C7_Att08_Bid_Form.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- N0025326Q0008
About this file
This is a Bid Form template for solicitation N0025326Q0008, issued by Naval Undersea Warfare Center (NUWC) Keyport for the installation of Crane Rail Cross Bracing at Building 514. The form requires contractors to provide detailed pricing for all tasks associated with the project, organized by line items that must include material costs, labor costs (broken down by trade and hourly rates), equipment costs, and subtotals. The form includes example line items such as air handler installation with associated HVAC technician and electrician labor, miscellaneous materials, and equipment rental (scissor lift), as well as site mobilization/demobilization costs with general laborer and Site Safety and Health Officer (SSHO) labor and equipment transport. Contractors must complete all sections with sufficient detail to permit technical and price evaluation in accordance with Section L instructions and must retain all formulas for calculating totals rather than hard-entering values.
The bid form culminates in a summary section requiring contractors to account for subcontractor performance value, prime contractor and project management costs, and overhead and profit percentages for general home office overhead, general field overhead, general and administrative expenses, and profit, along with bond costs. The completed form must result in the firm fixed price proposal amount for CLIN 0001 (Contract Line Item Number). This is a small business set-aside opportunity under NAICS code 333923, and all pricing must be submitted via email to the designated Navy contracting officers as digital copies only, with company quote forms explicitly not accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025326Q00080002.pdf | ||
| C7_Att13_Statement_Of_Work_Bldg514_Crane_Final.pdf | ||
| C7_Att13_Statement_Of_Work_Bldg514_Crane_Rev1.pdf | ||
| C7_Building_514_Crane_Support_Study_Drawing_Final.pdf | ||
| N0025326Q0008_Amendment_0001.pdf | ||
| C7_PPI_Answers_Final.docx | DOCX document | |
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C7_Att12_Security_Requirements.docx | DOCX document | |
| C7_Att01_Materials_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att06_Schedule_Of_Values.xlsx | XLSX spreadsheet | |
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att10_Safety_Data_Sheet.docx | DOCX document | |
| C7_N0025326Q0008.pdf | ||
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att13_Statement_Of_Work_B514.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025326Q0008 | Contractor: | |
| PID Description: | Building 514 | Date: | |
| Project Location: | Naval Undersea Warfare Center, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| Building 514 | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |