C05_Attachment 1- Revised Schedule of Items_Phase 2.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Multiple Trail Bridges Replacement Project Phase 2
Solicitation number
12445226Q0033
Issued by

About this file

This is a Schedule of Items pricing document for the 2020 Tropical Storm Zeta's Multiple Trail Bridges Replacement Project (Phase 2) under USDA Forest Service solicitation 12445226Q0033. The schedule outlines detailed line items and estimated quantities for seven trail bridge replacements and one embankment repair project located in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest. The projects include replacement of bridges at Dicks Creek Trail (M.P. 9.25), Lake Russell Trail (M.P. 0.10), Pole Creek Trail (M.P. 0.75), Becky Branch Trail (M.P. 18.84), Lick Log Trail (M.P. 6.79), and Sourwood Trail (M.P. 1.8), along with repair of the Becky Branch Trail Embankment Fill Slope Failure.

The document provides detailed pay items and quantities for each location, including construction survey and staking, site restoration (silt fence, seeding, mulching), earthwork and excavation, riprap installation, gabion baskets, structural components (glulam timber stringers, concrete, reinforcing steel), and specialized trail features such as guardrails and underdrains. All unit prices and total prices appear as placeholder values ($0) awaiting offeror pricing. Common work items across multiple locations include trail embankment construction, geosynthetics installation, trail bridge foundation excavation, keyed riprap placement, and revegetation activities. The mobilization pay item is listed separately as a lump sum entry covering all mobilization, bonding, insurance, and equipment costs.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

SCHEDULE OF ITEMS
2020 TROPICAL STORM ZETA'S MULTIPLE TRAIL BRIDGES REPLACEMENT PROJECT (PHASE 2)
PAY ITEM 15101 -- MOBILIZATION

(1) Dicks Creek Trail Bridge M.P. 9.25

(2) Lake Russell Trail Bridge M.P. 0.10

(3) Pole Creek Trail Bridge M.P. 0.75

(4) Becky Branch Trail Embankment Fill Slope Failure Repair

(5) Becky Branch Trail Bridge M.P. 18.84

(6) Lick Log Trail Bridge M.P. 6.79

(7) Sourwood Trail Bridge M.P. 1.8

PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15101Mobilization (Includes all mobilization, bonding, insurance, fire tools, equipment cleaning etc)Lump Sum1$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
DICKS CREEK TRAIL BRIDGE M.P. 9.25 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.CConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.ASilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.BTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard59$ - 0$ - 0
20701.CEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard100$ - 0$ - 0
20801.CStructure excavation, type Trail Bridge FoundationCubic Yard58$ - 0$ - 0
25105.AKeyed riprap, class 4Ton63$ - 0$ - 0
25302.CGabions baskets, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard11$ - 0$ - 0
30103.BAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard11$ - 0$ - 0
30104.CAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton10$ - 0$ - 0
55702.BStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot55$ - 0$ - 0
62503.BSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard578$ - 0$ - 0
62506.BMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard578$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
LAKE RUSSELL'S TRAIL BRIDGE M.P. 0.10 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.FConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.DSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.ETrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard48$ - 0$ - 0
20701.FEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard110$ - 0$ - 0
20801.FStructure excavation, type Trail Bridge FoundationCubic Yard15$ - 0$ - 0
25105.DKeyed riprap, class 4Ton92$ - 0$ - 0
30104.FAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton8$ - 0$ - 0
55201.CStructural concrete, Class A(AE)Cubic Yard8$ - 0$ - 0
55401.CReinforcing steel, #4 #5Pound1730$ - 0$ - 0
55702.EStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot58$ - 0$ - 0
62503.ESeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard68$ - 0$ - 0
62506.EMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard68$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
POLE CREEK TRAIL BRIDGE M.P. 0.75 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.EConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.CSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20302.ARemoval of 20' Span x 24" Wide Wooden Log Bridge, disposal method, Legally Off National Forest LandsEach1$ - 0$ - 0
20431.DTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard22$ - 0$ - 0
20701.EEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard70$ - 0$ - 0
20801.EStructure excavation, type Trail Bridge FoundationCubic Yard26$ - 0$ - 0
25105.CKeyed riprap, class 4Ton48$ - 0$ - 0
25302.DGabions basket, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard8$ - 0$ - 0
30103.CAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard8$ - 0$ - 0
30104.EAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton9$ - 0$ - 0
55702.DStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot30$ - 0$ - 0
62503.DSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard804$ - 0$ - 0
62506.DMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard804$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
BECKY BRANCH EMBANKMENT FAILURE
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.AConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
20305.A.1Removal of Structure Excavation, Disposal Method Legally off Govt. LandsCubic Yard90$ - 0$ - 0
20701.AEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard400$ - 0$ - 0
20801.AStructure excavation, type Gabion Basket FoundationCubic Yard90$ - 0$ - 0
25105.A.1Keyed riprap, class 2Ton52$ - 0$ - 0
25302.AGabions basket, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard32$ - 0$ - 0
25302.BGabions basket, wire type 12' x 3' x 1.5' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard4$ - 0$ - 0
30103.AAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard47$ - 0$ - 0
30104.AAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton75$ - 0$ - 0
55601.ATrail Guardrail, Type Trail Guardrail with galvanized Steel Tubing Railing, Galvanized Flange connectors, and Reinforced Concrete Column Post and fasteners.Foot32$ - 0$ - 0
60501.AStandard Underdrain SystemFoot100$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
BECKY BRANCH TRAIL BRIDGE M.P. 18.84 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.BConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
20305.B.1Removal of Structure Excavation, Disposal Method Legally off Govt. LandsCubic Yard7$ - 0$ - 0
20431.ATrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard20$ - 0$ - 0
20701.BEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard80$ - 0$ - 0
20801.BStructure excavation, type Trail Bridge FoundationCubic Yard7$ - 0$ - 0
25108.AGrouted riprap, class 3Ton72$ - 0$ - 0
30104.BAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton10$ - 0$ - 0
55201.AStructural concrete, Class A(AE)Cubic Yard6$ - 0$ - 0
55401.AReinforcing steel, #4 & #5Pound820$ - 0$ - 0
55702.AStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot40$ - 0$ - 0
62503.ASeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard112$ - 0$ - 0
62506.AMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard112$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
LICK LOG TRAIL BRIDGE M.P. 6.79 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.DConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.BSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.CTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard51$ - 0$ - 0
20701.DEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard70$ - 0$ - 0
20801.DStructure excavation, type Trail Bridge FoundationCubic Yard28$ - 0$ - 0
25105.BKeyed riprap, class 4Ton86$ - 0$ - 0
30104.DAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton11$ - 0$ - 0
55201.BStructural concrete, Class A(AE)Cubic Yard10$ - 0$ - 0
55401.BReinforcing steel, #4 & #5Pound1200$ - 0$ - 0
55702.CStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot70$ - 0$ - 0
60410.ARemove and reset existing 9' Length x 5' Wide x 3.5' depth Earth BermsEach20$ - 0$ - 0
62503.CSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard1000$ - 0$ - 0
62506.CMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard1000$ - 0$ - 0
SUB - TOTAL PRICE$ - 0
SOURWOOD TRAIL BRIDGE M.P. 1.8 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.HConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.FSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20302.BRemoval of 24' Span x 41" Wide Steel I-Beam Trail Bridge, disposal method, Legally Off National Forrest Lands.Each1$ - 0$ - 0
20431.FTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard30$ - 0$ - 0
20701.HEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard90$ - 0$ - 0
20801.HStructure excavation, type Trail Bridge FoundationCubic Yard40$ - 0$ - 0
25106.FKeyed riprap, class 4Ton57$ - 0$ - 0
25302.FGabions baskets, wire type 9' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard8$ - 0$ - 0
30103.EAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard8$ - 0$ - 0
30104.HAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton14$ - 0$ - 0
55702.GStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot51$ - 0$ - 0
62503.GSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard608$ - 0$ - 0
62506.GMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard608$ - 0$ - 0
SUB - TOTAL PRICE$ - 0

PROJECT GRAND TOTAL PRICE $ - 0