CDLR A003.pdf

PDF 87 KB Posted

Attached to
GSA OASIS 8(a) - PIER Fiber Maintenance
Solicitation number
N0018926RL022
Issued by

About this file

This is a DD Form 1423-1, Contract Data Requirements List, which specifies a single data item requirement for a federal contract.

The required data item is a Technical Report - Study/Services (Data Item Number A002) titled "After Action Report for Corrective Maintenance." The report is governed by authority DI-MISC-80500A with contract reference PWS 7.3.2, and the requiring office is NCTAMS LANT N5/N8. The contractor must submit the report on an as-needed basis beginning at the start of contract and continuing through contract completion, with submission due to the Contracting Officer's Representative (COR) or Administrative Contracting Officer (ACOR) by the end of the 10th business day after corrective maintenance is completed. The report must be formatted in Microsoft Office compatible files and include the time and date of the initial incident, contractor notification time, contractor arrival time on site, condition found, corrective action taken, any test results, and contractor departure time. Distribution is limited to one copy each in draft and final formats via email. The form was prepared by Douglas S. Smith on 12/19/2025 and approved by Christopher Jensen on 01/16/2026.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: TECHNICAL REPORT - STUDY/SERVICES
3_SUBTITLE: After Action Report for Corrective Maintenance
4_AUTHORITY_Data_Acquisit: DI-MISC-80508A
5_CONTRACT_REFERENCE: PWS 7.3.2
6_REQUIRING_OFFICE: NCTAMS LANT N5/N8
7_DID_250_REQ: N/A
8_APP_CODE: N/A
DIST_STATEMENT: PWS para. 13.1
10_FREQUENCY: As needed
11_AS_OF_DATE: Start of Contract
12_DATE_OF_FIRST_SUBMISSI: As needed
13_DATE_OF_SUBSEQUENT_SUB: As needed*
addressee1: COR/ACOR
draft1: 1
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_repro: 0
16_REMARKS: Block 13: Report is required on an as needed basis through the end of the contract.

Block 14: E-mail distribution preferred

The report shall be formatted in Microsoft Office compatible file to provide the time and date of the initial incident, time contractor was notified, contractor arrival time on site, condition found, corrective action taken, any test results, and contractor departure time from the site. The report is due to the COR by the end of the 10th business day after corrective maintenance is completed.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Douglas S. Smith
H_DATE: 12/19/2025
1_APPROVED_BY: Christopher Jensen
J_DATE: 01/16/2026
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR: TBD
of_pages: 1
Reset:

File details come from the government source that posted it. Updated .