This is a Statement of Work and supporting solicitation document for South Carolina Asian Longhorned Beetle (ALB) Tree Removal, Deregulation, and Restoration services under USDA APHIS PPQ contract 12639526R0006. The Government seeks a 4.5-year fixed-price Indefinite Delivery, Indefinite Quantity (IDIQ) contract consisting of a six-month base period and four one-year option periods to perform tree removal, host material deregulation, and landscape restoration services in Hollywood and Mount Pleasant, South Carolina. The contractor must remove all ALB-infested and high-risk host trees within the quarantine zone across various terrain types including housing developments, wetlands, woodlots, swamps, marshlands, and upland forests. Services include complete tree removal of any size, collateral tree removal, brush and woody debris removal, stump treatment, soil disturbance mitigation, topsoil replacement, seed sowing, and landscape restoration. The contractor must work with property owners on both public and private properties and restore removal sites to conditions comparable to or better than pre-removal conditions.
The Government anticipates placing orders totaling a minimum of $25,000 but not exceeding a cumulative maximum of $19,500,000 over the contract period. Proposals must be submitted by email to Kim Yen Tu at kimyen.tu@usda.gov by the deadline specified in the solicitation. Large business offerors exceeding $750,000 in subcontracting must submit a Small Business Subcontracting Plan meeting minimum goals of 20% small business, 5% small disadvantaged business, 5% women-owned small business, 3% HUBZone small business, and 3% service-disabled veteran-owned small business participation. Award will be made on an "all or none" basis using a best value tradeoff approach, with evaluation based on Project Management (management plan, quality assurance/quality control plan, key personnel), Technical Capability (technical approach, deregulation plan, specialized experience), Past Performance, and Price, with non-price factors significantly more important than price. Service Contract Labor Standards wage determinations apply to Charleston County, South Carolina as the place of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 12639526R0006 Amendment 2.pdf | ||
| SF30_12639526R0006 Amendment 1.pdf | ||
| Attachment 2 - Price Proposal Spreadsheet.xlsx | XLSX spreadsheet | |
| SF1449 12639526R0006.pdf | ||
| RFP Questions _Answers_7.27.26.docx | DOCX document | |
| C04_CSS_SC ALB Tree Removal Services 7.15.26.docx | DOCX document | |
| Attachment 1 - Statement of Work 7.15.docx | DOCX document | |
| Appendix A ALB Host Tree Estimate Analysis.pdf | ||
| Attachment 5 - Applicable Wage Determinations.pdf | ||
| Attachment 3 - Technical Proposal Submission Requirements 7.11.2026.docx | DOCX document | |
| Attachment 2 - Price Proposal Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 4 - Small Business Subcontracting Plan.docx | DOCX document | |
| Attachment 6 - Specialized Experience Questionnaire.docx | DOCX document | |
| Appendix B Quarantine Map.pdf | ||
| Appendix C SC Best Management Practices for Forestry.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
South Carolina Asian Longhorned Beetle (ALB) Tree Removal, Deregulation, and Restoration 12639526R0006 A. Statement of Requirement USDA APHIS PPQ is looking to procure services that include tree ALB tree removal, deregulation of host material, and associated landscape restoration services in Hollywood, South Carolina. The goal of the South Carolina ALB Program is to eradicate ALB from all known infested areas and to prevent the spread of the insect to uninfested areas through the survey and removal of infested and high-risk host trees.
B. Technical Data Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments” section of the posting.
· Attachment 1 – Statement of Work
· Appendix A – SC ALB Quarantine Zone Host Tree Analysis
· Appendix B - SC ALB Regulated Area
· Appendix C - Best Management Practices for Forestry
· Attachment 2 – Price Proposal Spreadsheet (For offerors to fill and submit with proposal)
· Attachment 3 – Technical Proposal Submission Requirements
· Attachment 4 – Small Business Subcontracting Plan
· Attachment 5 – Applicable Wage Determinations
· Attachment 6 – Specialized Experience Questionnaire
C. Notes to Offerors
1. Offers must be submitted by email to Kim Yen Tu at kimyen.tu@usda.gov by the time specified on the solicitation. It is the offeror’s responsibility to ensure offers are received on time.
