C04b_Spec-TreeCoolerDM(2026.5.21).docx

DOCX document 584 KB Posted

Attached to
McCall & Council Yard Tree Cooler Deferred Maint
Solicitation number
1240LT26Q0139
Issued by

About this file

This is a Specification and Statement of Work document for deferred maintenance work at two U.S. Forest Service tree cooler facilities in McCall, Idaho. The project runs from July 2026 for 180 calendar days and includes comprehensive building refurbishment at the McCall Tree Cooler (1000 N Mission St., Bldg #5) and Council Yard Tree Cooler (201 N Dartmouth St.). Work scopes include roof replacement (approximately 3,725 square feet of existing metal roofing removal and 4,225 square feet of new standing seam metal roofing installation at each site), structural additions (500 square feet per site), exterior upgrades (fiber cement lap siding, window replacement, concrete repairs, painting), interior work (floor polishing, toilet replacement, water heater and unit heater replacement, insulation installation), and utility infrastructure improvements. At the Council site only, additional work includes electrical service upgrades (underground power service installation), new concrete pads, and communications infrastructure installation (fiber conduits, backboards, IT racks, and patch panels provided by government).

The contract requires detailed submittals including construction schedules, quality control plans, product data, shop drawings, and as-built drawings. Payment is based on measured quantities using methods specified for each line item (actual quantities, designed quantities, lump sum, staked, or vehicle quantities). Mobilization costs are limited to 10 percent of the original contract amount with progressive payment tied to work completion milestones. All work must comply with established specifications sections covering concrete, metal fabrications, roofing, siding, electrical, plumbing, and communications systems. The contractor must maintain site safety, traffic control, dust mitigation, coordinate with Forest Service operations to minimize disruption, and properly dispose of hazardous materials including fluorescent lights and refrigerant. A site visit is scheduled for August 18, 2026, with questions due August 20, 2026, quotes due September 3, 2026, and award targeted for September 9, 2026.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

MCCALL & COUNCIL YARD TREE COOLERS DEFERRED MAINTENANCE

1.1 SCOPE OF CONTRACT

A. Work shall be performed at two sites, McCall Yard Tree Cooler and Council Yard Tree Cooler.

B. Work at the McCall Tree Cooler includes the following:

a. Remove approximately 3,725 square feet of existing metal roofing.

1. Salvage all existing roofing panels and place in location as directed by COR.

b. Construct 500 square feet of additional roof structure.

c. Install approximately 4,225 square feet of new standing seam metal roofing with ice/water shield and trim all around.

d. Remove the existing paper board siding, trim and felt paper.

e. Replace (5) existing windows.

f. Install new fiber cement lap siding and trim with building wrap.

g. Repair concrete on stairs & metal on the railings.

h. Paint exterior of building including siding and trim, and all metal posts and railings.

i. Remove existing sheet vinyl and polish concrete floors in office, hallway, and restrooms.

j. Repair all cracks in concrete throughout building.

k. Replace (2) existing toilets.

l. Replace water heater and trap primer.

m. Replace electric unit heater in wrapping room.

n. Move air handler control box to different location in the wrapping room.

o. Repair floor drainpipe penetrating through stem wall.

p. Install ½” CDX plywood on underside of trusses in office, hallway, and two bathrooms.

q. Install 10 inches of blown-in cellulose over office, hallway and two bathrooms.

r. Install 4 inches of foam board (r-value of 8/inch) on attic access board

s. Replace existing storm drain including inlet basins and underground piping as noted on the drawings.

t. Install a new concrete pad in front of loading dock.

u. Install removable chain and post across front of loading dock.

C. Work at the Council Yard Tree Cooler includes:

a. Remove approximately 3,725 square feet of existing metal roofing.

1. Salvage all existing roofing panels and place in location as directed by COR.

b. Construct 500 square feet of additional roof structure.

c. Repair/replace damaged metal fascia on building exterior.

d. Install approximately 4,225 square feet of new standing seam metal roofing with ice/water shield and trim all around.

e. Remove the existing paper board siding, trim and felt paper.

f. Replace (5) existing windows.

g. Install new fiber cement lap siding and trim with building wrap.

h. Repair concrete on stairs & metal on the railings.

i. Paint exterior of building including siding and trim, and all metal posts and railings.

j. Remove existing sheet vinyl and polish concrete floors in office, hallway, and restrooms.

k. Repair all cracks in concrete throughout building.

l. Replace (2) existing toilets.

m. Replace water heater and trap primer.

n. Replace (3) wall heaters in office and restrooms.

o. Replace electric unit heater in wrapping room.

p. Repair floor drainpipe penetrating through stem wall.

q. Install ½” CDX plywood on underside of trusses in office, hallway, and two bathrooms.

r. Install 10 inches of blown-in cellulose over office, hallway and two bathrooms.

s. Install 4 inches of foam board (r-value of 8/inch) on attic access board

t. Install a new concrete pad in front of loading dock.

u. Install removable chain and post across front of loading dock.

v. Install concrete pad on east side of tree cooler.

w. Remove existing overhead electrical power service to tree cooler and install new underground electrical power service.

x. Remove existing overhead electrical power service to building east of tree cooler and install new underground feeder from building to the north of tree cooler.

y. Install shutoff valve and blowout for building east of tree cooler.

z. Install new 2-inch conduits from Fire Crew Office to Woodshop, onto the Fire Engine Bay and finishing at the Tree Cooler.

aa. Install backboards, IT racks, fiber patch panels, patch panels, UPS and PDUs provided by the government.

ab. Pull and terminate fiber looping through Fire Crew Office, Fire Engine Bay, Woodshop, and Tree Cooler.

D. Quantities associated with these options are identified in the Schedule of Items.

PROJECT LOCATION

The project sites are located at two different locations of the Payette National Forest:

McCall Tree Cooler-1000 N Mission St. Bldg #5 McCall, ID 83638 Council Tree Cooler-201 N Dartmouth St. McCall, ID 83638

SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

Construction sites will be open to Forest Service employees during construction. The Contractor will be responsible for signing and limiting access where necessary. Contractor will be responsible to work with COR (Contracting Officer Representative) on schedule and construction so as to minimize disturbance to the users of the facilities.

Water is available at the site for construction purposes.

Utilities are available at the site for construction purposes.

Bathroom facilities are available onsite.

TRAFFIC CONTROL AND CONSTRUCTION SIGNING

No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the CO (Contracting Officer) and Local Transportation Authority. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.

Signing and barricades shall be adequate to protect Forest Service employees and the public.

WORK CAMPS, STAGING AND STORAGE AREAS

Areas for staging operations and storage of materials shall be approved by the COR.

Confine storage of materials and equipment as approved by the COR.

Contractor shall maintain access to the facilities for Forest Service personnel.

INSPECTION OF WORKSITE

The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost (e.g. inclement weather, travel times to/from work sites, availability of accommodation and amenities at or near work sites, etc). Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

START DATE

July 2026

CONTRACT TIME

180 Calendar Days Specifications

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 011900 - MOBILIZATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014100 - QUALITY CONTROL

SECTION 017320 - SELECTIVE DEMOLITION

SECTION 024119 - SELECTIVE DEMOLITION

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033510 - POLISHED CONCRETE FINISHING

SECTION 055000 - METAL FABRICATIONS

SECTION 055119 - METAL GRATING STAIR TREADS AND RISERS

SECTION 055213 - PIPE RAILINGS

SECTION 061000 - ROUGH CARPENTRY

SECTION 061600 - SHEATHING

SECTION 070150.19 - PREPARATION FOR REROOFING

SECTION 072100 - THERMAL INSULATION

SECTION 074113.16 - STANDING-SEAM METAL ROOF PANELS

SECTION 074646 - FIBER-CEMENT SIDING, SOFFIT AND TRIM

SECTION 076200 - SHEET METAL FLASHING AND TRIM (LOW SLOPE)

SECTION 077253 - SNOW GUARDS

SECTION 085413 - FIBERGLASS WINDOWS

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

SECTION 099001 - COLORS

SECTION 099113 - EXTERIOR PAINTING

SECTION 102800 - TOILET AND BATH ACCESSORIES

SECTION 221102 - CURB VALVES AND BOXES

SECTION 221103 - PLUMBING APPURTENANCES

SECTION 260000 - COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260533.13 - CONDUITS FOR ELECTRICAL SYSTEMS

SECTION 260533.16 - BOXES AND COVERS FOR ELECTRICAL SYSTEMS

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 262416 - PANELBOARDS

SECTION 262726 - WIRING DEVICES

SECTION 270500 - COMMON WORK RESULTS FOR COMMUNICATIONS

SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

SECTION 270528 - PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION 312000 - EARTHWORK

END OF SECTION C

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2

USDA FOREST SERVICE, R4

MCCALL & COUNCIL TREE COOLERS DEFERRED MAINTENANCE

SECTION 011250 - MEASUREMENT AND PAYMENT

1. GENERAL

SUMMARY

Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

DETERMINATION OF QUANTITIES

The following measurements and calculations shall be used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

UNITS OF MEASUREMENT

Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

Acre: Make longitudinal and transverse measurements for area computations horizontally.

50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

Cubic Yard (CY): A measurement computed by one of the following methods:

Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

Each (EA): One complete unit, which may consist of one or more parts.

Gallons (GAL): The quantity shall be measured by any of the following methods:

Measured volume in container.

Metered volume by approved metering system.

Commercially package volume.

Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

Lump Sum (LS): One complete unit.

Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

Square Foot (SF): Measured on a plane parallel to the surface being measured.

Square Yard (SY): Measured on a plane parallel to the surface being measured.

Ton: Measured as a short ton consisting of 2,000 pounds.

METHOD OF MEASUREMENT

One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

As a result of changes in the work authorized by the CO.

As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PRODUCTS (NOT APPLICABLE)

EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250

May 2026

MEASUREMENT AND PAYMENT 011250-1

MCCALL & COUNCIL TREE COOLERS DEFERRED MAINTENANCE

SECTION 011900 - MOBILIZATION

1. GENERAL

SUMMARY

This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

MEASUREMENT AND PAYMENT

The measurement shall be lump sum for mobilization. Payment shall be as follows:

Bond premiums will be reimbursed after receipt of the evidence of payment.

50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PRODUCTS (NOT USED)

EXECUTION (NOT USED)

END OF SECTION 011900

MOBILIZATION 011900-1

MCCALL & COUNCIL TREE COOLERS DEFERRED MAINTENANCE

SECTION 013300 - SUBMITTAL PROCEDURES

1. GENERAL

SUMMARY

This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

See other specification section within this package for additional requirements on submittal.

SUBMITTAL PROCEDURES

Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

If intermediate submittal is necessary, process it in same manner as initial submittal.

Allow 14 days for processing each re-submittal.

No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

Identification: Place a permanent label or title block on each submittal for identification.

Indicate name of firm or entity that prepared each submittal on label or title block.

Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

Include the following information on label for processing and recording action taken:

Project name.

Date.

Name and address of Contractor.

Name of manufacturer.

Unique identifier, including revision number.

Number and title of appropriate Specification Section.

Drawing number and detail references, as appropriate.

If more than one item is shown on submittal sheet, identify item.

Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

MEASUREMENT AND PAYMENT

No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PRODUCTS

ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

Mark each copy of each submittal to show which products and options are applicable.

Include the following information, as applicable:

Manufacturer's written recommendations.

Manufacturer's product specifications.

Manufacturer's installation instructions.

Manufacturer's catalog cuts.

Wiring diagrams showing factory-installed wiring.

Compliance with recognized trade association standards.

Compliance with recognized testing agency standards.

Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

Preparation: Include the following information, as applicable:

Dimensions.

Identification of products.

Fabrication and installation drawings.

Roughing-in and setting diagrams.

Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

Notation of dimensions established by field measurement.

Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

Samples: Prepare physical units of materials or products, including the following:

Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) General: Prepare and submit Informational Submittals required by other Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

EXECUTION

GENERAL

Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

Submittals not required by the Contract Documents will not be reviewed and may be discarded.

Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

Requests for substitutions will only be considered if contractor submits the following:

Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

EDIT table below for each project. COORDINATE table references with edited specification sections.

SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

TABLE 013000-1

Spec. Section
Section Title
Subsection
Required Submittal
C
General Specifications
1.3A
Stream Protection Plan
C
General Specifications
1.4A
Traffic Control Plan
010250
Construction Staking
3.6 A
Survey Notes
013300
Submittal Procedures
2.1D
Construction Schedule
014100
Quality Control
1.3 A
Contractor quality control plan
014100
Quality Control
1.3 B
Permits, Licenses, and Certificates
014100
Quality Control
1.3 C
Test and inspection reports
014100
Quality Control
1.3 D
As-Built drawings
023701
Sediment & Erosion Control Measures
1.2A
Sediment & Erosion Control Plan
031350
Expanded Polystyrene Concrete Formwork
1.5B
Material testing and approval reports
031350
Expanded Polystyrene Concrete Formwork
1.5C
Product Data: Installation manual or guide
031350
Expanded Polystyrene Concrete Formwork
1.5D
Shop Drawings
033000
Cast-in-Place Concrete
1.3A
Product Data
033000
Cast-in-Place Concrete
1.3B
Design Mix
033000
Cast-in-Place Concrete
1.3C
Shop Drawings
033000
Cast-in-Place Concrete
1.3D
Samples
033000
Cast-in-Place Concrete
1.3E
Qualification Data
033000
Cast-in-Place Concrete
1.3F
Material Test Reports
033000
Cast-in-Place Concrete
1.3G
Material Certificates
033015
Concrete For Minor Structures
1.3A
Product Data
033540
Colored Concrete Sidewalk
1.2A
Product Sample
047000
Manufactured Masonry
1.3A
Product Data, Samples, Qualifications, Instructions
047200
Cast Stone
1.03.A
Product Data, Samples, Qualifications, Instructions
047200
Cast Stone
1.03.B
O & M, Warranty
047200
Cast Stone Masonry
1.3A
Product Data
047200
Cast Stone Masonry
1.3B
Mortar samples for color
047200
Cast Stone Masonry
1.3C
Cast Stone Samples
051200
Structural Steel Framing
1.3A
Product Data
051200
Structural Steel Framing
1.3B
Shop Drawings-See Spec.
051200
Structural Steel Framing
1.3D
Qualification Data for Installer, fabricator, and testing agency.
051200
Structural Steel Framing
1.3E
Welding certificates.
051200
Structural Steel Framing
1.3F
Product Test reports. See spec.
052100
Steel Joist Framing
1.4A
Product Data
052100
Steel Joist Framing
1.4B
Shop Drawings
052100
Steel Joist Framing
1.4C
Welding Certificates
052100
Steel Joist Framing
1.4D
Manufacturers Certificates
052100
Steel Joist Framing
1.4E
Mill Certificates
052100
Steel Joist Framing
1.4F
Qualification Data
052100
Steel Joist Framing
1.4G
Research/Evaluation Reports
053100
Steel Decking
1.2A
Product Data
053100
Steel Decking
1.2B
Shop Drawings
053100
Steel Decking
1.2C
Product Certificates
053100
Steel Decking
1.2D
Field Quality-Control Test and Inspection Reports
053100
Steel Decking
1.2E
Product Test Reports
053100
Steel Decking
1.2F
Research/Evaluation Reports
054000
Cold-Formed Metal Framing
1.2A
Product Data
054000
Cold-Formed Metal Framing
1.2B
Shop Drawings
055000
Metal Fabrications
1.3A
Product Data
055000
Metal Fabrications
1.3B
Shop Drawings
055000
Metal Fabrications
1.3C
Qualification Data
055000
Metal Fabrications
1.3D
Welding Certificates
055000
Metal Fabrications
1.3E
Paint Compatibility Certificates
061000
Rough Carpentry
1.3.A
Product Data
061000
Rough Carpentry
1.3A
Product Data
061600
Sheathing
1.2.A
Product Data
061753
Shop Fabricated Wood Trusses
1.4.A
Shop Drawings, Qualifications
064023
Interior Architectural Woodwork
1.2A
Product Data and Samples
073130
Wood Shingle Roof for Building
1.3.A-B
Product Data, Maintenance Data
074113
Metal Roof Panels
1.3A
Product Data
074113
Metal Roof Panels
1.3B
Shop Drawings
074113
Metal Roof Panels
1.3C
Coordination Drawings
074113
Metal Roof Panels
1.3D
Mtnc Data for O&M Manuals
074600
Fiber Cement Siding
1.2.A-B
Product Data, Samples
078400
Firestopping
1.6A
Product Data
078400
Firestopping
1.6B
Manufacturer’s engineering judgment identification number and drawing details.
078400
Firestopping
1.6C
MSDS Sheets
079200
Joint Sealants
1.2.A
Product Data
079200
Joint Sealants
1.2A
Product Data
081110
Standard Steel Doors and Frame
1.4A
Product Data
081110
Standard Steel Doors and Frame
1.4B
Coordination Drawings
081110
Standard Steel Doors and Frame
1.4C
Product Test Reports
081113
Hollow Metal Doors and Frames
1.3.A
Product Data
083600
Sectional Doors
1.2A
Product Data
083600
Sectional Doors
1.2B
Shop Drawings
085200
Aluminum Clad Wood Windows
1.4.A-B
Product Data- Warranty
087110
Door Hardware
1.2A-C
Product Data, Hardware Schedule, Keying Schedule
092400
Portland Cement Plastering
1.2A
Product Data
092900
Gypsum board
1.2.A
Product Data
093000
Tiling
1.4A
Product Data
093000
Tiling
1.4B
Samples
093000
Tiling
1.4C
Qualification Data - Installer
095113
Acoustical Panel Ceilings
1.2A
Product Data
095113
Acoustical Panel Ceilings
1.2B
Coordination Drawings
095113
Acoustical Panel Ceilings
1.2C
Samples
095113
Acoustical Panel Ceilings
1.2D
LEED submittal
095113
Acoustical Panel Ceilings
1,2E
Maintenance Data
096516
Linoleum Flooring
1.2A
Product Data
096516
Linoleum Flooring
1.2B
Samples
096516
Linoleum Flooring
1.2C
Maintenance Data
096530
Resilient Wall Base and Accessories
1.2A
Product Data
097200
Wall Coverings – FRP
1.3A
Product Data & Color Samples
099100
Paint
3.3
Color Selection Sheets
099110
Exterior Painting
1.2A
Product Data
099110
Exterior Painting
1.2B
Product List
099113
Exterior Paints and Coatings
1.3A-B
Product Data, Samples
099120
Interior Painting
1.2A
Product Data
099120
Interior Painting
1.2B
Color Samples
099123
Interior Paints and Coatings
1.3A-B
Product Data, Samples
099300
Staining and Transparent Finishing
1.2A-B
Product Data, Samples
101400
Signs
1.2A
Sign List Submittal
101415
High Density Polyethylene Signs
1.2A
Sign List Submittal
101415
Site Identification Sign
2.1C
Sign List Submittal
104413
Fire Protection Specialties
1.2.A
Product Data
104413
Fire Extinguishers
1.2A
Product Data
107500
Flagpoles
1.2A
Product Data
122113
Horizontal Louvered Blinds
1.2A-C
Product Data, Samples, Maintenance Data
122113
Horizontal Louver Blinds
1.2A
Product Data
122113
Horizontal Louver Blinds
1.2B
Shop Drawings
122113
Horizontal Louver Blinds
1.2C
Samples
122113
Horizontal Louver Blinds
1.2D
Maintenance Data
129400
Family Units
1.2A
Product Data
129400
Family Units
1.2B
Color Samples
129410
Site Furnishings
1.2A
Product Data
133400
Precast Concrete Utility Building
1.2A
Manufacturer’s Literature
133400
Precast Concrete Utility Building
1.2B
Shop Drawings
133400
Precast Concrete Utility Building
1.2C
Design Calculations
133400
Precast Concrete Utility Building
1.2D
Concrete Delivery Certificates
133401
Precast Concrete Vault Restroom Building
1.2A
Manufacturer’s Literature
133401
Precast Concrete Vault Restroom Building
1.2B
Shop Drawings
133401
Precast Concrete Vault Restroom Building
1.2C
Design Calculations
133401
Precast Concrete Vault Restroom Building
1.2D
Concrete Delivery Certificates
133402
Utility Boxes
1.3A
Product Data
133402
Utility Boxes
1.3B
Shop Drawings
133402
Utility Boxes
1.3C
Product Certificates
136000
Shelter
1.2A
Shop Drawings
220500
Common Work Results for Plumbing
1.3A
Welding Certificates
220553
Identification for Plumbing Piping
1.2A
Product Data
221100
Water Distribution Systems
1.3A
Product Data
221100
Water Distribution Systems
1.3B
Water Disposal Plan
221100
Water Distribution Systems
1.3C
Operation and Maintenance Data
221103
Plumbing Appurtenances
1.2A
Product Data
221103
Plumbing Appurtenances
1.2B
Operation and Maintenance Data
221105
Water Hydrants
1.3A
Manufacturer’s Literature and Maintenance Data
221105
Water Hydrants
1.3B
Washed Rock Certification
221105
Water Hydrants
1.3C
Maintenance Data
221105
Water Hydrants
1.3D
Color Sample
221119
Domestic Water Piping Specialties
1.3A
Product Data
221119
Domestic Water Piping Specialties
1.3B
Field Quality-Control Test Reports
221119
Domestic Water Piping Specialties
1.3C
Operation and Maintenance Data
221120
Submersible Well Pumps
1.2A
Product Data
221123.13
Domestic Water Packaged Booster Pump
1.2A
Product Data
221123.13
Domestic Water Packaged Booster Pump
1.2B
Shop Drawings
221123.13
Domestic Water Packaged Booster Pump
1.2C
Maintenance Data
221142
Stream Crossings
1.2A
Construction Plan for Stream Crossing
221200
Underground Water Storage Tank
1.3A
Product Data and Shop Drawings
221200
Underground Water Storage Tank
1.3B
Product Certificate
221200
Underground Water Storage Tank
1.3C
Operation and Maintenance Data
221300
Onsite Wastewater Treatment System
1.3A
Product Data
221300
Onsite Wastewater Treatment System
1.3B
Sand Filtering Material
221300
Onsite Wastewater Treatment System
1.3C
