C25802377_Addendum_4.pdf

PDF 194 KB Posted

Attached to
C25802377 - Auxiliary HVAC Control System Upgrade
Solicitation number
0000037162
Issued by
Sacramento County, Sacramento City, West Sacramento City, California

About this file

This is Addendum #4 to a project manual for the State of California Department of Parks and Recreation Statewide Program Support Center (SPSC) Auxiliary HVAC Control System Upgrade, issued on November 18, 2025. The addendum removes two line items from the original scope of work: the requirement to install and configure a new Carrier I-Vu server (as the Department currently possesses a Carrier I-CU server from a previous HVAC controls project) and the provision and installation of one new Carrier i-Vu controller for control of one existing dehumidification unit. These removals represent modifications to the original project specifications detailed in Section 231000 of the Project Manual. Bidders are required to acknowledge receipt of this addendum by signing and returning the acknowledgement form with their bid documents.

The addendum reflects cost-reduction measures by utilizing existing equipment on site rather than procuring new hardware. This modification is consistent with the broader project scope, which includes upgrading HVAC control systems at the McClellan Facility with an engineer's estimate of $80,000 and a contract term of 730 calendar days from notice to proceed. The mandatory job showing was scheduled for November 13, 2025, with a question submission deadline of November 21, 2025 at 2:00 p.m. The project requires a C-20 contractor license and includes DVBE participation goals with a 6% minimum waived but with applicable incentives, as well as a 5% small business preference for certified small businesses.

View the file

Other files

File Type Posted
C25802377_Addendum_1.pdf PDF
C25802377__PW_IFB-Instru.Booklet-Adum_4_rev_11-19-2025.pdf PDF
C25802377_Addendum_2.pdf PDF
C25802377_Addendum_3.pdf PDF
Job_Walk_List_(C25802377).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of California • Natural Resources Agency Gavin Newsom, Governor

DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director

SPSC

4940 Lang Ave.

McClellan Park, CA 95652

C25802377 Statewide Program Support Center (SPSC)

Auxiliary HVAC Control System Upgrade

ADDENDUM #4 – November 18, 2025

1. REMOVED: from the C25802377-Project Manual on Page 3 of 3 detailed scope of work.

Under Operator interface and server Configuration, it says install and configure a new carrier I-vu server or equivalent product upon approval to host the DDC system database. We currently have the Carrier I-CU server from the last HVAC controls project, this line item on page 24 of the C250802377 - Project Manual has been removed.

2. REMOVED: from Specifications SECTION 231000, HVAC CONTROL SYSTEMS in the

C2580237 – Project Manual page 74, Removed: Provide and install (1) new Carrier i-Vu controller for control of (1) existing dehumidification unit

ADDENDUM ACKNOWLEDGEMENT PLEASE SIGN and Return with Bid Documents.

Name: _________________________________________Name of Company:

_______________________________ Date: ________________

File details come from the government source that posted it. Updated .