2026-05-04, EMS Station - Project Manual - Volume 2.pdf

PDF 7 MB Posted

Attached to
Invitation for Bids for Construction of Washington County C. Wayne Stevens, Jr. Public Safety Facility
Solicitation number
IFB-119574
Issued by
Stafford County, Glen Lyn Town, Virginia

About this file

This is a Project Manual Volume 2 for the construction of the C. Wayne Stevens, Jr. Public Safety Facility in Glade Spring, Virginia, prepared by the County of Washington, Virginia with architectural and engineering services provided by The Lane Group. The project encompasses the design and construction of an Emergency Medical Services (EMS) station and public safety facility located at the Glade-Highlands Regional Industrial Park. The manual contains comprehensive technical specifications and contract documents organized into multiple divisions covering general requirements, technical specifications, and general construction conditions. Key construction elements include concrete work (forming, reinforcing, and cast-in-place), masonry (unit masonry and veneer), structural steel framing (steel joists and decking), miscellaneous metals, rough and finished carpentry, building insulation, and associated MEP (mechanical, electrical, plumbing) systems. The specifications detail concrete mixtures with varying compressive strengths ranging from 3,000 to 4,000 psi, masonry materials including concrete masonry units and clay brick veneer, steel joist framing with specific manufacturer approvals, and architectural finishes including polished concrete floors, gypsum board, ceramic tile, and painting.

The project specifications establish rigorous quality assurance and testing requirements managed by Owner-engaged independent testing agencies. Special inspections are mandated for concrete placement, reinforcement installation, masonry construction, steel framing, and floor finish verification, with comprehensive reporting to the Architect, Contractor, and Owner. Material submittals include product data, shop drawings, and mock-ups for architectural elements such as plastic-laminate cabinets and decorative metal panels. The specifications require compliance with multiple industry standards including ACI for concrete, ASTM standards for materials, TMS 602/ACI 530.1/ASCE 6 for masonry, AWS D1.1 for welding, and SJI specifications for steel joists. Construction is subject to Virginia prevailing wage requirements and includes provisions for cold-weather and hot-weather construction procedures. The project incorporates additive bid items for specialized features such as decorative formed metal privacy screens at maintenance bays and sound testing equipment for specialized applications.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C. WAYNE STEVENS, JR.

PUBLIC SAFETY FACILITY

GLADE – HIGHLANDS REGIONAL

INDUSTRIAL PARK

GLADE SPRING, VA 24340

JANUARY 30, 2026

PROJECT MANUAL – VOLUME 2

CONTRACT DOCUMENTS AND SPECIFICATIONS

OWNER:

COUNTY OF WASHINGTON, VIRGINIA

1 GOVERNMENT CENTER PLACE, SUITE A

ABINGDON, VIRGINIA 24210

ARCHITECT / ENGINEER:

THE LANE GROUP

Architects – Engineers – Planners Environmental Specialists

310 WEST VALLEY ST NW

ABINGDON, VA 24210

276.206.8571

Washington County VA – Public Safety Facility Table of Contents

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 1 of 5

TABLE OF CONTENTS

SECTION NO. SECTION TITLE

VOLUME ONE

Title Page (Cover)

Seal Sheet

Table of Contents

PART I GENERAL REQUIREMENTS

Invitation for Bids

Instructions to Bidders AIA A701

Supplemental Instructions to Bidders RD 1942-A, Guide 27, Attach. “2”

Terms and Conditions for Bid

Additional Terms and Conditions for Federally Funded Contracts

Pre-Bid Question Form DGS-30-272

PART II BID SUBMITTAL DOCUMENTS

Bid Form DGS-30-220

Bid Bond AIA A310

References

Lobbying Certification

Debarment and Suspension Certification

Vendor eVA Registration Requirements DGS-30-384

PART III CONDITIONS OF THE CONTRACT

Terms and Conditions for Federally Funded Contracts

General Conditions of the Contract for Construction AIA A201-2017

Attachment to AIA Doc. A201-2017 RD 1942-A Guide 27, Attach. “4”

Supplemental General Conditions DGS-30-376

Labor Standard Provisions RD Instruction 1940-C, Exhibit A

Davis Bacon Wage Rates

PART IV CONTRACT FORMS

Notice of Award DGS-30-068 (CO-9.1)

Standard Form of Agreement Between Owner and Contractor AIA A101-2017

Attachment to AIA Doc. A101-2017 RD 1942-A Guide 27, Attach. “3”

Exhibit A – Insurance and Bonds AIA A101-2017

Performance Bond AIA A312

Payment Bond AIA A312

Worker’s Compensation Certificate of Coverage DGS-30-076 (CO-9a)

Notice to Proceed DGS-30-068 (CO-9.2)

Application and Certificate for Payment AIA G702 / G703

Partial Payment Estimate RD 1928-18

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 2 of 5

Affidavit of Payment and Claims DGS-30-108 (CO-13)

General Contractor Estimate for Change Order DGS-30-200 (GC-1)

Contract Change Order AIA G701

Contract Change Order RD 1924-7

Certificate of Substantial Completion AIA G704

Certificate of Completion by Architect / Engineer DGS-30-112 (CO-13.1)

Contractor’s Affidavit of Payment of Debts and Claims AIA G706

Contractor’s Affidavit of Release of Liens AIA G706A

Release of Liens RD 1924-9

Release of Claimants RD 1924-10

Consent of Surety to Final Payment AIA G707

Builder’s Warranty RD 1924-19

PART V GENERAL REQUIREMENTS

Division 1 - Project Requirements

010100 Summary of Work

010400 Procedures and Quality Control

012300 Additive Bid Items

012500 Contract Modification Procedures

012900 Payment Procedures

013000 Submittals

013100 Project Management and Coordination

013200 Construction Progress Documentation

014000 Quality Requirements

015000 Temporary Facilities

016000 Product Requirements

017000 Execution Requirements

017700 Closeout Procedures

017810 Project Record Documents

017820 Operation and Maintenance Data

017900 Demonstration and Training

VOLUME TWO

Title Page (Cover)

Seal Sheet

Table of Contents

PART VI TECHNICAL SPECIFICATIONS

Division 2 – Existing Conditions

This Division is not used.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 3 of 5

Division 3 – Concrete

031000 Concrete Forming and Accessories

032000 Concrete Reinforcing

033000 Cast-in-Place Concrete

033543 Polished Concrete Finishing

Division 4 – Masonry

042000 Concrete Unit Masonry

042613 Masonry Veneer

Division 5 – Metals

052100 Steel Joist Framing

053100 Steel Decking

055000 Miscellaneous Metals

057500 Decorative Metal Panels

Division 6 – Wood, Plastics, and Composites

061000 Rough Carpentry

061600 Roof Sheathing / Coverboards

064116 Plastic-Laminate-Faced Architectural Cabinets

Division 7 – Thermal and Moisture Protection

072000 Building Insulation

072140 Foamed-in-Place Masonry Wall Insulation

074116 Insulated Metal Roof Panels

074213 Insulated Metal Wall Panels

075323 EPDM Roofing Membrane

076200 Sheet Metal Flashing and Trim

077100 Roof Specialties

077200 Roof Accessories

079200 Joint Sealants

Division 8 – Openings

081113 Hollow Metal Doors and Frames

081416 Flush Wood Doors

083613 Sectional Overhead Doors

084113 Aluminum-Framed Entrances and Storefronts

085113 Aluminum Windows

087100 Door Hardware (Hardware schedule to be provided by Bid Addendum #1)

088000 Glass & Glazing

Division 9 – Finishes

092116 Non – Structural Metal Framing (To be provided by Bid Addendum #1)

092900 Gypsum Board

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 4 of 5

093013 Ceramic Tiling

095113 Acoustical Panel Ceilings (To be provided by Bid Addendum #1)

096513 Resilient Base and Accessories (To be provided by Bid Addendum #1)

Division 9 – Finishes

099113 Exterior Painting (To be provided by Bid Addendum #1)

099123 Interior Painting (To be provided by Bid Addendum #1)

099600 Industrial Protective and Marine Coatings

Division 10 – Specialties

101419 Dimensional Letter Signage (To be provided by Bid Addendum #1)

102239 Folding Panel Partitions (To be provided by Bid Addendum #1)

102800 Toilet, Bath and Laundry Accessories (To be provided by Bid Addendum #1)

104000 Fire Protection Specialties

104400 Specialty Signs

105113 Metal Lockers (To be provided by Bid Addendum #1)

105723 Wire Shelving

107313 Metal Canopies

107516 Ground Set Flagpoles (To be provided by Bid Addendum #1)

Division 11 – Equipment

This Division is not used.

Division 12 – Furnishings

122413 Manual Roller Window Shade System

123661 Solid Surfacing Countertops

Division 21 – Fire Suppression

See Drawing FP102.

Division 22 – Plumbing

See Drawing MPE101 and MPE102.

Division 23 – Heating, Ventilation & Air Conditioning

Division 26 – Electrical

Division 31 – Earthwork

311000 Site Clearing

312000 Earthwork for Utilities

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 5 of 5

313000 Site Grading

313116 Termite Control

314000 Earthwork for Structures

315000 Erosion and Sediment Control

Division 32 – Exterior Improvements

321216 Roadway

321713 Parking Bumpers (To be provided by Bid Addendum #1)

321723 Pavement Markings

321726 Tactile Warming Surfacing (To be provided by Bid Addendum #1)

329200 Topsoil and Seeding

329300 Plants (To be provided by Bid Addendum #1)

Division 33 – Utilities

330100 Water line Construction

330200 Sewer line Construction

330300 Storm Sewer Construction

PART VI EXHIBITS

Temporary Construction Sign for Rural Development Projects

List of Drawings

Boundary Survey by Addison Surveyors dated 01-14-2025

Geotechnical Study by The Lane Group, Inc. dated 11-04-2025

Environmental Report by The Lane Group, Inc. dated February 2025 available upon request.

END OF TABLE OF CONTENTS

Washington County VA – Public Safety Facility Seal Sheet

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 1 of 2

SEAL SHEET

Washington County VA – Public Safety Facility Seal Sheet

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 2 of 2

TECHNICAL SPECIFICATIONS

Washington County VA – EMS Station 031000 – Concrete Forming and Accessories

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 1 of 4

SECTION 031000 – CONCRETE FORMING AND ACCESSORIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Form-facing material for cast-in-place concrete.

2. Shoring, bracing, and anchoring.

1.2 ACTION SUBMITTALS

A. Product Data: For each of the following:

1. Exposed surface form-facing material.

2. Concealed surface form-facing material.

3. Form ties.

4. Waterstops.

5. Form-release agent.

B. Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.

1. For exposed vertical concrete walls, indicate dimensions and form tie locations.

2. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301.

a. Location of construction joints is subject to approval of the Architect.

1.3 INFORMATIONAL SUBMITTALS

A. Field quality-control reports.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.

1. Design wood panel forms in accordance with APA's "Concrete Forming

Design/Construction Guide."

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 2 of 4

2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.

2.2 FORM-FACING MATERIALS

A. As-Cast Surface Form-Facing Material:

1. Provide continuous, true, and smooth concrete surfaces.

2. Furnish in largest practicable sizes to minimize number of joints.

3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete, and as follows:

a. Plywood, metal, or other approved panel materials.

b. Exterior-grade plywood panels, suitable for concrete forms, complying with

DOC PS 1, and as follows:

1) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.

B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.

1. Provide lumber dressed on at least two edges and one side for tight fit.

2.3 RELATED MATERIALS

A. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

B. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

2. Form release agent for form liners shall be acceptable to form liner manufacturer.

C. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

PART 3 - EXECUTION

3.1 INSTALLATION OF FORMWORK

A. Comply with ACI 301.

B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the

Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 3 of 4

C. Limit concrete surface irregularities as follows:

1. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.

D. Construct forms tight enough to prevent loss of concrete mortar.

1. Minimize joints.

2. Exposed Concrete: Symmetrically align joints in forms.

E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.

1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.

2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

3. Install keyways, reglets, recesses, and other accessories, for easy removal.

F. Do not use rust-stained, steel, form-facing material.

G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.

1. Provide and secure units to support screed strips.

2. Use strike-off templates or compacting-type screeds.

H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.

1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.

2. Locate temporary openings in forms at inconspicuous locations.

I. Chamfer or tool corners and edges of permanently exposed concrete.

J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.

K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.

1. Determine sizes and locations from trades providing such items.

2. Obtain written approval of Architect prior to forming openings not indicated on

Drawings.

L. Construction and Movement Joints:

1. Construct joints true to line with faces perpendicular to surface plane of concrete.

2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

3. Place joints perpendicular to main reinforcement.

4. Locate joints for beams, slabs, joists, and girders in the middle third of spans.

a. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 4 of 4

5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

M. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

N. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

O. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.

3. Clean embedded items immediately prior to concrete placement.

3.3 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

END OF SECTION 031000

Washington County VA –EMS Station 032000 – Concrete Reinforcing

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 1 of 3

SECTION 032000 - CONCRETE REINFORCING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel reinforcement bars.

2. Welded-wire reinforcement.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Each type of steel reinforcement.

2. Bar supports.

B. Shop Drawings: Comply with ACI SP-066:

1. Include placing drawings that detail fabrication, bending, and placement.

2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.

C. Construction Joint Layout:

1. Location of construction joints shall be as indicated on Drawing S101.

1.3 INFORMATIONAL SUBMITTALS

A. Material Test Reports: For the following, from a qualified testing agency:

1. Steel Reinforcement

B. Field quality-control reports.

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A615, Grade 60, deformed.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 2 of 3

B. Plain-Steel Welded-Wire Reinforcement: ASTM A185, plain, fabricated from as-drawn steel wire into flat sheets.

2.2 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with

CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or

CRSI Class 2 stainless steel bar supports.

B. Steel Tie Wire: ASTM A1064, annealed steel, not less than 0.0508 inch in diameter.

1. Finish: Plain.

2.3 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

PART 3 - EXECUTION

3.1 PREPARATION

A. Protection of In-Place Conditions:

1. Do not cut or puncture vapor retarder.

2. Repair damage and reseal vapor retarder before placing concrete.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

3.2 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 3 of 3

D. Provide concrete coverage in accordance with ACI 318.

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Splices: Lap splices as indicated on Drawings.

1. Bars indicated to be continuous, and all vertical bars shall be lapped not less than 48 bar diameters at splices, or 24 inches, whichever is greater.

2. Stagger splices in accordance with ACI 318.

G. Install welded-wire reinforcement in longest practicable lengths.

1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard

Practice."

a. For reinforcement less than W4.0 or D4.0, continuous support spacing shall not exceed 12 inches.

2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.

3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.

4. Lace overlaps with wire.

3.3 JOINTS

A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated on the Drawings.

1. Place joints perpendicular to main reinforcement.

2. Continue reinforcement across construction joints unless otherwise indicated.

3. Do not continue reinforcement through sides of strip placements of floors and slabs.

3.4 INSTALLATION TOLERANCES

A. Comply with ACI 117.

3.5 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Steel-reinforcement placement.

2. Steel-reinforcement mechanical splice couplers (if used).

END OF SECTION 032000

Washington County VA – EMS Station 033000 – Cast in Place Concrete

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 1 of 17

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Cast-in-place concrete, including formwork, concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Structural Notes on Drawing S001.

2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.

3. Section 312300 "Earthwork for Structures" for drainage fill under slabs-on-ground.

1.2 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, and other pozzolans materials subject to compliance with requirements.

B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.

1.3 ACTION SUBMITTALS

A. Product Data: For each of the following.

1. Portland cement.

2. Fly ash.

3. Aggregates.

4. Admixtures:

a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.

5. Vapor retarders.

6. Liquid floor treatments.

7. Curing materials.

8. Joint fillers.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 2 of 17

B. Design Mixtures: For each concrete mixture. Submit the following in accordance with ACI accepted methods.

1. Mixture identification.

2. Minimum 28-day compressive strength.

3. Durability exposure class.

4. Maximum w/cm.

5. Slump limit.

6. Air content.

7. Nominal maximum aggregate size.

8. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.

9. Intended placement method.

10. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

C. Shop Drawings:

1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.

a. Location of construction joints are indicated on Drawing S101.

D. Concrete Schedule: For each location of each Class of concrete indicated in "Concrete

Mixtures" Article, including the following:

1. Concrete Class designation.

2. Location within Project.

3. Exposure Class designation.

4. Formed Surface Finish designation and final finish.

5. Final finish for floors.

6. Curing process.

7. Floor treatment if any.

1.4 INFORMATIONAL SUBMITTALS

A. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Curing compounds.

4. Vapor retarders.

5. Joint-filler strips.

B. Material Test Reports: For the following, from a qualified testing agency:

1. Portland cement.

2. Fly ash.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 3 of 17

3. Aggregates.

4. Admixtures.

C. Research Reports: For concrete admixtures in accordance with ICC's Acceptance Criteria

AC198.

D. Preconstruction Test Reports: For each mix design.

E. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications: Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with

ASTM C94 requirements for production facilities and equipment.

B. Publications: Comply with the following unless modified by requirements in the Contract

Documents:

1. ACI 301, “Specification for Structural Concrete.”

2. ACI 117, “Specification for Tolerances for Concrete Construction and Materials.”

3. CRSI “Recommended Practice of Placing Reinforcing Bars”

4. AWS D1.4, “Structural Welding Code.”

5. ACI “Manual of Standard Practices for Detailing Reinforced Concrete Surfaces.”

C. Pre-Installation Conference: Conduct Conference at Project Site.

1.6 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.

1. Include the following information in each test report:

a. Admixture dosage rates.

b. Slump.

c. Air content.

d. Seven-day compressive strength.

e. 28-day compressive strength.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Comply with ASTM C94 and ACI 301.

1.8 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 4 of 17

B. Hot-Weather Placement: Comply with ACI 301and ACI 305.1.

PART 2 - PRODUCTS

2.1 FORM-FACING MATERIALS

A. Refer to Section 031000, “Concrete Forming and Accessories.

B. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

2.2 STEEL REINFORCEMENT

A. Refer to Section 032000, “Concrete Reinforcing.”

B. Reinforcing Bars: ASTM A 615/A615M, Grade 60, deformed.

C. Plain-Steel Welded Wire Reinforcement: ASTM A 185, plain, fabricated from as-drawn steel wire into flat sheets.

D. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI’s

Manual of Standard Practice.”

2.3 CONCRETE, GENERAL

A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract

Documents.

2.4 CONCRETE MATERIALS

A. Cementitious Materials:

1. Portland Cement: ASTM C150, Type I/II, supplemented by Fly Ash.

2. Fly Ash: ASTM C618, Class C or F, 25 percent of cementitious material maximum.

B. Normal-Weight Aggregates: ASTM C33, Class 3M coarse aggregate or better, graded. Provide aggregates from a single source.

1. Maximum Coarse-Aggregate Size: 1-1/2 inches nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Air-Entraining Admixture: ASTM C260.

D. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 5 of 17

Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.

1. Water-Reducing Admixture: ASTM C494, Type A.

2. Retarding Admixture: ASTM C494, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494, Type G.

6. Plasticizing and Retarding Admixture: ASTM C1017, Type II.

E. Water and Water Used to Make Ice: ASTM C94, potable.

2.5 VAPOR RETARDERS

A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A; not less than 15 mils thick. Include manufacturer's recommended adhesive or pressure-sensitive tape.

2.6 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

B. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.

1. Color:

a. Ambient Temperature Below 50 deg F: Black.

b. Ambient Temperature between 50 deg F and 85 deg F: Any color.

c. Ambient Temperature Above 85 deg F: White.

C. Curing Paper: Eight-feet wide paper, consisting of two layers of fibered kraft paper laminated with double coating of asphalt.

D. Water: Potable or complying with ASTM C1602.

E. Clear, Waterborne, Membrane-Forming, Dissipating Curing Compound: ASTM C309, Type 1, Class B.

F. Clear, Waterborne, Membrane-Forming, Non-dissipating Curing Compound: ASTM C309, Type 1, Class B, certified by curing compound manufacturer to not interfere with bonding of floor covering.

G. Clear, Waterborne, Membrane-Forming, Curing and Sealing Compound: ASTM C1315, Type 1, Class A.

H. Verify method of curing with polishing and floor covering contractor.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 6 of 17

2.7 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber.

B. Floor Slab Protective Covering: Eight-feet-wide cellulose fabric.

2.8 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned based on laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than

Portland cement in concrete as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use high-range water-reducing or plasticizing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete, and concrete with a w/cm below

0.50.

2.9 CONCRETE MIXTURES

A. Class A: Normal-weight concrete used for footings:

1. Exposure Class: ACI 318 F1.

2. Minimum Compressive Strength: 3000 psi at 28 days.

3. Maximum w/cm: 0.49.

4. Slump Limit: 5 inches, plus or minus 1 inch.

5. Air Content:

a. Exposure Class F1: 2 percent, plus or minus 1 percent at point of delivery for concrete containing 1-1/2-inch nominal maximum aggregate size.

B. Class B: Normal-weight concrete used for foundation piers:

1. Exposure Class: ACI 318 F2.

2. Minimum Compressive Strength: 3000 psi at 28 days.

3. Maximum w/cm: 0.49.

4. Slump Limit: 4 inches, plus or minus 1 inch.

5. Air Content:

a. 2 percent, plus or minus 1 percent at point of delivery for concrete containing 1-

1/2-inch nominal maximum aggregate size.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 7 of 17

C. Class C: Normal-weight concrete used for interior slabs-on-ground:

1. Exposure Class: ACI 318 F0.

2. Minimum Compressive Strength: 4000 psi at 28 days.

3. Maximum w/cm: 0.45. No Fly Ash.

4. Minimum Cementitious Materials Content: 470 lb/cu. yd.

5. Slump Limit: 4 inches, plus or minus 1 inch.

6. Air Content:

a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.

D. Class D: Normal-weight concrete used for exterior slabs:

1. Exposure Class: ACI 318 F3.

2. Minimum Compressive Strength: 4000 psi at 28 days.

3. Maximum w/cm: 0.45.

4. Slump Limit: 4 inches, plus or minus 1 inch.

5. Air Content:

a. Exposure Classes F3: 5.5 – 6.0 percent, plus or minus 1 percent at point of delivery for concrete containing 1-1/2-inch nominal maximum aggregate size.

2.10 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI’s “Manual of Standard Practice.”

2.11 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with

ASTM C94 and furnish batch ticket information.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with ASTM C94. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 8 of 17

PART 3 - EXECUTION

3.1 FORMWORK

A. Design, erect, shore, brace, and maintain formwork according to ACI 301 to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Chamfer or tool exterior corners and edges of permanently exposed concrete.

3.2 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.

3. Install reglets to receive waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

3.3 INSTALLATION OF VAPOR RETARDER

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with

ASTM E1643 and manufacturer's written instructions.

1. Install vapor retarder with longest dimension parallel with direction of concrete pour.

2. Face laps away from exposed direction of concrete pour.

3. Lap vapor retarder over footings and grade beams not less than 6 inches, sealing vapor retarder to concrete.

4. Lap joints 6 inches and seal with manufacturer's recommended tape.

5. Terminate vapor retarder at the top of floor slabs, grade beams, and pile caps, sealing entire perimeter to floor slabs, grade beams, foundation walls, or pile caps.

6. Seal penetrations in accordance with vapor retarder manufacturer's instructions.

7. Protect vapor retarder during placement of reinforcement and concrete.

a. Repair damaged areas by patching with vapor retarder material, overlapping damages area by 6 inches on all sides, and sealing to vapor retarder.

3.4 STEEL REINFORCEMENT

A. Comply with CRSI’s “Manual of Standard Practice” for placing reinforcement.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 9 of 17

3.5 JOINTS

A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.

1. Install so strength and appearance of concrete are not impaired, at locations indicated on

Drawings or as approved by Architect.

2. Place joints perpendicular to main reinforcement.

a. Continue reinforcement across construction joints unless otherwise indicated.

b. Do not continue reinforcement through sides of strip placements of floors and slabs.

3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

4. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.

2. Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch-wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.

D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.

2. Terminate full-width joint-filler strips not less than 1/2 inch or more than 1 inch below finished concrete surface, where joint sealants, specified in Section 079200 "Joint

Sealants," are indicated.

3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

E. Doweled Joints:

1. Install dowel bars and support assemblies at joints where indicated on Drawings.

2. Lubricate or asphalt coat one-half of dowel bar length to prevent concrete bonding to one side of joint.

F. Dowel Plates: Install dowel plates at joints where indicated on Drawings.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 10 of 17

3.6 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.

2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.

B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect in writing, but not to exceed the amount indicated on the concrete delivery ticket.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301, but not to exceed the amount indicated on the concrete delivery ticket.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

E. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

1. If a section cannot be placed continuously, provide construction joints as indicated.

2. Deposit concrete to avoid segregation.

3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

4. Consolidate placed concrete with mechanical vibrating equipment in accordance with

ACI 301.

a. Do not use vibrators to transport concrete inside forms.

b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.

c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.

d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

F. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Do not place concrete floors and slabs in a checkerboard sequence.

2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 11 of 17

3. Maintain reinforcement in position on chairs during concrete placement.

4. Screed slab surfaces with a straightedge and strike off to correct elevations.

5. Level concrete, cut high areas, and fill low areas.

6. Slope surfaces uniformly to drains where required.

7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.

8. Do not further disturb slab surfaces before starting finishing operations.

3.7 FINISHING FORMED SURFACES

A. As-Cast Surface Finishes:

1. ACI 301 Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.

a. Patch voids larger than 3/4 inch wide or 1/2 inch deep.

b. Remove projections larger than 1/4 inch.

c. Patch tie holes.

d. Surface Tolerance: ACI 117 Class B.

e. Locations: Apply to concrete surfaces exposed to public view, or to be covered with a coating or covering material applied directly to concrete.

2. ACI 301 Surface Finish SF-3.0:

a. Patch voids larger than 3/4 inch wide or 1/2 inch deep.

b. Remove projections larger than 1/8 inch.

c. Patch tie holes.

d. Surface Tolerance: ACI 117 Class A.

e. Locations: Apply to concrete surfaces exposed to public view or to be covered with a coating or covering material applied directly to concrete.

B. Related Unformed Surfaces:

1. At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.

2. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.

3.8 FINISHING FLOORS AND SLABS

A. Comply with ACI 302.1R recommendations for screeding, straightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Float Finish:

1. When bleedwater sheen has disappeared and concrete surface has stiffened sufficiently to permit operation of specific float apparatus, consolidate concrete surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 12 of 17

2. Repeat float passes and straightening until surface is left with a uniform, smooth, granular texture and complies with ACI 117 tolerances for conventional concrete.

3. Apply float finish to surfaces to receive trowel finish.

C. Trowel Finish:

1. After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.

2. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.

3. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.

4. Do not add water to concrete surface.

5. Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.

6. Apply a trowel finish to surfaces exposed to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another thin-film-finish coating system.

7. Finish and measure surface, so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.-long straightedge resting on two high spots and placed anywhere on the surface does not exceed 3/16 inch.

D. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and locations indicated on Drawings.

1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.

2. Coordinate required final finish with Architect before application.

3.9 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS

A. Filling In:

1. Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.

2. Mix, place, and cure concrete, as specified, to blend with in-place construction.

3. Provide other miscellaneous concrete filling indicated or required to complete the Work.

3.10 CONCRETE CURING

A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI 301 and ACI 306.1 for cold weather protection during curing.

2. Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.

3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h, calculated in accordance with

ACI 305.1, before and during finishing operations.

B. Curing Formed Surfaces: Comply with ACI 308.1 as follows:

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 13 of 17

1. Cure formed concrete surfaces.

2. If forms remain during curing period, moist cure after loosening forms.

3. If removing forms before end of curing period, continue curing for remainder of curing period, as follows:

a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.

b. Continuous Sprinkling: Maintain concrete surface continuously wet.

c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.

d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.

e. Membrane-Forming Curing Compound: Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.

1) Recoat areas subject to heavy rainfall within three hours after initial application.

2) Maintain continuity of coating and repair damage during curing period.

C. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:

1. Begin curing immediately after finishing concrete.

2. Interior Concrete Floors:

a. Floors to Receive Floor Coverings Specified in Other Sections: Contractor has option of the following:

1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.

a) Lap edges and ends of absorptive cover not less than 12-inches.

b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.

2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches , and sealed by waterproof tape or adhesive.

a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

b) Cure for not less than seven days.

3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:

a) Water.

b) Continuous water-fog spray.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 14 of 17

b. Floors to Receive Curing Compound:

1) Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.

2) Recoat areas subjected to heavy rainfall within three hours after initial application.

3) Maintain continuity of coating, and repair damage during curing period.

4) Removal: After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer unless manufacturer certifies curing compound does not interfere with bonding of floor covering used on Project.

c. Floors to Receive Curing and Sealing Compound:

1) Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller in accordance with manufacturer's written instructions.

2) Recoat areas subjected to heavy rainfall within three hours after initial application.

3) Repeat process 24 hours later and apply a second coat. Maintain continuity of coating, and repair damage during curing period.

3.11 CONCRETE SURFACE REPAIRS

A. Defective Concrete: Repair and patch defective areas when approved by Architect. Remove and replace concrete that cannot be repaired and patched to Architect’s approval. Contractor is solely responsible for the appearance and performance of placed concrete product and shall take necessary steps, including testing, repair and/or replacement to provide a suitable final product.

1. No VOIDS allowed in any exposed concrete surfaces. Contractor shall remove and replace all defective concrete as determined by the Architect.

3.12 TOLERANCES

A. Conform to ACI 117.

3.13 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.

B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

1. Testing agency shall be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with

ASTM C31.

2. Testing agency shall immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 15 of 17

3. Testing agency shall report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.

a. Test reports shall include reporting requirements of ASTM C31, ASTM C39, and

ACI 301, including the following as applicable to each test and inspection:

1) Project name.

2) Name of testing agency.

3) Names and certification numbers of field and laboratory technicians performing inspections and testing.

4) Name of concrete manufacturer.

5) Date and time of inspection, sampling, and field testing.

6) Date and time of concrete placement.

7) Location in Work of concrete represented by samples.

8) Date and time sample was obtained.

9) Truck and batch ticket numbers.

10) Design compressive strength at 28 days.

11) Concrete mixture designation, proportions, and materials.

12) Field test results.

13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.

14) Type of fracture and compressive break strengths at seven days and 28 days.

C. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at

Project site.

D. Inspections:

1. Headed bolts and studs.

2. Verification of use of required design mixture.

3. Concrete placement, including conveying and depositing.

4. Curing procedures and maintenance of curing temperature.

5. Verification of concrete strength before removal of shores and forms from beams and slabs.

6. Batch Plant Inspections: On a random basis, as determined by Architect.

E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with

ASTM C 172 shall be performed in accordance with the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50

cu. yd. or fraction thereof.

a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C143:

Glade – Highlands Regional Industrial Park, Glade Spring, VA Page 16 of 17

a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.

b. Perform additional tests when concrete consistency appears to change.

3. Slump Flow: ASTM C1611:

a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.

b. Perform additional tests when concrete consistency appears to change.

4. Air Content: ASTM C231 pressure method, for normal-weight concrete;

a. One test for…