Bid Addendum 01 - Canby-Marquam Paving Project.pdf
PDF 4 MB Posted
- Solicitation number
- S-C01010-00011714
- Issued by
- Clackamas County, Canyonville City, Oregon
About this file
This document is an Addendum to the Invitation to Bid (ITB) #2024-97 issued by Clackamas County, Oregon for the Canby-Marquam Highway Paving Project. The project involves asphalt paving and milling on approximately 5.2 miles of State Highway 170. The bid closing date has been changed from October 23, 2024 to October 24, 2024. The bid schedule has been revised, and plan sheets C-13, C-14, and C-15 have been updated. The project must be completed within 120 calendar days of the notice to proceed.
The ITB requires unit pricing for various pay items including asphalt, milling, and other roadwork. The contract will be awarded to the lowest responsive and responsible bidder. The ITB does not mention any set-aside designations or restrictions on bidder types, and no incumbent contractor is identified. The total award value or budget range is not provided, but the project is subject to state prevailing wage requirements. No specific funding sources are listed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2024-97
Canby-Marquam Highway Paving Project
ADDENDUM NUMBER 1
October 17, 2024
On October 1, 2024, Clackamas County (“County”) published Invitation to Bid #2024-97 (“BID”). The County has found that it is in its interest to amend the BID through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original BID and subsequent Addenda shall remain unchanged.
1. The bid closing date is hereby changed from October 23, 2024 at 2:00PM to October 24, 2024 at 2:00PM
2. Remove and replace the Bid Schedule with the attached titled Addendum #1 Canby- Marquam Highway Paving Project Bid Schedule.
Note – the bid items listed below have changed:
• Changed the Item Description of Item #’s 126 & 127.
3. Remove and replace project plan sheets C-13, C-14, and C-15 with attached titled Addendum #1 Canby-Marquam Hwy Paving Project Plans C-13, C-14, C-15 REV 1.
Attachments:
• Addendum #1 Canby-Marquam Highway Paving Project Bid Schedule
• Addendum #1 Canby-Marquam Highway Paving Project Revised Plan Sheets C-13, C-14, C-
End of Addendum #1
Canby-Marquam Highway Paving Project Spring/Summer 2025 page 1 of 2 Item # Spec # Item Description Unit Quantity Unit Price Amount
TEMPORARY FEATURES AND APPURTENANCES
101 00180 WORKPLACE HARASSMENT PREVENTION PLAN LS 1
102 00197 EXTRA WORK DONE ON FORCE ACCOUNT BASIS FA 1 10,000.00$ 10,000.00$
103 00210 MOBILIZATION LS 1
104 00221 TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: CANBY-MARQUAM HIGHWA LS 1
105 00222 PORTABLE CHANGEABLE MESSAGE SIGNS EA 7
106 00222 TEMPORARY PROJECT INFORMATION SIGNS SF 60
107 00225 TEMPORARY FLEXIBLE PAVEMENT MARKERS EA 8,600
108 00225 TEMPORARY REMOVABLE TAPE FOOT 1,160
109 00280 EROSION CONTROL LS 1
110 00290 POLLUTION CONTROL PLAN LS 1
TEMPORARY FEATURES AND APPURTENANCES-SUBTOTAL $
ROADWORK
111 00310 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1
112 00320 CLEARING AND GRUBBING LS 1
113 00331 12 INCH SUBGRADE STABILIZATION SQYD 250
114 00490 INSTALL CAST IRON MONUMENT BOXES EACH 1
ROADWORK - SUBTOTAL $
BASES
115 00620 COLD PLANE PAVEMENT REMOVAL, 0-2 INCHES DEEP SQYD 5,000
116 00620 COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP SQYD 2,000
117 00641 AGGREGATE SHOULDERS (1-1/2"-0) TON 2,000
118 00641 AGGREGATE APPROACH: AGGREGATE BASE TON 60
BASES - SUBTOTAL $
WEARING SURFACES
119 00744 LEVEL 3, 1/2 INCH ACP TON 8,500
120 00748 18 INCH ASPHALT CONCRETE PAVEMENT REPAIR SQYD 1,000
121 00749 EXTRA FOR ASPHALT APPROACHES EACH 25
122 00749 EXTRA FOR SPOT GRIND AND INLAYS SQYD 2,000
WEARING SURFACES - SUBTOTAL $
Canby-Marquam Highway Paving Project Spring/Summer 2025 page 2 of 2 Item # Spec # Item Description Unit Quantity Unit Price Amount
PERMANENT TRAFFIC SAFETY AND GIUIDENCE DEVICES
123 00810 GUARDRAIL MODIFICATION @ STA 88+32 RT LS 1
124 00810 GUARDRAIL MODIFICATION @ STA 97+92 LT LS 1
125 00810 GUARDRAIL MODIFICATION @ STA 158+26 RT LS 1
126 00840 DELINATORS, TYPE 2 EACH 82
127 00840 DELINATORS, TYPE 4 ALTERNATE 1 EACH 34
128 00855 MONO-DIRECTIONAL WHITE TYPE 1AR MARKERS EA 36
129 00855 BI-DIRECTIONAL YELLOW TYPE 1AR MARKERS, RECESSED EA 400
130 00857 TRAVERSABLE RUMBLE STRIPS EA 5
131 00866 DRIBBLE LINE, SPRAYED, SURFACE FOOT 16,000
132 00866 HI-BUILD PAINT, 25 MIL, SPRAYED, SURFACE FOOT 56,600
133 00867 PAVEMENT BAR, TYPE B-HS SF 260
134 00867 PAVEMENT LEGEND, TYPE B-HS : "STOP AHEAD" EACH 1
PERMANENT TRAFFIC SAFETY AND GUIDENCE DEVICES - SUBTOTAL $
TOTAL $
Total Price Dollars and
Cents
Name of Firm
Name (Print)
Signature Date v N 0 u ci u :i: "'
F'
�I
� 0 0 C
3'vN 0 .g
·e
C
19132] a::
U) a::
z a::
a§ U) a::
� REMOVE AND INSTALL 4EA MONO-DIRECTIONAL WHITE
lYP lAR MARKERS AROUND CURVE@ EQ SPACING
STA 78+86
a::
z a::
co
_ !_!_!��;��-�H-�E-�-�l��AN_s_m_o
N ��H o
D
·c
J_ APPROX
R� W
I :2+24
NO
WORK
STA 78+62
END PAVING LIMITS
END ACP OVERLAY
TRANSITION METHOD 'C'
SEE DET 1 SHT C-03
CANBY-MARQUAM HWY
APPROX. R/W
REMOVE AND INSTALL 4EA
MONO-DIRECTIONAL WHITE
lYP lAR MARKERS AROUND
CURVE @ EQ SPACING
REMOVE AND INSTALL 4EA
MONO-DIRECTIONAL WHITE lYP lAR
MARKERS AROUND CURVE @ EQ SPACING
0"-2" GRIND/2" ACP INLAY
LEVEL 3, 1/2" ACP MIX
0"-2" GRIND/2" INLAY PLAN
LEVEL 3, 1/2" ACP MIX
APPROX. R/W
SCALE: 1"=50'
APPROX. R/W
PLAN
SCALE: 1"=50'
STA 80+86
END ACP OVERLAY
TRANSITION METHOD 'C'
SEE DET 1 SHT C-03
2" ACP OVERLAY
LEVEL 3, 1/2" ACP MIX
PAVEMENT REHABILITATION LEGEND
W!la
ASPHALT CONCRETE PAVING,
SEE TYPICAL SECTION, SHT C-01
APPROXIMATE 2-IN SPOT GRIND
AND INLAY RESTORATION AREA,
SEE NOTE 2 THIS SHT (TYP)
GRADE ASPHALT OR BASE SECTION
TO MAINTAIN POSITIVE DRAINAGE.
ASPHALT APPROACH,
SEE DET S SHT C-02
AGGREGATE APPROACH,
SEE DET 6 SHT C-02.
D 2024.07.12 IGITALLY SIGNED 16:43:27_0TOO'
RENEWS 6-30-25
CONSTRUCTION NOTES:
1. FOR ROADWAY PAVING IMPROVEMENTS, SEE
TYPICAL SECTION SHEET C-01.
2. PRIOR TO PAVEMENT OVERLAY OPERATIONS OR
FOLLOWING PAVEMENT REMOVAL OPERATIONS, THE
INSPECTOR MAY DIRECT ADDITIONAL RESTORATIONS
AS NECESSARY TO ADDRESS EXISTING PAVEMENT
DEFICIENCIES. WORK MAY INCLUDE SPOT GRIND AND
INLAY DEPTH, ASPHALT CONCRETE PAVEMENT REPAIR
OR SUBGRADE STABILIZATION. SEE PAVING DETAILS
ON SHEET C-02.
3. ASPHALT AND AGGREGATE DRIVEWAY
TRANSITIONS SHOWN ON THE PLANS ARE VISUALS
FOR ESTIMATING PURPOSES ONLY. DRIVEWAYS SHALL
BE BUILT PER THE INSPECTOR'S FIELD LAYOUT. SEE
PAVING DETAILS ON SHEET C-02.
PAVEMENT MARKING NOTES:
1. INSTALL NEW PAVEMENT MARKINGS AS CALLED
OUT WITH G) PER ODOT STD DWGS.
2. RECORD EXISTING PAVEMENT MARKINGS AND
REPLACE MARKINGS IN EXISTING CONFIGURATION
AFTER PAVING UNLESS OTHERWISE SHOWN OR
DIRECTED BY THE ENGINEER. CONTRACTOR SHALL
COORDINATE LAYOUT WITH INSPECTOR PRIOR TO
PLACEMENT.
KEY NOTES:
MAINTAIN AND PROTECT EXIST MAILBOX AND
SUPPORTS
GUARDRAIL MODIFICATION @ STA 88+32 RT
NORTH END:
REMOVE EXTG TERMINAL AND GUARDRAIL - 75 LF
INSTALL MIDWEST BURIED END TERMINAL - 50 LF
INSTALL 31" AND 29" TRANSITION - 25 LF
ADJUST EXTG GUARDRAIL TO 29" - 120 LF
SOUTH END:
REMOVE EXTG TERMINAL - 55 LF
INSTALL MIDWEST SOFT STOP TERMINAL
INSTALL lYPE 4/ALTl GUARDRAIL TRAFFIC
IDELJNEATORS W/ 28
REFLECTOR PATTERN AT 50' SPACING - 6 EA
{SEE ODOT STD DWGS RD400, RD402, RD403, RD406,
RD436, RD481, & TM570)
REMOVE AND INSTALL NEW lYPE 2 DELINEATOR, W-2B PATTERN (SEE ODOT STD DWG TM570) USE
CARSONITE SURVIVOR CDS306601 MARKER POSTS
4\ consor en w l o z z z
:5 a..
CJ
z
� ,.. �z u;i o ..iU u
ID
0 w ts 0 iii c:::
Cl) z u5 a:
w I ci z
ID
t :r:
< a..
� c:::
PORTLAND, OREGON 97204 heet No.
c:::
t u w c:::
z z :r:
0 -:, z
ID
0 w
N If) "" N I I c:i z fu w -, 0 a:: o._
"" N 0 N >_J ;i i5 (!) w :r:
i'i <(
:ilc
ONE SW COLUMBIA STREET, SUITE 1700
P
.9;, _____________ .J. _ _;C�-1:.;3�-.J
/1 7/
AD
D
ED
D
EL
IN
EA
TO
R M
FG
IN
FO
R
M
AT
IO
N
JSparks Polygon
<fl
<fl
0.
N 0 N
:i;
u u
'.'.l
�I 0.
0 0 C
:i;
3' N 0 f 8 "'
I i t ·e
C
,-I
LI')
O'I
�i=:
g(/)
<( UJ
tl:JZ (/) ...... ...J
J:
u
:E
R=232.23' ll=34°56'39" L=274.08'
2" ACP OVERLAY
LEVEL 3, 1/2" ACP MIX
STA 97+92
BEGIN CANBY-MARQUAM
HIGHWAY PROJECT S LIMITS
BEGIN ACP OVERLAY
TRANSITION METHOD 'A'
SEE ODOT STD DWG RD610
STA 92+00
BEGIN ACP OVERLAY
TRANSITION
METHOD 'C'
SEE SHEET C-03 DET 1
PLAN
SCALE: 1"=50'
PLAN
SCALE: 1"=50'
I I
I I
APPROX. R/W
j_ _____ _ 130396!
LEVEL 3, 1/2" ACP MIX
STA 94+00
END ACP OVERLAY
TRANSITION METHOD 'C'
SEE SHEET C-03 DET 1
END CANBY-MARQUAM
HWY N LIMITS
NO PAVING WORK
PAVEMENT REHABILITATION LEGEND
ASPHALT CONCRETE PAVING,
SEE TYPICAL SECTION, SHT C-01
APPROXIMATE 2-IN SPOT GRIND
AND INLAY RESTORATION AREA,
SEE NOTE 2 THIS SHT (TYP)
GRADE ASPHALT OR BASE SECTION
TO MAINTAIN POSITIVE DRAINAGE.
