Rev2_C04a_ SOI - TreeCooler DM (2026.03.09).xlsx

XLSX spreadsheet 15 KB Posted

Attached to
McCall & Council Yard Tree Cooler Deferred Maint
Solicitation number
1240LT26Q0139
Issued by

About this file

This is a Schedule of Items (SOI) pricing template for deferred maintenance work at two U.S. Forest Service facilities in the Payette National Forest near McCall, Idaho. The document outlines 24 line items for refurbishment and upgrades at the McCall Tree Cooler (1000 N Mission St., Bldg #5) and Council Tree Cooler (201 N Dartmouth St.), with work categories including roof replacement, siding and window replacement, interior flooring and concrete repairs, mechanical systems upgrades (toilets, water heaters, unit heaters, wall heaters), IT infrastructure installation (backboards, racks, PDUs, UPS), electrical work (conduit, fiber, 3-phase power service), and plumbing modifications. All line items are priced as lump sum (LSQ/LS) quantities, with one example provided showing 10 tons at $120 per ton totaling $1,200; the Total Base Bid currently displays $0, indicating this is a blank pricing template for contractor completion.

The associated solicitation (1240LT26Q0139) is issued by the Department of Agriculture Forest Service for a 180-day Performance Period from September 9, 2026, through March 6, 2027. Key dates include a mandatory site visit on August 18, 2026, at 500 N Mission St., McCall, ID, with Questions and Answers due by August 20, 2026, quotes due September 3, 2026, and award anticipated September 9, 2026. The project aims to restore and upgrade existing building infrastructure to ensure safe, functional, and efficient work environments for Forest Service personnel and visitors. Interested contractors should contact samuel.thompson@usda.gov or call 208-634-0715 for additional information.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

McCall & Council Yard Tree Cooler Deferred Maintenance
Schedule of Items
ITEM NUMBERDESCRIPTIONMETHOD OF MEASUNITQUANTITYPRICETOTAL
1MobilizationLSQLS1
2Remove and Salvage Existing Roofing & Install New Metal Roof PanelsLSQLS210%
3Construct New Roof Additions (Over Ramp & Stairs)LSQLS2
4Remove and Replace SidingLSQLS2
5Paint ExteriorLSQLS2
6Replace Existing WindowsLSQLS210 tons at $120 per ton…$1200.
7Remove Vinyl Flooring & Grind and Polish ConcreteLSQLS2
8Patch Concrete Floors & DockLSQLS2
9Replace Toilets and Water Heater & Repair Floor DrainLSQLS2
10Replace Unit HeaterLSQLS2
11Insulate Selected AreasLSQLS2water and sewerline, 1' x 2' cross section times total length
12Repair Concrete and Metal Railings on Stairs & RampLSQLS2
13Install New Concrete Pad in Front of Loading DockLSQLS2
14Install Removable Chain and Post across front of Loading DockLSQLS2
15Replace (3) Wall Heaters in Restrooms and Office (Council Site)LSQLS1
16Install (4) IT Backboards, Racks, panels, PDUs, UPS (Council Site)LSQLS1
17Install Conduit & Fiber with Terminations (Council Site)LSQLS1
18Install New Concrete Pad on East Side of Tree Cooler (Council Site)LSQLS1
19Underground 3-Phase Power Service to Tree Cooler (Council Site)LSQLS1
20Remove 1-Phase Power Service to Bldg East of Tree Cooler (Council Site)LSQLS1
21Install Valve/Blowout at Bldg East of Tree Cooler (Council Site)LSQLS1
22Reroute Plumbing Vent from Roof to West Gable End (Council Site)LSQLS1
23Replace Storm Drain by Tree Cooler (McCall Site)LSQLS1
24Move Air Handler Control Box (McCall Site)LSQLS1
Total Base Bid:LSQLS1$0

File details come from the government source that posted it. Updated .