C05 1240LT27Q0005.pdf
PDF 615 KB Posted
- Attached to
- Stove Prairie Campground Gate Replacement
- Solicitation number
- 117346
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Request for Quotation (RFQ) for commercial construction services issued by the USDA Forest Service for the Stove Prairie Campground Gate Replacement project. The solicitation number is 1240LT27Q0005, issued on October 20, 2026, with quotes due November 11, 2026, at 14:00 Eastern Standard Time. The project involves the disposal and replacement of an existing broken 32-foot double-lane closure gate at Stove Prairie Landing, located at 16500 Pourdre Canyon Road, Bellevue, Colorado. The work must be completed by August 31, 2027, with performance beginning within 10 calendar days of contract award. This is a Total Small Business Set-Aside acquisition under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a $45 million size standard and an estimated project magnitude between $25,000 and $100,000.
Contractors must submit a detailed 1–3-page technical approach addressing key tasks, milestones, and project understanding, along with a construction schedule such as a Gantt chart. Pricing must be submitted using the provided Excel spreadsheet (Attachment 1 – C05 SOI Stove Prairie Campground gate Replacement) with line-item pricing rounded to the nearest whole dollar, and the vendor name and UEI number must be included. Award will be made on a firm fixed-price basis to the responsible offeror providing the best value, based on evaluation of technical approach and price. Questions are due October 28, 2026, at 14:00 EST. Contractors must furnish either a payment bond or irrevocable letter of credit equal to 100 percent of the contract price within 10 days of award. The solicitation incorporates numerous FAR and AGAR clauses applicable to commercial construction, including requirements for construction wage rates, Buy American materials compliance, sustainability, and various labor and employment standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER, 1. SOLICITATION NO. 2. TYPE OF SOLICITATION
SEALED BID (IFB) 3. DATE ISSUED PAGE OF PAGES
AND AWARD
(Construction, Alteration, or Repair)
1240LT27Q0005 INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL 10/20/2026 1
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
1175346
6. PROJECT NO.
7. ISSUED BY CODE 40LT 8. ADDRESS OFFER TO
Jordan Carlsen Jordan.Carlsen@usda.gov 463-304-1537
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
9. FOR
INFORMATION CALL
a. NAME
JORDAN CARLSEN
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
463-304-1537
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project: Stove Prairie Campground Gate Replacement.
Description: The requirement calls for the disposal and replacement of an existing broken 32' double lane closure gate at Stove Prairie Landing.
NAICS code 237990 - Other Heavy and Civil Engineering Construction as as 100% SB Set Aside.
PSC Code Z1PZ - Maintenance of other non-building facilities. Size standard - $45 million.
Questions Due: October 28th, 2026 at 14:00 Eastern Standard Time(EST).
Quotes Due: November 11th, 2026 at 14:00 Eastern standard Time (EST).
All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected.
11. The Contractor shall begin performance within 10 calendar days and complete it within 274 calendar days after receiving award, notice to proceed. The performance period is mandatory negotiable. (See .)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
YES NO 12b. CALENDAR DAYS
a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time
11/11/2026 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due .
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
NSN 7540-01-155-3212 STANDARD FORM 1442 (Rev. 12/2022) Prescribed by GSA FAR(48 CFR) 53.236-1(d) mailto:Jordan.Carlsen@usda.gov
AMOUNTS
OFFER (Must be fully completed by offeror)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
Continued...
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY CODE 40LT 27. PAYMENT WILL BE MADE BY
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
LUCAS J. DAHLMAN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
1240LT27Q0005
PAGE OF
3 16
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
Delivery: 08/31/2027 Delivery Location Code: 82AT
USDA FOREST SERVICE
ARAPAHOE-ROOSEVELT NF PAWNEE NG
2150 CENTRE AVENUE BUILDING E
FORT COLLINS CO 80526-8119 US
Disposal and replacement of Stove Prairie Gate per the SOW and associated documents.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Stove Prairie Campground Gate Replacement Solicitation 1240LT27Q0005
Description – This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240LT27Q0005 is issued as a Request for Quotation (RFQ) for Stove prairie Landing double lane closure gate replacement. The scope of the work includes the removal of an existing broken 32’ double lane closure gate at Stove prairie landing.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Project Magnitude: Between $25,000 and $100,000
Alternative Payment Protections FAR 52.228-13 (July 2000)
(a) The Contractor shall submit one of the following payment protections:
(1) Payment Bonds
(2) Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100% of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
Payment Bond must be submitted using the mandatory Standard Form (SF) 25A. Please note that no substitute forms will be accepted.
Technical Data - Technical data and supporting documentation associated with this solicitation are available through the following sources:
1. Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of SAM.gov
• Attachment 1 – C05 SOI Stove Prairie Campground gate Replacement
• Attachment 2 – C05 Stove Prairie Concrete Specs FP 24 Section 601
• Attachment 3 – C05 Stove Prairie Road Closure Gate Details
• Attachment 4 – C05 SOW Stove Prairie CG Gate Replacement
Project Location The project location is located at Stove prairie campground 16500 Pourdre Canyon Rd Bellevue CO
Definitization of Equitable Adjustments for Change Orders -
Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR
443.304 -70.
Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions
The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.
Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025) https://www.usda.gov/about-usda/general-information/staff-offices/departmental-administration/office-contracting-and-procurement-ocp/policies-regulations https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
(o) Warranty. FAR 52.246-21, Warranty of Construction is applicable to this contract.
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
52.222-50 (Jan 2017) Combating Trafficking in Persons (Nov 2025) ☐ Alternate I (Nov 2025) of 52.222-50
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)
☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I
☐ 52.203-13 (Nov 2021) of 52.203-6 Contractor Code of Business Ethics and Conduct (Nov 2021)
☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with
☐ 52.209-9 Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) Updates of Publicly Available Information Regarding Responsibility
☒ 52.209-10 Matters (Sep 2025) Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025)
☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov
☒ 52.219-6 2025) Notice of Total Small Business Aside (Nov 2025) ☐ Alternate I (Mar 2020).
☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)
☐ Alternate III (Nov 2025) of 52.219-9.
☐ Alternate IV (Nov 2025) of 52.219-9
☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003)
☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☐ 52.222-41 Service Contract Labor Standards (Aug 2018) ☐ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage -- Fringe Benefits
☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☐ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☒ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov
☐ 52.223-9 2025) Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ☐ Alternate I (May 2008) of 52.223-9
☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential
☐ 52.223-12 Hydrofluorocarbons (Nov 2025) Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air
☒ 52.223-23 Conditioners (Nov 2025) Sustainable Products and Services (Nov 2025)
☐ 52.224-3 Privacy Training (Jan 2017) ☐ Alternate I (Jan 2017) of 52.224-3
☐ 52.225-1 Buy American-Supplies (Nov 2025) ☐ Alternate I (Oct 2022) of 52.225-1
☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025) ☐ Alternate II (Nov 2025) of 52.225-3.
☐ Alternate III (Nov 2025) of 52.225-3.
☐ Alternate IV (Oct 2022) of 52.225-3
☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct
2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services
(Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services
(Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management
(Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)
☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☐ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)
☐ Alternate I (Apr 2023) of 52.247-64.
☐ Alternate II (Nov 2021) of 52.247-64
The Contractor shall comply with the following FAR Clauses for Commercial Construction.
52.222-6 Construction Wage Rate Requirements (Nov 2025) 52.222-7 Withholding of Funds (Nov 2025) 52.222-8 Payrolls and Basic Records (Nov 2025) 52.222-9 Apprentices and Trainees (Nov 2025) 52.222-10 Compliance with Copeland Act Requirements (Nov 2025) 52.222-11 Subcontracts (Labor Standards) (Nov 2025) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
(May 2014) 52.222-14 Disputes Concerning Labor Standards (Nov 2025) 52.222-15 Certificate of Eligibility (May 2014) 52.236-5 Material and Workmanship (Jul 2025)
The following clauses are applicable when checked:
☐ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018)
☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug 2018)
☐ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025)
☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☐ Alternate I (Oct 2022) of 52.25-9
☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade Agreements (Nov 2025) ☐ Alternate I (Nov 2025) (of 52.225-11 ☐ Alternate II (Oct 2022) of 52.225-11
☐ 52.228-2 Additional Bond Security (Oct 1997) ☐ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☒ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☒ 52.228-13 Alternative Payment Protections (Jul 2020) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☐ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☐ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (Jul 2025) ☒ 52.236-10 Operations and Storage Areas (Jul 2025) ☐ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☐ 52.236-13 Accident Prevention (Jul 2025)
☐ Alternate I (Nov 1991) of 52.236-13 ☐ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☐ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☐ 52.236-16 Quantity Surveys (Jul 2025)
☐ Alternate I (Apr 1984) of 52.236-16 ☒ 52.236-17 Layout of Work (Jul 2025) ☐ 52.236-21 Specifications and Drawings for Construction (Jul 2025)
☐ Alternate I (Apr 1984) of 52.236-21 ☐ Alternate II (Apr 1984) of 52.236-21
☒ 52.242-14 Suspension of Work (Apr 1984)
☐ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3
Other Applicable Clauses
52.247-34 F.O.B. Destination (Jan 1991)
AGAR Clauses This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf
AGAR 452.203-70 Unenforceable Supplier Terms (Sep 2026)
AGAR 452.204–70 Modification for Contract Closeout (Apr 2026)
AGAR 452.232-71 Progress Payments for Commercial Construction Contracts (May 2026)
AGAR 452.236-70 Electronic Submission of Payment Requests (Sep 2026)
52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025)
Period for acceptance of offers.
The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
1. QUESTIONS DUE: Questions shall be submitted to via email to the Contracting Specialist, Jordan Carlsen at Jordan.Carlsen@usda.com. Questions are due no later than October 28th, 2026, at 14:00 Eastern Standard Time (EST). This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.
2. QUOTES DUE: Please submit your quote no later than November 11th, 2026, at 14:00 Eastern Standard Time (EST). Quotes submitted past the date and time above will be considered late and will not be accepted. Submit the following documents below with your quote:
1. Technical Approach documentation
2. Pricing documentation – Use the Schedule of Items C05 SOI Stove Prairie Campground gate Replacement to input pricing for the Base Items Email addresses for submission of quote: Jordan Carlsen, Contract Specialist, at Jordan.Carlsen@usda.gov
In the submission of your quote, include in the email’s subject line: Solicitation https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf mailto:Jordan.Carlsen@usda.com
1240LT27Q0005 Stove Prairie Campground
Quotes shall be no more than 3 pages, NOT including the Schedule of Items. Offerors shall use Times New Roman Font 12 on 8 x 11 size paper. Documentation submitted for the Bid Guarantee will not be included in the 10-page document criterion.
3. ACKNOWLEDGEMENT OF AMENDMENTS TO THE SOLICITATION: Offerors shall acknowledge all amendments in Block 19 of the SF-1442, at the time of offer, failure to do so will result in the rejection of your offer.
Solicitation Information
Award Type It is anticipated that a Firm Fixed Price contract will be awarded as a result of this synopsis/solicitation. The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.
Period of Performance The Contractor is required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed and complete the entire work area no later than August 31 2027.
Organized Site Visit Site Visits are not required but are recommended. The site is open to the public.
Evaluation and Basis for Award The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government.
(a) The Government intends to evaluate quotations and determine which quote provides the best value to the Government, based on the evaluation factors outlined in this solicitation.
The Government may consider quotations that exceed minimum requirements and offer additional value or benefits, even if they are not the lowest priced. However, formal trade-off procedures will not be conducted.
FAR 52.212-2 Evaluation - Commercial Products and Commercial Services (Nov 2025)
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
Technical Approach:
The technical approach will evaluate the ability of the offeror to provide a sound, compliant, approach that meets all requirements and shows a thorough understanding of the work involved in providing all labor, materials, equipment, and oversight required to perform the flooring installation
It is the contractor's responsibility to ensure that their quotation clearly demonstrates their capability to meet the requirement. All offerors must provide the following, minimum, information and documentation with their quotations to be considered responsive and have their offers evaluated:
A detailed 1–3-page narrative of the offeror's technical approach; this must include an execution plan outlining how they will accomplish the scope of work in accordance with the Statement of Work (SOW), drawings, and/or technical specifications. A simple statement of capabilities will not suffice. The offeror must address how it will accomplish the requirements of the SOW addressing
• Key tasks
• Milestones and
• Demonstrate a thorough understanding of the project.
(3) Offerors shall include a Construction Schedule (such as a Gantt Chart) illustrating the project’s schedule for the work to be completed and key tasks all within the estimated Period of Performance for this contract.
Confidence Assessment: Based on the offeror’s technical approach and schedule, the Government will assign one of the following confidence ratings:
• High Confidence – Government has a high expectation of successful performance.
• Some Confidence – Government has a reasonable expectation of success.
• Low Confidence – Government has concerns about successful performance.
• Neutral Confidence – No relevant past performance available; no positive or negative inference will be made.
Price:
The offeror shall provide pricing as requested below and in the attached spreadsheet titled “Attachment 1 – C05 SOI Stove Prairie Campground Gate Replacement”.
Schedule of Items - All items shall be priced and submitted on the Excel Spreadsheet provided, Attachment 1 - C05 SOI Stove Prairie Campground Gate Replacement.
Do not submit pricing in Adobe format.
All individual line-item pricing provided shall be rounded up to the nearest whole dollar, do not include cents, the total pricing should equate to the individual line-item amounts.
Ensure the name of the company and the UEI number is added to the top of the Schedule of Items (Vendor name and UEI block highlighted in yellow).
Total price evaluation will be for each base period. Failure to propose pricing for the base items on individual line items may result in a quotation being excluded from further consideration. The offeror’s quotation will be evaluated in accordance with FAR 12.204, to determine if it is fair and reasonable.
(b) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017)
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (Sep 2025)
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Sep 2025)
52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)
The following provisions are applicable if checked:
☒ 52.204-7 System for Award Management—Registration (Nov 2025) ☐ Alternate I (Nov 2025) to 52.204-7
☒ 52.222-5 Construction Wage Requirements, Secondary Site of the Work (Nov 2025) ☐ 52.225-2 Buy American Certificate (Oct 2022) ☐ 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
☐ 52.225-6 Trade Agreements-Certificate (Feb 2021) ☒ 52.225-10 Notice of Buy American Requirement- Construction Materials (May 2014)
☐ Alternate I (May 2014) of 52.225-10 ☐ 52.225-12 Notice of Buy American Requirement-Construction Materials under Trade
Agreements (May 2014) ☐ Alternate I (May 2014) of 52.225-12 ☐ Alternate II (Nov 2023) of 52.225-12
☐ 52.226-3 Disaster or Emergency Area Representation (Nov 2007) ☐ 52.228-1 Bid Guarantee (Sep 1996) ☒ 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025)
Other Applicable FAR Provisions
AGAR Provisions This solicitation incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf
NOTICE FOR FILING AGENCY PROTESTS
United States Department of Agriculture (USDA) Protest Procedures
The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions. Interested parties with concerns about this solicitation are encouraged to seek resolution through the following USDA procedures.
Tier 1: Contracting Officer Concern Resolution
Submission: Interested parties with concerns about either the solicitation or subsequent award should first submit their concern directly to the Contracting Officer, providing sufficient detail to allow the Contracting Officer to understand and assess the issue.
Process: The Contracting Officer will review the concern, seek clarification as needed, and engage with the interested party to attempt prompt resolution.
Review Timeline: The Contracting Officer will make every effort to provide a response or resolution within 10 business days of receiving the concern.
Effect on Award or Performance: Tier 1 engagement is not considered an official notification of filing an agency protest and does not pause solicitation deadlines, delay award decisions, or suspend contract performance.
Next Steps: If the matter cannot be resolved at Tier 1, the interested party may file a written agency protest under Tier 2. USDA encourages all parties to seek resolution with the Contracting Officer before filing an agency protest.
https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf
Tier 2: Agency Protest If concerns cannot be resolved at Tier 1, an interested party may file a written agency protest with either the Contracting Officer or the USDA Independent Review Authority. The decision by the USDA Independent Review Authority is an alternative to a decision by the Contracting Officer. The USDA Independent Review Authority will not consider an appeal of the Contracting Officer’s decision on an agency protest.
The protest must state whether the protester elects review by the Contracting Officer, by the UDSA Independent Review Authority. If no election is stated, the Contracting Officer will decide the protest.
Required Information: Protests shall include the information set forth in FAR 33.104-4 (a)(3).
Failure to submit the required information may result in a delay or dismissal of the protest.
Submission: Agency protests should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.
Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.
mailto:SPE.inquiry@usda.gov
Effect on Award or Performance: Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined to be in the best interest of the Government.
Review Timeline: USDA strives to resolve agency-level protests within 35 business days of receipt.
Election of Forum: By filing a protest with USDA, the protesters agree not to file a protest on the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If such a protest is filed externally, the USDA agency protest will be dismissed.
Questions: Questions regarding this notice or protest procedures should be directed to the Contracting Officer identified in this solicitation.
| Description – |
| Alternative Payment Protections FAR 52.228-13 (July 2000) |
| Technical Data - |
| Project Location |
| Definitization of Equitable Adjustments for Change Orders - |
| Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions |
| The following clauses are applicable if checked: |
| Other Applicable Clauses |
| AGAR Clauses |
| Period for acceptance of offers. |
| 1240LT27Q0005 Stove Prairie Campground |
| Solicitation Information |
| Organized Site Visit |
| Evaluation and Basis for Award |
| Technical Approach: |
| Price: |
| 52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 |
| The following provisions are applicable if checked: |
| Other Applicable FAR Provisions |
| NOTICE FOR FILING AGENCY PROTESTS |
| Tier 1: Contracting Officer Concern Resolution |
| Tier 2: Agency Protest |
File details come from the government source that posted it. Updated .