CDRL A0003 Lockout Tagout.docx
DOCX document 30 KB Posted
- Attached to
- Computer Numerical Control (CNC) with Live Tooling Federal contract opportunity
- Solicitation number
- W911RQ-23-R-9999
About this file
This Contract Data Requirements List (CDRL) requires the contractor to furnish a machine-specific lockout/tagout procedure and materials for a CNC lathe with live tooling. The contractor must provide a graphical LOTO procedure clearly describing the steps to establish a zero-energy state for the equipment in accordance with OSHA Regulation 1910.147. The procedure shall be printed on durable laminated material suitable for posting on the equipment, and all LOTO locations shall be clearly identified with durable labels keyed to the procedure. The contractor shall also furnish the procedure in an electronic format for transfer to a maintenance management system. The procedure is due one time prior to work start.
The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command seeking a quotation for one CNC Lathe with live tooling from the HAAS ST-40L model or equal. Interested vendors shall provide pricing for the lathe, installation, software, startup and training. The solicitation will follow FAR subpart 12.6 procedures for commercial items. The NAICS code is 333517 with a small business size standard of 500 employees. Quotes are due to the Red River Army Depot Contracting Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL A0004 Final Acceptance Testing.docx | DOCX document | |
| CDRL A0006 Manuals.docx | DOCX document | |
| COMBINED SYNOPSIS CNC Lathe.docx | DOCX document | |
| CDRL A0001 Project Time Chart.docx | DOCX document | |
| (SUPPLY) LOCAL TERMS AND CONDITIONS updated 1-13-22.docx | DOCX document | |
| CDRL A0005 Training.docx | DOCX document | |
| CDRL A0002 Installation Schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| CNC Lathe with live tooling |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0003 |
| Lockout/Tagout (LOTO) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.2 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The Contractor shall furnish a graphical, machine-specific LOTO procedure that clearly and specifically describes the steps necessary to establish a zero-energy state for the equipment in accordance with the requirements of OSHA Regulation CFR 1910.147. The procedure shall be printed on a durable laminated material suitable for posting on the equipment. All LOTO locations on the equipment shall be clearly identified with a durable label keyed to the LOTO procedure. Contractor shall furnish the procedure in an electronic format so the information can be easily transferred into a maintenance management system. Reference PD 3.2
Per block 8. POC will review LOTO procedure and materials IAW with PD and will inform contracting on necessary changes to be made if any within seven (7) working days.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Lockout/Tagout procedure will be required one time only prior to work start.
Per block 11. Lockout/Tagout procedure will be required one time only prior to work start.
Per block 12. . Project Time Chart will be required one time only prior to work start.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 12 Dec 2022 |
| Andy Graves, Chief Facilitization Team |
| 12 Dec 2022 |
File details come from the government source that posted it. Updated .