2. PROPOSAL SUBMISSION REQUIREMENTS: It is the Offeror’s responsibility to ensure completeness of the proposal. Proposals submitted in response to this solicitation MUST include the following:
☐ Cover letter with the following information:
· Solicitation Number
· Organization/Business name and address
· Names, titles, phone, and email addresses of persons authorized to negotiate on the offerors’ s behalf with the government
· Name, titles, phone, and email addresses of persons authorized to sign proposal
☐ Signed SF1449 and acknowledgement of Amendments if applicable
☐ Complete Price Proposal. Please use Attachment 2, Pricing Proposal Spreadsheet to fill out pricing. No changes to the Price schedule or CLINS will be accepted. Offers must include a price for all items in this solicitation to be eligible for award. The Government will award on an “All or None” basis.
☐ Technical Proposal.
Provide responses to all technical evaluation factors as specified in Attachment 3, Technical Proposal Submission Requirements.
☐ Offeror’s Representations and Certifications. Offers must be registered in SAM.gov, including Representations and Certifications.
☐ Proposed Subcontracting Plan. THIS ONLY APPLIES TO LARGE BUSINESSES ONLY.
Large Business Offerors are required to submit a subcontracting plan by using Attachment 4, Small Business Subcontracting Plan.
The U.S. Department of Agriculture (USDA), Animal Plant and Health Inspection Service (APHIS), is committed to the participation of Small Businesses, Small Disadvantaged Businesses, Women‐Owned Small Businesses, HUBZone Small Businesses, and Service Disabled Veteran Owned Small Businesses in the performance of work under this solicitation and resulting contract. Your attention is directed to solicitation clauses 52.219‐8 entitled "Utilization of Small Business Concerns," 52.219‐9 entitled "Small Business Subcontracting Plan".
Submission of a Subcontracting Plan (use attachment 4) in accordance with the above clauses and FAR 19.704 is required for proposals exceeding $750,000.00. Award will not be made until the Contracting Officer approves the Subcontracting Plan. The offerors subcontracting plan shall meet or exceed the goals expressed below, in terms of percentages of total planned subcontracting dollars. The accepted plan shall be included in and made part of the resultant contract. The minimum required goals expressed in percent of total planned subcontracting dollars are:
a. Small Business 20.0%
b. Small Disadvantaged Business 5.0%
c. Women‐Owned Small Business 5.0%
d. HUBZone Small Business 3.0%
e. Service‐Disabled Veteran‐Owned Small Business 3.0%
f. Reporting (ISR/ESR through www.esrs.gov) 100%
It is the contractor’s responsibility to propose goals that are achievable. Adjustments to the above goals may be proposed and may be considered for negotiation by the Contracting Officer. The subcontracting plan will be evaluated in accordance with FAR 19.704 Subcontracting Plan Requirements, which can be accessed at the following website: https://www.acquisition.gov/browse/index/far
Contractors should be aware that failure to meet subcontracting goals in the performance of the contract may negatively impact performance evaluations, see also Clause 52.219‐16 LIQUIDATED DAMAGES‐SUBCONTRACTING PLAN (SEPT 2021).
The Offeror shall provide information in regard to the extent to which the Offeror has attained applicable goals for small business participation, particularly the extent of participation of small disadvantaged business concerns, under previous contracts that required subcontracting plans. Provide rationale supporting successful overall subcontracting performance and evidence demonstrating corporate support to achieve subcontracting goals.
3. Any questions pertaining to this Request for Proposal shall be directed to Kim Yen Tu by email only to kimyen.tu@usda.gov no later than July 24st, 2026. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. The government will not respond directly to individual questions and Responses will not be provided to telephonic inquiries.
D. Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions. Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
| 52.212-4 | Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) | |
| ☐ Alternate I (Nov 2025) of 52.212-4 | ||
| 52.203-17 | Contractor Employee Whistleblower Rights (Nov 2023) | |
| 52.203-19 | Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) | |
| 52.222-50 | Combating Trafficking in Persons (Nov 2025) |
☐ Alternate I (Nov 2025) of 52.222-50
| 52.226-8 | Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) |
| 52.232-39 | Unenforceability of Unauthorized Obligations (Jun 2013) |
| 52.232-40 | Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) |
| 52.233-3 | Protest After Award (Sep 2025) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (Sep 2025) |
| 52.240-91 | Security Prohibitions and Exclusions (Nov 2025) |
☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:.
| ☒ 52.203-6 | Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I | (Nov 2021) of 52.203-6 | |
| ☒ 52.203-13 | Contractor Code of Business Ethics and Conduct (Nov 2021) | ||
| ☐ 52.204-9 | Personal Identity Verification of Contractor Personnel Jan 2011 | ||
| ☒ 52.204-13 | System for Award Management—Maintenance (Nov 2025) | ||
| ☐ 52.204-91 | Contractor identification (Nov 2025) | ||
| ☒ 52.209-6 | Protecting the Government’s Interest When Subcontracting with | ||
| Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) | |||
| ☒ 52.209-9 | Updates of Publicly Available Information Regarding Responsibility | ||
| Matters (Sep 2025) | |||
| ☒ 52.209-10 | Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) | ||
| ☒ 52.219-4 | Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov | 2025) | |
| ☐ 52.219-6 | Notice of Total Small Business Aside (Nov 2025) |
☐ Alternate I (Mar 2020).
| ☒ 52.219-8 | Utilization of Small Business Concerns (Nov 2025) |
| ☒ 52.219-9 | Small Business Subcontracting Plan (Nov 2025) |
☐ Alternate III (Nov 2025) of 52.219-9.
☐ Alternate IV (Nov 2025) of 52.219-9
| ☒ 52.219-14 | Limitations on Subcontracting (Nov 2025) |
| ☒ 52.219-16 | Liquidated Damages—Subcontracting Plan (Nov 2025) |
| ☐ 52.219-33 | Nonmanufacturer Rule (Nov 2025) |
| ☒ 52.222-3 | Convict Labor (June 2003) |
| ☒ 52.222-19 | Child Labor—Cooperation with Authorities and Remedies (Nov 2025) |
| ☒ 52.222-35 | Equal Opportunity for Veterans (Nov 2025) |
☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) ☐ Alternate I (Jul 2014) of 52.222-36
| ☒ 52.222-37 | Employment Reports on Veterans (Nov 2025) |
| ☒ 52.222-40 | Notification of Employee Rights Under the National Labor Relations Act (Dec 2010 |
| ☒ 52.222-41 | Service Contract Labor Standards (Aug 2018) |
| ☒ 52.222-42 | Statement of Equivalent Rates for Federal Hires (May 2014) |
This Statement is for Information Only:
It is not a Wage Determination
| Employee Class |
| Monetary Wage -- Fringe Benefits |
Forestry and logging Occupations
| Brush/Precommercial thinner |
| GS-4 |
| Choker setter |
| WG-3 |
| Faller/Bucker |
| WG-5 |
| Forestry Equipment Operator |
| WG-6 |
| Forestry/Logging Heavy Equipment Operator |
| WG-8 |
| Forestry Technician |
| WG-8 |
| Truck Driver |
| WG-8 |
| Tree climber |
| GS-5 |
| ☒ 52.222-43 | Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) | |
| ☐ 52.222-44 | Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) | |
| ☐ 52.222-51 | Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) | |
| ☐ 52.222-53 | Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) | |
| ☒ 52.222-54 | Employment Eligibility Verification (Nov 2025) | |
| ☒ 52.222-62 | Paid Sick Leave Under Executive Order 13706 (Jan 2022) | |
| ☒ 52.222-90 | Addressing DEI Discrimination by Federal Contractors (Apr 2026) | |
| ☐ 52.223-2 | Reporting of Biobased Products Under Service and Construction Contracts (Nov | 2025) |
| ☐ 52.223-9 | Estimate of Percentage of Recovered Material Content for EPA-Designated Items | (May 2008) |
☐ Alternate I (May 2008) of 52.223-9
| ☒ 52.223-11 | Ozone-Depleting Substances and High Global Warming Potential | Hydrofluorocarbons (Nov 2025) | |
| ☐ 52.223-12 | Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air | Conditioners (Nov 2025) | |
| ☒ 52.223-23 | Sustainable Products and Services (Nov 2025) | ||
| ☒ 52.224-3 | Privacy Training (Jan 2017) |
☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025) ☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025) ☐ Alternate II (Nov 2025) of 52.225-3.
