CDRL1_REPORT.pdf

PDF 98 KB Posted

Attached to
NSN 2840-01-308-4467NZ, P/N 4070107, LINER, AUGMENTOR COM, FD2030-26-01584
Solicitation number
SPRTA126R0402
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying two data items required under Contract/PR No. FD20302601584 for the F-100 Liner Augmentor Component (P/N 4070107, NSN 2840013084467). The requiring office is AFLCMC/LPSAA, and the form was prepared on April 1, 2026, and approved the same date.

Data Item A001 requires a First Article Qualification Test Plan and Procedures (DI-NDTI-81307A) to be submitted as a single delivery (1 TIME frequency) 30 calendar days from the contract date. The plan must address verification of all drawing dimensions and tolerances with corresponding equipment, non-destructive inspection procedures, visual inspection requirements, material properties (mechanical, metallurgical, and chemical), manufacturing process approvals from Pratt & Whitney (P&W) or the Contracting Engineering Activity (AFLCMC/LPSAA), and forging/casting source certifications. Data Item A002 requires a Test/Inspection Report (DI-NDTI-80809B/T) to be delivered 120 calendar days from government approval of the test plan, documenting satisfaction of all first article test plan requirements, drawing compliance, and part process sheets. Both deliverables must be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat PDF format to AFLCMC/LZPED at Tinker Air Force Base, Oklahoma. Both data items are subject to Distribution Statement A (approved for public release; distribution unlimited) and must adhere to guidelines contained in LPF-QAR-003.

View the file

Other files

File Type Posted
Qualification Requirment.pdf PDF
Test Inspection Report.pdf PDF
FA Qualification Test Plan and Procedures.pdf PDF
Transportation-1653.pdf PDF
FA_REPORT.pdf PDF
IUID Checklist.pdf PDF
SPRTA1-26-R-0402.pdf PDF
FA Test Plans and Reports.pdf PDF
Packaging-158.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/n 4070107

E. CONTRACT / PR NO.

FD20302601584

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

nsn: 2840013084467 Noun: Liner Augmentor Com

4. AUTHORITY

DI-NDTI-81307A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE n/a

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

n/a

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 31 MAR 2026DATE:

Block 9: DIST STATEMENT REQUIRED: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848 SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor must provide a plan to ensure that all drawing requirements are met on each first article. The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension. An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/ certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.

A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AF1 105A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

01 APR 2026

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Shelley, Eric C

AFLCMC / LPSBE 405-734-0001 / 884-0001

J. DATE

01-APR-26

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2026

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/n 4070107

E. CONTRACT / PR NO.

FD20302601584

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

nsn: 2840013084467 Noun: Liner Augmentor Com

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE n/a

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

n/a

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 31 MAR 2026DATE:

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848

SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report.

Guidelines for the test reports are contained within LPF-QAR-003 Rev E, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AF1 105A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

01 APR 2026

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Shelley, Eric C

AFLCMC / LPSBE 405-734-0001 / 884-0001

J. DATE

01-APR-26

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2026

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .