C04_Attachment 1- Schedule of Items_Phase 2.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Multiple Trail Bridges Replacement Project Phase 2
Solicitation number
12445226Q0033
Issued by

About this file

This is a Schedule of Items attachment for Phase 2 of the Multiple Trail Bridges Replacement Project, a commercial items Request for Quotation issued by the Department of Agriculture Forest Service for the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest.

The solicitation (12445226Q0033) is a Total Small Business Set-Aside with a $45,000,000 small business size standard threshold, classified under NAICS code 237310 (Highway, Street, and Bridge Construction). The project requires construction of seven new trail bridges, reconstruction of one trail embankment fill slope failure repair, and new construction of one boardwalk platform with ramp that will connect to the new Lake Russell M.P. 2.18 trail bridge. The specific schedule of items, quantities, specifications, and pricing details are contained in the referenced Excel spreadsheet attachment (C04_Attachment 1- Schedule of Items_Phase 2.xlsx), which provides the itemized breakdown of construction components and associated requirements for quotation purposes. All responsible sources, including small business concerns, are eligible to submit quotations for this acquisition.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

SCHEDULE OF ITEMS
2020 TROPICAL STORM ZETA'S MULTIPLE TRAIL BRIDGES REPLACEMENT PROJECT (PHASE 2)
PAY ITEM 15101 -- MOBILIZATION

(1) Dicks Creek Trail Bridge M.P. 9.25

(2) Lake Russell Trail Bridge M.P. 0.10

(3) Pole Creek Trail Bridge M.P. 0.75

(4) Becky Branch Trail Embankment Fill Slope Failure Repair

(5) Becky Branch Trail Bridge M.P. 18.84

(6) Lick Log Trail Bridge M.P. 6.79

(7) Sourwood Trail Bridge M.P. 1.8

(8) Lake Russell Trail Bridge M.P. 2.18

PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15101Mobilization (Includes all mobilization, bonding, insurance, fire tools, equipment cleaning etc)Lump Sum1$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
DICKS CREEK TRAIL BRIDGE M.P. 9.25 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.CConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.ASilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.BTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard59$ - 0$ - 0
20701.CEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard100$ - 0$ - 0
20801.CStructure excavation, type Trail Bridge FoundationCubic Yard58$ - 0$ - 0
25105.AKeyed riprap, class 4Ton63$ - 0$ - 0
25302.CGabions baskets, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard11$ - 0$ - 0
30103.BAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard11$ - 0$ - 0
30104.CAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton10$ - 0$ - 0
55702.BStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot55$ - 0$ - 0
62503.BSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard578$ - 0$ - 0
62506.BMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard578$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
LAKE RUSSELL'S TRAIL BRIDGE M.P. 0.10 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.FConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.DSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.ETrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard48$ - 0$ - 0
20701.FEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard110$ - 0$ - 0
20801.FStructure excavation, type Trail Bridge FoundationCubic Yard15$ - 0$ - 0
25105.DKeyed riprap, class 4Ton92$ - 0$ - 0
30104.FAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton8$ - 0$ - 0
55201.CStructural concrete, Class A(AE)Cubic Yard8$ - 0$ - 0
55401.CReinforcing steel, #4 #5Pound1730$ - 0$ - 0
55702.EStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot58$ - 0$ - 0
62503.ESeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard68$ - 0$ - 0
62506.EMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard68$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
POLE CREEK TRAIL BRIDGE M.P. 0.75 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.EConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.CSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20302.ARemoval of 20' Span x 24" Wide Wooden Log Bridge, disposal method, Legally Off National Forest LandsEach1$ - 0$ - 0
20431.DTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard22$ - 0$ - 0
20701.EEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard70$ - 0$ - 0
20801.EStructure excavation, type Trail Bridge FoundationCubic Yard26$ - 0$ - 0
25105.CKeyed riprap, class 4Ton48$ - 0$ - 0
25302.DGabions basket, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard8$ - 0$ - 0
30103.CAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard8$ - 0$ - 0
30104.EAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton9$ - 0$ - 0
55702.DStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot30$ - 0$ - 0
62503.DSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard804$ - 0$ - 0
62506.DMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard804$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
BECKY BRANCH EMBANKMENT FAILURE
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.AConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
20305.A.1Removal of Structure Excavation, Disposal Method Legally off Govt. LandsCubic Yard90$ - 0$ - 0
20701.AEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard400$ - 0$ - 0
20801.AStructure excavation, type Gabion Basket FoundationCubic Yard90$ - 0$ - 0
25105.A.1Keyed riprap, class 2Ton52$ - 0$ - 0
25302.AGabions basket, wire type 12' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard32$ - 0$ - 0
25302.BGabions basket, wire type 12' x 3' x 1.5' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard4$ - 0$ - 0
30103.AAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard47$ - 0$ - 0
30104.AAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton75$ - 0$ - 0
55601.ATrail Guardrail, Type Trail Guardrail with galvanized Steel Tubing Railing, Galvanized Flange connectors, and Reinforced Concrete Column Post and fasteners.Foot32$ - 0$ - 0
60501.AStandard Underdrain SystemFoot100$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
BECKY BRANCH TRAIL BRIDGE M.P. 18.84 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.BConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
20305.B.1Removal of Structure Excavation, Disposal Method Legally off Govt. LandsCubic Yard7$ - 0$ - 0
20431.ATrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard20$ - 0$ - 0
20701.BEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard80$ - 0$ - 0
20801.BStructure excavation, type Trail Bridge FoundationCubic Yard7$ - 0$ - 0
25108.AGrouted riprap, class 3Ton72$ - 0$ - 0
30104.BAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton10$ - 0$ - 0
55201.AStructural concrete, Class A(AE)Cubic Yard6$ - 0$ - 0
55401.AReinforcing steel, #4 & #5Pound820$ - 0$ - 0
55702.AStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot40$ - 0$ - 0
62503.ASeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard112$ - 0$ - 0
62506.AMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard112$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
LICK LOG TRAIL BRIDGE M.P. 6.79 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.DConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.BSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20431.CTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard51$ - 0$ - 0
20701.DEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard70$ - 0$ - 0
20801.DStructure excavation, type Trail Bridge FoundationCubic Yard28$ - 0$ - 0
25105.BKeyed riprap, class 4Ton86$ - 0$ - 0
30104.DAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton11$ - 0$ - 0
55201.BStructural concrete, Class A(AE)Cubic Yard10$ - 0$ - 0
55401.BReinforcing steel, #4 & #5Pound1200$ - 0$ - 0
55702.CStructural Timber and Lumber, 6’-9 13/16” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot70$ - 0$ - 0
60410.ARemove and reset existing 9' Length x 5' Wide x 3.5' depth Earth BermsEach20$ - 0$ - 0
62503.CSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard1000$ - 0$ - 0
62506.CMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard1000$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
SOURWOOD TRAIL BRIDGE M.P. 1.8 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.HConstruction survey and staking, method I, tolerance, Class ALump Sum1$ - 0$ - 0
15702.FSilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot100$ - 0$ - 0
20302.BRemoval of 24' Span x 41" Wide Steel I-Beam Trail Bridge, disposal method, Legally Off National Forrest Lands.Each1$ - 0$ - 0
20431.FTrail Embankment Construction, Compact Placement Method, FP-14 Section 204.11(A)Cubic Yard30$ - 0$ - 0
20701.HEarthwork geosynthetics, type Class I, nonwoven, Type ASquare Yard90$ - 0$ - 0
20801.HStructure excavation, type Trail Bridge FoundationCubic Yard40$ - 0$ - 0
25106.FKeyed riprap, class 4Ton57$ - 0$ - 0
25302.FGabions baskets, wire type 9' x 3' x 3' Welded Wire Mesh (9 gauge) w/ tie wire, stiffeners, and spirals, coating Polyvinyl Chloride (PVC)Cubic Yard8$ - 0$ - 0
30103.EAggregate base, grading 4" to 8" durable clean angular rock (no fines) compaction method (Machine Place Inside Gabion Baskets)Cubic Yard8$ - 0$ - 0
30104.HAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)Ton14$ - 0$ - 0
55702.GStructural Timber and Lumber, 4’-4 1/8” Out-to-Out Width Glulam Stringer Trail Bridge w/ Deck Planks, Running Planks, & Handrails On Both SidesFoot51$ - 0$ - 0
62503.GSeeding, Dry method (Refer to Subsheet D-111. Do not seed trail walking surface itself)Square Yard608$ - 0$ - 0
62506.GMulching, Dry method (Refer to Subsheet D-111. Do not mulch trail walking surface itself)Square Yard608$ - 0$ - 0
SUB- TOTAL PRICE$ - 0
LAKE RUSSELL'S TRAIL BRIDGE M.P. 2.18 REPLACEMENT
PAY ITEMDESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15201.GConstruction survey and staking, method I, tolerance, Class A (Includes construction staking out 203 L.F. of trail centerline horizontal alignment with trail finished grades, (1) culvert inlet and outlet inverts, all four bottom of footing corners of each of the three (3) reinforced concrete abutments, and all drilled shafts)Lump Sum1$ - 0$ - 0
15702.ESilt fence (Includes installation and removal after Govt.'s Final Acceptance)Foot720$ - 0$ - 0
15705Soil Erosion Control, (3) - 48" Diameter Temporary Culvert Pipe (Includes Furnishing and Installation of Three (3) Individual 48" Daimeters x 22-L.F. Each AASHTO HDPE Duall Wall Pipes. Also Includes Removal and Reshaping to Existing Conditions)Foot66$ - 0$ - 0
20103Clearing & Grubbing, disposal method, Scatter On Site (In Neat Manner. Do Not Pile Debris, Limbs, Top Soils, or Vegetation) (Includes Clearing & Grubbing a Depth of 6-Inches for 200-feet x 6'-0" wide of Trail Reconstruction & 66-feet x 6'-0" Wide for Boardwalk and Boardwalk Platform)Square Yard180$ - 0$ - 0
20220Removal, Individual 14-inch Diameter Rotten Tree, disposal method, Scatter On Site (Perpendicular To Fill Slope on Downhill Side)Each1$ - 0$ - 0
20305.ARemoval of Excessive Structure Excavation Material, disposal method, Legally Off National Forest LandsCubic Yard47$ - 0$ - 0
20701.GEarthwork geosynthetics, type Class I, nonwoven, Type A (Shall Be Placed Beneath All Abutments Riprap, Creek Bank Riprap (Both Sides), and Shafts Riprap)Square Yard133$ - 0$ - 0
20701.HEarthwork geosynthetics, type B4 Biaxial Geogrid (Includes Furnishing and Placement in 30-Ft Trail Access Segment)Square Yard30$ - 0$ - 0
20801.GStructure excavation, type All Trail Bridge Abutments & All Drilled ShaftsCubic Yard160$ - 0$ - 0
25105.EKeyed riprap, class 4 (Furnished and Placed in Front & Rear of Abutment #2 and Abutment #3, Around All Drilled Shafts, and Creek Bank (Both Sides) Armoring)Ton121$ - 0$ - 0
30104.GAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) - 6" Compacted Thickness For a Total of 220' Length x 4'-6" Wide Trail (Includes 200' of Trail and 20' at End of Boardwalk Trail Segment)Ton53$ - 0$ - 0
30104.HAggregate base, grading C (FP-14 Table 703-2) compaction method, FP-14 Section 204.11(a)(1) (Includes Furnishing of This Material For Backfilling of the Temporary Pipe Crossings Shown in Pay item 15705. Also Includes Removal Of This Aggregate Material After Project Final Acceptance. All Aggregate Material Removed After Pipe Removals Shall Be Used and Spread, and Compacted On All Lake Russell Trails Within This Vicinity. Using the Abutments Excavation Material for Backfilling is Prohibited Due to NEPA Environmental Reasons)Ton232$ - 0$ - 0
30104.IAggregate base, grading 4" to 8" durable clean angular rock Gabion Stone (No Fines) compaction method FP-14 Section 204.11(a)(1) - 18" Compacted Thickness For a Total of 30' Length x 5'-0" Wide Access TrailTon20$ - 0$ - 0
30104.JAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) - 6" Compacted Thickness For a Total of 30' Length x 5'-0" Wide Access TrailTon7$ - 0$ - 0
30104.KAggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) - 6" Compacted Thickness Beneath All Abutment FootingsTon14$ - 0$ - 0
55201.CStructural concrete, Class A(AE) - 4,500 PSI (Includes all Forming & False Work, All Reinforced Concrete Abutments in its Entirety, 6" Dia. Underdrain System For each Abutment, AASHTO #57 Stone Behind all Abutment Walls, all Geotextile For Each Underdrain System, All Anchor Bolts, All (9) - Individual 24" Dia. Drilled Shafts w/ Reinforcement and Concrete and Construction of Shafts etc)Cubic Yard57$ - 0$ - 0
55401.CReinforcing steel, #4, #5, #6, #8 (Includes all Reinforcement for all Abutments & All Drilled Shafts)Pound8043$ - 0$ - 0
55702.FStructural Timber and Lumber (Trail Bridge) -- Each Glulam Girder Shall Have a "Camber" Based on a 900-FT Radius, 6'-2 7/16" Inside-Clear-Width Trail Bridge w/ All Glulam Stringers, All Bearing Shoes, All Bolts & Washers, All Fasteners, Diaphragms, Deck Planks, Running Planks, & Posts and Handrails On Both SidesFoot115$ - 0$ - 0
55702.GStructural Timber and Lumber (Boardwalk & Boardwalk Platform), 6'-9 9/16" Inside-Clear-Width Boardwalk & Boardwalk Platform w/ All Glulam Stringers, All Bearing Shoes, All Bolts & Washers, All Fasteners, Diaphragms, Deck Planks, Running Planks, & Posts and Handrails On Both Sides of Boardwalk and On All Sides of Boardwalk PlatformFoot71$ - 0$ - 0
6020112-Inch Pipe Culvert, Type, AASHTO & ASTM Rated HDPE Duall Wall Pipe (Includes furnishing and placement within Trail Alignment)Foot20$ - 0$ - 0
62503.FSeeding, Dry method (Refer to Subsheet C-118. Do not seed trail walking surface itself)Square Yard224$ - 0$ - 0
62506.FMulching, Dry method (Refer to Subsheet C-118. Do not mulch trail walking surface itself)Square Yard224$ - 0$ - 0
SUB- TOTAL PRICE$ - 0

PROJECT GRAND TOTAL PRICE $ - 0

File details come from the government source that posted it. Updated .