☐ Alternate III (Nov 2025) of 52.225-3.
☐ Alternate IV (Oct 2022) of 52.225-3
| ☐ 52.225-5 | Trade Agreements (Nov 2023) | ||
| ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic | or Consular Mission outside the United States (May 2020) | ||
| ☐ 52.225-26 | Contractors Performing Private Security Functions Outside the United States (Oct | 2016) | |
| ☐ 52.226-4 | Notice of Disaster or Emergency Area Set-Aside (Nov 2007) | ||
| ☐ 52.226-5 | Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) | ||
| ☐ 52.229-12 | Tax on Certain Foreign Procurements | ||
| ☐ 52.232-29 | Terms for Financing of Purchases of Commercial Products and Commercial Services | ||
| (Nov 2021) | |||
| ☐ 52.232-30 | Installment Payments for Commercial Products and Commercial Services | ||
| (Nov 2021) | |||
| ☒ 52.232-33 | Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) | ||
| ☐ 52.232-34 | Payment by Electronic Funds Transfer—Other Than System for Award Management | (Jul 2013) | |
| ☐ 52.232-36 | Payment by Third Party (Nov 2025) | ||
| ☒ 52.237-2 | Protection of Government Buildings, Equipment, and Vegetation (Apr 1984) | ||
| ☒ 52.237-3 | Continuity of Services (Jan 1991) | ||
| ☐ 52.240-92 | Security Requirements (Nov 2025) | ||
| ☒ 52.240-93 | Basic Safeguarding of Covered Contractor Information Systems (No 2025) | ||
| ☐ 52.247-64 | Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025) |
☐ Alternate I (Apr 2023) of 52.247-64.
☐ Alternate II (Nov 2021) of 52.247-64
Other Applicable Clauses
52.216-18 Ordering (Aug 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through 02/28/2031.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
52.216-19 Delivery – Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $3,000,000;
(2) Any order for a combination of items in excess of $3,000,000; or
(3) A series of orders from the same ordering office within seven (7)business days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 business days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22 Indefinite Quantity (Nov 2025)
a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order, which may include order options to be exercised after the ordering period of this contract but before the end of the period of performance of the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order, including options exercised, to the same extent as if the order were completed during the contract's ordering period; provided, that the Contractor shall not be required to make any deliveries under this contract after 90 days after contract end date..
(End of clause)
52.217-8 Option to Extend Services (Nov 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days prior to contract expiration.
(End of clause)
52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 Calendar days prior to contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five years.
(End of clause)
52.219-16 Liquidated Damages-Subcontracting Plan (Oct 2025)
(a) The Government will measure performance by applying the percentage goals to the total actual subcontracting dollars, or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (b) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan, established in accordance with the clause in this contract entitled “Small Business Subcontracting Plan,” the Contractor shall pay the Government liquidated damages in a stated amount. The amount of probable damages attributable to the Contractor's failure to comply shall equal the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
(b) Before the Contracting Officer makes a final decision that the Contractor has failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate the good faith efforts it made and to discuss the matter. The Contracting Officer may take failure to respond to the notice as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer will issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (a) of this clause.
(c) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
(d) The Contractor has the right of appeal, under the clause in this contract entitled, Disputes, from any final decision of the Contracting Officer.
(e) Liquidated damages shall be in addition to any other remedies that the Government may have.
(End of clause)
52.228-5 Insurance-Work on a Government Installation. (Jan 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective-
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
(End of clause)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation (Apr 1984) The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
(End of clause)
52.246-4 Inspection of Services-Fixed-Price. (Aug 1996)
(a) Definition."Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may-
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may-
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
(End of clause)
52.246-20 Warranty of Services. (May 2001)
(a) Definition.
Acceptance, as used in this clause, means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services, as partial or complete performance of the contract.
(b) Notwithstanding inspection and acceptance by the Government or any provision concerning the conclusiveness thereof, the Contractor warrants that all services performed under this contract will, at the time of acceptance, be free from defects in workmanship and conform to the requirements of this contract. The Contracting Officer shall give written notice of any defect or nonconformance to the Contractor within 6 months from the date of acceptance by the government. This notice shall state either-
(1) That the Contractor shall correct or reperform any defective or nonconforming services; or
(2) That the Government does not require correction or reperformance.
(c) If the Contractor is required to correct or reperform, it shall be at no cost to the Government, and any services corrected or reperformed by the Contractor shall be subject to this clause to the same extent as work initially performed. If the Contractor fails or refuses to correct or reperform, the Contracting Officer may, by contract or otherwise, correct or replace with similar services and charge to the Contractor the cost occasioned to the Government thereby, or make an equitable adjustment in the contract price.
(d) If the Government does not require correction or reperformance, the Contracting Officer shall make an equitable adjustment in the contract price.
(End of clause)
AGAR Clauses
452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (May 2026)
(a) By entering into this contract, the contractor certifies that:
(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.
(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the contractor and any subcontractor or teaming partner will not do so for the duration of the contract.
(b) If the contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
(c) The contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.
(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.
(e) Submission of a knowing false statement relating to contractor’s compliance with the above requirements and/or eligibility for the contract may subject the contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.
(f) The contractor must include the provisions of this clause in all subcontract solicitations.
(g) Failure on the part of the contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.
(End of Clause) AGAR 452.203-72 Unenforceable Supplier Terms (MAY 2026)
(a) Definitions.
Supplier terms mean provisions customarily drafted by vendors of supplies or services and intended to create a binding legal obligation on the end user. The term applies:
1. Regardless of the format or style of the document. For example, supplier terms may appear in standard terms of sale or lease, Terms of Service (TOS), End User License Agreement (EULA), or another similar legal instrument or agreement, and may be presented as part of a proposal or quotation responding to a solicitation for a contract or order or otherwise become effective after the contract date.
1. Regardless of the media or delivery mechanism used. For example, supplier terms may be presented as one or more paper documents or may appear on a computer or other electronic device screen during a purchase, software installation, other product delivery, registration for a service, or another transaction.
(b) Applicability. When any supply or service acquired under this contract is subject to supplier terms, the supplier terms are deemed part of the contract only to the extent they are consistent with this clause. Supplier terms that conflict with any part of this clause, the contract, or Federal law are void and will not be considered incorporated into a contract, even if they are physically present in a contract documentation or systems. In the event of any inconsistency between supplier terms and this contract, this clause and the terms of the Government contract must govern and supersede any supplier terms in all cases.
(c) Authorization Required. Notwithstanding any other provision, no supplier terms must be binding on the Government unless the term is expressly authorized on the USDA Supplier Terms Authorization Form signed by the Contracting Officer, and the completed Authorization Form has been incorporated into the contract.
(d) Unenforceable Terms. Any supplier terms that impose obligations or restrictions inconsistent with applicable Federal law are unenforceable against the Government and deemed stricken from the agreement. This includes, but is not limited to, any clause that:
(1) Requires the Government to pay future fees, penalties, interest, legal costs, early‑termination fees, cancellation fees, minimum purchase commitments, true‑up payments, seat‑count minimums, usage minimums, continued‑use charges, or any other financial obligation not expressly authorized by the contract.
(2) Requires the Government to indemnify the contractor or any other entity.
(3) Restricts the Government’s ability to obtain similar supplies or services from another source.
(4) Imposes any penalty, financial or otherwise, based on the Government’s decision not to exercise an option.
(5) Subjects the United States Government to the laws of any U.S. state, territory, district, municipality, or foreign nation, except where Federal law expressly permits such application.
(6) Requires dispute resolution in a forum or venue other than one prescribed by applicable Federal law.
