This is a Statement of Work (SOW) issued by the US Department of Agriculture for the replacement of a 32-foot double lane closure gate at Stove Prairie Landing within the Arapaho & Roosevelt National Forests and Pawnee National Grassland. The existing gate, which controls seasonal access restrictions to the site, consists of two individual gates spanning the roadway width with a central locking mechanism and supporting posts on either side.
The scope of work encompasses two lump-sum line items: (1) Mobilization, covering all preparatory work and movement of personnel, equipment, and supplies to the project site; and (2) Gate Installation, which includes site preparation, removal of the existing gate and posts, disposal of removed materials at a state-approved landfill or recycling facility, surveying, excavation, concrete pouring for holding and support posts, installation of prefabricated gates, backfill, grading, and revegetation. The contractor must furnish all labor, equipment, materials, supervision, transportation, and insurance. All work must comply with Forest Service Supplemental Specifications and FP-24 Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects. The government will furnish Yale locks for gates and government-provided seed. Key deliverables due 14 days before construction commencement include a construction schedule, materials submittals (gate drawings, concrete tests, object markers), staging area outline, traffic control plan, and accident prevention plan. The recreation site must remain open to the public during construction with appropriate safety barriers meeting MUTCD standards. Invoices must be submitted via the Department of Treasury's Invoice Processing Platform (IPP), with payment due within 30 days of invoice receipt. The Contracting Officer's Representative is Juan Londono (juan.londono@usda.gov), and the project is located at 16500 Poudre Canyon Road, Bellvue, Colorado.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Stove Prairie Campground Gate Replacement
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
Project
General Information
1.0 Scope of Work
The purpose is for disposal and replacement of an existing broken 32’ double lane closure gate at Stove Prairie Landing.
2.0 Background
The existing double lane closure gate at Stove Prairie Landing serves as the closure device for seasonal restrictions at this site, prohibiting traffic from accessing the site. This gate totals 32’, spanning the entire width of the double lane by using two individual gates on either side with a locking mechanism securing the end of both gates in the middle of the roadway. There are two posts on either side of the road that hold the gate and provide the hinging mechanism and there are two other posts on both sides that provide support for the end of both gates when the road is open.
Contractor Requirements
3.0 Technical Requirements / Tasks
SCHEDULE OF ITEMS (SOI)
ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND
Base Items
Description Method of Measure
Unit Quantity Unit Price TOTAL
1 Mobilization L.S.Q Lump Sum
Job
Replacement of 32’ double lane gate
L.S.Q Lump Sum
Job
TOTAL BASE ITEMS
Electronic version of the SOI has also been provided to the contractor.
The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman’s compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. All work shall be in accordance with the attached “Forest Service Supplemental Specifications” and FP-24 Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects.
This project includes the following items:
1. Mobilization
a. This base item consists of all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. This base item applies to work included in the base items only.
b. Payment shall be made at the contract lump-sum price.
2. Gate Installation
a. This base item consists of all materials, personnel, labor, equipment, and supplies to install prefabricated gates, holding posts, and support posts. This item includes site preparation, removal of existing gate and posts, disposal (or otherwise, as specified by CO) of removed material and items off Forest Service land and disposed of in a State approved landfill or recycling, surveying to ensure level gate installation, excavation, bedding, pouring concrete for holding posts and support posts, installation of gate, backfill, final site grading, and revegetation of disturbed areas.
b. Gate must be installed according to the attached drawings and in the location marked by the
COR.
The contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and Municipal laws, codes, and regulations applicable to the performance of the work. The contractor shall be responsible for all damages to persons or property, which occur as a result of the Contractor’s performance or negligence. Contractor is responsible for utility locate before excavation.
Project Site Requirements
- Recreation site will remain open to the public during construction. Contractor shall install and maintain suitable barriers to ensure the protection of the public, employees, and facilities. All signs shall meet MUTCD standards.
- Contractor may be allowed to temporarily close or block off traffic, with prior approval of traffic control plan from the Contracting Officer, for the safety of the public.
A. Inspection and Acceptance
a. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and testing at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
B. Contract Administration
a. Invoices – Contractor shall follow all invoicing requirements as listed in the clauses.
b. Payments will be made from the Contractor’s invoice(s). All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.
c. Payment for services rendered shall be made within 30 days following receipt of an invoice for the work.
The contractor shall submit invoices on a monthly basis and at the end of the month. If at any time the Contractor does not perform the services per the contract in a timely manner the Contracting Officer reserves the right to contract for the work with another party and will adjust payment accordingly.
d. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
e. Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).
If the itemized invoice has not been reviewed and approved by the COR, the IPP payment request will be rejected. Please follow the minimum requirements to ensure a successful payment process.
IPP Invoice shall have the following areas completed at a minimum:
Invoice Number Invoice Date Bill Period Start Date Bill Period End Date Supplier Contact Name Supplier Contact Phone Contract Number
Itemized invoice shall include at a minimum:
Contractor Name & Address Contract number Invoice Number Description of Services or work completed.
Date of services or completion.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
C. Forest Service Representatives
a. The signing Contracting Officer for this contract/purchase order and will be the contact on all things concerning this contract, shall be determined at a later date. Their contact information will be provided.
b. The Contracting Officers Representative (COR) is Juan Londono, reachable at juan.londono@usda.gov
D. Contract Administration
a. Contract Award: A written award or acceptance of offer mailed or otherwise furnished to the Contractor shall result in a binding contract without further action by either party.
b. Notice to Proceed. The Contractor shall commence work upon receipt of a properly executed Notice to
Proceed.
c. Changes: The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
d. Unauthorized Instructions from Government or Other Personnel: The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.
e. Designation of Contracting Officer’s Representative (COR): Designation will be made upon contract issuance of the contract and a copy of the designation letter will be furnished to the Contractor. Limits of authority are described in each designation letter.
f. Designation of Authorized Representative of the Contractor: The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.
WASHING OF EQUIPMENT
Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
The Contractor shall wash all equipment except for hauling vehicles prior to entering National Forest Land. Remove all soil which could contain noxious weed seed. Remove grease and oil from drive mechanisms which would be discharged into the stream when equipment is operating. Prior to transporting equipment to the site, assure that the equipment's hydraulic, lubrication and fuel systems are free from leaks.
4.0 Government Furnished
- Yale locks for gates
- Government furnished seed
5.0 Deliverables / Schedule
Key Deliverables
Item No.
Deliverable / Item Title
Description Frequency Delivery Format
Due By
1 Schedule A schedule outlining the proposed construction timeline, from mobilization to demobilization
Before construction begins
Via email to
CO/COR
14 days before construction is intended to begin
2 Materials Submittals
Submit all materials for this contract to the COR, including:
- Gate Drawings
- Concrete tests for footings
- Object Markers
Before construction begins
Via email to
CO/COR
14 days before construction is intended to begin
3 Staging area Outline a proposed staging area Before construction begins
Via email to
CO/COR
14 days before construction is intended to begin
4 Traffic Control Plan
Submit a traffic control plan of the construction area, with consideration given to users of recreation site
Before construction begins
Via email to COR
14 days before construction is intended to begin
5 Accident Prevention Plan
Submit a site-specific safety plan to ensure contractor and public safety
Before construction begins
Via email to COR
14 days before construction is intended to begin
6.0 Travel
Stove Prairie Campground: 16500 Poudre Canyon Rd, Bellvue, CO
7.0 Contractor’s Key Personnel
Contractor shall ensure that all work is conducted by personnel fully qualified to perform the tasks and supervised by a designated Contractor’s Representative.
8.0 Security Requirements
N/A
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
- Area Map
- Gate Details Drawing
- Concrete Specifications
Area Map
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |