View the file

Other files for this federal contract opportunity

Other files attached to Special Operation Forces (SOF) C-130 Precision Strike Package (PSP) Technical Documentation Project (TDP), newest first.
File Type Posted
FAQs FA8509-23-R-0005.pdf PDF
Amendment-1 Combined.Synopsis 16 Jun 23.pdf PDF
50011070120.PDF PDF
TOs and Drawings.pdf PDF
Samples 2.pdf PDF
Price Spreadsheet.xlsx XLSX spreadsheet
Instruc2.pdf PDF
Samples 1.pdf PDF
50011610122 .pdf PDF
Instruc2.pdf PDF
Price Spreadsheet.xlsx XLSX spreadsheet
Source Documents for TCTO.pdf PDF
ONLY for SAMPLE TASK TMCR FOR TCTO 1C-130(AHM)J -792 .pdf PDF
Instruc2.pdf PDF
TOs and Drawings.pdf PDF
Amendment-1 Combined.Synopsis 16 Jun 23.pdf PDF
Samples 1.pdf PDF
TM3.pdf PDF
PWS.pdf PDF
Combined.Synopsis 7 Jun 23.pdf PDF
Instruc2.pdf PDF
Samples Part 2.pdf PDF
Samples Part 1.pdf PDF
Excel.xlsx XLSX spreadsheet
TMCR.pdf PDF
TM2.pdf PDF
TM1.pdf PDF
SVB.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A,B,C,D TDP _____ TM ______ OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP TDP FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001, B001, C001, D001 Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICEDI-MGMT-80368A PWS Para 4.3.2,4.6.1 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION DD REQUIRED Monthly N/A

a. ADDRESSEE

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A N/A Reg Repro

16. REMARKS See Blk 16 for 1

Block 7: The Contractor shall submit DD Form 250 for each report. The final report shall be submitted with a DD Form 250 through Wide Area Workflow (WAWF) to DoDAAC FA8509, attention: tamara.horton@us.af.mil, to collectively account for data previously submitted by Letters of Transmittal. The Government will approve/disapprove within five (5) business days of receipt.

Blocks 10-13: The Contractor shall submit the report by the end of each month. The Government Program Manager will approve/disapprove within ten (10) business days. If corrections/changes are required, the Government will submit within five (5) business days of receipt. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit within five (5) days.

Block 9: Distribution authorized to US Government Agencies and their Contractors, Administrative or Operational Use, 29 March 2023. Other request shall be referred to

WIUAA.

Block 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.

*Consolidated trip report will be added to the MSR when travel was completed within the current reporting period.

Email Addresses:

AFLCMC/WIUAA tamara.horton@us.af.mil AFLCMC/WIUKA jeffery.pruitt.1@us.af.mil email Addresses

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Tamara S. Horton 29 March 2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A,B,C,D TDP _____ TM ______ OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP TDP FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002, B002, C002,D002 Conference Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICEDI-ADMN- 81250C PWS Para 4.5,4.5.1,4.5.2 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED ASREQ N/A

a. ADDRESSEE

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A N/A Reg Repro

16. REMARKS See Blk 16 for 1

Block 7: Submit final DD Form 250 for DoDAAC FA8509, via Wide Area Work Flow (WAWF), to attention: tamara.horton@us.af.mil to collectively account for data previously submitted. The Government will approve/disapprove within 30 workdays (business) days of receipt.

Blocks 10-13: The Contractor shall submit the draft report five (5) business days after completion of meeting minutes. The Government Program Manager will approve/disapprove within ten business days. If corrections/changes are required, the Government will submit within ten business days of receipt. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit within 5 days.

Block 9: Distribution authorized to US Government Agencies and their Contractors, Administrative or Operational Use, 29 March 2023. Other request shall be referred to

WIUAA.

Block 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.

Email Addresses:

AFLCMC/WIUAA tamara.horton@us.af.mil AFLCMC/WIUKA jeffery.pruitt.1@us.af.mil email Addresses

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A,B,C,D TDP _____ TM ______ OTHER TMSS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP TDP FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003, B003, C003, D003

Technical Order Verification Recommendation (TOVR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICEDI-TMSS-80607 PWS Para 4.4.1 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION DD REQUIRED See Blk 16 See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A See Blk 16 See Blk 16 Reg Repro

16. REMARKS See Blk 16 for 1 1

Block 7: Submit final DD Form 250 for DoDAAC FA8509, via Wide Area Work Flow (WAWF), to attention: tamara.horton@us.af.mil to collectively account for data previously submitted. The Government will approve/disapprove within 30 workdays (business) days of receipt.

Blocks 10-13: The Contractor shall submit the draft five (5) business days after completion of report. The Government Program Manager will approve/disapprove within ten (10) business days. If corrections/changes are required, the Government will submit within ten (10) days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit within five (5) business days.

Block 9: Distribution authorized to US Government Agencies and their Contractors, Administrative or Operational Use, 29 March 2023. Other request shall be referred to

WIUAA.

Block 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.

Email Addresses:

AFLCMC/WIUAA tamara.horton@us.af.mil AFLCMC/WIUKA jeffery.pruitt.1@us.af.mil email Addresses

15. TOTAL 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Tamara S, Horton 29 March 2023

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A, B, C, D TDP _____ TM ____x__ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP TDP FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004, B004, C004, D004 Technical Manual Contract Requirement (TMCR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICETM-86-01Q PWS Para 4.4.2, 4.4.3 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION DD REQUIRED See Blk 16 See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE

See Blk 16

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final N/A See Blk 16 See Blk 16 Reg Repro

16. REMARKS See Blk 16 for 1

Any tailoring to the DID shall be coordinated with the TO Manager prior to RFP approval. This CDRL and the current tailored TM 86-01(x) shall be attached to the RFP. See version of the system TM-86-01Q (noted in the Delivery Order CDRL Package) applicable to the specific delivery order for detailed Technical Manual Requirements. Please ensure the appropriate DFARS Clauses are included in sequential award.

BLK 4:

General and specific Technical Manual Requirements are contained in the TM-86- 01Q attached.

BLK 9:

IAW TM-86-01Q, Paragraph 9.

BLK 10:

IAW TM-86-01Q, Paragraph 11.

BLK 12:

TOs: IAW TM-86-01Q, Paragraph 11.

TCTOs: For modifications, initial TCTO is due 45 calendar days prior to Fielding Configuration Control Board (CCB).

BLK 13:

TOs: Final TO delivery is due 30 calendar days after Pre-Publication Review and final acceptance by TCTOs: Subsequent/Final delivery of TCTO is due 14 calendar days prior to Fielding CCB. Subsequent deliveries for corrections of any data is due within 10 business days of notification, when applicable.

BLK 14:

Post in a format compatible with Microsoft Office 2003 or later. Notify the Government Contracting Officer, PM and applicable TO Manager via email when updated. All unclassified transmission of technical data shall be via email, or Express Delivery Services. Data shall not be transmitted via email unless encrypted.

Email Addresses:

AFLCMC/WIUAA tamara.horton@us.af.mil AFLCMC/WIUKA jeffery.pruitt.1@us.af.mil email Addresses

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A, B, C, D TDP _____ TM _____ OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP TDP FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005, B005, C005, D005 Conference Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICEDI-ADMN-81249C PWS para. 4.5,4.5.1,4.5.2 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ N/A

a. ADDRESSEE

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final N/A N/A N/A Reg Repro

16. REMARKS See Blk 16 for 1

Block 7: The Contractor shall submit DD Form 250 for each report. The final report shall be submitted with a DD Form 250 through Wide Area Workflow (WAWF) to DoDAAC FA8509, attention: tamara.horton@us.af.mil, to collectively account for data previously submitted by Letters of Transmittal. The Government will approve/disapprove within five (5) business days of receipt.

Block 9: Distribution authorized to US Government Agencies and their Contractors, Administrative or Operational Use, 29 March 2023. Other request shall be referred to

WIUAA.

BLK 10: The Contractor shall submit the draft agenda NLT ten (10) business days prior to the conference/meeting. The Government will review and provide comments, if required, NLT three (3) business days after receipt. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit NLT two (2) business days.

Block 14: Electronic versions of each preliminary and final report shall be emailed to the listed individuals applicable.

Email Addresses:

AFLCMC/WIUAA tamara.horton@us.af.mil AFLCMC/WIUKA jeffery.pruitt.1@us.af.mil email Addresses

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002/1002/2002/3002 A, B, C, D TDP _____ TM ______ OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AC-130J PSP Tech Data FD2060-23-30010

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006, B006, C006, D006 Program Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICEDI-MGMT-81797 PWS Para 4.3.3 AFLCMC/WIUAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final See Blk 16 See Blk 16 Reg Repro

16. REMARKS See Blk 16 for 1

BLK 7: Submit final DD Form 250 for DoDAAC FA8509, via iRAPT (formally WAWF), to attention: Tamara.Horton@us.af.mil to collectively account for data previously submitted. The Government will approve/disapprove within 30 workdays (business) days of receipt.

BLKs 10-13: The Contractor shall submit the plan within thirty (30) days of contract award. The Government Program Manager will approve/disapprove within five (5) business days after receipt of the plan. If corrections/changes are required, the Government will submit within five (5) days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit within five (5) business days.

BLK 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use). Other request for this document shall be referred to AFLCMC/WIUAA.

BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.

Email Addresses: Tamara.Horton@us.af.mil email Addresses

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Tamara S. Horton 29 March 2023

File details come from the government source that posted it. Updated .