(7) Establishes a period of limitations for bringing an action that differs from that provided by applicable Federal law.
(8) Grants the contractor rights to use, mine, access, aggregate, analyze, or otherwise exploit Government data, usage data, or metadata.
(9) Deems the Government to have accepted initial or revised terms based on silence, continued performance, or failure to object.
(10) Grants the supplier the right to audit Government facilities, systems, records, or use of the product or service, except as expressly authorized by the contract and applicable Federal law.
(11) Requires the Government to accept supplier security requirements, network access requirements, monitoring, penetration testing, or other technical or security measures.
(12) Permits the supplier to suspend, degrade, or terminate access to products or services based on alleged non‑payment, alleged breach, automated security triggers.
(13) Limits the Government’s right to use, install, access, test, evaluate, or transfer the licensed product or service in any manner consistent with the contract and Federal law.
(14) Requires the Government to store, process, maintain, or transmit data in a particular geographic location, or permits the supplier to transfer Government data outside the United States, except as expressly authorized by applicable Federal law.
(15) Authorizes the supplier to use the Government’s name, seal, trademark, logo, or any reference to the Government as an end user or customer for marketing, publicity, promotional activities, press releases, or similar purposes.
(16) Incorporates by reference, or requires the Government to accept, terms or conditions imposed by any third party, subcontractor, or upstream service provider, unless such terms are expressly incorporated into the contract by bilateral modification.
(17) Limits, conditions, or negates the contractor’s performance obligations, service levels, or remedies through a supplier‑provided service level agreement (SLA).
(18) Uses Government data, usage data, metadata, prompts, content, or interactions to train, fine‑tune, improve, or derive any artificial intelligence, machine learning, or automated decision‑making model.
(19) Subjects the Government to automated decision‑making, automated risk scoring, automated content moderation, or any algorithmic process that may affect access, performance, or rights under the contract.
(20) Utilizes artificial intelligence or algorithmic tools that produce decisions, recommendations, or outputs affecting contract performance without providing transparency, explainability, auditability, and bias‑mitigation consistent with applicable Federal law and policy.
(21) Profiles, tracks, or analyzes Government user behavior, preferences, communications, or interactions for personalization, marketing, or algorithmic optimization purposes.
(e) Non-binding Actions. Neither the Government nor any Government authorized end user is deemed to have consented to any term, condition, or clause by virtue of its inclusion in the supplier agreement or through the use of clickwrap, browsewrap, “I agree” mechanisms, or similar means. Execution of such mechanisms does not bind the Government or its authorized end users to any unenforceable terms.
(f) End user. The supplier agreement must bind the ordering activity as the end user to the extent it does not conflict with the terms of this clause, but it must not bind or impose personal liability on any Government employee or any person acting on behalf of the Government in their personal capacity.
(g) Law and disputes. The supplier agreement is governed by Federal law.
(h) Statutory exception. This clause does not apply to indemnification or any other payment by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(i) Continued performance. The supplier or licensor must not unilaterally revoke, terminate, or suspend any rights granted to the Government except as allowed by the contract. If the supplier or licensor believes the ordering activity to be in breach of the supplier agreement, it must pursue its rights under the Contract Disputes Act or other applicable Federal statute while proceeding diligently with performance, pending final resolution of any dispute in accordance with the Disputes Clause at FAR 52.212‑4(d) or FAR 52.233‑1, as applicable.
(j) Arbitration. Binding arbitration must not be used unless specifically authorized by agency guidance.
(k) Equitable or injunctive relief. Equitable or injunctive relief, including the award of attorney fees, costs, or interest, may be awarded against the United States Government only when explicitly provided by statute (e.g., the Prompt Payment Act or the Equal Access to Justice Act).
(l) Revisions to supplier agreements. Any revisions to the supplier agreement must be incorporated into the contract using a bilateral modification. Unilateral revisions are not binding on the Government.
(m) No automatic renewals. If any license or service tied to periodic payment is provided under the supplier agreement (e.g., annual software maintenance or annual lease term), such license or service must not renew automatically upon expiration of its current term without prior express written consent from an authorized Government representative.
(n) Indemnification. Any clause of the supplier agreement requiring the supplier or licensor to defend or indemnify the end user is amended to provide that the U.S. Department of Justice has the sole right to represent the United States in any such action, in accordance with 28 U.S.C. 516.
(o) Taxes or surcharges. Any taxes or surcharges which the supplier or licensor seeks to pass along to the Government as end user will be governed by the terms of the associated Government contract or order and must be submitted to the Contracting Officer for a determination of applicability prior to invoicing unless specifically agreed otherwise.
(p) Non‑assignment. The supplier agreement may not be assigned, nor may any rights or obligations thereunder be delegated, without the Government’s prior approval, except as expressly permitted by FAR 52.212-4(b) or FAR 52.232-23, as applicable.
(q) Confidential information. If the supplier agreement includes a confidentiality clause, such clause is amended to state that neither the agreement nor the contract price list, as applicable, must be deemed “confidential information.” Issues regarding release of “unit pricing” will be resolved consistent with the Freedom of Information Act. Notwithstanding anything in the supplier agreement to the contrary, the Government may retain any confidential information as required by law, regulation, or its internal document retention procedures for legal, regulatory, or compliance purposes; provided, however, that all such retained confidential information will continue to be subject to the confidentiality obligations of the supplier agreement.
(r) Conflict with Federal law. If any other language, provision, or clause of the supplier agreement conflicts or is inconsistent with Federal law or the terms and conditions of this contract, such language, provisions, or clauses will be considered null and void and will not be binding on the United States Government.
(End of Clause) 452.204–70 Modification for Contract Closeout (Apr 2026)
(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) may issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but is not required to provide a signature. The Contracting Officer will immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) For commercial contracts not exceeding the simplified acquisition procedure threshold under FAR 12.001(c), if more than $1,000 in unliquidated funds remain at closeout, the Contracting Officer will issue a bilateral deobligation modification. Only the modification requires the contractor’s signature, though a Release of Claims may be requested. If the required documents are not returned within 60 days, the Contracting Officer will issue a unilateral modification and proceed with closeout once performance is complete, acceptance is confirmed, and final payment is made.
(c) For all other non-commercial or non–cost‑reimbursement contracts, if more than $1,000 in unliquidated funds remain at closeout, the Contracting Officer will issue a bilateral deobligation modification and a Release of Claims, both requiring contractor signature. If these documents are not returned within 120 days, the Contracting Officer will issue a unilateral modification u and proceed with closeout upon completion of performance, acceptance, and final payment.
(End of Clause)
Solicitation Information
Award Type It is anticipated that a 4.5-year fixed price Indefinite Delivery, Indefinite Quantity (IDIQ) contract will be awarded as a result of this synopsis/solicitation. The IDIQ will consist of one base period for six months and four (4) one-year option periods. The total duration of this contract shall not exceed 4.5 years.
The line-item quantities listed in the Pricing Schedule are estimates for evaluation purposes only and are not intended to convey either a minimum or maximum quantity that will be ordered by the Government. The period of performance for this contract is 4.5 years from date of award. See clauses FAR 52.216‐18, Ordering and FAR 52.216‐22, Indefinite Quantity. During the period specified in FAR clause 52.216‐18, Ordering, the Government shall place orders totaling a minimum of $25,000 (per contract) but not in excess of a cumulative maximum of $19,500,000 (per contract). Contract delivery order minimums and maximums are addressed in 52.216‐19, “Order Limitations”.
The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.
Evaluation and Basis for Award The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is incorporated into this solicitation. Proposals will be evaluated using a best value trade‐off approach. The Government reserves the right to award to other than the lowest priced offer. The Government intends to evaluate proposals and make award without discussion; however the Government reserves the right to conduct discussions if determined necessary.
If discussions are determined to be necessary, discussions will occur with all offerors unless a competitive range has been established. Failure to submit mandatory information for a subfactor, indicated by the word shall, may result in the lowest rating or “unacceptable” for that subfactor or factor, and the offeror may be ineligible for award.
FAR 52.212-2 Evaluation - Commercial Products and Commercial Services (Nov 2025)
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
1. Project Management
a. Management Plan
b. Quality Assurance/Quality Control Plan
c. Key Personnel
2. Technical Capability
a. Technical Approach
b. Deregulation Plan
c. Specialized Experience
3. Past Performance
4. Price
Project Management and Technical Capability are of equal importance and are more important than Past Performance. The significant subfactors are all equally important within each factor. All non-price evaluation factors, when combined, are significantly more important than Price.
It is intended that proposals be evaluated, and award made, without discussions with the offerors (other than communications conducted for the purpose of minor clarification(s). If discussions are determined to be necessary, discussions will occur with all offerors unless a competitive range has been established. Failure to submit mandatory information for a factor may result in a rating of “unacceptable” for that factor, and the offeror will be ineligible for award unless the Contracting Officer decides to hold discussions and includes the offeror in the competitive range.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Service Contract Labor Standards
The Service Contract Labor Standards could apply to any contracts awarded through this solicitation. In accordance with (IAW) FAR 22.1002-3(a)(2), the place of performance for this contract is known. The Contracting Officer has determined Charleston County, South Carolina as the place of performance and has included Wage Determinations for the locality as an attachment to this solicitation. The Contracting Officer will obtain wage determinations for additional possible places of performance if asked to do so in writing at kimyen.tu@usda.gov.
Offerors must request additional wage determinations no later than two days before solicitation close. Offerors who intend to perform in a place or area of performance for which a wage determination has not been attached or requested may nevertheless submit proposals. However, a wage determination shall be incorporated in the resultant contract, and there shall be no adjustment to the contract price.
52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025)
FAR 52.212-1 is amended as follows:
Period for acceptance of offers.
The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
| 52.203-18 | Prohibition on Contracting with Entities that Require Certain Internal Confidentiality | Agreements or Statements-Representation (Jan 2017) | |
| 52.209-2 | Prohibition on Contracting with Inverted Domestic Corporations - Representation | (Sep 2025) | |
| 52.209-11 | Representation by Corporations Regarding Delinquent Tax Liability or a Felony | Conviction under any Federal Law (Sep 2025) | |
| 52.240-90 | Security Prohibitions and Exclusions Representations and Certifications (Nov 2025) |
The following provisions are applicable if checked:
| ☒ 52.203-11 | Certification and Disclosure Regarding Payments to Influence Certain Federal | Transactions (Sep 2024) |
| ☒ 52.204-7 | System for Award Management—Registration (Nov 2025) |
☐ Alternate I (Nov 2025) to 52.204-7
| ☐ 52.207-6 | Solicitation of Offers from Small Business Concerns and Small Business Teaming | Arrangements or Joint Ventures (Multiple-Award Contracts) (Aug 2024) | ||
| ☐ 52.209-12 | Certification Regarding Tax Matters (Oct 2025) | |||
| ☐ 52.219-2 | Equal Low Bids (Nov 2025) | |||
| ☐ 52.222-18 | Certification Regarding Knowledge of Child Labor for Listed End Products (Feb | 2021) | ||
| ☐ 52.222-48 | Exemption from Application of the Service Contract Labor Standards for | Maintenance, Calibration, or Repair of Certain Equipment–Certification (Nov 2025) | ||
| ☐ 52.222-52 | Exemption from Application of the Service Contract Labor Standards for Certain | Services-Certification (Nov 2025) | ||
| ☐ 52.222-56 | Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020) | |||
| ☐ 52.223-4 | Recovered Material Certification (May 2008) | |||
| ☐ 52.225-2 | Buy American Certificate (Oct 2022) | |||
| ☐ 52.225-4 | Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025) | |||
| ☐ 52.225-6 | Trade Agreements-Certificate (Feb 2021) | |||
| ☐ 52.226-3 | Disaster or Emergency Area Representation (Nov 2007) | |||
| ☐ 52.229-11 | Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025) |
Other Applicable FAR Provisions
52.216-27 Single or Multiple Awards (1995) The Government may elect to award a single delivery order…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .