CDRL A0004 Final Acceptance Testing.docx
DOCX document 30 KB Posted
- Attached to
- Computer Numerical Control (CNC) with Live Tooling Federal contract opportunity
- Solicitation number
- W911RQ-23-R-9999
About this file
This document contains a Contract Data Requirements List (CDRL) detailing final acceptance testing requirements for a Computer Numerical Control (CNC) lathe with live tooling. The CDRL requires the contractor to perform a final acceptance test demonstrating the system's ability to successfully complete 10 cuts of various metals without failure. The test must be observed by a government Point of Contact and conducted once installation and operation of the lathe is complete. Upon passing the test, the contractor will have fulfilled the single CDRL requirement. The related federal contract opportunity posted by the Red River Army Depot seeks one HAAS ST-40L CNC lathe or equivalent, including installation, software, startup and training. Interested companies should submit a quote for the lathe by the solicitation closing date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| (SUPPLY) LOCAL TERMS AND CONDITIONS updated 1-13-22.docx | DOCX document | |
| CDRL A0005 Training.docx | DOCX document | |
| CDRL A0002 Installation Schedule.docx | DOCX document | |
| CDRL A0003 Lockout Tagout.docx | DOCX document | |
| CDRL A0001 Project Time Chart.docx | DOCX document | |
| CDRL A0006 Manuals.docx | DOCX document | |
| COMBINED SYNOPSIS CNC Lathe.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| CNC Lathe with live tooling |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0004 |
| Final Acceptance Testing |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.3 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The Contractor shall perform a final acceptance test that demonstrates the systems ability to cut various types of metal through every process without failures. The test shall consist of the operation of 10 cuts designed by RRAD personnel with no failures. Reference PD 3.3
Per block 8. POC will observe the final acceptance test IAW with PD and will inform contracting on results immediate after testing is completed.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.
Per block 11. Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.
Per block 12. . Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 12 Dec 2022 |
| Andy Graves, Chief Facilitization Team |
| 12 Dec 2022 |
File details come from the government source that posted it. Updated .