The document provided is a bid analysis comparison for the Canby-Marquam Highway Paving Project, which is a state and local contract opportunity issued by the Oregon Department of Transportation (ODOT) in Clackamas County, Oregon. The project involves asphalt paving, milling, and related work on approximately 5.2 miles of State Highway 170. Bidders are required to provide unit pricing for estimated quantities of various pay items. The work must be completed within 120 calendar days of the notice to proceed, and the contract will be awarded to the lowest responsive and responsible bidder. Bids are due by 2:00 PM on October 24, 2024, with the contract expected to be awarded on April 15, 2024. A mandatory pre-bid conference will be held on February 28, 2024.

The available information does not mention any set-aside designations or restrictions on the types of organizations that can respond to the Invitation to Bid. No incumbent contractor is identified, and the total award value or budget range is not provided. However, the project is subject to state prevailing wage requirements. The procurement does not specify any existing infrastructure or technology that requires integration, nor does it list any funding sources for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compare to Estimate Canby/Marquam Hwy Paving Project Estimate Verse Low Bid

Engineer's EstimateKNL Industries, Inc.Comparison (total price)Average of the Bids
Canby/Marquam Hwy Paving Project Estimate Verse Low Bid
Bid ItemUnitQuantityUnit PriceTotal PriceUnit PriceTotal PriceMaximumMinimumAverage Unit PriceAverage Total
101WORKPLACE HARASSMENT PREVENTION PLANLS1$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,000.00$ 500.00$ 956.25$ 956.25
102EXTRA WORK DONE ON FORCE ACCOUNT BASISFA1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.001700$ 20,000.00
103MOBILIZATIONLS1$ 108,000.00$ 108,000.00$ 37,000.00$ 37,000.00$ 108,000.00$ 37,000.00$ 93,943.38$ 93,943.382550$ 4,960.00
104TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: CANBY/MARQUAM HWYLS1$ 50,000.00$ 50,000.00$ 30,000.00$ 30,000.00$ 50,000.00$ 30,000.00$ 88,095.00$ 88,095.007650$ 983.20
105PORTABLE CHANGEABLE MESSAGE SIGNSEA7$ 2,500.00$ 17,500.00$ 3,000.00$ 21,000.00$ 21,000.00$ 17,500.00$ 2,383.75$ 16,686.259775$ 9,933.20
