P-3 DHC-8 Recompete Section B 02.27.2025.pdf
PDF 315 KB Posted
- Solicitation number
- CBP-RFP-02272025-001
About this file
This document is a detailed Section B pricing schedule for a U.S. Customs and Border Protection (CBP) Maritime Patrol Aircraft Maintenance and Logistical Services contract. The solicitation covers maintenance and support for P-3 and DHC-8 aircraft fleets, with a comprehensive pricing structure spanning a 3-month transition phase and 9 subsequent option years. The contract utilizes multiple pricing mechanisms including Firm Fixed Price (FFP), Cost Plus Incentive Fee (CPIF), Cost Reimbursement (CR), and Cost Plus Fixed Fee (CPFF) contract line items (CLINs).
The total contract value escalates incrementally across option years, ranging from an initial transition phase cost of $559,942.71 to a final option year 9 contract price of $9,598,351.46. Major cost categories include transportation, parts, equipment, travel, IT equipment, training, and miscellaneous expenses across sites in Jacksonville (JAX) and Houston (HOU). The contract requires the contractor to provide comprehensive logistics support, including program management, facilities, personnel, material management, engineering, integrated logistics support, and other direct costs necessary to maintain CBP's maritime patrol aircraft fleet.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
PART A – TRANSITION (3 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL CLIN TOTAL PRICE
00001 Program Management/Program Office 3 $0.00 FFP 00002 Facilities 3 $0.00 FFP
Total Phase-In FFP Price $0.00 FFP
PART B – TRANSITION (3 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL CLIN TOTAL PRICE CPIF
LABOR
00003 JAX Site Personnel 3 $0.00 CPIF
00004 HOU Site Personnel 3 $0.00 CPIF
00005 Material Management/IHR 3 $0.00 CPIF
00006 Engineering Pool
Target Cost $0.00 Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00 Maximum Fee TBP% $0.00 Minimum Fee 0% $0.00
Proposed Sharing Ratios Government TBP% / Contractor TBP%
TOTAL TRANSITION CPIF PRICE $0.00 CPIF
PART C – TRANSITION (3 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL CLIN TOTAL PRICE
OTHER DIRECT COSTS
00007 ILS:
A Transportation 3 $0.00 CR B Parts C Equipment
00008 Travel:
A PMO 3 $156,372.90 CR
B All Labor Travel 3 $0.00 CR
00009 OTHER ODC:
A IT Equipment 3 $370,788.00 CR B Training 3 $32,781.81 CR C MISC: Uniforms, safety glasses, etc. 3 $0.00 CR
TOTAL TRANSITION CR PRICE $559,942.71 CR
PART D – TRANSITION (3 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL CLIN TOTAL PRICE
00010 ILS
A Repairs and Services 3 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 3 $0.00 $0.00 CPFF C Props 3 $0.00 $0.00 CPFF
TOTAL TRANSITION CPFF PRICE $0.00 CPFF
TOTAL TRANSITION CONTRACT PRICE $559,942.71
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – BASE YEAR OPTION (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
10001 Program Management/Program Office 12 $0.00 $0.00 FFP 10002 Facilities 12 $0.00 $0.00 FFP
TOTAL BASE YEAR FFP PRICE $0.00 FFP
PART B – BASE YEAR OPTION (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
10003 JAX Site Personnel 12 $0.00 $0.00 CPIF
10004 HOU Site Personnel 12 $0.00 $0.00 CPIF
10005 Material Management/IHR 12 $0.00 $0.00 CPIF
10006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00 Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00 Maximum Fee TBP% $0.00 Minimum Fee 0% $0.00
Proposed Sharing Ratios Government TBP% / Contractor TBP%
TOTAL BASE YEAR CPIF PRICE $0.00 CPIF
PART C – BASE YEAR OPTION (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
10007 ILS:
A Transportation 12 $0.00 $291,127.24 CR B Parts 12 $0.00 $7,000,000.00 CR C Equipment 12 $0.00 $241,685.24 CR
10008 Travel:
A PMO 12 $0.00 $169,214.90 CR
B All Labor Travel 12 $0.00 $1,050,711.60 CR
10009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR B Training 12 $0.00 $60,000.00 CR C MISC: Uniforms, safety glasses, etc. 12 $0.00 $297,085.00 CR
TOTAL BASE YEAR CR PRICE $9,241,528.98 CR
PART D – BASE YEAR OPTION (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
10010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF C Props 12 $0.00 $0.00 CPFF
10011 NOVATE
A Parts Lot $0.00 Cost Reimbursable B Repairs Lot $0.00 CPFF C Equipment Lot $0.00 Cost Reimbursable
TOTAL BASE YEAR CPFF PRICE $0.00 CPFF
TOTAL BASE YEAR CONTRACT PRICE $9,241,528.98
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART I – THE SCHEDULE - UPDATE FOR OpYr 1 - 120 Day
PART A – OPTION YEAR 1 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
20001 Program Management/Program Office 12 $0.00 $0.00 FFP
20002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 1 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 1 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
20003 JAX Site Personnel 12 $0.00 $0.00 CPIF
20004 HOU Site Personnel 12 $0.00 $0.00 CPIF
20005 Material Management/IHR 12 $0.00 $0.00 CPIF
20006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 1 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 1 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
20008 ILS:
A Transportation 12 $0.00 $299,861.06 CR
B Parts 12 $0.00 $7,210,000.00 CR
C Equipment 12 $0.00 $248,935.80 CR
20009 Travel:
A PMO 12 $0.00 $174,291.35 CR
B All Labor Travel 12 $0.00 $1,082,232.95 CR
20010 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $61,800.00 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $309,948.70 CR
TOTAL OPTION YEAR 1 CR PRICE $9,518,774.85 CR
PART D – OPTION YEAR 1 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE CPFF
20012 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 1 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 1 CONTRACT PRICE $9,518,774.85
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – OPTION YEAR 2 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
30001 Program Management/Program Office 12 $0.00 $0.00 FFP
30002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 2 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 2 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
30003 JAX Site Personnel 12 $0.00 $0.00 CPIF
30004 HOU Site Personnel 12 $0.00 $0.00 CPIF
30005 Material Management/IHR 12 $0.00 $0.00 CPIF
30006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 2 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 2 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
30007 ILS:
A Transportation 12 $0.00 $308,856.89 CR
B Parts 12 $0.00 $5,426,300.00 CR
C Equipment 12 $0.00 $256,403.87 CR
30008 Travel:
A PMO 12 $0.00 $179,520.09 CR
B All Labor Travel 12 $0.00 $1,114,699.94 CR
30009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $63,654.00 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $323,198.31 CR
TOTAL OPTION YEAR 2 CR PRICE $7,804,338.09 CR
PART D – OPTION YEAR 2 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
30010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 2 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 2 CONTRACT PRICE $7,804,338.09
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – OPTION YEAR 3 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
40001 Program Management/Program Office 12 $0.00 $0.00 FFP 40002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 3 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 3 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
40003 JAX Site Personnel 12 $0.00 $0.00 CPIF
40004 HOU Site Personnel 12 $0.00 $0.00 CPIF
40005 Material Management/IHR 12 $0.00 $0.00 CPIF
40006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00 Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00 Maximum Fee TBP% $0.00 Minimum Fee 0% $0.00
Proposed Sharing Ratios Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 3 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 3 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
40007 ILS:
A Transportation 12 $0.00 $318,122.60 CR B Parts 12 $0.00 $5,589,089.00 CR C Equipment 12 $0.00 $264,095.99 CR
40008 Travel:
A PMO 12 $0.00 $184,905.69 CR
B All Labor Travel 12 $0.00 $1,148,140.93 CR
40009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR B Training 12 $0.00 $65,563.62 CR C MISC: Uniforms, safety glasses, etc. 12 $0.00 $336,845.41 CR
TOTAL OPTION YEAR 3 CR PRICE $8,038,468.24 CR
PART D – OPTION YEAR 3 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
40010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 2 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 3 CONTRACT PRICE $8,038,468.24
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and
PART A – OPTION YEAR 4 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
50001 Program Management/Program Office 12 $0.00 $0.00 FFP
50002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 4 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 4 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
50003 JAX Site Personnel 12 $0.00 $0.00 CPIF
50004 HOU Site Personnel 12 $0.00 $0.00 CPIF
50005 Material Management/IHR 12 $0.00 $0.00 CPIF
50006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 4 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 4 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
50007 ILS:
A Transportation 12 $0.00 $327,666.27 CR
B Parts 12 $0.00 $5,756,761.67 CR
C Equipment 12 $0.00 $272,018.87 CR
50008 Travel:
A PMO 12 $0.00 $190,452.86 CR
B All Labor Travel 12 $0.00 $1,182,585.16 CR
50009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $67,530.53 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $350,901.92 CR
TOTAL OPTION YEAR 4 CR PRICE $8,279,622.28 CR
PART D – OPTION YEAR 4 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
50010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 4 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 4 CONTRACT PRICE $8,279,622.28
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and
PART A – OPTION YEAR 5 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
60001 Program Management/Program Office 12 $0.00 $0.00 FFP
60002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 5 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 5 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
60003 JAX Site Personnel 12 $0.00 $0.00 CPIF
60004 HOU Site Personnel 12 $0.00 $0.00 CPIF
60005 Material Management/IHR 12 $0.00 $0.00 CPIF
60006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 5 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 5 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
60007 ILS:
A Transportation 12 $0.00 $337,496.26 CR
B Parts 12 $0.00 $5,929,464.52 CR
C Equipment 12 $0.00 $280,179.43 CR
60008 Travel:
A PMO 12 $0.00 $196,166.45 CR
B All Labor Travel 12 $0.00 $1,218,062.72 CR
60009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $69,556.44 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $365,380.13 CR
TOTAL OPTION YEAR 5 CR PRICE $8,528,010.95 CR
PART D – OPTION YEAR 5 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
60010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 5 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 5 CONTRACT PRICE $8,528,010.95
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and
PART A – OPTION YEAR 6 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
70001 Program Management/Program Office 12 $0.00 $0.00 FFP
70002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 6 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 6 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
70003 JAX Site Personnel 12 $0.00 $0.00 CPIF
70004 HOU Site Personnel 12 $0.00 $0.00 CPIF
70005 Material Management/IHR 12 $0.00 $0.00 CPIF
70006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 6 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 6 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
70007 ILS:
A Transportation 12 $0.00 $347,621.15 CR
B Parts 12 $0.00 $6,107,348.46 CR
C Equipment 12 $0.00 $288,584.82 CR
70008 Travel:
A PMO 12 $0.00 $202,051.44 CR
B All Labor Travel 12 $0.00 $1,254,604.60 CR
70009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $71,643.14 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $380,292.68 CR
TOTAL OPTION YEAR 6 CR PRICE $8,783,851.28 CR
PART D – OPTION YEAR 6 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE CPFF
70010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 6 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 6 CONTRACT PRICE $8,783,851.28
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – OPTION YEAR 7 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE FFP
80001 Program Management/Program Office 12 $0.00 $0.00 FFP
80002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 7 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 7 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE CPIF
LABOR
80003 JAX Site Personnel 12 $0.00 $0.00 CPIF
80004 HOU Site Personnel 12 $0.00 $0.00 CPIF
80005 Material Management/IHR 12 $0.00 $0.00 CPIF
80006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 7 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 7 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
80007 ILS:
A Transportation 12 $0.00 $358,049.78 CR
B Parts 12 $0.00 $6,290,568.91 CR
C Equipment 12 $0.00 $297,242.36 CR
80008 Travel:
A PMO 12 $0.00 $208,112.98 CR
B All Labor Travel 12 $0.00 $1,292,242.74 CR
80009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $73,792.43 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $395,652.61 CR
TOTAL OPTION YEAR 7 CR PRICE $9,047,366.82 CR
PART D – OPTION YEAR 7 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
80010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 7 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 7 CONTRACT PRICE $9,047,366.82
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – OPTION YEAR 8 (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE FFP
90001 Program Management/Program Office 12 $0.00 $0.00 FFP 90002 Facilities 12 $0.00 $0.00 FFP
PART B – OPTION YEAR 8 (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE CPIF
LABOR
90003 JAX Site Personnel 12 $0.00 $0.00 CPIF
90004 HOU Site Personnel 12 $0.00 $0.00 CPIF
90005 Material Management/IHR 12 $0.00 $0.00 CPIF
90006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00 Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00 Maximum Fee TBP% $0.00 Minimum Fee 0% $0.00
Proposed Sharing Ratios Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 8 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 8 (12 Months) - COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
90007 ILS:
A Transportation 12 $0.00 $368,791.28 CR B Parts 12 $0.00 $6,479,285.98 CR C Equipment 12 $0.00 $306,159.63 CR
90008 Travel:
A PMO 12 $0.00 $214,356.37 CR
B All Labor Travel 12 $0.00 $1,331,010.02 CR
90009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR B Training 12 $0.00 $76,006.20 CR C MISC: Uniforms, safety glasses, etc. 12 $0.00 $411,473.34 CR
TOTAL OPTION YEAR 8 CR PRICE $9,318,787.82 CR
PART D – OPTION YEAR 8 (12 Months) - COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE CPFF
90010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 8 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 8 CONTRACT PRICE $9,318,787.82
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and conditions of the contract in support of Customs and Border Protection P-3 and DHC-8 fleet.
PART A – OPTION YEAR 9 including Phase Out (12 Months) - FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
10.0001 Program Management/Program Office 12 $0.00 $0.00 FFP
10.0002 Facilities 12 $0.00 $0.00 FFP
TOTAL OPTION YEAR 9 FFP PRICE $0.00 FFP
PART B – OPTION YEAR 9 including Phase Out (12 Months) - COST PLUS INCENTIVE FEE (IAW FAR 16.304) CONTRACT LINE ITEM
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
LABOR
10.0003 JAX Site Personnel 12 $0.00 $0.00 CPIF
10.0004 HOU Site Personnel 12 $0.00 $0.00 CPIF
10.0005 Material Management/IHR 12 $0.00 $0.00 CPIF
10.0006 Engineering Pool 12 $0.00 $0.00 CPIF
Target Cost $0.00
Target Fee TBP% $0.00
Target Cost Plus Incentive Fee $0.00
Maximum Fee TBP% $0.00
Minimum Fee 0% $0.00
Proposed Sharing Ratios
Government TBP% / Contractor TBP%
TOTAL OPTION YEAR 9 CPIF PRICE $0.00 CPIF
PART C – OPTION YEAR 9 including Phase Out (12 Months)- COST REIMBURSEMENT (IAW FAR 16.301) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
OTHER DIRECT COSTS
10.0007 ILS:
A Transportation 12 $0.00 $379,855.02 CR
B Parts 12 $0.00 $6,673,664.56 CR
C Equipment 12 $0.00 $315,344.42 CR
10.0008 Travel:
A PMO 12 $0.00 $220,787.06 CR
B All Labor Travel 12 $0.00 $1,370,940.32 CR
10.0009 OTHER ODC:
A IT Equipment 12 $0.00 $131,705.00 CR
B Training 12 $0.00 $78,286.39 CR
C MISC: Uniforms, safety glasses, etc. 12 $0.00 $427,768.69 CR
TOTAL OPTION YEAR 9 CR PRICE $9,598,351.46 CR
PART D – OPTION YEAR 9 including Phase Out (12 Months)- COST PLUS FIXED FEE (IAW FAR 16.306) CONTRACT LINE ITEMS
CLIN DESCRIPTION QTY MO TOTAL PER MO TOTAL PRICE
10.0010 ILS
A Repairs and Services 12 $0.00 $0.00 CPFF
Major Sub-Contractors:
B Engines 12 $0.00 $0.00 CPFF
C Props 12 $0.00 $0.00 CPFF
TOTAL OPTION YEAR 9 CPFF PRICE $0.00 CPFF
TOTAL OPTION YEAR 9 CONTRACT PRICE $9,598,351.46
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS) (Attachment (1)) and terms and
| Phase-In |
| Base Year Option |
| Option Year 1 |
| Option Year 2 |
| Option Year 3 |
| Option Year 4 |
| Option Year 5 |
| Option Year 6 |
| Option Year 7 |
| Option Year 8 |
| Option Year 9 |
File details come from the government source that posted it. Updated .