C04_Attachment 8- Past Performance Questionnaire.pdf

PDF 165 KB Posted

Attached to
Multiple Trail Bridges Replacement Project Phase 2
Solicitation number
12445226Q0033
Issued by

About this file

This is a Past Performance Questionnaire (PPQ) template used by the U.S. Department of Agriculture (USDA) to collect and evaluate contractor past performance information during the federal procurement process.

The questionnaire is divided into three sections. Section I requests contractor information including company name, address, phone/fax number, and point of contact, with authorization from an authorized contractor representative required. Section II requests respondent information from the client or reference providing the evaluation, including the reference's name, address, contact details, reference contract number, project title, contract value/type, period of performance, duration of the working relationship, and a detailed description of work performed. Section III contains the performance evaluation criteria organized into three categories: Contract Performance (8 items covering workforce qualifications, regulatory compliance, equipment maintenance, personnel management, safety/environmental compliance, subcontractor coordination, and overall performance); Quality of Service/Control (4 items addressing quality standards, quality control plans, deficiency correction, and workmanship); and Timeliness of Performance (3 items evaluating schedule compliance, record submission timeliness, and delay resolution). Each evaluation item uses a binary rating system of "A" (Acceptable) or "U" (Unacceptable), with "Acceptable" indicating the government has reasonable expectation of successful performance or the performance record is unknown, and "Unacceptable" indicating no reasonable expectation of successful performance. The form includes space for remarks explaining any unacceptable ratings and allows for additional documentation as needed. Completed questionnaires are to be returned to Marian Feist at marian.feist@usda.gov.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE (PPQ)

SECTION I: CONTRACTOR INFORMATION

A. Your Company Name and Address:

B. Phone /Fax #: _____________________________________________________________________

C. Point of Contact/email address: ________________________________________________________

D. Authorization is hereby granted to provide the information requested in SECTION II and III of this questionnaire.

Signature of Authorized Contractor Representative Date

Printed Name and Title of Authorized Contractor Representative

SECTION II: RESPONDENT INFORMATION: Request a reference from respondent by completing Section II and III and return to Marian Feist at marian.feist@usda.gov.

A. Client/Reference Name and Address: ___________________________________________________

B. Phone/Fax #: ______________________________________________________________________

C. Point of Contact/email address: ________________________________________________________

D. Reference Contract Number: __________________________________________________________ Project Title _______________________________________________________________________ Contract Value/Type: ________________________________________________________________ Period of Performance: _______________________________________________________________ How long have you worked with the contractor: ___________________________________________ More detailed description of the work performed____________________________________________

E. Date completed: ___________________________________________________________________

Past Performance Evaluation Ratings Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

mailto:paula.reinhard@usda.gov

SECTION III: PERFORMANCE EVALUATION

A. CONTRACT PERFORMANCE

1. Working relationship with your Company?

2. How well did the contractor provide experienced workers, managers and supervisors with the technical and administrative abilities needed?

A U

3. Did the contractor exhibit knowledge of and compliance with government (or other) regulations and industry standards?

A U

4. How well did the contractor provide and properly maintain operational equipment throughout the term of the contract?

A U

5. Did the contractor demonstrate the ability to hire, maintain, and replace, if necessary qualified personnel during the contract?

A U

6. How well did the contractor comply with Environmental, health, labor laws, safety and security requirements?

A U

7. How well did the contractor coordinate and control subcontractors, if any? A U

8. Contractor’s Overall Performance A U

B. QUALITY OF SERVICE/CONTROL

1. Contractor’s accomplishment in meeting the quality standards A U

2. The contractor provided an effective quality control plan or inspection procedures to meet contract requirements? If no, please explain.

A U

3. Contractor identified and corrected deficient Work A U

4. Contractor’s Overall Quality of Workmanship A U

C. TIMELINESS OF PERFORMANCE

1. How well did the contractor comply with the contract schedule? A U

2. Did the contractor provide timely and accurate records, submittals, and/or reports? A U

3. How well did the contractor resolve any delays? A U

REMARKS: For ratings of unacceptable, please provide remarks to describe the reasons for the rating. If additional remarks are necessary, please attach an additional sheet.

ATTACHMENT 4 – Past Performance Questionnaire (PPQ)

File details come from the government source that posted it. Updated .