106TEMPORARY PROJECT INFORMATION SIGNSSF60$ 65.00$ 3,900.00$ 35.00$ 2,100.00$ 3,900.00$ 2,100.00$ 47.50$ 2,850.0023100$ 2,240.00
107TEMPORARY FLEXIBLE PAVEMENT MARKERSEA8,600$ 2.00$ 17,200.00$ 2.00$ 17,200.00$ 17,200.00$ 17,200.00$ 1.46$ 12,577.504000$ 400.00
108TEMPORARY REMOVABLE TAPEFOOT1,160$ 4.00$ 4,640.00$ 2.00$ 2,320.00$ 4,640.00$ 2,320.00
109EROSION CONTROLLS1$ 1,500.00$ 1,500.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,000.00$ 2.81$ 3,255.2548775$ 38,516.40
110POLLUTION CONTROL PLANLS1$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,000.00$ 500.00$ 2,300.00$ 2,300.00
111REMOVAL OF STRUCTURES AND OBSTRUCTIONSLS1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 562.50$ 562.50
112CLEARING AND GRUBBINGLS1$ 3,000.00$ 3,000.00$ 9,500.00$ 9,500.00$ 9,500.00$ 3,000.00$ 7,184.13$ 7,184.13
11312 INCH SUBGRADE STABILIZATIONSQYD250$ 50.00$ 12,500.00$ 50.00$ 12,500.00$ 12,500.00$ 12,500.00$ 6,350.00$ 6,350.00
114INSTALL CAST IRON MONUMENT BOXESEACH1$ 1,000.00$ 1,000.00$ 600.00$ 600.00$ 1,000.00$ 600.00$ 48.63$ 12,156.25
115COLD PLANE PAVEMENT REMOVAL, 0-2 INCHES DEEPSQYD5,000$ 8.00$ 40,000.00$ 2.00$ 10,000.00$ 40,000.00$ 10,000.00$ 1,362.50$ 1,362.50
116COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEPSQYD2,000$ 9.00$ 18,000.00$ 2.00$ 4,000.00$ 18,000.00$ 4,000.00$ 4.65$ 23,250.00
117AGGREGATE SHOULDERS (1-1/2"-0)TON2,000$ 75.00$ 150,000.00$ 40.00$ 80,000.00$ 150,000.00$ 80,000.00$ 9.09$ 18,175.00
118AGGREGATE APPROACH: AGGREGATE BASETON60$ 150.00$ 9,000.00$ 50.00$ 3,000.00$ 9,000.00$ 3,000.00$ 42.39$ 84,775.00
119LEVEL 3, 1/2 INCH ACPTON8,500$ 120.00$ 1,020,000.00$ 90.00$ 765,000.00$ 1,020,000.00$ 765,000.00$ 122.00$ 7,320.00
12018 INCH ASPHALT CONCRETE PAVEMENT REPAIRSQYD1,000$ 85.00$ 85,000.00$ 50.00$ 50,000.00$ 85,000.00$ 50,000.00$ 90.32$ 767,709.38
121EXTRA FOR ASPHALT APPROACHESEACH25$ 700.00$ 17,500.00$ 300.00$ 7,500.00$ 17,500.00$ 7,500.00$ 71.84$ 71,843.75
122EXTRA FOR SPOT GRIND AND INLAYSSQYD2,000$ 8.00$ 16,000.00$ 13.50$ 27,000.00$ 27,000.00$ 16,000.00$ 834.38$ 20,859.38
123GUARDRAIL MODIFICATION @ STA 88+32 RTLS1$ 50,000.00$ 50,000.00$ 19,000.00$ 19,000.00$ 50,000.00$ 19,000.00$ 16.56$ 33,125.00
124GUARDRAIL MODIFICATION @ STA 97+92 LTLS1$ 28,000.00$ 28,000.00$ 4,500.00$ 4,500.00$ 28,000.00$ 4,500.00$ 17,175.00$ 17,175.00
125GUARDRAIL MODIFICATION @ STA 158+26 RTLS1$ 20,000.00$ 20,000.00$ 7,500.00$ 7,500.00$ 20,000.00$ 7,500.00$ 4,356.25$ 4,356.25
126DELINATORS, TYPE 3EACH82$ 75.00$ 6,150.00$ 100.00$ 8,200.00$ 8,200.00$ 6,150.00$ 7,368.75$ 7,368.75
127DELINATORS, TYPE 4 ALTERNATE 2EACH34$ 60.00$ 2,040.00$ 38.00$ 1,292.00$ 2,040.00$ 1,292.00$ 98.75$ 8,097.50
128MONO-DIRECTIONAL WHITE TYPE 1AR MARKERSEA36$ 30.00$ 1,080.00$ 9.00$ 324.00$ 1,080.00$ 324.00$ 80.38$ 2,732.75
129BI-DIRECTIONAL YELLOW TYPE 1AR MARKERS, RECESSEDEA400$ 25.00$ 10,000.00$ 9.00$ 3,600.00$ 10,000.00$ 3,600.00$ 7.88$ 283.50
130TRAVERSABLE RUMBLE STRIPSEA5$ 1,500.00$ 7,500.00$ 1,250.00$ 6,250.00$ 7,500.00$ 6,250.00$ 16.73$ 6,690.00
131DRIBBLE LINE, SPRAYED, SURFACEFOOT16,000$ 0.30$ 4,800.00$ 0.22$ 3,520.00$ 4,800.00$ 3,520.00$ 1,151.25$ 5,756.25
132HI-BUILD PAINT, 25 MIL, SPRAYED, SURFACEFOOT56,600$ 0.50$ 28,300.00$ 0.35$ 19,810.00$ 28,300.00$ 19,810.00$ 0.12$ 1,920.00
133PAVEMENT BAR, TYPE B-HSSF260$ 15.00$ 3,900.00$ 20.00$ 5,200.00$ 5,200.00$ 3,900.00$ 0.30$ 16,767.75
134PAVEMENT LEGEND, TYPE B-HS : "STOP AHEAD"EACH1$ 3,000.00$ 3,000.00$ 1,050.00$ 1,050.00$ 3,000.00$ 1,050.00$ 14.05$ 3,653.00
Total$ 1,761,510.00Total$ 1,180,966.00Average Total$ 1,361,211.00

Bid Tabs

Arndt Road/Airport Road Paving Package Bid Tabulations
KNL Industries. IncBrix Paving Northwest, Inc.Eagle Elsner IncKnife River NWKerr ConstructionNorth Santiam PavingTFT ConstructionRoy Houck ConstructionLow/High AnalysisAverage of the Bids
Bid ItemUnitQuantityUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalLow UPHigh UPAverage Unit PriceAverage Total
101WORKPLACE HARASSMENT PREVENTION PLANLS1$ 500.00$ 500.00$ 100.00$ 100.00$ 1,000.00$ 1,000.00$ 1,300.00$ 1,300.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 750.00$ 750.00$ 2,500.00$ 2,500.00$ 100.00$ 2,500.00$ 956.25$ 956.25
102EXTRA WORK DONE ON FORCE ACCOUNT BASISFA1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
103MOBILIZATIONLS1$ 37,000.00$ 37,000.00$ 75,000.00$ 75,000.00$ 98,047.00$ 98,047.00$ 95,500.00$ 95,500.00$ 155,000.00$ 155,000.00$ 136,000.00$ 136,000.00$ 45,000.00$ 45,000.00$ 110,000.00$ 110,000.00$ 37,000.00$ 155,000.00$ 93,943.38$ 93,943.38
104TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: CANBY/MARQUAM HWYLS1$ 30,000.00$ 30,000.00$ 72,000.00$ 72,000.00$ 69,000.00$ 69,000.00$ 99,260.00$ 99,260.00$ 100,000.00$ 100,000.00$ 130,500.00$ 130,500.00$ 89,000.00$ 89,000.00$ 115,000.00$ 115,000.00$ 30,000.00$ 130,500.00$ 88,095.00$ 88,095.00
105PORTABLE CHANGEABLE MESSAGE SIGNSEA7$ 3,000.00$ 21,000.00$ 2,500.00$ 17,500.00$ 1,700.00$ 11,900.00$ 3,400.00$ 23,800.00$ 1,920.00$ 13,440.00$ 1,750.00$ 12,250.00$ 2,000.00$ 14,000.00$ 2,800.00$ 19,600.00$ 1,700.00$ 3,400.00$ 2,383.75$ 16,686.25
106TEMPORARY PROJECT INFORMATION SIGNSSF60$ 35.00$ 2,100.00$ 60.00$ 3,600.00$ 45.00$ 2,700.00$ 71.00$ 4,260.00$ 43.00$ 2,580.00$ 40.00$ 2,400.00$ 46.00$ 2,760.00$ 40.00$ 2,400.00$ 35.00$ 71.00$ 47.50$ 2,850.00
107TEMPORARY FLEXIBLE PAVEMENT MARKERSEA8,600$ 2.00$ 17,200.00$ 2.00$ 17,200.00$ 2.50$ 21,500.00$ 1.00$ 8,600.00$ 1.70$ 14,620.00$ 0.50$ 4,300.00$ 1.25$ 10,750.00$ 0.75$ 6,450.00$ 0.50$ 2.50$ 1.46$ 12,577.50
108TEMPORARY REMOVABLE TAPEFOOT1,160$ 2.00$ 2,320.00$ 3.50$ 4,060.00$ 1.75$ 2,030.00$ 3.00$ 3,480.00$ 7.70$ 8,932.00$ 2.00$ 2,320.00$ 1.50$ 1,740.00$ 1.00$ 1,160.00$ 1.50$ 7.70$ 2.81$ 3,255.25
109EROSION CONTROLLS1$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$ 2,000.00$ 2,000.00$ 1,000.00$ 1,000.00$ 1,850.00$ 1,850.00$ 350.00$ 350.00$ 5,500.00$ 5,500.00$ 4,200.00$ 4,200.00$ 350.00$ 5,500.00$ 2,300.00$ 2,300.00
110POLLUTION CONTROL PLANLS1$ 500.00$ 500.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 200.00$ 200.00$ 500.00$ 500.00$ 50.00$ 50.00$ 750.00$ 750.00$ 1,000.00$ 1,000.00$ 50.00$ 1,000.00$ 562.50$ 562.50
111REMOVAL OF STRUCTURES AND OBSTRUCTIONSLS1$ 10,000.00$ 10,000.00$ 6,000.00$ 6,000.00$ 5,000.00$ 5,000.00$ 5,300.00$ 5,300.00$ 19,573.00$ 19,573.00$ 1,100.00$ 1,100.00$ 5,500.00$ 5,500.00$ 5,000.00$ 5,000.00$ 1,100.00$ 19,573.00$ 7,184.13$ 7,184.13
112CLEARING AND GRUBBINGLS1$ 9,500.00$ 9,500.00$ 5,000.00$ 5,000.00$ 1,000.00$ 1,000.00$ 2,800.00$ 2,800.00$ 5,000.00$ 5,000.00$ 9,000.00$ 9,000.00$ 3,500.00$ 3,500.00$ 15,000.00$ 15,000.00$ 1,000.00$ 15,000.00$ 6,350.00$ 6,350.00
11312 INCH SUBGRADE STABILIZATIONSQYD250$ 50.00$ 12,500.00$ 40.00$ 10,000.00$ 51.00$ 12,750.00$ 56.00$ 14,000.00$ 72.00$ 18,000.00$ 23.00$ 5,750.00$ 37.00$ 9,250.00$ 60.00$ 15,000.00$ 23.00$ 72.00$ 48.63$ 12,156.25
114INSTALL CAST IRON MONUMENT BOXESEACH1$ 600.00$ 600.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,600.00$ 1,600.00$ 1,500.00$ 1,500.00$ 3,000.00$ 3,000.00$ 1,000.00$ 1,000.00$ 1,200.00$ 1,200.00$ 600.00$ 3,000.00$ 1,362.50$ 1,362.50
115COLD PLANE PAVEMENT REMOVAL, 0-2 INCHES DEEPSQYD5,000$ 2.00$ 10,000.00$ 6.00$ 30,000.00$ 2.85$ 14,250.00$ 5.75$ 28,750.00$ 6.40$ 32,000.00$ 8.00$ 40,000.00$ 1.50$ 7,500.00$ 4.70$ 23,500.00$ 1.50$ 8.00$ 4.65$ 23,250.00
116COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEPSQYD2,000$ 2.00$ 4,000.00$ 15.50$ 31,000.00$ 5.50$ 11,000.00$ 11.00$ 22,000.00$ 6.90$ 13,800.00$ 17.00$ 34,000.00$ 4.50$ 9,000.00$ 10.30$ 20,600.00$ 2.00$ 17.00$ 9.09$ 18,175.00
117AGGREGATE SHOULDERS (1-1/2"-0)TON2,000$ 40.00$ 80,000.00$ 54.00$ 108,000.00$ 50.00$ 100,000.00$ 42.00$ 84,000.00$ 40.00$ 80,000.00$ 33.00$ 66,000.00$ 35.00$ 70,000.00$ 45.10$ 90,200.00$ 33.00$ 54.00$ 42.39$ 84,775.00
118AGGREGATE APPROACH: AGGREGATE BASETON60$ 50.00$ 3,000.00$ 220.00$ 13,200.00$ 115.00$ 6,900.00$ 87.00$ 5,220.00$ 89.00$ 5,340.00$ 150.00$ 9,000.00$ 90.00$ 5,400.00$ 175.00$ 10,500.00$ 50.00$ 220.00$ 122.00$ 7,320.00
119LEVEL 3, 1/2 INCH ACPTON8,500$ 90.00$ 765,000.00$ 103.00$ 875,500.00$ 80.35$ 682,975.00$ 83.00$ 705,500.00$ 98.00$ 833,000.00$ 82.00$ 697,000.00$ 98.00$ 833,000.00$ 88.20$ 749,700.00$ 80.35$ 103.00$ 90.32$ 767,709.38
12018 INCH ASPHALT CONCRETE PAVEMENT REPAIRSQYD1,000$ 50.00$ 50,000.00$ 100.00$ 100,000.00$ 63.00$ 63,000.00$ 69.00$ 69,000.00$ 93.00$ 93,000.00$ 86.00$ 86,000.00$ 63.00$ 63,000.00$ 50.75$ 50,750.00$ 50.00$ 100.00$ 71.84$ 71,843.75
121EXTRA FOR ASPHALT APPROACHESEACH25$ 300.00$ 7,500.00$ 1,200.00$ 30,000.00$ 550.00$ 13,750.00$ 900.00$ 22,500.00$ 1,475.00$ 36,875.00$ 500.00$ 12,500.00$ 550.00$ 13,750.00$ 1,200.00$ 30,000.00$ 300.00$ 1,475.00$ 834.38$ 20,859.38
122EXTRA FOR SPOT GRIND AND INLAYSSQYD2,000$ 13.50$ 27,000.00$ 18.00$ 36,000.00$ 19.00$ 38,000.00$ 6.00$ 12,000.00$ 44.00$ 88,000.00$ 12.00$ 24,000.00$ 9.00$ 18,000.00$ 11.00$ 22,000.00$ 6.00$ 44.00$ 16.56$ 33,125.00
123GUARDRAIL MODIFICATION @ STA 88+32 RTLS1$ 19,000.00$ 19,000.00$ 14,300.00$ 14,300.00$ 15,000.00$ 15,000.00$ 14,800.00$ 14,800.00$ 14,300.00$ 14,300.00$ 15,000.00$ 15,000.00$ 20,000.00$ 20,000.00$ 25,000.00$ 25,000.00$ 14,300.00$ 25,000.00$ 17,175.00$ 17,175.00
124GUARDRAIL MODIFICATION @ STA 97+92 LTLS1$ 4,500.00$ 4,500.00$ 4,000.00$ 4,000.00$ 4,250.00$ 4,250.00$ 4,100.00$ 4,100.00$ 4,000.00$ 4,000.00$ 5,000.00$ 5,000.00$ 4,000.00$ 4,000.00$ 5,000.00$ 5,000.00$ 4,000.00$ 5,000.00$ 4,356.25$ 4,356.25
125GUARDRAIL MODIFICATION @ STA 158+26 RTLS1$ 7,500.00$ 7,500.00$ 7,000.00$ 7,000.00$ 7,250.00$ 7,250.00$ 7,200.00$ 7,200.00$ 7,000.00$ 7,000.00$ 8,000.00$ 8,000.00$ 7,000.00$ 7,000.00$ 8,000.00$ 8,000.00$ 7,000.00$ 8,000.00$ 7,368.75$ 7,368.75
126DELINATORS, TYPE 3EACH82$ 100.00$ 8,200.00$ 100.00$ 8,200.00$ 110.00$ 9,020.00$ 80.00$ 6,560.00$ 100.00$ 8,200.00$ 100.00$ 8,200.00$ 90.00$ 7,380.00$ 110.00$ 9,020.00$ 80.00$ 110.00$ 98.75$ 8,097.50
127DELINATORS, TYPE 4 ALTERNATE 2EACH34$ 38.00$ 1,292.00$ 75.00$ 2,550.00$ 100.00$ 3,400.00$ 45.00$ 1,530.00$ 150.00$ 5,100.00$ 100.00$ 3,400.00$ 70.00$ 2,380.00$ 65.00$ 2,210.00$ 38.00$ 150.00$ 80.38$ 2,732.75
128MONO-DIRECTIONAL WHITE TYPE 1AR MARKERSEA36$ 9.00$ 324.00$ 7.00$ 252.00$ 7.50$ 270.00$ 7.50$ 270.00$ 8.00$ 288.00$ 7.00$ 252.00$ 7.00$ 252.00$ 10.00$ 360.00$ 7.00$ 10.00$ 7.88$ 283.50
129BI-DIRECTIONAL YELLOW TYPE 1AR MARKERS, RECESSEDEA400$ 9.00$ 3,600.00$ 19.00$ 7,600.00$ 20.00$ 8,000.00$ 19.00$ 7,600.00$ 8.00$ 3,200.00$ 19.00$ 7,600.00$ 18.80$ 7,520.00$ 21.00$ 8,400.00$ 8.00$ 21.00$ 16.73$ 6,690.00
130TRAVERSABLE RUMBLE STRIPSEA5$ 1,250.00$ 6,250.00$ 1,050.00$ 5,250.00$ 1,100.00$ 5,500.00$ 1,050.00$ 5,250.00$ 1,250.00$ 6,250.00$ 1,050.00$ 5,250.00$ 1,260.00$ 6,300.00$ 1,200.00$ 6,000.00$ 1,050.00$ 1,260.00$ 1,151.25$ 5,756.25
131DRIBBLE LINE, SPRAYED, SURFACEFOOT16,000$ 0.22$ 3,520.00$ 0.08$ 1,280.00$ 0.09$ 1,440.00$ 0.08$ 1,280.00$ 0.21$ 3,360.00$ 0.10$ 1,600.00$ 0.08$ 1,280.00$ 0.10$ 1,600.00$ 0.08$ 0.22$ 0.12$ 1,920.00
132HI-BUILD PAINT, 25 MIL, SPRAYED, SURFACEFOOT56,600$ 0.35$ 19,810.00$ 0.26$ 14,716.00$ 0.28$ 15,848.00$ 0.27$ 15,282.00$ 0.35$ 19,810.00$ 0.30$ 16,980.00$ 0.26$ 14,716.00$ 0.30$ 16,980.00$ 0.26$ 0.35$ 0.30$ 16,767.75
133PAVEMENT BAR, TYPE B-HSSF260$ 20.00$ 5,200.00$ 11.30$ 2,938.00$ 12.00$ 3,120.00$ 12.00$ 3,120.00$ 18.80$ 4,888.00$ 12.00$ 3,120.00$ 11.30$ 2,938.00$ 15.00$ 3,900.00$ 11.30$ 20.00$ 14.05$ 3,653.00
134PAVEMENT LEGEND, TYPE B-HS : "STOP AHEAD"EACH1$ 1,050.00$ 1,050.00$ 1,050.00$ 1,050.00$ 1,100.00$ 1,100.00$ 1,100.00$ 1,100.00$ 950.00$ 950.00$ 1,100.00$ 1,100.00$ 1,040.00$ 1,040.00$ 1,200.00$ 1,200.00$ 950.00$ 1,200.00$ 1,073.75$ 1,073.75
Total$ 1,180,966.00Total$ 1,517,296.00Total$ 1,243,000.00Total$ 1,288,162.00Total$ 1,610,856.00Total$ 1,362,022.00Total$ 1,293,956.00$ 1,393,430.00Average$ 1,361,211.00