Attach 1_C06 SOI Stove Prairie Campground gate Replacement.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Stove Prairie Campground Gate Replacement
Solicitation number
117346
Issued by

About this file

This file is a Schedule of Items (SOI) pricing template for the Stove Prairie Campground Gate Replacement project at Arapaho & Roosevelt National Forests and Pawnee National Grassland. The SOI contains two line items for bidding: Mobilization (Lump Sum) and Replacement of 32' double lane gate (Lump Sum), with both items requiring contractors to submit total pricing for the job. Contractors must provide unit prices and total costs for each line item, though the specific pricing amounts are not populated in this template version.

The associated solicitation (1240LT27Q0005) is a 100% Small Business (SB) Set-Aside issued by the Department of Agriculture Forest Service for the disposal and replacement of an existing broken 32' double lane closure gate at Stove Prairie Landing. The work falls under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with PSC Code Z1PZ (Maintenance of other non-building facilities) and a size standard of $45 million. Questions were due October 28, 2026, and quotes were originally due November 11, 2026, but were amended to November 16, 2026, at 14:00 EST. All submissions must be directed to Contract Specialist Jordan Carlsen at Jordan.Carlsen@usda.gov, with late quotes subject to rejection. The solicitation was amended on November 4, 2026, to revise the quote deadline and include consolidated questions and answers, wage determinations, and revised attachments detailing gate specifications and the Statement of Work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SCHEDULE OF ITEMS
Stove Prairie Campground Gate Replacement

ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND

BaseDescriptionMethod ofUnitQuantityUnit PriceTOTAL
1MobilizationL.S.QLump SumJob
2Replacement of 32' double lane gateL.S.QLump SumJob
TOTAL BASE ITEMS

File details come from the government source that posted it. Updated .