This document is a Contract Data Requirements List (CDRL) appendix specifying deliverable requirements for a CH-53K Organizational Level Support Equipment contract.
The contractor is required to submit a Request for Information (RFI) Technical Data Package as a single data item (A001) whenever further information or clarification on the provided Technical Data Package is needed to perform the fabrication process. The RFI documentation must be delivered in Microsoft Word format and submitted as soon as possible to avoid manufacturing delays. The Government will respond within two (2) business days of each request. Government final inspection and acceptance of all production units shall be accomplished at the source by a Government representative prior to DD-250 completion. The deliverable is assigned Price Group IV and requires Distribution Statement D, restricting distribution to DoD and DoD Contractors only. Deliverables must be submitted to POC Ed Ceralde, CH-53K Support Equipment Engineering, at (732) 323-4664 or edward.v.ceralde.civ@us.navy.mil. The CDRL was prepared and approved on March 3, 2026, referencing SOW Paragraph 3.5.1 and requiring office BL22100.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDEX A: CONTRACT DATA REQUIREMENTS LIST (CDRL)
17. PRICE GROUP
Group IV
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER XX
D. SYSTEM/ITEM
CH-53K Organizational Level
SE
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Request for Information (RFI) Technical Data Package
3. SUBTITLE
See Block 16
4. AUTHORITY (Data Acquisition Document No.)
See Block 16
5. CONTRACT REFERENCE
SOW Paragraph 3.5.1
6. REQUIRING OFFICE
BL22100
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A Draft
Final
Reg. Repro
16. REMARKS
Block 3: The contractor shall submit a Request for Information whenever further information or clarification on the Technical Data Package (TDP) provided is needed in order to perform the fabrication process. The Government shall reply within two (2) business days of the request.
Block 4: Request for Information Documentation shall be delivered in Microsoft word format.
Block 7: Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250. Government Inspection and Acceptance of all production units shall be accomplished at the source by a Government representative.
Block 9: Use Distribution Statement D. Distribution authorized to DoD and DoD Contractors only, (30 January 2007) other U.S. requests shall be referred to Code 486300B
Block 12: Submission shall be done as soon as possible in order to avoid any manufacturing delays. The cognizant CH-53K Support Equipment Engineer will respond within two (2) business days after the contractor's submission.
Block 14: Certificates shall be delivered to POC Ed Ceralde(CH-53K SE Engineering)
(732) 323-4664 Email Address: edward.v.ceralde.civ@us.navy.mil
POC 0 1 1
15. TOTAL 0 1
G. PREPARED BY : H. DATE I. APPROVED BY : J. DATE
03/03/26 03/03/26
| 2026-03-03T13:21:51-0500 | |
| CERALDE.EDWARD.VILLARANTE.1165969878 |
| 2026-03-03T13:57:57-0500 | |
| SHAH.TAHIR.A.1228640880 |