C7_Att01_Materials_Equipment_In_Place_List.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- N0025326Q0008
About this file
This is a Materials and Equipment In-Place List spreadsheet template for documenting installed equipment under Naval contract N00253-25-SIMACQ-KPT-102-0073 for Building 514 Crane Rail Cross Bracing installation at Naval Undersea Warfare Center (NUWC) Keyport. The spreadsheet is designed to track all equipment and materials installed as part of this project, capturing critical asset information including building and room numbers, equipment descriptions, quantities, unit of measure, and total installed costs (including labor and material for both removal and installation of assets). Each line item requires detailed supplier information (name, address, email, phone), manufacturer specifications (model number and serial number), warranty expiration dates, and installation dates. The template includes specific notes requiring separate line items for each asset with a unit of issue of "EACH," cost data that encompasses both removal and installation labor, and designation of removed equipment with asset numbers assigned by the government's Facility Management System upon final submission.
The example entries demonstrate the template application: Breathing Air Filters (Atlas Copco FTX345BU units at $2,400 each installed in Building 5094, Room 101) and Carpet installation (300 square feet of Mohawk carpet in Building 5094, Rooms 116-118 at $4,200 total cost). Contractors submitting final documentation should not assign new asset numbers, as the government will generate these during processing. This spreadsheet serves as the required documentation format for contractors to evidence completion of equipment installations under the solicitation N0025326Q0008, which is a 100% small business set-aside with FOB Destination pricing to NUWC Keyport, WA 98345.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025326Q00080002.pdf | ||
| C7_Att13_Statement_Of_Work_Bldg514_Crane_Final.pdf | ||
| C7_Att13_Statement_Of_Work_Bldg514_Crane_Rev1.pdf | ||
| C7_Building_514_Crane_Support_Study_Drawing_Final.pdf | ||
| N0025326Q0008_Amendment_0001.pdf | ||
| C7_PPI_Answers_Final.docx | DOCX document | |
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att08_Bid_Form.xlsx | XLSX spreadsheet | |
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C7_Att12_Security_Requirements.docx | DOCX document | |
| C7_N0025326Q0008.pdf | ||
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att13_Statement_Of_Work_B514.pdf | ||
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att06_Schedule_Of_Values.xlsx | XLSX spreadsheet | |
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att10_Safety_Data_Sheet.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | N00253-25-SIMACQ-KPT-102-0073 | ||||||||||||||
| Project Title: | Bldg. 514 Install Crane Rail Cross Bracing | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | N00253-25-SIMACQ-KPT-102-0073 | ||||||||||||||
| Project Title: | Bldg. 514 Install Crane Rail Cross Bracing | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |