACEWAY PER ELECTRICAL
SPECIFICATIONS. ALL INSTALLATIONS SHALL COMPLY WITH
MICHIGAN DEPARTMENT OF CORRECTIONS STANDARDS.
25. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING
AND INSTALLING ALL MECHANICAL/PLUMBING EQUIPMENT.
26. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER
HARDWARE REQUIRED TO WIRING THE HVAC AND PLUMBING
EQUIPMENT PER THE SEQUENCE OF OPERATIONS.
27. CONTRACTOR TO REINSTALL ATTIC INSULATION AROUND
AREAS WHERE NEW PIPING HAS BEEN INSTALLED OR IN AREAS
WHERE INSULATION HAS BEEN DISTURBED DURING
CONSTRUCTION.
28. ALL EQUIPMENT MUST BE IN HAND PRIOR TO ANY DEMOLITION
STARTING.
29. CONTRACTOR TO FLUSH ENTIRE HEATING HOT WATER SYSTEM
AND FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET
BOILER REQUIREMENTS FOR EACH BUILDING WITH BOILERS
BEING REPLACED.
30. CONNECT ALL BOILER ALARM CONTACTS TO STARNET 2
SYSTEM THRU ETHERNET CONTACT CLOSURE. CONNECT TO
SECURITY IT RACK WITH PURPLE CAT-6 CABLE(S) AS REQUIRED
TO CONNECT TO STARNET 2 SYSTEM. CONTRACTOR TO HIRE
AND COORDINATE CONNECTION TO SECURITY IT RACK AND
PROGRAMMING OF THE ALARM POINTS ONTO THE STARNET 2
SYSTEM WITH BRET EMERSON FROM COMMTECH DESIGN
(PHONE#: (616)-446-4545).
31. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
32. CONTRACTOR TO REFER TO ALL ELECTRICAL CONSTRUCTION
DOCUMENTS AND DIVISION 26 SPECIFICATIONS FOR CONTROL
WIRING RACEWAYS. ALL CONTROL WIRING RACEWAYS ARE TO
MEET MDOC REQUIREMENTS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLS
HVAC PIPING
HVAC DUCTWORK
SD
F/S F/S s s
TEMPERATURE CONTROL SYMBOLS
M
P
M
H
S
T P T N
T
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
MDOC MICHIGAN DEPARTMENT OF CORRECTIONS
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CONDENSATE DRAIN
HEATING WATER SUPPLY
HEATING WATER RETURN
DIRECT EXPANSION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
HR
CD
HS
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED AND ALL OTHER TRADES PRIOR TO
DEMOLITION AND CONFORM TO MDOC STANDARDS.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED AND
CONFORMING TO MDOC STANDARDS.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA, MDOC STANDARDS, OR
OTHERS. THESE STANDARDS SHALL BE FOLLOWED WHETHER OR NOT
INDICATED ON THE DRAWING AND SPECIFICATIONS .
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING PARTITIONS, MILLWORK,
CASEWORK, OR OTHER FIXED ACCESSORIES AND EQUIPMENT WITH
MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE ARCHITECT.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS AND CONFORM TO MDOC
STANDARDS.
10. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING
REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED
THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.
ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN
PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,
OR FOR CONSULTATION OF PROPER DISPOSAL.
11. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
12. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
13. TEMPORARY LIGHTING AND POWER SHALL BE PART OF THE SCOPE OF THIS
WORK; SEE ELECTRICAL.
14. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
15. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
GENERAL DEMOLITION NOTESPROJECT PHASING
1. BOILERS TO BE REPLACED FROM MAY 15TH THROUGH
SEPTEMBER 30TH.
2. EXISTING EQUIPMENT IS TO REMAIN OPERATIONAL UNTIL
NEW EQUIPMENT IS RECEIVED AND READY TO BE INSTALLED.
3. ALL HEATING EQUIPMENT IS TO BE FULLY OPERATIONAL BY
OCTOBER 1ST. IF NOT, CONTRACTOR IS RESPONSIBLE FOR
PROVIDING TEMPORARY HEATING UNTIL THE HEATING
SYSTEM IS FULLY FUNCTIONING. CONTRACTOR TO
COORDINATE WITH PROJECT TEAM REGARDING IMPENDING
COLD WEATHER.
4. PROJECT TO BE PHASED AS REQUIRED TO DEAL WITH HIGH
PRIORITY BUILDINGS FIRST. BUILDINGS LISTED BELOW FROM
HIGH PRIORITY AT THE TOP TO LOWER PRIORITY AT THE
BOTTOM.
4.1. WEST ADMINISTRATION BUILDING
4.2. EAST EDUCATION BUILDING
4.3. WEST FOOD SERVICE BUILDING
4.4. EAST AND WEST HOUSING UNIT BUILDINGS
DX
M-100
MECHANICAL SYMBOLS,
NOTES, AND
ABBREVIATIONS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
BRH
MTJ
X-SD 250
8"Ø TYP. 2
X-SD 225
8"Ø ---
X-SD 150
8"Ø ---
X-SD 150
8"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 125
8"Ø ---
X-SD 110
6"Ø ---
X-SD 25
6"Ø ---
X-SD 100
6"Ø TYP. 2
X-SD 125
6"Ø ---
X-SD 125
6"Ø ---
X-SD 150
8"Ø ---
X-SD 300
10"Ø TYP. 2
X-SD 150
8"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 50
6"Ø ---
X-SD 50
6"Ø ---
X-SD 150
8"Ø ---
X-SD 50
6"Ø ---
X-SD 100
6"Ø ---
X-SD 25
6"Ø ---
X-SD 100
6"Ø ---
X-SD 25
6"Ø TYP. 2
X-SD 125
6"Ø ---
X-SD 50
6"Ø ---
X-SD 50
6"Ø ---
X-SD 125
6"Ø ---
X-SD 125
6"Ø ---
X-SD 150
6"Ø ---
X-SD 225
8"Ø TYP. 2
X-SD 150
8"Ø TYP. 2
X-SD 250
8"Ø ---
X-SD 300
10"Ø TYP. 2
X-SD 200
8"Ø --- X-SD 50
6"Ø ---
X-SD 125
6"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 50
6"Ø ---
X-SD 250
8"Ø ---
X-SD 250
8"Ø
X-EF
X-EG 75
X-EG 75
X-RP
X-RP X-RP
X-RP
X-RP
X-RP X-RP
X-RP
X-RP
X-RP X-RP
X-RP
X-RP
X-VAV-A43
X-VAV-A43
X-VAV-A35
X-VAV-A34
X-VAV-A33
X-VAV-A24
X-VAV-A54
X-VAV-A30
X-VAV-A54
X-VAV-A51
X-VAV-A21
X-VAV-A20
X-HC
X-AHU-2
X-FCU
X-RP
X-VAV-A36
X-RG
24"x4"
X-6"x12" SA
X-10"x12" SA X-12"x10" RA
X-RG ---
24"x8" ---
X-8"x14" SA
X-10"x8" SA
X-12"x10"
SA
X-18"x14" RA
X-16"x12"
RA
X-RG ---
24"x8" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x12" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-8"x10" SA X-10"x10" SA X-14"x10" SA
X-12"x10" RA
X-16"x14" RA
X-12"x8" RAX-8"x8" RA
X-10"x6" RA
X-10"x6" RA
X-12"x12" RA X-12"x12" SA
X-14"x10" SA
X-8"x10" SA
X-8"x8" SA
X-6"x8" SA
X-14"x12" SA
X-12"x10" SA
X-8"x10" SA
X-10"x10" RA
X-8"x8" RA
X-14"x10" RA
X-14"x12" RA
X-16"x12" RA
X-16"x12" RA
X-32"x22" RA DNX-24"x20" SA
DN
X-22"x18" RA
X-24"x18" RA
X-24"x20" RA
X-32"x22" RA
X-10"x8" SA
X-10"x8" SA
X-12"x10" SA
X-6"x8" SA
X-8"x8" SA
X-6"x8" SA X-10"x8" SA
X-10"x10" SA
X-10"x8" SA X-6"x6" RAX-TG ---
24"x4" TYP. 2
X-10"x10" SA
X-10"x10" SA
X-10"x10" SA
X-12"x12" SA
X-10"x10" RA
X-8"x6" RA
X-14"x10" RA
X-12"x12" SAX-6"x12" SAX-12"x10" SA
X-10"x10"
SA
X-10"x8" SA
X-6"x8" SA
X-16"x14" SA
X-18"x16" SA
X-18"x18" SA
X-20"x20" SA
X-22"x20" SA
X-8"x6" RA
X-8"x6" RA
X-8"x6" RA
X-6"x6" RA
X-6"x6" RA X-10"x8" RA
X-6"x6" RA
X-6"x8" SA
X-10"x10" SA
M-310
VISITING
A41
X-SD 25
6"Ø TYP. 2
X-AC
X-AC
STOR.
A23
DENTAL SUITE
A24
OFFICE
A54
MEDICAL SUITE
A25
PSYCHIARTY
A26
NURSE SUPERVISOR
A51
EXAM WAITING
MED. PASS
A32
HOLDING
A50
HOLDING
A49
VESTIBULE
A52
CONTROL
A35
ELECTRICAL
A48
DEPUTY
SUPERINTENDENT
A42
ASSISTANT
DEPUTY
A43
ASSISTANT
DEPUTY
A44
DEPUTY
SUITE
A45
CORR.
A36
VIDEO
HEARINGS
EMERGENCY
A33
VENDING
A22
STORAGE
CONTROL
BUBBLE
A21
CORRIDOR
A20
VESTIBULE
A59
CORRIDOR
A34
INTERVIEW
A37
SHAKE
DOWN
A38 TOILET
A35
TOILET
A35
SOILED
UTILITY
A29
CLEAN
UTILITY
A55
ELEC.
A56
JANITOR
A28
TOILET
A27
CENTRAL SUPPLY
& STORAGE
A30
CORRIDOR
A47
VISITING
A56
VISITING
A57
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S S
S S
X-RG ---
24"x4" ---
X-6"x6" RA
X-EF
X-12"x10" RA
X-EF
X-EF
X-EF
M-800
X-POWER EXHAUST 4
X-G DNX-G
X-CONCRETE PAD
NOT IN SCOPE
M-400
X-SD 250
8"Ø TYP. 2
X-SD 225
8"Ø ---
X-SD 150
8"Ø ---
X-SD 150
8"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 125
8"Ø ---
X-SD 110
6"Ø ---
X-SD 25
6"Ø ---
X-SD 100
6"Ø TYP. 2
X-SD 125
6"Ø ---
X-SD 125
6"Ø ---
X-SD 150
8"Ø ---
X-SD 300
10"Ø TYP. 2
X-SD 150
8"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 50
6"Ø ---
X-SD 50
6"Ø ---
X-SD 150
8"Ø ---
X-SD 50
6"Ø ---
X-SD 100
6"Ø ---
X-SD 25
6"Ø ---
X-SD 100
6"Ø ---
X-SD 25
6"Ø TYP. 2
X-SD 125
6"Ø ---
X-SD 50
6"Ø ---
X-SD 50
6"Ø ---
X-SD 125
6"Ø ---
X-SD 125
6"Ø ---
X-SD 150
6"Ø ---
X-SD 225
8"Ø TYP. 2
X-SD 150
8"Ø TYP. 2
X-SD 250
8"Ø ---
X-SD 300
10"Ø TYP. 2
X-SD 200
8"Ø --- X-SD 50
6"Ø ---
X-SD 125
6"Ø ---
X-SD 200
8"Ø TYP. 2
X-SD 50
6"Ø ---
X-SD 250
8"Ø ---
X-SD 250
8"Ø
X-EF
X-EG 75
X-EG 75
X-RP
X-RP X-RP
X-RP
X-RP
X-RP X-RP
X-RP
X-RP
X-RP X-RP
X-RP
X-RP
X-VAV-A43
X-VAV-A43
X-VAV-A35
X-VAV-A34
X-VAV-A33
X-VAV-A24
X-VAV-A54
X-VAV-A30
X-VAV-A54
X-VAV-A51
X-VAV-A21
X-VAV-A20
X-HC
X-FCU
X-RP
X-VAV-A36
X-RG
24"x4"
X-6"x12" SA
X-10"x12" SA X-12"x10" RA
X-RG ---
24"x8" ---
X-8"x14" SA
X-10"x8" SA
X-12"x10"
SA
X-18"x14" RA
X-16"x12"
RA
X-RG ---
24"x8" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x12" ---
X-RG ---
24"x4" ---
X-RG ---
24"x4" ---
X-RG ---
24"x8" ---
X-RG ---
24"x8" ---
X-RG ---
24"x4" ---
X-8"x10" SA X-10"x10" SA X-14"x10" SA
X-12"x10" RA
X-16"x14" RA
X-12"x8" RAX-8"x8" RA
X-10"x6" RA
X-10"x6" RA
X-12"x12" RA X-12"x12" SA
X-14"x10" SA
X-8"x10" SA
X-8"x8" SA
X-6"x8" SA
X-14"x12" SA
X-12"x10" SA
X-8"x10" SA
X-10"x10" RA
X-8"x8" RA
X-14"x10" RA
X-14"x12" RA
X-16"x12" RA
X-16"x12" RA
X-32"x22" RA DNX-24"x20" SA
DN
X-22"x18" RA
X-24"x18" RA
X-24"x20" RA
X-32"x22" RA
X-10"x8" SA
X-10"x8" SA
X-12"x10" SA
X-6"x8" SA
X-8"x8" SA
X-6"x8" SA X-10"x8" SA
X-10"x10" SA
X-10"x8" SA X-6"x6" RAX-TG ---
24"x4" TYP. 2
X-10"x10" SA
X-10"x10" SA
X-10"x10" SA
X-12"x12" SA
X-10"x10" RA
X-8"x6" RA
X-14"x10" RA
X-12"x12" SAX-6"x12" SAX-12"x10" SA
X-10"x10"
SA
X-10"x8" SA
X-6"x8" SA
X-16"x14" SA
X-18"x16" SA
X-18"x18" SA
X-20"x20" SA
X-22"x20" SA
X-8"x6" RA
X-8"x6" RA
X-8"x6" RA
X-6"x6" RA
X-6"x6" RA X-10"x8" RA
X-6"x6" RA
X-6"x8" SA
X-10"x10" SA
VISITING
A41
X-SD 25
6"Ø TYP. 2
X-AC
X-AC
STOR.
A23
DENTAL SUITE
A24
OFFICE
A54
MEDICAL SUITE
A25
PSYCHIARTY
A26
NURSE SUPERVISOR
A51
EXAM WAITING
MED. PASS
A32
HOLDING
A50
HOLDING
A49
VESTIBULE
A52
CONTROL
A35
ELECTRICAL
A48
DEPUTY
SUPERINTENDENT
A42
ASSISTANT
DEPUTY
A43
ASSISTANT
DEPUTY
A44
DEPUTY
SUITE
A45
CORR.
A36
VIDEO
HEARINGS
EMERGENCY
A33
VENDING
A22
STORAGE
CONTROL
BUBBLE
A21
CORRIDOR
A20
VESTIBULE
A59
CORRIDOR
A34
INTERVIEW
A37
SHAKE
DOWN
A38 TOILET
A35
TOILET
A35
SOILED
UTILITY
A29
CLEAN
UTILITY
A55
ELEC.
A56
JANITOR
A28
TOILET
A27
CENTRAL SUPPLY
& STORAGE
A30
CORRIDOR
A47
VISITING
A56
VISITING
A57
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S S
S S
X-RG ---
24"x4" ---
X-6"x6" RA
X-EF
X-12"x10" RA
X-EF
X-EF
X-EF
X-G DN
X-CONCRETE PAD
NOT IN SCOPE
AHU-25 6
M-800 1-1/4" G
POWER EXHAUST 5
32"x22" RA 24"x20" SA
CONCRETE PAD5
C
M-400
X-AC
X-1/2"
T
X-AC
X-CD PUMP
X-DX
X-DX
X-CU X-
DX
X-
DX
X-CU
X-CONCRETE PAD
3 3
X-SECURITY
CONTROLLER
X-DX
X-DX
X-CONTROL PANEL
X-CD
X-1/2" CD
X-1/2" CD
X-IT RACK
X-IT RACK
X-IT RACK
X-CD
X-DX
X-DX
EXISTING CONDENSING UNIT, CONTROLS, CONTROL WIRING, DX PIPING, CONDENSATE
PIPING, CONDENSATE PUMP, CONCRETE PAD, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING CONTROL PANEL, CONTROLS, CONTROL WIRING AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
DISCONNECT, REMOVE, AND DEMO EXISTING SPLIT SYSTEM EVAPORATOR,
CONDENSING UNIT, THERMOSTAT, CONTROLS, CONTROL WIRING, DX PIPING,
CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES. CONTRACTOR TO PATCH,
PRIME, AND PAINT EXISTING WALL PENETRATIONS AS REQUIRED TO MATCH EXISTING
AND SEAL WATER TIGHT.
DISCONNECT, REMOVE, AND DEMO EXISTING ROOFTOP UNIT, CURB, POWER EXHAUST,
AND ALL ASSOCIATED ACCESSORIES. EXISTING CONCRETE PAD TO REMAIN. DEMO
EXISTING DUCTWORK, GAS PIPING, AND ALL ASSOCIATE ACCESSORIES AS REQUIRED
FOR INSTALLATION OF NEW ROOFTOP UNIT AND POWER EXHAUST IN THE SAME
LOCATION. COMPLETE A PRE-TEST, AIR BALANCE, AND HYDRONIC FLOW BALANCE OF
THE X-AHU-2 (SUPPLY, RETURN AND OUTSIDE AIR) AND ALL TERMINAL UNITS
ASSOCIATED WITH X-AHU-2 AND THE AREA THAT IT SERVES (INCLUDING RADIANT
HEATING PANELS) BEFORE DEMOLISHING UNIT.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO PATCH, PRIME, AND PAINT ALL WALL/CEILINGS AS REQUIRED
AFTER ALL DEMOLITION/NEW WORK IS COMPLETED. CONTRACTOR TO SEAL ALL
EXTERIOR WALL PENETRATIONS TO MATCH EXISTING AND SEAL WATER TIGHT.
2. COMPLETE A HYDRONIC PRE-TEST ON CFMS (MAX & MIN), GPMS AND
TEMPERATURES OF ALL VARIABLE AIR VOLUME BOXES AND ALL RADIANT CEILING
PANELS PRIOR TO DEMOLISHING X-AHU-2.
3. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
INSTALL NEW WALL MOUNTED AC UNIT, CONDENSING UNIT, THERMOSTAT,
CONTROL WIRING, CONTROLS, DX PIPING, CONDENSATE PIPING, AND ALL
ASSOCIATED ACCESSORIES IN LOCATION SHOWN PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS. CONNECT NEW SPLIT SYSTEM TO EXISTING
DDC CONTROL SYSTEM. MODIFY EXISTING BAS FRONT END GRAPHICS AS
REQUIRED TO INTEGRATE NEW SPLIT SYSTEM. CONDENSING UNIT TO BE
MOUNTED ON A MANUFACTURE PROVIDED UNISTRUT STAND FASTENED
TO EXISTING/NEW CONCRETE PAD. CONDENSING UNIT TO BE INSTALLED
TO ACCOMMODATE ALL MANUFACTURER RECOMMENDED CLEARANCES.
ROUTE NEW DX PIPING AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. DX PIPING TO PENETRATE EXISTING EXTERIOR WALL.
NEW EXTERIOR WALL PENETRATIONS ARE TO BE PATCHED TO MATCH
EXISTING AND SEAL WATER TIGHT. DX PIPING DROPS TO THE
EVAPORATOR ARE TO BE SURFACE MOUNTED ON THE WALL.
SUPPORT REFRIGERANT PIPING WITH PIPE SUPPORTS BASED ON MIRO
#5-RAH-7 OR APPROVED EQUIVALENT. SPACE PIPING SUPPORTS PER
MANUFACTURER'S RECOMMENDATIONS.
ROUTE NEW CONDENSATE PIPING AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN. CONDENSATE PIPING TO PENETRATE EXISTING
EXTERIOR WALL. NEW EXTERIOR WALL PENETRATIONS ARE TO BE
PATCHED TO MATCH EXISTING AND SEAL WATER TIGHT. CONDENSATE
PIPING TO TERMINATE 24" ABOVE EXISTING GRADE.
FURNISH AND INSTALL GRADE MOUNTED ROOFTOP UNIT ON EXISTING
CONCRETE PAD AND MANUFACTURER PROVIDED CURB. INSTALL NEW
DUCTWORK, GAS PIPING, CONTROLS, POWERED EXHAUST, AND ALL
ASSOCIATED ACCESSORIES AS REQUIRED FOR A COMPLETE AND
OPERABLE SYSTEM. ADD ADDITIONAL DUCTWORK SUPPORTS AND
EQUIPMENT SUPPORTS AS REQUIRED. INSTALL NEW CONCRETE PAD AS
SHOWN EXTENDED TO BUILDING AS REQUIRED TO NOT ALLOW GRASS
UNDER DUCTWORK. CONNECT ROOFTOP UNIT TO EXISTING CONTROL
SYSTEM AS REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.
COMPLETE A POST-TEST AND AIR BALANCE OF THE AHU-2 (SUPPLY,
RETURN AND OUTSIDE AIR) AND ALL TERMINAL UNITS ASSOCIATED WITH
AHU-2 .
REGRADE AND SEED AROUND NEW CONCRETE PAD TO MATCH EXISTING
GRADE.
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. CONTRACTOR TO MODIFY EXISTING INTERIOR WALLS AS REQUIRED TO
INSTALL NEW WALL MOUNTED EVAPORATOR, THERMOSTAT, CONTROL WIRING,
DX PIPING, CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES. AFTER
ALL NEW WORK IS COMPLETED, CONTRACTOR TO PATCH, PRIME, AND PAINT
WALLS AS REQUIRED TO MATCH EXISTING.
2. CONTRACTOR TO MODIFY EXISTING EXTERIOR WALL AS REQUIRED TO
PENETRATE AND INSTALL NEW DX PIPING AND CONDENSATE PIPING. AFTER
NEW DX PIPING AND CONDENSATE PIPING IS INSTALLED, CONTRACTOR TO
PATCH, PRIME, AND PAINT EXISTING WALL AS REQUIRED TO MATCH EXISTING
AND SEAL WATER TIGHT.
3. CONTRACTOR TO REMOVE AND REINSTALL EXISTING CEILING GRID AND
CEILING TILES AS REQUIRED TO COMPLETE THEIR WORK. THE CONTRACTOR IS
RESPONSIBLE FOR THE REPLACEMENT OF BROKEN/DAMAGED CEILING TILES.
4. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURE'S INSTALLATION
INSTRUCTIONS AND MAINTAIN PROPER CLEARANCES.
5. INSTALL 0.020" THICK ALUMINUM, STUCCO EMBOSSED JACKET AROUND ALL
EXTERIOR ROUTED REFRIGERANT PIPING.
6. EXTEND EXISTING CONCRETE PAD AS REQUIRED TO INSTALL NEW EXTERIOR
CONDENSING UNITS PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS
AND MAINTAIN ALL REQUIRED EQUIPMENT CLEARANCES. CONCRETE PAD TO
MATCH THICKNESS OF EXISTING CONCRETE PAD AND EXTEND ATLEAST 4"
PAST CU-2.
7. COMPLETE A HYDRONIC POST-TEST ON CFMS (MAX & MIN), GPMS AND
TEMPERATURES OF ALL VARIABLE AIR VOLUME BOXES AND ALL RADIANT
CEILING PANELS POST INSTALLATION OF AHU-2.
8. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
X-1/2"
X-CD PUMP
X-DX
X-DX
X-CU
X-CONCRETE PAD
X-SECURITY
CONTROLLER
X-DX
X-DX
X-CONTROL PANEL
X-CD
X-1/2" CD
X-IT RACK
X-IT RACK
X-IT RACK
X-CD
X-DX
X-DX
AC-1
CU-1
DX
T
AC-1
3/4" CD DN
DX
CU-2
DX
3 PIPE SUPPORT
(TYP.)
DX
AC-2
3/4" CD DN
CONCRETE PAD1
T
AC-21
M-400
WEST ADMINISTRATION
BUILDING - FIRST FLOOR
PLAN - MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N WEST ADMINISTRATION BUILDING - FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/8" = 1'-0"
0 1 5 10 20
BRH
MTJ
WEST ADMINISTRATION BUILDING - ENLARGED
ELECTRICAL ROOM - MECHANICAL DEMOLITION
SCALE: 1/2" = 1'-0"
WEST ADMINISTRATION BUILDING - ENLARGED
ELECTRICAL ROOM - MECHANICAL NEW
SCALE: 1/2" = 1'-0"
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, CONCRETE PAD, PIPING, VALVES, BOILER
SUPPORT FRAME, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO REMOVE COMMON VENT THROUGH ROOF AND PATCH,
PRIME, AND PAINT CEILING AS REQUIRED TO MATCH EXISTING. CONTRACTOR
TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER TIGHT, AND
MAINTAIN ANY EXISTING ROOF WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.
5. DEMOILSH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL
NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
M-401
M-401
DEMONEW
X-FOOT SUPPORT
(TYP.)
P P
X-SUCTION
DIFFUSER (TYP.)
X-4" HS
X-4" HS
X-AS-4
X-P-8
X-B-5
X-B-4
X-P-9X-AS-5
X-B-4 ON
TOP OF X-B-5
X-P-10X-P-11
X-1" HS/HR
X-2 1/2" HS/HR
X-2"
HS/HR
X-3" CWS/CWR
X-GUH-3
X-MAU-1
X-AHU-1
X-AHU-2
X-2 1/2"
CWS X-2 1/2"
CWR
X-2" HR
X-2 1/2" HS
X-P-12
X-2 1/2"
CWS
X-3"
CWR
X-2 1/2"
CWR
X-40"x20" RA
DN TO X-AHU-2
X-34"Ø OA
X-38"Ø OA
X-40"Ø OA
X-20"Ø OA
DN TO X-AHU-2
X-44"x16" SA
DN TO X-AHU-2
X-40"x16" SA
DN TO X-MAU-1
X-34"Ø OA
DN TO X-MAU-1
X-26"Ø OA
DN TO X-AHU-1
X-60"x18" SA
DN TO X-AHU-1
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
X-4" G
X-3/4" G
X-4" G
X-4" G
X-2" G
X-2" G
X-12" FLUE
THRU ROOF
X-FS
(TYP. 4)
SEE HVAC
FOR CONTINUATION
X-DWH
X-4" G
X-T
X-STEAM BOILER
X-L
COMBUSTION AIR INTAKE DUCT
ROUTED UP AND DOWN OPEN
ENDED ON BOTH ENDS
M
X-CONCRETE PAD1
X-D
X-FOOT SUPPORT
(TYP.)
X-REDUCER (TYP.)
X-STRAINER (TYP.)
P P
DN TO X-DRAIN
X-FLEXIBLE CONN. (TYP.)
X-COMPOUND GAUGE (TYP.)
X-TRIPLE DUTY VALVE (TYP.)
X-UNION (TYP.)
X-BUTTERFLY VALVE (TYP.)
X-AS-5
X-P-9
X-SUCTION
DIFFUSER (TYP.)
X-3/4" CW
X-XT
X-1" CW
X-4" HS
X-B-5
X-CHECK
VALVE (TYP.)
VTR
X-PRESSURE RELIEF
VALVE (TYP.)
X-PIPE TO
FLOOR DRAIN
(TYP.)
X-THERMOMETER (TYP.)
X-B-4
VTR
X-10" V X-P-10
X-GAS COCK (TYP.)
X-DRIP LEG
(TYP.)
X-4" G X-R
X-CONDENSATE
NEUTRALIZING
KIT (TYP.)
X-4" CONCREATE
PAD (TYP.)
X-1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP.)
X-2" G
X-3" HS
X-4" HS
X-4" HS
X-4" HS
X-4" HS
X-4" HR
X-4" HR
X-P-11
X-2" G
X-BACKFLOW
PREVENTOR (TYP.)2
X-AS-4
X-P-8
X-P-9X-AS-5
X-1" HS/HR
X-2 1/2" HS/HR
X-2"
HS/HR
X-3" CWS/CWR
X-GUH-3
X-MAU-1
X-AHU-1
X-AHU-2
X-2 1/2"
CWS X-2 1/2"
CWR
X-2" HR
X-2 1/2" HS
X-P-12
X-2 1/2"
CWS
X-3"
CWR
X-2 1/2"
CWR
X-40"x20" RA
DN TO X-AHU-2
X-34"Ø OA
X-38"Ø OA
X-40"Ø OA
X-20"Ø OA
DN TO X-AHU-2
X-44"x16" SA
DN TO X-AHU-2
X-40"x16" SA
DN TO X-MAU-1
X-34"Ø OA
DN TO X-MAU-1
X-26"Ø OA
DN TO X-AHU-1
X-60"x18" SA
DN TO X-AHU-1
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
SEE HVAC
FOR CONTINUATION
X-4" G
X-3/4" G
X-4" G
X-4" G
X-2" G
X-2" G X-FS
(TYP. 4)
SEE HVAC
FOR CONTINUATION
X-DWH
X-4" G
X-T
X-STEAM BOILER
X-L
COMBUSTION AIR INTAKE DUCT
ROUTED UP AND DOWN OPEN
ENDED ON BOTH ENDS
M X-D
B-1FS
B-2FS
4" CA & 6" V THRU
ROOF (TYP.3)
BOILER EPO SWITCH3
S
CARBON MONOXIDE SENSOR4
BOILER EPO SWITCH
(BY EC) 3
HR
HS
B-3FS
G
1 CONCRETE PAD
X-FOOT SUPPORT
(TYP.)