Shop Drawings
221300
Onsite Wastewater Treatment System
1.3D
Installation Method
221300
Onsite Wastewater Treatment System
1.3E
Coordination Drawings
221300
Onsite Wastewater Treatment System
1.3F
O&M Data
221300
Onsite Wastewater Treatment System
1.3G
Certificates
221310
Sewage Holding Tank
1.3A
Product Data
221310
Sewage Holding Tank
1.3B
Shop Drawings
221310
Sewage Holding Tank
1.3C
Coordination Drawings
221310
Sewage Holding Tank
1.3D
Product Certificate
221319
Sanitary Waste Piping Specialties
1.2A
Product Data
224000
Plumbing Fixtures
1.3A
Product Data
224000
Plumbing Fixtures
1.3B
Operation and Maintenance Data
224700
Water Coolers
1.2A
Product Data
224700
Water Coolers
1.2B
Shop Drawings
224700
Water Coolers
1.2C
Operation and Maintenance Data
230593
Testing, Adjusting, and Balancing for HVAC
1.2A
Certified TAB Reports per Paragraph 3.10
230593
Testing, Adjusting, and Balancing for HVAC
1.2B
Warranties
230700
HVAC Insulation
1.2A
Product Data
231126
Fac. Liquified-Petroleum Gas Piping
1.3A
Field Quality-Control Reports
231126
Fac. Liquified-Petroleum Gas Piping
1.3B
Operation and Maintenance Data
233423
HVAC Power Ventilators
1.2A
Product Data
233423
HVAC Power Ventilators
1.2B
Shop Drawings
233423
HVAC Power Ventilators
1.2C
Field Quality-Control Test Reports
233423
HVAC Power Ventilators
1.2D
Operation and Maintenance Data
233713
Diffusers, Registers, and Grilles
1.2A
Product Data
235400
Furnaces
1.2A
Product Data
235400
Furnaces
1.2B
Operation and Maintenance Data
235400
Furnaces
1.2C
Warranty
235523
Propane-Fired Radiant Heaters
1.2A
Product Data
235523
Propane-Fired Radiant Heaters
1.2B
Shop Drawings
235523
Propane-Fired Radiant Heaters
1.2C
Field Quality-Control Test Reports
235523
Propane-Fired Radiant Heaters
1.2D
Operation and Maintenance Data
260500
Common Work Results for Electrical
1.2A
Product Data
260533
Raceway and Boxes for Electrical Systems
1.3A
Product Data
260533
Raceways and Boxes for Electrical Systems
1.3
Handholes and Boxes for Underground Wiring
260533
Raceway and Boxes for Electrical Systems
1.3A
Product Data
260533
Raceway and Boxes for Electrical System
1.3A
Product Data
271100
Communications Equipment Room Fittings
1.3A
Shop Drawings
271100
Communications Equipment Room Fittings
1.3B
Qualification Data
271500
Communications Horizontal Cabling
1.5A
Product Data
271500
Communications Horizontal Cabling
1.5B
Shop Drawings
271500
Communications Horizontal Cabling
1.5C
Qualification Data
312000
Earthwork
1.3A
Bedding and Backfill Certification
312000
Earthwork
1.3A
Sieve Analysis
312000
Earthwork
1.3B
Product Data
312225
Excavation and Embankment
1.3A
Density Test Results
312225
Excavation and Embankment
1.3C
Blasting Plan
312225
Excavation and Embankment
1.3D
Permits and Licenses
312230
Rock Blasting
1.2
See Specification
321200
Hot Mix Asphalt Paving
1.2A
Product Data
321200
Hot Mix Asphalt Paving
1.2B
Job Mix Design
321200
Hot Mix Asphalt Paving
1.2C
Material Certificate
321203
Crack Seal
1.2A
Product Data
321204
Crushed Aggregate Base or Surface Course
1.2A
Aggregate Base – Source, Gradation, Material Properties
321204
Crushed Aggregate Base or Surface Course
1.2B
Compaction Test Results and Proctor
322100
Tent Pad Surface Material
2.3
Aggregate Gradation and Certificate of Compliance
322622
Precast Concrete Curb
2.1B
Certificate of Conformance – Concrete Curb
322640
Pavement Markings
1.3A
Product Data
323113
Chain-Link Fences and Gates
1.4A
Product Data
323113
Chain-Link Fences and Gates
1.4B
Shop Drawings
323113
Chain-Link Fences and Gates
1.4C
Product Certificate
323120
Stock Gate
1.3A
Product Data
323160
Barbed Wire Fence and Gates
1.3A
Certificate of Inspection of Treatment
329212
Landscape Rock
1.2A
Material Samples
332100
Water Supply Wells
1.4A
Product Data
332100
Water Supply Wells
1.4B
Project Record Documents
332100
Water Supply Wells
1.4C
Field Quality-Control Reports
332100
Water Supply Wells
1.4D
Operation and Maintenance Data
332100
Water Supply Wells
1.4E
Installation Instructions
332100
Water Supply Wells
1.4F
Water Disposal Plan
332228
Culvert Pipe and Pipe Arches
1.3A
Shop Drawings
332228
Culvert Pipe and Pipe Arches
1.3B
Fabricator’s Certification
332228
Culvert Pipe and Pipe Arches
1.4A
Culvert Locations and Lengths

REVISION HISTORY:

PRIMARY AUTHOR: Unknown.

2/16/2023: K. Carnes – Minor table formatting to resolve spec finalizing errors.

3//6/2024: K. Carnes – Formatting fix to Revision History to ensure removal when preparing spec. Added additional minor concrete, fence, and gate line items to table.

3/6/2025: D. Wewer – Added to table

END OF SECTION 013300

SUBMITTAL PROCEDURES 013300-11

MCCALL & COUNCIL TREE COOLERS DEFERRED MAINTENANCE

SECTION 014100 - QUALITY CONTROL

1. GENERAL

This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

QUALITY CONTROL

The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

Testing agency will re-test and re-inspect corrected work.

Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

SUBMITTALS

Contractor Quality Control Plan Permits, Licenses, and Certificates Test and Inspection Reports As-Built Drawings

MEASUREMENT AND PAYMENT

No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PRODUCTS (Not Applicable)

EXECUTION

QUALITY CONTROL SYSTEM

General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

CONTRACTOR QUALITY CONTROL PLAN

At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

The Government reserves the right to require changes in the plan during the contract period as necessary.

No change in the approved plan may be made without written concurrence by the Contracting Officer.

At a minimum, the plan shall include the following:

A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

Methods of performing, documenting, and enforcing quality control of all work.

Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

TEST AND INSPECTION REPORTS

Submit three copies of complete test results no later than three calendar days after the test was performed.

Submit failing test results and proposed remedial actions within four hours of noted deficiency.

Testing and Inspection Reports shall include the following:

SPEC WRITER: REVISE LIST BELOW TO SUIT PROJECT.

Date of issue.

Project title and number.

Name, address, and telephone number of testing agency.

Dates and locations of samples, tests, or inspections.

Names of individuals performing tests and inspections.

Reference Specification Section(s).

Complete test or inspection data.

Test and inspection results and an interpretation of test results.

Ambient conditions at time sample was taken, tested, or inspected.

Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

Name and signature of laboratory inspector.

Recommendations on retesting and reinspecting.

PERMITS, LICENSES, AND CERTIFICATES

For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

AS-BUILT DRAWINGS

The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

EDIT table below for each project. COORDINATE table references with edited specification sections.

Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:

TABLE 014100-1

Item

Subsection Certification or Test Required

Frequency

031350
1.6 B
Proof of three years experience installing formwork.
Prior to commencement of work
031350
1.6 C
Show manufacturer has been continuously manufacturing product for a minimum of three years.
Prior to commencement of work
031350
3.8E
3 concrete cylinders made and 1 slump test.
Per truck load, and after modification of concrete, if applies.
033000
2.12
Mixing and Delivery
Each Truck
033000
3.13
Concrete – Slump, Air, Temperature
1 composite per truck load delivered
033000
3.13
Concrete - Compression Test Specimens
at 7 days and 28 days (see spec)
033015
3.5C
Mixing and Delivery
Each Truck
033015
3.12A
Concrete – Slump, Air, Temperature
1 composite per truck load delivered
033015
3.12B
Concrete - Compression Test Specimens
at 7 days and 28 days (see spec)
051200
1.4A
Fabricator Qualifications
Prior to commencement of work
051200
1.4B
Welding Qualifications
Prior to commencement of work
052100
1.5A
Manufacturer’s Qualifications
Prior to commencement of work
052100
1.5B
Steel Joist Institute (SJI) Qualifications
Prior to commencement of work
052100
1.5C
Welding Qualifications
Prior to commencement of work
053100
3.4
Steel Decking
See Spec.
055000
1.4
Welding Qualifications
Prior to commencement of work
071400
1.4A
Installer Qualifications
Prior to commencement of work
074113
1.4A
Installer Qualifications
Prior to commencement of work
078400
3.04
Field Quality Control
See Spec.
096516
1.3
Installer Qualifications
Prior to commencement of work
221100
3.2N
HDPE Pipe - Bent Strap Test
Once Daily
221100
3.6A
Hydrostatic Testing of Water System
See Spec.
221100
3.6B
Pressure and Leakage Test – Water Line
See Spec.
221100
3.7A
Bacteriological Examination
After disinfection, before use
221116
3.14
Pipe Inspections and Tests
See Spec.
221120
3.6A
Mechanical and Electrical Testing (Pump System)
See Spec.
221200
3.11A
Leak Test
Until Passing
221200
3.11B
Air Test
See Spec.
221200
3.11C
Pressure Test
Until Passing
221300
3.11A
System Test
See Spec.
221300
3.11B
Leak Test
Prior to Backfill
221300
3.12A
Residual Head Test
Until Passing
221300
3.12B
Leakage Test
Until Passing
221300
3.12C
Pump Test
Until Passing
221300
3.12D
System Test
See Spec.
221310
3.4A
Holding Tank Leakage Test
Until Passing
223300
3.3B
Inspections and Tests
See Spec.
224700
3.4A
Water Cooler Testing
See Spec.
231126
3.6
LPG Pipe Test, Inspect, & Purge
See Spec.
233300
3.2A
Air Duct - Tests and Inspection
See Spec.
235400
3.3A
Field Tests and Inspections
See Spec.
235523
3.2A
Tests and Inspections
See Spec.
260500
1.5C
Electrical Testing
See Spec.
269999
3.2
Storage Tank Water Level Controls
See Spec.
271500
3.8
Field Quality Control
See Spec.
312000
3.13C
Compaction Test – at Pipe Zone
One per 600 Feet of Trench
312000
3.13C
Compaction Test – at Pipe Zone
One test – at each road crossing
312000
3.13D
Compaction Test – above Pipe Zone
One per 600 Feet of Trench
312000
3.13D
Compaction Test – above Pipe Zone
One test every other lift – at each road crossing
312000
3.13I
Tracer Wire Conductivity Test
Until Passing
312000
3.16A
Compaction Test – Backfill/Fills
One per Tank, Utility Building or Utility Box
312000
3.18A
Compaction Test - Subsurface Drainage Material
One per Tank
312000
3.18B
Compaction Test – Drainage Backfill
One per Tank
312000
3.19D
Compaction Test – Backfill/Fills under Buildings
One test every 600 S.F. area per lift, minimum of one test per building
312000
3.19D
Compaction Test – Exterior Concrete Slabs
1 per slab
312000
3.19D
Compaction Test – Backfill/Fills and Subgrade under Buildings and Driveways
One test every 150 sq. yd. area per lift and at Subgrade
312000
3.19D
Compaction Test – Backfill/Fills Foundation Walls
One test for each 100 feet of wall length
312225
3.12B
Moisture-Density Relationship
One Test for Each Soil Type Encountered
312225
3.12B
Compaction – Road Embankment (Method 4)
One test every 300 sq. yd. of embankment per lift
312225
3.12B
Compaction – Subgrade
One test every 1000 sq. yd. of subgrade
321200
3.9B
Gradation and Asphalt Content
One per 700 tons or Min. of 1 per Project
321200
3.9C
Field Density Tests – Asphalt
One test for every 300 sq. yd. of pavement
321204
3.4A
Compaction Tests – Road Base and Surface Course
One test for every 300 sq. yd. of

aggregate

321204
3.4A
Compaction Tests – Aggregate Base for Concrete Slabs
One test for each family unit or group area
321204
3.4A
Compaction Tests – Aggregate Base for Concrete Slabs
One test for each prefabricated building pad
332100
3.4A
Plumbness and Alignment Test
See Spec.
332100
3.4C
Performance Tests (Multiple)
See Spec.
332100
3.6A
Water Analysis Test
See Spec.
332228
3.8C
Compaction Tests
One test for every 12 inches of lift placed

REVISION HISTORY:

PRIMARY AUTHOR: Unknown.

3/29/2011: D. Wewer – Updated Table for 03300 testing.

2/16/2023: K. Carnes – Minor table formatting to resolve spec finalizing errors.

4/08/2025: K. Carnes – Added lines to the table for Section 033015 testing.

END OF SECTION 014100

QUALITY CONTROL 014100-6

MCCALL & COUNCIL TREE COOLERS DEFERRED MAINTENANCE

SECTION 017320 - SELECTIVE DEMOLITION

1. GENERAL

SUMMARY

This Section includes demolition and removal of the following:

Selected portions of a building.

Repair procedures for selective demolition operations.

DEFINITIONS

Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

Remove and Salvage: Detach items from existing construction and deliver them to Government.

Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.

Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

MATERIALS OWNERSHIP

Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.

SUBMITTALS

Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, including interruption of utility services.

Waste Manifests for materials deemed hazardous by the State of Utah including refrigerant and fluorescent lights.

QUALITY ASSURANCE

Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

Standards: Comply with ANSI A10.6 and NFPA 241.

Pre-demolition Conference: Conduct conference at Project site with contractor, subcontractors and Contracting Officer’s Representative.

PROJECT CONDITIONS

Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.

Maintain access to existing building amenities, pathways, and other adjacent occupied or used facilities.

Do not close or obstruct walkways, corridors, or other occupied or used facilities without written…

This is the start of the file's text. The full file is on GovTribe.