C201 Erosion and Sediment Control Plan.pdf

PDF 687 KB Posted

Attached to
Invitation for Bids for Construction of Washington County C. Wayne Stevens, Jr. Public Safety Facility
Solicitation number
IFB-119574
Issued by
Stafford County, Glen Lyn Town, Virginia

About this file

This is an Erosion and Sediment Control Plan prepared by The Lane Group Inc. for Washington County, Virginia's new Emergency Medical Services (EMS) facility located in Glade Spring at the Highlands Business Park. The plan, dated January 30, 2026, outlines comprehensive erosion control measures for a construction project involving approximately 2.85 acres of land disturbance. The document establishes specific requirements for vegetative and structural erosion control practices, including temporary construction entrances, silt fencing, storm drain inlet protection, rock check dams, temporary and permanent seeding, mulching, and soil stabilization blankets and matting. All erosion and sediment control measures must comply with minimum standards and specifications outlined in the Virginia Stormwater Management Handbook. The plan requires contractor notification to the plan approving authority one week prior to the preconstruction conference, commencement of land-disturbing activities, and final inspection. A copy of the approved plan must be maintained on-site at all times.

The contractor is responsible for inspecting all erosion control measures at minimum every seven calendar days and after any rainfall event producing 0.5 inches or greater precipitation, with necessary repairs completed immediately. Perimeter slopes and all slopes steeper than 3:1 must achieve stabilization within 7 calendar days of the last land-disturbing activity, while all other disturbed areas require stabilization within 14 calendar days. All disturbed, unpaved, and ungraveled areas must be seeded and mulched, with slopes exceeding 2% requiring erosion control matting anchoring. Following project completion, all temporary erosion control measures must be removed, and permanent vegetative cover must be established on all denuded areas not otherwise permanently stabilized. The plan references the Virginia Erosion & Sediment Control Handbook for detailed installation requirements for any measures not specifically detailed on the plan sheet.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IP

IP

IP

IP

PS

TSMU

PS

TSMU

PS

TSMU

CE

FFE: 2076.70

UGE

UGE

UGE

UGE

UGE

UGE

UGE

G

EN

ER

AT

O R

U

TI

LI

LT

Y

TR

AN

SF

O

R M

ER

IP

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLODLODLODLODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD LOD LOD LOD LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

6 6

6 6

206820

2063.50

CD

CD

SHEET:

DATE:

NO. REVISION DATE

Fi le

: F :\W

AS

H

IN

G

TO

N

C O

U N

TY

, V

IR

G

IN

IA

\E M

S

FA

C

IL

IT

Y

G

LA

D E

SP

R

IIN

G

\S

IT

E D

ES

IG

N \G

LA

D

E

SP

R

IN

G E

M S

SI

TE

D

ES

IG

N

.D W

G

DRAWN BY CHECKED BY

PROJECT NO.

N

EW

E M

S

FA

C

IL

IT

Y

FO

R

W

AS

H

IN

G

TO

N C

O U

N

TY

, V

IR

G

IN

IA

H

IG

H

LA

N

D S

BU

IS

N

ES

S

PA

R K

O W

EN

S

D R

IV

E

G

LA

N D

E

SP

R

IN

G , V

A

01-30-2026

MPH MRL

TLG-2515

THE LANE GROUP INC.

LA

N E

GR

OU

P en gi ne er in g ar ch ite ct ur e en vi ro nm en ta l

V A

LL

EY

S

TR

EE

T

N W

A

BI

N

G D

O N

, V A

Ph on e:

.2

.8 w w w .th el an eg ro up in c.

co m A

BI

N

G D

O N

B

IG

S

TO

N

E G

A P

G

A

LA

X th e

SCALE IN FEET

020 20 40 60

C201

ER

O

SI

O

N

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

A

N D

N O

TE

S

GENERAL EROSION AND SEDIMENT CONTROL NOTES:

1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES

WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE

VIRGINIA STORMWATER MANAGEMENT HANDBOOK.

2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL

INSPECTION.

3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP OF LAND

DISTURBANCE.

4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.

5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN AS DETERMINED BY THE PLAN APPROVING AUTHORITY.

6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.

7. THE ENGINEER, INSPECTOR, LOCAL BUILDING OFFICIAL, OR VDCR RESERVE THE RIGHT TO REQUIRE EROSION CONTROL MEASURES IN ADDITION TO THOSE SHOWN IF CONDITIONS WARRANT IN ORDER TO ADDRESS EROSION.

8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.

9. THE TOTAL AREA OF DISTURBANCE IS ESTIMATED TO BE 2.85 ACRE.

10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES NO LESS THAN EVERY 7 CALENDAR DAYS AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT PRODUCING 1/2 INCH OF PRECIPITATION OR GREATER. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE

MADE IMMEDIATELY.

11. ALL DISTURBED AND UNPAVED OR UNGRAVELED AREAS ARE TO BE SEEDED AND MULCHED.

12. ALL SLOPES DISTURBED IN EXCESS OF 2% SHALL BE MULCHED WITH EROSION CONTROL MATTING, PROPERLY

ANCHORED.

13. FOLLOWING PROJECT COMPLETION AND STABILIZATION, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE

CLEANED UP/REMOVED.

14. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON ALL DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IN THE OPINION OF THE LOCAL PROGRAM ADMINISTRATOR OR HIS DESIGNATED AGENT, IS UNIFORM, MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT EROSION.

15. REFER TO THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK FOR INSTALLATION REQUIREMENTS FOR ANY

MEASURE(S) REQUIRED THAT ARE NOT DETAILED ON THIS PLAN SHEET.

16. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF THE SITE WHERE LAND-DISTURBING ACTIVITIES HAVE

TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE:

A. PERIMETER SLOPES AND ALL SLOPES STEEPER THAN THREE (3) HORIZONTAL TO ONE VERTICAL (3:1) SHALL BE

PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN

ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY.

B. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST

LAND-DISTURBING ACTIVITY.

B/M

IP

VESCH NUMBER/DESCRIPTIONSYMBOL

PS

MU

TS

EROSION CONTROL MEASURES LEGEND

3.02 TEMPORARY CONSTRUCTION ENTRANCE

3.05 SILT FENCE

3.07 STORM DRAIN INLET PROTECTION

3.20 ROCK CHECK DAM

3.31 TEMPORARY SEEDING

3.32 PERMANENT SEEDING

3.35 MULCHING

3.36 SOIL STABILIZATION BLANKETS & MATTING

SF

CE

11.19.202501.30.2026

Sheets and Views
C201

File details come from the government source that posted it. Updated .