R=S00.00' j 6=27° 58'15"' L=380.00'
99+00
0"-2" GRINO/2"-4" ACP INLAY
LEVEL 3, 1/2" ACP MIX
1304301
APPROACH, SEE
CONSTRUCTION
NOTE 3, TYP
ASPHALT APPROACH,
SEE DET 4 SHT C-02
AGGREGATE APPROACH,
SEE DET 5 SHT C-02
2024.07.12 DIGITALLY SIGNED 16:43:37_07'00'
OREGON
RENEWS 6-30-25
CONSTRUCTION NOTES:
1. FOR ROADWAY PAVING IMPROVEMENTS, SEE
TYPICAL SECTION SHEET C-01.
2. PRIOR TO PAVEMENT OVERLAY OPERATIONS OR
FOLLOWING PAVEMENT REMOVAL OPERATIONS, THE
INSPECTOR MAY DIRECT ADDITIONAL RESTORATIONS
AS NECESSARY TO ADDRESS EXISTING PAVEMENT
DEFICIENCIES. WORK MAY INCLUDE SPOT GRIND AND
INLAY DEPTH, ASPHALT CONCRETE PAVEMENT REPAIR
OR SUBGRADE STABILIZATION. SEE PAVING DETAILS
ON SHEET C-02.
3. ASPHALT AND AGGREGATE DRIVEWAY
TRANSITIONS SHOWN ON THE PLANS ARE VISUALS
FOR ESTIMATING PURPOSES ONLY. DRIVEWAYS SHALL
BE BUILT PER THE INSPECTOR'S FIELD LAYOUT. SEE
PAVING DETAILS ON SHEET C-02.
PAVEMENT MARKING NOTES:
1. INSTALL NEW PAVEMENT MARKINGS AS CALLED
OUT WITH G) PER ODOT STD DWGS.
2. RECORD EXISTING PAVEMENT MARKINGS AND
REPLACE MARKINGS IN EXISTING CONFIGURATION
AFTER PAVING UNLESS OTHERWISE SHOWN OR
DIRECTED BY THE ENGINEER. CONTRACTOR SHALL
COORDINATE LAYOUT WITH INSPECTOR PRIOR TO
PLACEMENT.
KEY NOTES:
MAINTAIN AND PROTECT EXIST MAILBOX AND
SUPPORTS
@ GUARDRAIL MODIFICATION @ STA 88+32 RT SEE
NOTE 12, SHEET C-13
@ GUARDRAIL MODIFICATION@ STA 97+92 LT
ADJUST EXIST GUARDRAIL TO 31" HEIGHT - 233 LF
(SEE ODOT STD DWG RD481)
@ REMOVE AND INSTALL NEW TYPE 2 DELINEATOR,
W-2B PATTERN (SEE ODOT STD DWG TM570)
@ INSTALL TYPE 4 WHITE REFLECTIVE GUARDRAIL
TRAFFIC DELINEATORS WITH W-2B REFLECTOR
{SEE ODOT STD DWG TM570) USE CARSONITE
SURVIVOR CDS306601 MARKER POSTS
4\ consor
ONE SW COLUMBIA STREET, SUITE 1700
PORTLAND, OREGON 97204
P503.225.9010 en w l o z z z a..
CJ
z a..
z Qz
(.) � OIO """"
� oo en°' °' , <(0>- 0, a.. z [Sa:::
�(l)WwO Z::;, a::
���U>,'.° r-ciffiS (.)"->> ::i owjz f-' omg a..OoW
(.)WZ l[) O::
o-<-O
�z u;i o ..iU
ID
C w ts 0 iii O'.'.
Cl) z u5 a:
w 1-ci z
ID
C t :r:
< a..
� O'.'.
heet No.
C-14
O'.'.
I-u w O'.'.
z z :r:
0 -:, z
ID
C w
N If) "'"" N I "' I c:i z .... u w -, 0 a:: n.
"" N 0 N >_J ;i i5 (!) w :r:
i'i <(
/1 7/
AD
D
ED
D
EL
IN
EA
TO
R M
FG
IN
FO
R
M
AT
IO
N
0.
N 0 N u u
0 >- � '.'.l + �I \0
0. 0
W<( _l! >1- 6 gl/) " wlU � wz0
(/l C ...J g :r:
u � I- 3'
::E: N 0
·e
C
R=728.98' 11=22 ° 06'02" L=322.96'
0"-2" GRIND/2"-4" INLAY
LEVEL 3, 1/2" ACP MIX
DWY
STA 101+92
END ACP OVERLAY
TRANSITION METHOD 'A'
SEE ODOT STD DWG RD610
Im!]
APPROX. R/W
130430!
- - 16 END
STA 104+00
APPROX. R/W
APPROACH,SEE
CONSTRUCTION
NOTE 3, TYP
PLAN
SCALE: 1"=50'
APPROX. R/W
16 BEG;-;.;-----.... _
STA 105+30 - ---------
N
END
STA 109+30 16 Ii
��-1-
APPROX. R/W �
4" ACP OVERLAY
LEVEL 3, 1/2" ACP MIX
PLAN
SCALE: 1"=50'
'<:I" I.O r-1 <(3 1-g [./)w II) Ww ...J :r:
::E:
DIGITALLY SIGNED 2024-07• 12
16:43:49-07'00'
RENEWS 6-30-25
CONSTRUCTION NOTES:
1. FOR ROADWAY PAVING IMPROVEMENTS, SEE
TYPICAL SECTION SHEET C-01.
2. PRIOR TO PAVEMENT OVERLAY OPERATIONS OR
FOLLOWING PAVEMENT REMOVAL OPERATIONS, THE
INSPECTOR MAY DIRECT ADDITIONAL RESTORATIONS
AS NECESSARY TO ADDRESS EXISTING PAVEMENT
DEFICIENCIES. WORK MAY INCLUDE SPOT GRIND AND
INLAY DEPTH, ASPHALT CONCRETE PAVEMENT REPAIR
OR SUBGRADE STABILIZATION. SEE PAVING DETAILS
ON SHEET C-02.
3. ASPHALT AND AGGREGATE DRIVEWAY
TRANSITIONS SHOWN ON THE PLANS ARE VISUALS
FOR ESTIMATING PURPOSES ONLY. DRIVEWAYS SHALL
BE BUILT PER THE INSPECTOR'S FIELD LAYOUT. SEE
PAVING DETAILS ON SHEET C-02.
PAVEMENT MARKING NOTES:
1. INSTALL NEW PAVEMENT MARKINGS AS CALLED
OUT WITH G) PER ODOT STD DWGS.
2. RECORD EXISTING PAVEMENT MARKINGS AND
REPLACE MARKINGS IN EXISTING CONFIGURATION
AFTER PAVING UNLESS OTHERWISE SHOWN OR
DIRECTED BY THE ENGINEER. CONTRACTOR SHALL
COORDINATE LAYOUT WITH INSPECTOR PRIOR TO
PLACEMENT.
KEY NOTES:
0 MAINTAIN AND PROTECT EXIST MAILBOX AND
SUPPORTS
@ REMOVE AND INSTALL NEW TYPE 2 DELINEATOR,
W-2B PATTERN
(SEE ODOT STD DWG TM570) USE CARSONITE
SURVIVOR CDS306601 MARKER POSTS
PAVEMENT REHABILITATION LEGEND
ASPHALT CONCRETE PAVING,
SEE TYPICAL SECTION, SHT C-01
TO C-01
APPROXIMATE 2 IN SPOT GRIND
AND INLAY RESTORATION AREA,
SEE NOTE 2 THIS SHT (TYP)
GRADE ASPHALT OR BASE SECTION
TO MAINTAIN POSITIVE DRAINAGE.
ASPHALT APPROACH,
SEE DET 4 SHT C-02
AGGREGATE APPROACH,
SEE DET S SHT C-02.
� consor
ONE SW COLUMBIA STREET, SUITE 1700
PORTLAND, OREGON 97204
PS-03.225.9010
en w l o z z z a..
CJ
z a..
z Qz
(.) � OIO
<,:sl" � oo en a:: a:: , <( 0>- o, a.. z [Sa:::
�(l)WwO Z::;, a::
���u>,'.' r-ciffiS
(.)"->> ::i owjz >-' omg a..OoW
(.)WZ l[) O::
o..:�o
�z u;i <o ..iU
ID
C w ts 0 iii c:::
Cl) z u5
� a:
w f-ci z
ID
C t :r:
< a..
� c:::
heel No.
C-15
O'.'.
I-u w O'.'.
z z :r:
z
ID
C w
N If) "'"" N I "' I c:i z f u w --, 0 a:: o._
"" N 0 N >_J ;i i5 (!) w :r:
i'i <(
/1 7/
AD
D
ED
D
EL
IN
EA
TO
R M
FG
IN
FO
R
M
AT
IO
N
File details come from the government source that posted it. Updated .