CDRL A0002 Installation Schedule.docx

DOCX document 29 KB Posted

Attached to
Computer Numerical Control (CNC) with Live Tooling Federal contract opportunity
Solicitation number
W911RQ-23-R-9999
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document contains a Contract Data Requirements List (CDRL) for an installation schedule related to the purchase of one Computer Numerical Control (CNC) lathe with live tooling. The Red River Army Depot-Army Contracting Command seeks to purchase a HAAS ST-40L lathe or equal from interested companies, including machine, installation, software, startup and training. The selected contractor must coordinate and submit a proposed installation schedule to the Contracting Officer's Representative at least 60 days prior to delivery for review and approval. The schedule is required only once prior to delivery and distribution will be for administrative and operational use within the requiring organization.

View the file

Other files for this federal contract opportunity

Other files attached to Computer Numerical Control (CNC) with Live Tooling, newest first.
File Type Posted
CDRL A0006 Manuals.docx DOCX document
COMBINED SYNOPSIS CNC Lathe.docx DOCX document
CDRL A0004 Final Acceptance Testing.docx DOCX document
CDRL A0003 Lockout Tagout.docx DOCX document
CDRL A0001 Project Time Chart.docx DOCX document
(SUPPLY) LOCAL TERMS AND CONDITIONS updated 1-13-22.docx DOCX document
CDRL A0005 Training.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ____
TM _____
OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
CNC Lathe with live tooling
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

0002
Installation Schedule
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

PD 3.1.1
RRAD, Contracting
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
REQUIRED
ASRE Q
SEE BLOCK 16, ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
RRAD, Contracting

Per block 5. The Contractor shall coordinate the proposed installation schedule with RRAD POC within 60 Days prior to delivery of the system. The installation schedule is subject to approval. Approval of the installation schedule shall not relieve the contractor of any responsibility for the performance. Reference PD 3.1.1

Per block 8. POC will review installation schedule 60 days prior to delivery.

Per block 9. For administrative and operational use only. (See DoDI 5230.24)

Per block 10. Installation Schedule will be required one time only 60 days prior to delivery.

Per block 11. Installation Schedule will be required one time only 60 days prior to delivery.

Per block 12. . Installation Schedule will be required one time only 60 days prior to delivery

Distribution addresses:

POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting

Repro = electronic delivery

PED, POC
1
1
15. TOTAL ▬▬▬▬►
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Jay Oliver
12 Dec 2022
Andy Graves, Chief Facilitization Team
12 Dec 2022

File details come from the government source that posted it. Updated .