X-REDUCER (TYP.)
X-STRAINER (TYP.)
P P
DN TO X-DRAIN
X-FLEXIBLE CONN. (TYP.)
X-COMPOUND GAUGE (TYP.)
X-TRIPLE DUTY VALVE (TYP.)
X-UNION (TYP.)
X-BUTTERFLY VALVE (TYP.)
X-AS-5
X-P-9
X-SUCTION
DIFFUSER (TYP.)
X-3/4" CW
X-XT
X-1" CW
X-GAS COCK (TYP.)
X-4" G X-R
X-2" G
X-4" HS
X-4" HS
X-4" HS
X-4" HS
X-4" HR
X-2" G
X-BACKFLOW
PREVENTOR (TYP.)
B-1FS
CONDENSATE
NEUTRALIZING
KIT (TYP.)
2"
TO FLOOR DRAIN (TYP.)
STRAINER (TYP)
UNION (TYP)
HR
G
HS
HR
B-3FS G
HS
HR
HR
HR
HS
HS
G
G
2" 2"
2"
2"
4"
4"
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
SHUTOFF VALVE
(TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P-1FS P-3FS
P/T (TYP.)
2"2"
1 1
4"
PIPE TO
FLOOR
(TYP.)
12" MAX
BOILER LOOP
TEMPERATURE
SENSOR
2 2
B-2FS
2"
G
HS
HR
2"
P-2FS
2"
G
CONCRETE PAD
VTR
CA
V
VTR
CA
V
VTR
CA
V
4"
4"
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY PRECISION ROOFING
(PHONE#: 517-675-8509).
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF
WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE
COMBUSTION AIR AND VENT ROUTING WITH EXISTING
PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF
PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF
STRUCTURE.
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING
RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT TO NEW BOILERS.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:
C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE
SENOR TO MEET BOILER INSPECTION REQUIREMENTS.
M-401
WEST FOOD SERVICE
BUILDING - FIRST FLOOR
PLAN - MECHANICAL
DEMOLITION/NEW
BRH
MTJ
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST FOOD SERVICE BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW
WEST FOOD SERVICE BUILDING MECHANICAL ROOM -
MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
WEST FOOD SERVICE BUILDING MECHANICAL ROOM BOILER
PIPING DIAGRAM - DEMOLITION
SCALE: NTS
WEST FOOD SERVICE BUILDING MECHANICAL ROOM -
MECHANICAL NEW
SCALE: 1/4" = 1'-0"
WEST FOOD SERVICE BUILDING MECHANICAL ROOM BOILER
PIPING DIAGRAM - NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
10510 4020
M-402
M-402
DEMO NEW
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, CONCRETE PAD, PIPING, VALVES, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE
COMMON VENT THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS
REQUIRED TO MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION
TO MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
EXISTING LOUVER, DAMPER, CONTROLS AND ALL ASSOCIATED ACCESSORIES
TIED TO DOMESTIC WATER HEATER TO REMAIN. DISCONNECT, REMOVE, AND
DEMO EXISTING CONTROLS AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY THAT ARE ASSOCIATED WITH THE BOILER BEING DEMOLISHED.
EXISTING SUPPLY AIR FAN TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.
5. DEMOLISH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL
NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
X-P 1A-1D
(STACKED)
X-B-1
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-P
X-SERVER RACK
X-FS
(TYP. 4) X-10" FLUE
THRU ROOF
X-1 1/2" G X-2" G
X-1 1/4" G
X-2" GX-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
1 X-DWH X-T
MECHANICAL ROOM
H4
(2) X-L(2) 40"x24" INTAKE
LOUVERS W/DAMPERS3
M
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-P-17
X-B-1
X-BYPASS POT
FEEDER
X-FUNNEL
X-CBV SET
AT 92 GPM
X-GAS COCK (TYP.)
X-DRIP LEG
(TYP.)
X-2" G X-2" GX-R
X-2" G
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-CONDENSATE
NEUTRALIZING
KIT (TYP.)
X-1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP.)
X-4" CONCRETE PAD
X-VTR
X-10" V
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-2 1/2" HS
X-2 1/2" HR
X-1/2" HS
2 2
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
X-P 1A-1D
(STACKED)
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-SERVER RACK
X-FS
(TYP. 4)
X-1 1/2" G X-2" G
X-1 1/4" G
X-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
X-DWH X-T
MECHANICAL ROOM
H4
(2) X-L(2) 40"x24" INTAKE
LOUVERS W/DAMPERS
M
B-1AB
CONCRETE PAD
B-2AB
G
HR
4" CA & 6" V THRU
ROOF (TYP.2)
BOILER EPO SWITCH3
S
CARBON MONOXIDE
SENSOR
HS
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-FUNNEL
X-2" G X-2" GX-R
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1/2" HS
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
4" CONCRETE
PAD
B-1AB
CONDENSATE
NEUTRALIZING
KIT (TYP.)
2-1/2"
TO FLOOR DRAIN (TYP.)
UNION (TYP)
HRHR
G
HS
HR
B-2AB G
HS
HS
HR
HR
HR
HS HS
G
G
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
SHUTOFF VALVE
(TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P-1AB P-2AB
P/T (TYP.)
G
1-1/2"1-1/2"
1 1
PIPE TO
FLOOR
(TYP.)
2 2
12" MAX
2"
VTR
CA
V
STRAINER (TYP)
VTR
CA
V
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
1-1/2"
2-1/2"
2-1/2"
BOILER LOOP
TEMPERATURE
SENSOR
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY PRECISION ROOFING
(PHONE#: 517-675-8509).
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF
WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE
COMBUSTION AIR AND VENT ROUTING WITH EXISTING
PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF
PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF
STRUCTURE.
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING
RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT TO NEW BOILERS.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:
C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE
SENOR TO MEET BOILER INSPECTION REQUIREMENTS.
M-402
WEST HOUSING UNIT A-B
- FIRST FLOOR PLAN -
MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST HOUSING UNIT A-B - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW
WEST HOUSING UNIT A-B MECHANICAL ROOM -
MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
WEST HOUSING UNIT A-B MECHANICAL ROOM BOILER
PIPING DIAGRAM - DEMOLITION
SCALE: NTS
WEST HOUSING UNIT A-B MECHANICAL ROOM -
MECHANICAL NEW
SCALE: 1/4" = 1'-0"
WEST HOUSING UNIT A-B MECHANICAL ROOM BOILER
PIPING DIAGRAM - NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
10510 4020
M-403
M-403
DEMO NEW
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, CONCRETE PAD, PIPING, VALVES, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE
COMMON VENT THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS
REQUIRED TO MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION
TO MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
EXISTING LOUVER, DAMPER, CONTROLS AND ALL ASSOCIATED ACCESSORIES
TIED TO DOMESTIC WATER HEATER TO REMAIN. DISCONNECT, REMOVE, AND
DEMO EXISTING CONTROLS AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY THAT ARE ASSOCIATED WITH THE BOILER BEING DEMOLISHED.
EXISTING SUPPLY AIR FAN TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.
5. DEMOLISH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL
NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
X-P 1A-1D
(STACKED)
X-B-1
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-P
X-SERVER RACK
X-FS
(TYP. 4) X-10" FLUE
THRU ROOF
X-1 1/2" G X-2" G
X-1 1/4" G
X-2" GX-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
1 X-DWH X-T
MECHANICAL ROOM
H4
(2) X-L
X-BOILER EPO SWITCH
M
(2) 40"x24" INTAKE
LOUVERS W/DAMPERS3
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-P-17
X-B-1
X-BYPASS POT
FEEDER
X-FUNNEL
X-CBV SET
AT 92 GPM
X-GAS COCK (TYP.)
X-DRIP LEG
(TYP.)
X-2" G X-2" GX-R
X-2" G
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-CONDENSATE
NEUTRALIZING
KIT (TYP.)
X-1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP.)
X-4" CONCRETE PAD
X-VTR
X-10" V
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-2 1/2" HS
X-2 1/2" HR
X-1/2" HS
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
X-P 1A-1D
(STACKED)
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-SERVER RACK
X-FS
(TYP. 4)
X-1 1/2" G X-2" G
X-1 1/4" G
X-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
X-DWH X-T
MECHANICAL ROOM
H4
(2) X-L
M
(2) 40"x24" INTAKE
LOUVERS W/DAMPERS
B-1CD
CONCRETE PAD
B-2CD
G
HR
4" CA & 6" V THRU
ROOF (TYP.2)
S
CARBON MONOXIDE
SENSOR
HS
BOILER EPO SWITCH
B-1CD B-2CD
P-2CD
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-FUNNEL
X-2" G X-2" GX-R
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1/2" HS
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
P-1CD
4" CONCRETE
PAD
CONDENSATE
NEUTRALIZING
KIT (TYP.)
TO FLOOR DRAIN (TYP.)
UNION (TYP)
HRHR
G
HS
HR
G
HS
HS
HR
HR
HR
HS HS
G
G
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
SHUTOFF VALVE
(TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P/T (TYP.)
G
1 1
PIPE TO
FLOOR
(TYP.)
12" MAX
2"
2-1/2" 1-1/2"1-1/2"VTR
CA
V
STRAINER (TYP)
VTR
CA
V
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
1-1/2"
2-1/2"
2-1/2"
BOILER LOOP
TEMPERATURE
SENSOR
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY PRECISION ROOFING
(PHONE#: 517-675-8509).
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF
WARRANTIES. INSTALL BIRDSCREEN ON VENT PIPING. COORDINATE
COMBUSTION AIR AND VENT ROUTING WITH EXISTING
PIPING/DUCTWORK AND BUILDING COMPONENTS. FRAME NEW ROOF
PENETRATIONS WITH 2"x2"x4" ANGLE IRON CONNECTED TO ROOF
STRUCTURE.
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN. CONNECT NEW HEATING SUPPLY PIPING, HEATING
RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO EXISTING PIPING. MODIFY THE EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW EPO SWITCH AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOW PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT TO NEW BOILERS.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N:
C3010-D OR APPROVED EQUIVALENT) AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. NEW CARBON MONOXIDE
SENOR TO MEET BOILER INSPECTION REQUIREMENTS.
M-403
WEST HOUSING UNIT C-D
- FIRST FLOOR PLAN -
MECHANICAL
DEMOLITION/NEW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
250689.00
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
472/25362.CTS
funding code sheet description
CD Set 02/12/2026
N WEST HOUSING UNIT C-D - FIRST FLOOR PLAN - MECHANICAL DEMOLITION/NEW
WEST HOUSING UNIT C-D MECHANICAL ROOM -
MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
WEST HOUSING UNIT C-D MECHANICAL ROOM BOILER
PIPING DIAGRAM - DEMOLITION
SCALE: NTS
WEST HOUSING UNIT C-D MECHANICAL ROOM -
MECHANICAL NEW
SCALE: 1/4" = 1'-0"
WEST HOUSING UNIT C-D MECHANICAL ROOM BOILER
PIPING DIAGRAM - NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
10510 4020
M-404
M-404
DEMO NEW
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, BOILER PUMP,
CONTROLS, CONTROL WIRING, CONCRETE PAD, PIPING, VALVES, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO REMOVE
COMMON VENT THROUGH ROOF AND PATCH, PRIME, AND PAINT CEILING AS
REQUIRED TO MATCH EXISTING. CONTRACTOR TO PATCH ROOF PENETRATION
TO MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. MODIFY EXISTING
PIPING AS REQUIRED FOR NEW CONNECTIONS SHOWN ON NEW DRAWING.
EXISTING LOUVER, DAMPER, CONTROLS AND ALL ASSOCIATED ACCESSORIES
TIED TO DOMESTIC WATER HEATER TO REMAIN. DISCONNECT, REMOVE, AND
DEMO EXISTING CONTROLS AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY THAT ARE ASSOCIATED WITH THE BOILER BEING DEMOLISHED.
EXISTING SUPPLY AIR FAN TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. ALL EQUIPMENT, PIPING, CONTROLS, CONTROL WIRING, CONCRETE PADS,
AND ASSOCIATED ACCESSORIES TO REMAIN AND BE REUSED UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL
WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPLETE.
4. EXISTING ZONE PUMPS AND ALL CONTROLS ARE TO REMAIN.
5. DEMOLISH EXISTING PIPING AS REQUIRED TO MAKE SPACE TO INSTALL
NEW BOILERS, PIPING, PUMPS, AND ALL ASSOCIATED ACCESSORIES.
6. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
X-P 1A-1D
(STACKED)
X-B-1
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-P
X-SERVER RACK
X-FS
(TYP. 4) X-10" FLUE
THRU ROOF
X-1 1/2" G X-2" G
X-1 1/4" G
X-2" GX-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
1 X-DWH X-T
MECHANICAL ROOM
H4
M
(2) X-L
X-BOILER EPO SWITCH
(2) 40"x24" INTAKE
LOUVERS W/DAMPERS3
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-P-17
X-B-1
X-BYPASS POT
FEEDER
X-FUNNEL
X-CBV SET
AT 92 GPM
X-GAS COCK (TYP.)
X-DRIP LEG
(TYP.)
X-2" G X-2" GX-R
X-2" G
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-CONDENSATE
NEUTRALIZING
KIT (TYP.)
X-1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP.)
X-4" CONCRETE PAD
X-VTR
X-10" V
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-2 1/2" HS
X-2 1/2" HR
X-1/2" HS
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
X-P 1A-1D
(STACKED)
X-SF-1
X-GUH
X-AS-1
X-L
SEE HYDRONIC
FOR CONTINUATION
SEE HYDRONIC
FOR CONTINUATION
X-4" FLUE
THRU ROOF
X-CT-1
X-SERVER RACK
X-FS
(TYP. 4)
X-1 1/2" G X-2" G
X-1 1/4" G
X-3/4" G
X-2 1/2" HS
(STACKED)
X-2 1/2" HR
(STACKED)
X-DWH X-T
MECHANICAL ROOM
H4
M
(2) X-L(2) 40"x24" INTAKE
LOUVERS W/DAMPERS
B-1GH
CONCRETE PAD
B-2GH
G
HR
4" CA & 6" V THRU
ROOF (TYP.2)
S
CARBON MONOXIDE
SENSOR
HS
BOILER EPO SWITCH3
4" CONCRETE
PAD
CONDENSATE
NEUTRALIZING
KIT (TYP.)
TO FLOOR DRAIN (TYP.)
UNION (TYP)
HRHR
G
HS
HR
G
HS
HS
HR
HR
HR
HS HS
G
G
GAS COCK (TYP)
1-1/2" DRAIN
VALVE PIPE TO
FLOOR DRAIN.
(TYP)
DRIP LEG (TYP)
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P/T (TYP.)
G
1 1
PIPE TO
FLOOR
(TYP.)
12" MAX
X-AS-1
X-CT-1
X-STRAINER (TYP.)
X-P-1A
X-P-1B
X-P-1C
X-P-1D
X-AIR VENT
X-THERMOMETER (TYP.)
P
P
P
P
X-3/4" CWX-BACKFLOW
PREVENTOR
(TYP.)
P
X-1 1/2" HR
X-CHECK VALVE (TYP.)
X-FUNNEL
X-2" G X-2" GX-R
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HR
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1 1/2" HS
X-1/2" HS
DN TO X-DRAIN
X-2 1/2" HS2 1/2" HR
X-1/2" HR
B-1GH B-2GH
P-1GH P-2GH
2"
SHUTOFF VALVE
(TYP)
2-1/2" 1-1/2"1-1/2"VTR
CA
V
STRAINER (TYP)
VTR
CA
V
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
1-1/2"
2-1/2"
2-1/2"
BOILER LOOP
TEMPERATURE
SENSOR
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. REFER TO PIPING DIAGRAM FOR PIPE SIZING.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL EQUIPMENT TO ENSURE ALL MANUFACTURER REQUIRED
SERVICE CLEARANCES ARE MET.
3. CONTRACTOR TO PATCH ROOF PENETRATION TO MATCH EXISTING, SEAL WATER
TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES AFTER DEMOLITION/NEW
WORK IS COMPLETE. EXISTING ROOF WARRANTY IS HELD BY PRECISION ROOFING
(PHONE#: 517-675-8509).
4. CONTRACTOR TO DRAIN AND FLUSH ENTIRE HEATING HOT WATER SYSTEM.
CONTRACTOR TO FILL/TREAT HYDRONIC LOOP AS REQUIRED TO MEET BOILER
REQUIREMENTS.
5. ALL WORK SHALL CONFORM TO MDOC STANDARDS.
1 INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING,
COMBUSTION AIR INLET, VENT OUTLET, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL NEW BOILER
ON NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL
DIRECTIONS. ROUTE VENT AND COMBUSTION AIR PIPING THROUGH
NEW ROOF CURBS AND NEW ROOF BOOTS. PATCH ROOF TO MATCH
EXIS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .