Attach 1_C06 SOI Stove Prairie Campground gate Replacement.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Stove Prairie Campground Gate Replacement
- Solicitation number
- 117346
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is a Schedule of Items (SOI) pricing template for the Stove Prairie Campground Gate Replacement project at Arapaho & Roosevelt National Forests and Pawnee National Grassland. The SOI contains two line items for bidding: Mobilization (Lump Sum) and Replacement of 32' double lane gate (Lump Sum), with both items requiring contractors to submit total pricing for the job. Contractors must provide unit prices and total costs for each line item, though the specific pricing amounts are not populated in this template version.
The associated solicitation (1240LT27Q0005) is a 100% Small Business (SB) Set-Aside issued by the Department of Agriculture Forest Service for the disposal and replacement of an existing broken 32' double lane closure gate at Stove Prairie Landing. The work falls under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with PSC Code Z1PZ (Maintenance of other non-building facilities) and a size standard of $45 million. Questions were due October 28, 2026, and quotes were originally due November 11, 2026, but were amended to November 16, 2026, at 14:00 EST. All submissions must be directed to Contract Specialist Jordan Carlsen at Jordan.Carlsen@usda.gov, with late quotes subject to rejection. The solicitation was amended on November 4, 2026, to revise the quote deadline and include consolidated questions and answers, wage determinations, and revised attachments detailing gate specifications and the Statement of Work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SCHEDULE OF ITEMS |
| Stove Prairie Campground Gate Replacement |
ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND
| Base | Description | Method of | Unit | Quantity | Unit Price | TOTAL |
| 1 | Mobilization | L.S.Q | Lump Sum | Job | ||
| 2 | Replacement of 32' double lane gate | L.S.Q | Lump Sum | Job | ||
| TOTAL BASE ITEMS |