CDRL A0004 Final Acceptance Testing.docx

DOCX document 30 KB Posted

Attached to
Computer Numerical Control (CNC) with Live Tooling Federal contract opportunity
Solicitation number
W911RQ-23-R-9999
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document contains a Contract Data Requirements List (CDRL) detailing final acceptance testing requirements for a Computer Numerical Control (CNC) lathe with live tooling. The CDRL requires the contractor to perform a final acceptance test demonstrating the system's ability to successfully complete 10 cuts of various metals without failure. The test must be observed by a government Point of Contact and conducted once installation and operation of the lathe is complete. Upon passing the test, the contractor will have fulfilled the single CDRL requirement. The related federal contract opportunity posted by the Red River Army Depot seeks one HAAS ST-40L CNC lathe or equivalent, including installation, software, startup and training. Interested companies should submit a quote for the lathe by the solicitation closing date.

View the file

Other files for this federal contract opportunity

Other files attached to Computer Numerical Control (CNC) with Live Tooling, newest first.
File Type Posted
(SUPPLY) LOCAL TERMS AND CONDITIONS updated 1-13-22.docx DOCX document
CDRL A0005 Training.docx DOCX document
CDRL A0002 Installation Schedule.docx DOCX document
CDRL A0003 Lockout Tagout.docx DOCX document
CDRL A0001 Project Time Chart.docx DOCX document
CDRL A0006 Manuals.docx DOCX document
COMBINED SYNOPSIS CNC Lathe.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ____
TM _____
OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
CNC Lathe with live tooling
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

0004
Final Acceptance Testing
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

PD 3.3
RRAD, Contracting
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
REQUIRED
ASRE Q
SEE BLOCK 16, ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
RRAD, Contracting

Per block 5. The Contractor shall perform a final acceptance test that demonstrates the systems ability to cut various types of metal through every process without failures. The test shall consist of the operation of 10 cuts designed by RRAD personnel with no failures. Reference PD 3.3

Per block 8. POC will observe the final acceptance test IAW with PD and will inform contracting on results immediate after testing is completed.

Per block 9. For administrative and operational use only. (See DoDI 5230.24)

Per block 10. Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.

Per block 11. Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.

Per block 12. . Final Acceptance Test will be required one time for 10 successful cuts only once machine has been installed and made operational.

Distribution addresses:

POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting

Repro = electronic delivery

PED, POC
1
1
15. TOTAL ▬▬▬▬►
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Jay Oliver
12 Dec 2022
Andy Graves, Chief Facilitization Team
12 Dec 2022

File details come from the government source that posted it. Updated .