About this file
This is a Contract Data Requirements List (DD Form 1423) that specifies technical data deliverables for an F-22 aircraft contract with Collins as the contractor. The contract is managed by 406 SCMS/GULAB (Air Force Material Command) under Performance Work Statement Paragraph 2.3.
The primary deliverable is Engineering Data for Provisioning (EDFP) designated as Data Item A002, which must be submitted as required on an ongoing basis. Submissions require one set of technical data in electronic format delivered simultaneously to the Prime Provisioning Activity at 406 SCMS Provisioning (Hill AFB, UT), the AIS System Sustainment Program Office, the Contracting Officer, and DLA Logistics Information Service. Required file formats include PDF (preferred), JPG, or TIF, with files named using the standardized convention "PLISN Part Number" (single space between PLISN and part number). All technical data must be annotated with PLISN, PCCN, SCC, PCC, CAGE, and part number. The data is classified as Controlled Unclassified Information (CUI) with Proprietary Business Information designation and Distribution Statement C restrictions. The PPA must accept or reject submitted technical data within 90 calendar days of receipt. Delivery shall be via email to 406scms.provisioning@us.af.mil or through the Department of Defense Secure Access File Exchange (SAFE). The contractor must provide all required data translated to English language and shall not assess developmental costs to the Government, only reproduction and assemblage costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - IPPS.pdf | ||
| SPRHA1-26-R-2222.pdf | ||
| F-22LG PC and Gap PWS.pdf | ||
| Attachment 2 - PPS.pdf | ||
| CDRL A001 (DI-SESS-81758A PTD).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024 Page 1 of 2
(Updated 20260326)UNCLASSIFIED
UNCLASSIFIED
Show Attachment Bar
Show Hide Instructions
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
F-22
E. CONTRACT/PR NO. F. CONTRACTOR
Collins
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Engineering Data for Provisioning (EDFP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81874/T
5. CONTRACT REFERENCE
PWS Para: 2.3
6. REQUIRING OFFICE
406 SCMS/GULAB
7. DD 250 REQ
DD250
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
As Required
11. AS OF DATE
N/A
12. DATE OF FIRST SUBMISSION
IAW AFMC Form 718
13. DATE OF SUBSEQUENT
SUBMISSION
As Required
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
A. For PPLs/SFPPLs, one set of technical data electronic copy will be provided to the Prime Provisioning Activity (PPA) (* Block 14), AIS System Sustainment Program Office and Contracting officer (** Block
14) with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, .PDF format (preferred) with accompanying transmittal correspondence to the following emails:
406scms.provisioning@us.af.mil richard.herring@us.af.mil jonathon.hales@us.af.mil
B. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406 SCMS/GULAB as the PPA and provide a courtesy copy to the PPA, 416SCMS Program Office and Contracting Officer.
C. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.
D. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/ rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.
E. Block 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Proprietary Business Information) (Aug 2025). Other requests for this document must be referred to 406 SCMS Provisioning - Hill; 406scms.provisioning@us.af.mil
F. CONTROLLED UNCLASSIFIED INFORMATION (CUI):
"CUI/" shall be displayed at the top and bottom of each all sheets:
The following CUI information shall be placed on the first sheet of each document, Engineering Data for Provisioning:
Controlled by: USAF Controlled by 416 SCMS/GUMAA CUI Category: Proprietary Business Information Distribution/Dissemination Control: C POC: 406 SCMS/GULAB-Hill.406scms.provisioning@us.af.mil
F.1. Electronic EDFP submittals are required. Delivery media shall be: e-mail. Note: CD +/-RW and DVD +/- RW are not acceptable. PPA e-mail address for delivery 406 SCMS Provisioning - Hill 406scms.provisioning@us.af.mil. DLA-LIS e-mail address for delivery is DLISPSO@dla.mil.
F.1.1. PPL, LLIL, SFPPL, CBIL & RIB: Electronic EDFP submittals are required to be delivered simultaneously with PTD to the PPA and DLA-LIS one (1) set each.
F.2. Acceptable electronic EDFP media format are:
F.2.1 .PDF format (preferred) or, Remove Continuation of Remarks Remove Current Page Insert Page
406 SCMS Provisioning 1 Attn: PPA 6038 Aspen Ave.
Bldg. 1289 SW Hill AFB, UT 84056 See Blk 16 Para. A
DLA Log Info Ser 1
DLA-KPD
74 Washington Ave North, Suite 7 Battle Creek MI 49017
SPC 1
SPO/SPM/PSM - LT
ACO/DCMA - LT
PCO - LT
15.TOTAL 0 3 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423, FEB 2024 Page 2 of 2
(Updated 20260326)UNCLASSIFIED
UNCLASSIFIED
Show Attachment Bar
Show Hide Instructions
16. REMARKS (Continuation)
F.2.2 .JPG image format (alternative) or, F.2.3 .TIF image format (alternative)
F.2.4 Each whole piece of tech data is to be saved in its entirety under one multi-page file
F.2.5 All tech data files will be named in the following format: PLISN Part Number (e.g. using A936 as PLISN and 10B520 as Part Number: A936 10B520.PDF). Be sure to have a single space between PLISN and Part Number as this is the established standardized “naming” convention requirement for DLA LIS’ internal server data storage and retrieval system-process.
G. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Attch. 1 to the Initial Provisioning Performance Specification (IPPS). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, and recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.
H. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.
I. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.
J. The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP, only cost necessary for reproduction and assemblage.
K. Preferred delivery method is Department of Defense (DoD) Secure Access File Exchange (SAFE)(https://safe.apps.mil/) or equivalent. In the event PTD submittal deliveries are to be made to a secured program specific electronic site (Contractor or Government), a transmittal notification will be concurrently forwarded to the PPA via e-mail at 406SCMS.Provisioning@us.af.mil.
Please also notify the following after submission:
kyle.swaner@us.af.mil teva.williams@us.af.mil logan.chapman.3@us.af.mil
G. PREPARED BY
Troy Herring
H. SIGNATURE I. APPROVED BY
Nathaniel T. Toole II
J. SIGNATURE Add Page to End
DD FORM 1423, FEB 2024
Page of (Updated 20260326) Instructions
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of (Updated 20260326)
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" Remove Continuation of Remarks
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| show: |
| hide: |
| A. CONTRACT LINE ITEM NUMBER: 0001 |
| exhibit: |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: F-22 |
| ContractNum: |
| Contractor: Collins |
| 1. DATA ITEM NUMBER: A002 |
| titleDataItem: Engineering Data for Provisioning (EDFP) |
| subtitle: |
| 4. AUTHORITY (Data Acquisition Document Number): DI-SESS-81874/T |
| contractRef: PWS Para: 2.3 |
| reqOffice: 406 SCMS/GULAB |
| 7. DD 250 REQUIREMENT: DD250 |
| 8. APPROVAL CODE : A |
| 9. DISTRIBUTION STATEMENT REQUIRED: C |
| freq: As Required |
| asOfDate: N/A |
| dateFirstSub: IAW AFMC Form 718 |
| dateSubseqSub: As Required |
| 16. REMARKS: A. For PPLs/SFPPLs, one set of technical data electronic copy will be provided to the Prime Provisioning Activity (PPA) (* Block 14), AIS System Sustainment Program Office and Contracting officer (** Block 14) with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, .PDF format (preferred) with accompanying transmittal correspondence to the following emails: |
406scms.provisioning@us.af.mil richard.herring@us.af.mil jonathon.hales@us.af.mil
B. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406 SCMS/GULAB as the PPA and provide a courtesy copy to the PPA, 416SCMS Program Office and Contracting Officer.
C. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.
D. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.
E. Block 9: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Proprietary Business Information) (Aug 2025). Other requests for this document must be referred to 406 SCMS Provisioning - Hill; 406scms.provisioning@us.af.mil
F. CONTROLLED UNCLASSIFIED INFORMATION (CUI):
"CUI/" shall be displayed at the top and bottom of each all sheets:
The following CUI information shall be placed on the first sheet of each document, Engineering Data for Provisioning:
Controlled by: USAF Controlled by 416 SCMS/GUMAA CUI Category: Proprietary Business Information Distribution/Dissemination Control: C POC: 406 SCMS/GULAB-Hill.406scms.provisioning@us.af.mil
F.1. Electronic EDFP submittals are required. Delivery media shall be: e-mail. Note: CD +/-RW and DVD +/- RW are not acceptable. PPA e-mail address for delivery 406 SCMS Provisioning - Hill 406scms.provisioning@us.af.mil. DLA-LIS e-mail address for delivery is DLISPSO@dla.mil.
F.1.1. PPL, LLIL, SFPPL, CBIL & RIB: Electronic EDFP submittals are required to be delivered simultaneously with PTD to the PPA and DLA-LIS one (1) set each.
F.2. Acceptable electronic EDFP media format are:
F.2.1 .PDF format (preferred) or,
| Click to add/remove continuation field for Remarks: |
| Click to delete CURRENT data items for 1 through 18, unless this is the only data item.: |
| Click to add a page of data items for 1 through 18 immediately following the current page.: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: 406 SCMS Provisioning |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Attn: PPA |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: 6038 Aspen Ave. |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Bldg. 1289 SW |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Hill AFB, UT 84056 |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: See Blk 16 Para. A |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: DLA Log Info Ser |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: DLA-KPD |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: 74 Washington Ave |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: North, Suite 7 |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Battle Creek MI 49017 |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: SPC |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: SPO/SPM/PSM - LT |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: ACO/DCMA - LT |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: PCO - LT |
| 15.TOTAL - Total draft copies is automatically calculated.: 0 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 3 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| priceGrp: |
| estTotalPrice: |
| remarks_cont: |
F.2.2 .JPG image format (alternative) or, F.2.3 .TIF image format (alternative)
F.2.4 Each whole piece of tech data is to be saved in its entirety under one multi-page file
F.2.5 All tech data files will be named in the following format: PLISN Part Number (e.g. using A936 as PLISN and 10B520 as Part Number: A936 10B520.PDF). Be sure to have a single space between PLISN and Part Number as this is the established standardized “naming” convention requirement for DLA LIS’ internal server data storage and retrieval system-process.
G. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Attch. 1 to the Initial Provisioning Performance Specification (IPPS). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, and recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.
H. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.
I. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.
J. The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP, only cost necessary for reproduction and assemblage.
K. Preferred delivery method is Department of Defense (DoD) Secure Access File Exchange (SAFE)(https://safe.apps.mil/) or equivalent. In the event PTD submittal deliveries are to be made to a secured program specific electronic site (Contractor or Government), a transmittal notification will be concurrently forwarded to the PPA via e-mail at 406SCMS.Provisioning@us.af.mil.
Please also notify the following after submission:
kyle.swaner@us.af.mil teva.williams@us.af.mil logan.chapman.3@us.af.mil
| preparedBy: Troy Herring |
| H. SIGNATURE: H. SIGNATURE |
| H. SIGNATURE: |
| approvedBy: Nathaniel T. Toole II |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| Click to add additional data items 1 through 18 to the end of the form.: |
File details come from the government source that posted it. Updated .