Lake Russell M.P. 2.18 Trail Bridge Replacement Project - Design Plans
This document is a comprehensive set of construction design plans for the United States Department of Agriculture Forest Service, Southern Region, covering the replacement of a trail bridge at Lake Russell (M.P. 2.18) located in Habersham County, Georgia within the Chattahoochee-Oconee National Forest. The project involves the construction of a 29-foot span trail bridge with a 6-foot-2-7/16-inch clear inside width using glulam stringers, an 86-foot span boardwalk structure, three reinforced concrete abutments, boardwalk foundation systems with drilled shafts, and associated trail approach work totaling approximately 3,063 linear feet. The project site is accessible by mechanized equipment no wider than 60 inches and is located approximately 26 miles southwest of Gainesville, Georgia.
The construction scope includes site preparation with temporary crossing using three 48-inch HDPE pipes, excavation and grading with geogrid and gabion stone material placement, installation of reinforced concrete trail bridge abutments and boardwalk foundation drilled shafts with riprap armoring, fabrication and installation of treated glulam stringer superstructures with diaphragms and bearing shoes, installation of treated timber sill connections and elastomeric pads, deck planking and running planks, handrail systems, seeding and erosion control measures including silt fence installation, and 12-inch diameter by 20-foot length culvert installation. The design incorporates design loadings of 90 PSF pedestrian live load, species SP/SP glulam with 24F-V3 combination symbol per AASHTO LRFD specifications, treated timber members throughout, standard construction details for connections and bearings, and construction stakeout coordinates for 54 survey points. General notes specify contractor responsibility for material storage 25 feet minimum from creek edges, equipment security at staging areas, replacement of damaged boardwalk components, proper water management during excavation, and compliance with silt fence inspection and maintenance requirements performed weekly and within 24 hours of precipitation events exceeding 1.2 inches.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
United States Department of Agriculture Forest Service
TRAVEL DIRECTIONS:
FROM GAINESVILLE, GA, TRAVEL NORTH ON US-23 N FOR APPROX. 19.2 MILES AND CONTINUE ON LEVEL GROVE ROAD
FOR 3.7 MILES AND TAKE STATE ROUTE 13 TO LAKE RUSSELL ROAD MAIN ENTRANCE.
RECOMMENDED BY:
APPROVED:
TRANSPORTATION ENGINEER DATE
FOREST SUPERVISOR DATE
DISTRICT RANGER
DATEENGINEERING STAFF OFFICER
DATE
R8 SOUTHERN REGION
CHATTAHOOCHEE-OCONEE NATIONAL FOREST
CRRD LAKE RUSSELL M.P. 2.18
TRAIL BRIDGE REPLACEMENT PROJECT
HABERSHAM COUNTY, GEORGIA
LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE
MAIN ENTRANCE ACCESS ROAD
LAT:34.519117
LONG: -83.496089
INDEX
SHEET SUB SHEET SHEET TITLE
1 G-100 TITLE SHEET
2 G-101 CIVIL ABBREVIATIONS & SYMBOL LEGEND
3 G-102 GENERAL NOTES AND EST. QTY.
4 C-101 SITE PLAN
5 C-102 TRAIL BRIDGE PLAN & PROFILE
6 C-103 BOARDWALK PLAN & PROFILE
7 C-104 TRAIL BRIDGE DETAILS
8 C-105 TRAIL BRIDGE SECTION VIEW
9 C-106 BOARDWALK STRUCTURAL NOTES
10 C-107 BOARDWALK SECTIONS AND FOUNDATION DETAILS
11 C-108 BOARDWALK AND PLATFORM PLAN VIEW
12 C-109 GLULAM TO GLULAM BEARING SHOE & SILL
CONNECTION DETAILS
13 C-110 STANDALONE GLULAM BEARING SHOE & SILL
CONNECTION DETAILS
14 C-111 ABUTMENT #1 DETAILS
15 C-112 ABUTMENT #2 AND #3 DETAILS
16 C-113 TEMPORARY CROSSING PLAN
17 C-114 TRAIL PLAN & PROFILE
18 C-115 CONSTRUCTION SURVEYING AND STAKING DETAILS
19 C-116 CONSTRUCTION STAKEOUT COORDINATES
20 C-117 SILT FENCE DETAILS
21 C-118 SEEDING SCHEDULE
DESIGN BY:
ENGINEER DATE
SHEET
LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE
FOR RECONSTRUCTION PROJECT LOCATION
COORDINATES: 34.486558, -83.500314
FOREST MAP
E. WHATLEY 12/01/2025
GAINESVILLE, GA (26 MILES
SOUTHWEST OF PROJECT SITE)
LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE
MAIN ENTRANCE ACCESS ROAD
LAT: 34.519117
LONG: -83.496089
FROM MAIN ENTRANCE ACCESS ROAD
TO LOCKED USFS GATE IS APPROX. 3.3 MILES
LOCKED USFS GATE LOCATION
LAT: 34.494510
LONG: -83.503957
ABBREVIATIONS
Ø DIAMETER
AB AGGREGATE BASE
ABDN ABANDONED
ACP ACRE, ASPHALT CONCRETE
ACP ASBESTOS CEMENT PIPE
ACM ASBESTOS CONTAINING MATERIAL
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
AGG AGGREGATE
ALGN ALIGNMENT
ARV AIR RELEASE VALVE
ASB AGGREGATE SUBBASE
ASPH ASPHALT
BC BEGIN CURVE
BEG BEGIN
BFP BACK FLOW PREVENTER
BLDC BUILDING CORNER
BLDG BUILDING
BMP BEST MANAGEMENT PRACTICES
BOD BOTTOM OF DOCK
BOL BOLLARD
BP BEGINNING OF PROJECT
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW FINISHED GRADE AT BOTTOM OF WALL
℄ CENTERLINE
C CONCRETE OR CIVIL
CB CATCH BASIN
C&G CURB AND GUTTER
CG&SW CURB, GUTTER, & SIDEWALK
CI CAST IRON OR CURB INLET
CIP CAST IRON PIPE
CLR CLEAR
CLSM CONTROLLED LOW-STRENGTH MATERIAL
CMN COMMUNICATION
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CONC CONCRETE
CONST CONSTRUCTION OR CONSTRUCT
CONF CONFORM TO EXISTING
COR CONTRACTING OFFICER REPRESENTATIVE
CU CUBIC
CY CUBIC YARD
D DELTA (CURVE)
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DEMO DEMOLISH
DET DETAIL
DI DROP INLET, DUCTILE IRON
DIA. DIAMETER
DIP DUCTILE IRON PIPE
DOM DOMESTIC
DW DOMESTIC WATER
DWG DRAWING
E EASTING COORDINATE
EC END CURVE
EG EXISTING GRADE
ELEV ELEVATION
ELEC ELECTRICAL
EOP EDGE OF PAVEMENT
EOS EDGE OF SHOULDER
EP ENDING OF PROJECT
ETW EDGE OF TRAVELED WAY
EVA EMERGENCY VEHICLE ACCESS
EVC END VERTICAL CURVE
EXT EXISTING
FA FIRE ALARM
F/C,FC FACE OF CURB
FD FOUND
FDC FIRE DEPARTMENT CONNECTION
FF,FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FIPT FEMALE IRON PIPE THREAD
FL FLOW LINE, FLANGE
FLG FLANGE
FM FLOWMETER
FOUND FOUNDATION
FRD FOREST ROAD DESIGNATION
FS FINISHED SURFACE
FT FOOT, FEET
FW FIRE WATER
G GAS, GROUND ELEVATION
GB GRADE BREAK
GI GALVANIZED IRON
GRD, G GROUND
GV GATE VALVE
HMA HOT MIX ASPHALT
HMAC HOT MIX ASPHALT CONCRETE
HORIZ HORIZONTAL
HT HEIGHT
HP HIGH POINT
I.E. INVERT ELEVATION
INST INSTALL
IRR IRRIGATION
JP JOINT POLE
JT JOINT TRENCH
L LEFT
L= LENGTH (CURVE)
LF LINEAR FEET
LAT LATERAL
LIP LIP OF GUTTER
LP LIGHT POLE, LOW POINT
LS LANDSCAPE
LSA LANDSCAPE ARCHITECT
MA MEDICAL AIR
MAX MAXIMUM
MEP MECHANICAL/ELECTRICAL/PLUMBING
MH MANHOLE
MIN. MINIMUM
MIPT MALE IRON PIPE THREAD
MJ MECHANICAL JOINT
MPVC MIDPOINT OF VERTICAL CURVE
MON MONUMENT
N NORTHING COORDINATE
(N) NEW
NFSR NATIONAL FOREST SYSTEM ROAD
NIC NOT IN CONTRACT
NO. NUMBER
NTS NOT TO SCALE
OHE OVERHEAD ELECTRIC
OVERALL HP - OVERALL HIGH POINT
OVERALL LP - OVERALL LOW POINT
(P) PROPOSED
PB PULL BOX
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PED PEDESTRIAN
PERF PERFORATED
PH POTHOLE
POC POINT ON CURVE
POI POINT OF INTERSECTION
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRV PRESSURE REDUCING VALVE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL INTERSECTION
R RIGHT
R= RADIUS (CURVE)
RC RELATIVE COMPACTION
RCP REINFORCED CONCRETE PIPE
RJ RESTRAINED JOINT
RP RADIUS POINT
R/W RIGHT OF WAY
S SOUTH
SD STORM DRAIN
SHLDR SHOULDER
STA STATION
STD STANDARD
STL STEEL
S/W SIDEWALK
TW TRAVELED WAY
TYP TYPICAL
USFS - UNITED STATES FOREST SERVICE
VC - VERTICAL CURVE
CIVIL SYMBOLS LEGEND
SURVEY TOPO AND SITE IMPROVEMENTS
CO
D D
WATER TAPPING SADDLE
SEWER MANHOLE
SEWER CLEANOUT
SEWER LAMP HOLE
SEWER VENT
STORM DRAIN MANHOLE
CATCH BASIN
CURB INLET
DRAINAGE INLET
GRADE BREAK
LIMIT OF WORK/GRADING
IRRIGATION BOX
GAS METER
GAS VALVE
WATER METER
WATER VALVE
WATER METER OR BFP
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
UNDERGROUND ELECTRIC
TRENCH DRAIN
METAL BEAM GUARD RAIL
SILT FENCE
CHAIN LINK FENCE
FLOW LINE
CONTOUR ELEVATION LINE
CENTER LINE
PROPERTY LINE
MONUMENT LINE
EASEMENT LINE
FINISH GRADE
SURFACE DRAINAGE SLOPE
SPOT ELEVATION
GATE VALVE
BUTTERFLY VALVE
DEMO
NEW EXISTING
6" CURB & GUTTER
EDGE OF AC PAVEMENT
6" VERTICAL CURB
DOMESTIC WATER MAIN
ELECTRIC LINE
FIRE WATER MAIN
GAS LINE
IRRIGATION LINE
OVERHEAD WIRES
OVERHEAD ELECTRIC
OVERHEAD TELEPHONE
RECYCLED WATER
SANITARY SEWER LINE
STORM DRAIN LINE
STREET LIGHT CONDUIT
TELECOMMUNICATIONS
TELEPHONE LINE
TELEVISION LINE
WATER LINE
STORM DRAIN CLEANOUT
ELECTRIC VAULT COVER
PULL BOX
HIGH VOLTAGE ELECTRIC
TELEPHONE MANHOLE
POWER POLE
GUY WIRE & ANCHOR
JOINT POLE
STREET LIGHT
ELECTROLIER
TRAFFIC SIGNAL
TRAFFIC SIGNAL
PEDESTRIAN LIGHT
PEDESTRIAN PUSH BUTTON
CROSSWALK DETECTOR
STREET LIGHT PULLBOX
SIGN (AS NOTED)
THRUST BLOCK
CAP
FF C C
W WW W
KEYNOTE
DEMOLITION NOTE1
DETAIL NUMBER
ANNOTATION
SECTION LETTER
A C-101
SHEET NUMBER ON WHICH
SECTION APPEARS
A C-101
SHEET NUMBER ON WHICH
DETAIL APPEARS
DETAIL INDICATOR
SECTION INDICATOR
DETAIL NUMBER
A
CONTROL POINT
GENERAL SHEET NOTES
1. THIS IS A STANDARD ABBREVIATION
AND LEGEND SHEET, THEREFORE,
SOME ABBREVIATIONS AND LEGEND
SYMBOLS MAY APPEAR ON THIS SHEET
AND MAY NOT BE UTILIZED ON THIS
PROJECT.
NEW EXISTING
TELECOMMUNICATIONS MANHOLETMH TMH
GUY
REGION 8
SOUTHERN REGION
SHEET 2 OF 21
G-101DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
CIVIL
ABBREVIATIONS &
SYMBOL LEGEND
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
REGION 8
SOUTHERN REGION
SHEET 3 OF 21
G-102DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
GENERAL NOTES
AND
EST. QTY.
GENERAL NOTES
I. SPECIFICATIONS
1. CONSTRUCTION OF THIS STRUCTURE IS TO BE IN ACCORDANCE WITH "AASHTO 2017 LRFD
BRIDGE DESIGN SPECIFICATIONS OR LATEST EDITION" AND "THE STANDARD SPECIFICATIONS
FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14" AND
"FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)".
II. DESIGN LOADING
1. THIS STRUCTURE WAS ANALYZED AND DESIGNED FOR A REINFORCED CONCRETE TRAIL
BRIDGE ABUTMENT WALL AND FOUNDATION WITH A LIVE LOAD SURCHARGE (TRAFFIC).
2. THE HEADWALL WAS CHECKED FOR STRENGTH 1 LIMIT STATE (11.5.3) AND SERVICE I LIMIT
STATE (11.5.2) FOR SLIDING STABILITY, OVERTURNING STABILITY, ECCENTRICITY LIMIT, AND
BEARING RESISTANCE.
III. EXCAVATION AND EXCAVATION SAFETY
1. STRUCTURAL EXCAVATION SHALL BE TO THE ELEVATIONS SHOWN ON THE DRAWINGS.
REGARDLESS OF MATERIAL ENCOUNTERED, UNLESS BEDROCK.
2. THE WALLS FOR THE STRUCTURE EXCAVATION SHALL BE SHORED OR SHIELDED, OR LAID
BACK, IN ACCORDANCE WITH "CONSTRUCTION STANDARDS FOR EXCAVATION", AS REQUIRED
BY OSHA 29 CFR, PART 1926, 650-652.
IV. SITE MAINTENANCE
1. ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE SHAPED TO FINAL GRADE, AS SHOWN ON THE DRAWINGS, AND/OR AS NEEDED (AS DETERMINED BY THE CONTRACTING
OFFICER). FINAL GRADING AND CLEAN-UP IS REQUIRED BEFORE APPROVAL OF FINAL
INVOICING.
2. SITE DISTURBANCE AND CLEARING SHALL BE LIMITED TO THE AREAS AS SHOWN IN THE
PLANSET DRAWINGS, AND WHERE CONSTRUCTION EQUIPMENT WILL BE STORED OR USED.
ANY TREES TO BE REMOVED AND CLEARED THAT'S NOT SHOWN IN THE PLANSET DRAWINGS
SHALL BE APPROVED BY THE C.O. PRIOR TO THE CONTRACTOR CUTTING OR REMOVING.
3. THE CONTRACTOR SHALL PREVENT ANY EXCAVATED MATERIAL FROM ENTERING INTO THE
CREEK AT ALL TIMES. ALL MATERIAL EXCAVATED SHALL BE PLACED AWAY FROM THE CREEK
A MINIMUM OF 25 FEET FROM THE EDGE OF THE CREEK, AND UTILIZE WEED-FREE CERTIFIED
STRAW WATTLES AROUND PERIMETER OF STOCKPILED MATERIAL.
4. INSPECT ALL EROSION CONTROL DEVICES AT THE START OF WORK, EACH DAY, OR AFTER
RAINFALL EVENTS GREATER THAN 0.5 INCHES. DAMAGED EROSION CONTROL DEVICES SHALL
BE REPAIRED IMMEDIATELY.
5. USE SEED-MIX OR EROSION CONTROL BLANKETS, AS INDICATED IN THE CONTRACT, TO
HAND-BROADCAST OVER THE AREAS OF DISTURBANCE. APPLY WEED-FREE STRAW MULCH
TO THE DISTURBED AREA, AT A RATE OF 4,000 POUNDS PER ACRE AS COVERED IN THE
SCHEDULE OF ITEMS.
6. CONTRACTOR SHALL NOT ALLOW WATER TO POND IN CONSTRUCTION AREA DURING
CONSTRUCTION DURATION.
V. STORAGE, CONSTRUCTION, AND CLEARING NOTES
1. CONSTRUCTION EQUIPMENT SHALL BE STORED A MINIMUM OF 25 FEET AWAY FROM THE EDGE OF THE CREEK, AND ON STABLE GROUND.
CONTRACTOR'S STAGING AND STOCKPILING AREAS SHALL BE APPROVED IN WRITING BY THE C.O.
2. USE CONTAINMENT PADS UNDER EQUIPMENT IF IT WILL BE STORED OVERNIGHT NEAR THE WORK SITE TO REDUCE POTENTIAL CONTAMINATION.
3. CONTRACTOR IS SOLELY RESPONSIBLE FOR REPLACING ANY BOARDWALK COMPONENTS THAT ARE DAMAGED, STOLEN, OR LOST DURING THE
COURSE OF THIS PROJECT. SECURITY AT ALL DESIGNATED AND APPROVED STAGING AREAS SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
4. CONTRACTOR SHALL PLACE EXCESS EXCAVATION AT AN AREA DESIGNATED BY THE C.O. AND HAUL ALL UNSUITABLE EXCAVATION TO AN APPROVED
LANDFILL OFF GOVT. LANDS.
5. CONTRACTOR SHALL IDENTIFY TREE OR SNAGS TO BE CUT PRIOR TO WORK THAT'S NOT IDENTIFIED IN PLANS. OBTAIN APPROVAL FROM THE C.O.
PRIOR TO CUTTING. CUT AND BULK FELLED TREES IN AN APPROVED AREA AS DESIGNATED BY THE C.O...
6. THE CONTRACTOR SHALL CONFINE ALL OPERATION AND ACTIVITIES TO IDENTIFIED CLEARING LIMITS UNLESS OTHERWISE SHOWN ON DRAWINGS.
7. IN THE EVENT THAT PREVIOUSLY UNDISCOVERED CULTURAL RESOURCES ARE ENCOUNTERED DURING THE COURSE OF THE PROJECT, ALL
GROUND-DISTURBING ACTIVITIES WILL BE HALTED UNTIL EVALUATED BY THE GOVERNMENT. IF NECESSARY, THE PROJECT MAY BE MODIFIED IN
ORDER TO PROTECT RESOURCES BEFORE WORK CONTINUES.
VI. SURVEY CONTROLS
1. ALL SURVEY DATA WAS RECORDED AND OBTAINED BY AEI FIRM.
2. CONTROLS AND BENCHMARKS COORDINATES ARE INCLUDED IN THE PLANSET DRAWINGS. CONTROLS ARE SET USING SPIKE NAILS AND PK NAILS.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL SURVEY CONTROLS PRIOR TO THE START OF CONSTRUCTION.
4. FIELD SURVEY DATA WAS COLLECTED ON MARCH 19TH, 2024.
5. COORDINATE SYSTEM: NAD83 PUERTO RICO AND VIRGIN ISLANDS, US SURVEY FOOT
6. COORDINATE SYSTEM CODE: PR83F
7. DATUM: NAD83
8. ALL DISTANCE AND ELEVATIONS ARE INDICATED IN US SURVEY FEET.
VII. HYDROLOGY
1. DRAINAGE AREA = N/A
2. Q100 PEAK FLOOD FLOW = N/A
3. FREEBOARD = N/A
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
LAKE RUSSELL
POOL ELEV: 991.30'
LAKE RUSSELL
TRAIL
.0
960.000
970.000
980.000
990.000
0.
960.000
0.
0.
950.000
960.000
950.000
950.000
950.000
950.000
950.000
950.000
940.000
0.
0.
CONCRETE
SPILLWAY
10001
CONTROL POINT COORDINATES
POINT #
NORTHING
1632469.522
1632631.481
1632497.378
1632723.322
1632500.940
1632435.740
EASTING
2497607.669
2497467.023
2497231.084
2497448.307
2497438.309
2497379.773
ELEVATION
1005.590
1005.690
952.080
995.858
976.616
957.207
DESCRIPTION
CP234
CP236
CP237
CP238
CP239
CP240
INTERSECTION
OF TRAIL
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF TRAIL HORIZONTAL
ALIGNMENT
CONTRACTOR SHALL REPAIR
30 L.F. OF THIS AREA FOR ACCESS.
(REFER TO DETAIL 1 OF THIS
SUBSHEET C-101)
CUT EXISTING 14"Ø DEAD TREE
AND SCATTER ON SITE
PERPENDICULAR TO DOWNHILL
SLOPE
TOP OF SLOPE, TYP.
TOE OF SLOPE, TYP.
DO NOT DAMAGE OR DISTURB
EXISTING 32" Ø TREE
EXISTING ℄ OF TRAIL
(DO NOT DISTURB)
BEGIN APPROACH TO TRAIL BRIDGE
℄ OF EXISTING DITCHLINE, TYP.
℄ OF EXISTING DITCHLINE, TYP.
INSTALL NEW HDPE CULVERT
86'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM STRINGER
TRAIL BRIDGE
3+63
-0+00
1+
2+00
3+00
8'
BEGINNING OF EXISTING
DROP DOWN STONE STEPS
(DO NOT DISTURB DURING
EXCAVATION)
ABUTMENT #3
ABUTMENT #2
ABUTMENT #1
29'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM
STRINGER TRAIL BRIDGE
BOARDWALK
PLATFORM DECK
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF PROPOSED
BOARDWALK
ALIGNMENT
EXISTING CONCRETE DAM SURFACE
FOR CONTRACTOR'S ACCESS TO TRAIL
BRIDGE SITE
C-110
C-110
C-109
C-101
5'-0" TOTAL ACCESS WIDTH
6" COMPACTED AGGREGATE BASE
GRADING C. COMPACT IN NTE 6" LIFTS
(COVERED IN LAKE RUSSELL M.P. 2.18
PAY ITEM 30104.J)
COMPACTED GABION STONE MATERIAL
OR RAILROAD BALLAST MATERIAL.
COMPACT IN NTE 6" LIFTS
TYPE B4 BIAXIAL GEOGRID A MINIMUM
OF 100% OF TRAIL EXCAVATION WIDTH
BETWEEN THE EXISTING EARTH
MATERIAL AND THE PROPOSED GABION
STONE MATERIAL WHEN INSTALLED.
(GEOGRID COVERED IN LAKE RUSSELL
M.P. 2.18 PAY ITEM 20701.H)
1' DEPTH OF COMPACTED
GABION STONE MATERIAL, OR
RAILROAD BALLAST MATERIAL
(COVERED IN LAKE RUSSELL M.P. 2.18
PAY ITEM 30104.I)
NATURAL EARTH MATERIAL
EXISTING TRAIL GRADE
EXCAVATE DOWN 6"
OF THE EXISTING TRAIL
AND INSTALL GEOGRID AND
GABION ROCK PLACEMENT
EXISTING TRAIL GRADE
6"
1'-6"
REGION 8
SOUTHERN REGION
SHEET 4 OF 21
C-101DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
SITE
PLAN
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
LAKE RUSSELL M.P. TRAIL BRIDGE M.P. 2.18
PLAN VIEW
BEGIN ACCESS TO M.P.
2.18 TRAIL BRIDGE
SITE GENERAL NOTES:
1. THE PROJECT SITE IS MISSING THE EXISTING TRAIL BRIDGE.
2. THE PROJECT SITE IS ACCESSIBLE BY MECHANIZED EQUIPMENT (NTE 60-INCHES WIDE).
3. TREES SHALL NOT BE DISTURBED OR CUT, UNLESS SPECIFIED INSIDE THIS SET OF DRAWINGS
AND/OR APPROVED BY THE C.O. IN WRITING. ANY DISTURBED AREAS SHALL BE REGRADED
AND SEEDED BY THE CONTRACTOR.
4. THE CONTRACTOR SHALL KEEP EQUIPMENT OUT OF THE CREEK AND MAINTAIN TRAIL ACCESS
AS MUCH AS POSSIBLE.
5. CONTRACTOR SHALL REMOVE ALL TRACK AND TIRE MARKS FROM THE TRAIL SURFACE
BEFORE GOVERNMENT FINAL ACCEPTANCE OF THE PROJECT IN ITS ENTIRETY WHICH SHALL
BE INCIDENTAL TO THE CONTRACTOR'S PROPOSAL.
6. BEYOND SURVEY LIMITS, THE CONTRACTOR SHALL TAPER THE FINISHED TRAIL EMBANKMENT
UNTIL DAYLIGHT TO EXISTING GROUND GRADE.
ACCESS TRAIL REPAIR SECTION VIEW1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
1+96 2+00 2+20 2+40 2+50 2+60 2+80 3+00 3+20 3+40 3+50 3+60 3+63
C/L OF BEARING
STAT: 2+35.30
ELEV 959.37
THALWEG
100 YR FLOOD
ELEV: 957.37
3' FREEBORAD
C/L OF TOP OF BACKWALL
ELEV: 965.21
C/L OF TOP OF BRIDGE SEAT
STAT: 3+20.30
ELEV 959.37
BOTTOM OF FOOTING
STA 2+39.30
ELEV 949.66
BOTTOM OF FOOTING
STA 3+16.30
ELEV 949.66
TOP OF FOOTING
STA 3+31.05
ELEV: 951.16
C/L OF TOP OF BACKWALL
ELEV: 965.21
BOTTOM OF FOOTING
STA 3+31.05
ELEV 949.66
TAPER
APPROACH
1'
OF
BEARING
OF
BEARING
OF
BEARING
OF
BEARING
BEGINNING OF EXISTING
DROP DOWN STONE STEPS
(DO NOT DISTURB DURING
EXCAVATION)
29' SPAN (OUT-TO-OUT)
BY 4'-6" OR 54" STRINGER DEPTH
4'-6" OR 54"
STRINGER DEPTH, TYP.
OF
BEARING
OF
BEARING
1'-6" TYP.
TOP OF FOOTING
STA 2+39.30
ELEV: 951.16
ABUTMENT #2
3' STEM WALL
OF
BEARING
OF
BEARING
OF
BEARING
OF
BEARING
8.25' HEEL
3'-6" TOE, TYP.
ABUTMENT #3
1'-6"
WATER SURFACE
ELEV: 948.85'
AS OF 11/06/25
3' STEM WALL
8.25' HEEL
BOTTOM OF FOOTING
STA 2+08.80
ELEV 955.37
1'-6"
2' STEM WALL
C/L OF TOP OF BRIDGE SEAT
STAT: 2+05.30
ELEV 959.37
C/L OF TOP OF BRIDGE SEAT
STAT: 3+22.30
ELEV 961.57
12" X 12" X 8' TREATED TIMBER SILL, TYP.12" X 12" X 8' TREATED TIMBER SILL, TYP.12" X 12" X 8' TREATED TIMBER SILL
C/L OF TOP OF BRIDGE SEAT
STAT: 2+33.30
ELEV 959.37
C/L OF TOP OF BACKWALL
ELEV: 965.21
4'-6" HEEL
3' TOE
14.75'
14.75'
86' SPAN (OUT-TO-OUT)
86' (CENTERLINE OF BEARING TO CENTERLINE OF BEARING)
STA 2+34.30
ELEV 965.21
9'-6"
ABUTMENT #1
3'-6"
13'-5 12" C/L OF TOP OF BOARDWALK
FINISHED GRADE DECK
ELEV 965.21
8' MIN. DRILLED DEPTH
AT THE BOARWALK
PLATFORM
LAKE RUSSELL
0.
960.000
0.
0.
950.000
960.000
950.000
950.000
950.000
950.000
940.000
0.
0.
10001
INTERSECTION
OF TRAIL
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF TRAIL HORIZONTAL
ALIGNMENT
CUT EXISTING 14"Ø DEAD TREE
AND SCATTER ON SITE
PERPENDICULAR TO DOWNHILL
SLOPE
TOP OF SLOPE, TYP.
TOE OF SLOPE, TYP.
DO NOT DAMAGE OR DISTURB
EXISTING 32" Ø TREE
EXISTING ℄ OF TRAIL
(DO NOT DISTURB)
BEGIN APPROACH TO TRAIL BRIDGE
℄ OF EXISTING DITCHLINE, TYP.
℄ OF EXISTING DITCHLINE, TYP.
INSTALL NEW HDPE CULVERT
86'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM STRINGER
TRAIL BRIDGE
3+63
-0+00
1+
2+00
3+00
8'
BEGINNING OF EXISTING
DROP DOWN STONE STEPS
(DO NOT DISTURB DURING
EXCAVATION)
ABUTMENT #3
ABUTMENT #2
ABUTMENT #1
29'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM
STRINGER TRAIL BRIDGE
BOARDWALK
PLATFORM DECK
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF PROPOSED
BOARDWALK
ALIGNMENT
C-110
C-110
C-109
REGION 8
SOUTHERN REGION
SHEET 5 OF 21
C-102DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
TRAIL BRIDGE
PLAN AND PROFILE
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
TRAIL BRIDGE VERTICAL PROFILE
(NTS)
SITE PLAN
(NTS)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
0+13 0+20 0+40 0+50 0+60 0+80 0+86
CONSTRUCT 3"X12"
BACKWALL (BACKING
PLANKS)
1V:6H
20'
20'
15'
BOTTOM OF SHAFT
ELEV 948.91
BOTTOM OF SHAFT
ELEV 948.52
BOTTOM OF SHAFT
ELEV 947.78
OF
BEARING
OF
BEARING ℄
OF
BEARING
TOP OF FINISHED
BOARDWALK DECK
C/L OF BEARING
OF BOARDWALK
STA 0+68.77
C/L OF BEARING
OF BOARDWALK
STA 0+34.13
BEGIN BOARDWALK
FINISHED DECK GRADE
STAT: 0+14.57
ELEV 965.21
15'-10"
FURNISH, PLACE, AND COMPACT
AGGREGATE BASE GRADING C, IN
NTE 6" COMPACTED LIFTS FOR FULL
WIDTH TO BOARDWALL FINISHED
SURFACE GRADE
C/L OF BEARING
OF BOARDWALK
STA 0+53.92
5 34" WIDE X 15 18" DEPTH
GLULAM STRINGER, TYP.
5 34" WIDE X 15 18" DEPTH
GLULAM STRINGER, TYP.
END BOARDWALK
FINISHED DECK GRADE
STAT: 0+69.81
ELEV 957.17
℄ OF 13'-5 12" WIDE
TIMBER SAWN SILL
LAKE RUSSELL
0.
960.000
0.
0.
950.000
960.000
950.000
950.000
950.000
950.000
940.000
0.
0.
10001
INTERSECTION
OF TRAIL
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF TRAIL HORIZONTAL
ALIGNMENT
CUT EXISTING 14"Ø DEAD TREE
AND SCATTER ON SITE
PERPENDICULAR TO DOWNHILL
SLOPE
TOP OF SLOPE, TYP.
TOE OF SLOPE, TYP.
DO NOT DAMAGE OR DISTURB
EXISTING 32" Ø TREE
EXISTING ℄ OF TRAIL
(DO NOT DISTURB)
BEGIN APPROACH TO TRAIL BRIDGE
℄ OF EXISTING DITCHLINE, TYP.
℄ OF EXISTING DITCHLINE, TYP.
INSTALL NEW HDPE CULVERT
86'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM STRINGER
TRAIL BRIDGE
3+63
-0+00
1+
2+00
3+00
8'
BEGINNING OF EXISTING
DROP DOWN STONE STEPS
(DO NOT DISTURB DURING
EXCAVATION)
ABUTMENT #3
ABUTMENT #2
ABUTMENT #1
29'-0" SPAN X 6'-2 7
16" INSIDE
CLEAR WIDTH GLULAM
STRINGER TRAIL BRIDGE
BOARDWALK
PLATFORM DECK
℄ OF TRAIL HORIZONTAL
ALIGNMENT
℄ OF PROPOSED
BOARDWALK
ALIGNMENT
C-110
C-110
C-109
REGION 8
SOUTHERN REGION
SHEET 6 OF 21
C-103DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
BOARDWALK
PLAN AND PROFILE
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
BOARDWALK VERTICAL PROFILE
(NTS)
SITE PLAN
(NTS)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
GENERAL NOTES:
1. ALL STRINGERS SHALL HAVE A "CAMBER" BASED ON A 900-FT RADIUS.
2. RUNNING PLANKS NOT SHOWN IN THE ABOVE FOR CLARITY.
3. CONTRACTOR SHALL FASTEN DECK PLANKS TO STRINGERS WITH TWO ROWS
60d (6-INCH) RING SHANK NAILS PER PLANK AT EACH STRINGER, OR SCREWS.
ALTERNATE CENTERS.
4. CONTRACTOR SHALL FASTEN RUNNING PLANKS TO DECK WITH 40d (5-INCH
RING SHANK) NAILS OR SCREWS AT 24-INCHES SPACING. ALTERNATE
CENTERS WITH TWO AT EACH END.
5. THE CONTRACTOR SHALL SPLICE RAILS AT POSTS. RAILS SHALL BE
CONTINUOUS FOR TWO POST SPACES. DO NOT LOCATE MORE THAN ONERAIL
SPLICE AT ANY ONE POST.
STRINGER SPAN (℄ BEARING - ℄ BEARING)
STRINGER TOTAL LENGTH (OUT-TO-OUT)
3" x 8" (NOMINAL SIZE) MINIMUM DECK PLANKS. MAINTAIN 3/8"± GAP BETWEEN PLANKS
BACKWALL
WIDTH
(VARIES)
VARIES
2'-6"
MAXIMUM
POSTS @ 5'-0" MAXIMUM
VARIES
2'-6"
MAXIMUM
THE CONTRACTOR SHALL INSTALL DIAPHRAGMS AT THIRD POINTS OF SPAN AND WITHIN A DISTANCE OF THE
DEPTH FROM THE ABUTMENTS
12"X12"X8' TREATED
TIMBER SILL (CUBE),
TYP. TO BOTH ABUTMENTS
BACKWALL HEIGHT
(VARIES)
6"
HANDRAIL CAP (SHOWN
AS DASHED LINE)
6" RING SHANKS NAILS
2"
5" RINGSHANK NAILS
(SEE NOTE FOR SPACING)
3" X 6" BACKING PLANK STIFFENER
ATTACH W/(2)-1/2"Ø BOLTS W/(2)-
MALLEABLE IRON WASHERS PER
BACKING PLANK SPACED
DIAGONALLY FROM EACH OTHER
ADJUST DIAPHRAGM LOCATION
AS REQUIRED TO AVOID POST BOLTS
℄ OF BRIDGE
℄ OF
ABUTMENT
℄ OF
ABUTMENT
ALL STRINGERS SHALL
HAVE A "CAMBER"
BASED ON A 900-FT
RADIUS
HANDRAIL (TRAIL
BRIDGE SECTION VIEW)
℄ OF
ABUTMENT
℄ OF
ABUTMENT
6"
4" X 6" POST (TYP.). ALL POSTS
SHALL BE ERECTED PERPENDICULAR
TO THE TRAIL BRIDGE CENTERLINE AT 90°
GLULAM STRINGER
PER TABLE 1-D3 18" X DEPTH VARIES GLULAM
DIAPHRAGM. SEE SUBSHEET
D-103 FOR DETAILS AND TABLE
1D ABOVE FOR DIAPHRAGM SPACINGS
2" X 6" X 4'-6"
VERTICAL END SUPPORT
FOR RAILS (TYP) (2)-16d
NAILS INTO EACH RAIL
W/(2)-3/8"Ø X 3 1/2" LAG
SCREWS AT BASE
*TABLE-1D: GLULAM STRINGER SIZE REQUIREMENTS - PER AASHTO LRFD SPECIFICATIONS
** STRINGER
TOTAL LENGTH
(FEET)
SITE NAME
TRAIL BRIDGE (4) - 7 12" WIDE X 54" DEPTH (GLULAM GIRDER SIZE)
90 PSF
PEDESTRIAN LIVE LOAD
DESIGN LOADING IN POUNDS PER SQUARE FOOT (PSF)
SPECIES - SP/SP, COMBINATION SYMBOL 24F - V3
C-105
C-105
(4) - 7 12" WIDE X 54" DEPTH (GLULAM GIRDER SIZE)TRAIL BRIDGE
(6) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGERBOARDWALK PLATFORM DECK
(8) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGERBOARDWALK DECK
(4) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGER15'-10" SPAN LENGTHBOARDWALK DECK
20'-0" SPAN LENGTH
14'-0" SPAN LENGTH
29'-0" SPAN LENGTH
86'-0" SPAN LENGTH
REGION 8
SOUTHERN REGION
SHEET 7 OF 21
C-104DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
TRAIL BRIDGE
DETAILS
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
TRAIL BRIDGE SIDE (ELEVATION) VIEW2
TRAIL BRIDGE PLAN VIEW1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
1'-2" TYP.
TO BOTH SIDES
(NOMINAL SIZE SHOWN)
3 12" TYP. TO BOTH SIDES
(ACTUAL SIZE SHOWN)
6'-2 7
16" INSIDE CLEAR WIDTH
3'-8" TYP.
REFER TO BEARING SHOE DETAIL 2 ON SUBSHEET
C-110. TYP TO ALL TRAIL BRIDGE ONLY BEARING SHOES
12" X 12" X 8' TREATED
TIMBER SILL, TYP.
(NOMINAL SIZE SHOWN)
10 34", TYP.
9 58", TYP.
2"
10 12" O.C. TYP.
TO BOTH SIDES
5'-1" POST FULL
LENGTH (TYP.
TO BOTH SIDES)
℄ OF TRAIL
BRIDGE
6'-5 12"
7'-4 12" TOTAL WIDTH
2" X 8" S4SRAIL CAP FASTEN TO EACH
POST AND TOP RAIL W/(2)-#10 X 4"
WOOD SCREWS ON 2'-0" CENTERS
8' SILL TOTAL WIDTH
7 12", TYP.
4"X6" (NOMINAL) X
1'-2" HEIGHT S4S
BLOCKING, TYP.
2" TYP.
4"X6" POST FABRICATE W/
TAPERED END (TOP) AND
W/ (2) - 13
16"Ø HOLES AT BOTTOM
(ACTUAL SIZE SHOWN), TYP. TO
BOTH SIDES
10 34", TYP.
9 58", TYP.
3/4"Ø BOLT X 18 12" LENGTH (MIN.)
ALL THREAD WITH NUT AND
(2)- MALLEABLE IRON WASHERS.
TYP. TO BOTH SIDES
2" X 6" S4SRAIL, FASTEN RAILS
TO POSTS W/(2)- #10 X 4" WOOD
SCREWS AT EACH CONNECTION.
(TYP. TO BOTH SIDES)
2 12"
30°
4'-6" OR 54"
STRINGER DEPTH, TYP.
1'-9"
O.C. SPACING TYP.
3'-1 34"
DIAPHRAGM
1'-1 7
16" WIDE X 5 18" THICK
DIAPHRAGM. SEE THIS
SUBSHEET C-105 FOR
DETAILS. EACH DIAPHRAGM
DEPTH SHALL BE 3'-1 34"
WHICH IS 70% OF THE
STRINGER DEPTH
18"
FOOTING
THICKNESS, TYP.
REINFORCED CONCRETE
ABUTMENT #1, #2, AND #3
HEIGHT VARIES
(REFER TO SUBSHEET
C-111 & C-112)
2x8 RUNNING PLANKS
(SHOWN IS ACTUAL SIZE)
3x8 DECKING (SHOWN
IS THE ACTUAL SIZE)
REINFORCED CONCRETE
ABUTMENT #1, #2, AND #3
DURING DIAPHRAGM INSTALLATION,
EACH DIAPHRAGM SHALL NOT
EXCEED 8'-0" ON CENTER
SPACING FOR FULL LENGTH
OF TRAIL BRIDGE SPAN. THEREFORE
34 TO 36 DIAPHRAGMS ARE REQUIRED
FOR THIS TRAIL BRIDGE
(5) - 1" Ø X 30" LENGTH GALVANIZED
ANCHOR BOLT W/ A MIN. OF 6"
LENGTH THREAD AT TIP WITH
NUT & WASHERS. TYP.
12"
8'
4" 4"
1'-10 78" 1'-10 78"1'-9"1'-9"
SIMPSON HU5.25/12TF MOUNT
HANGER THAT'S G90 GALVANIZED
(OR EQUAL). TYP. FOR ALL DIAPHRAGMS.
B
B
STRINGER DEPTH VARIES
(INCLUDES BRIDGE & BOARDWALK)
STRINGER
WIDTH
MALLEABLE IRON
WASHERS (TYP.)
5 18" WIDE GLULAM
DIAPHRAGM, TYP.
DIAPHRAGM (LENGTH VARIES)
GLULAM STRINGER O.C. SPACING
STRINGER3
4"Ø TIE RODS (FULL
LENGTH AS SHOWN) TYP.
4"
DIAPHRAGM
DEPTH
2 12"
2 12"
6"
OFFSET DIAPHRAGMS AT
INTERIOR STRINGER
1 12"
4"
1 12"
5 18" WIDE GLULAM
DIAPHRAGM, TYP.
1" SQUARE PLY ROUTE
AT TOP & BOTTOM
REGION 8
SOUTHERN REGION
SHEET 8 OF 21
C-105DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
TRAIL BRIDGE
SECTION VIEW
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
TRAIL BRIDGE SECTION VIEW1
DIAPHRAGM SECTION VIEW DIAPHRAGM SECTION B-B
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
20'-0" O .C. M
AX.
(BOARDWALK GLULAM STRINGERS AND FOUNDATION
SHAFTS SHALL NOT EXCEED 20'-0" O
.C. ℄ SPACING)
6'-9 9
16" CLEAR WIDTH
2"X8" S4S RAIL CAP
(NON-TREATED) TYP..
REFER TO SUBSHEET
C-107
4"X6" POST FABRICATED W/
TAPERED END (TOP) & WITH
(2) - 13"/16"Ø HOLES AT BOTTOM,
TYP.REFER TO SUBSHEET C-107
4"Ø BOLT X 16" LENGTH
W/ NUT AND (2)-MALLEABLE
IRON WASHERS, TYP. REFER
TO SUBSHEET C-107
DIAPHRAGM, TYP.
5 34" WIDE X 15 18" DEPTH GLULAM
STRINGER EACH, SPACED AT 20'-0"
O.C. MAX (BOARDWALK STRINGER), TYP
3"X8" MIN. DECK PLANKS
(3"X12" SHOWN). REFER
TO SUBSHEET C-107
2"X8" MIN. RUNNING PLANKS
(2"X12" SHOWN). REFER TO
SUBSHEET C-107
TREATED TIMBER SILL.
REFER TO SUBSHEET
C-107, C-108, C-109, AND
C-110, TYP.
BEARING SHOE. REFER TO
SUBSHEET C-109 & C-110, TYP.
TWO (2) GLULAM SHOWN FOR
CLARITY. REFER TO SUBSHEET
C-107 & C-108 FOR ACTUAL HOW
MANY GLULAM STRINGERS ARE
REQUIRED, TYP.
5 34" EACH,
TYP.
3"X12" BACKWALL
(BACKING PLANKS),
REFER TO SUBSHEET
C-103, TYP.
℄ OF TRAIL HORIZONTAL
ALIGNMENT
APPROACH FILL
FILL SLOPE
CATCHPOINT
END OF BOARDWALK.
REFER TO SUBSHEET
C-103
TRAIL BOARDWALK RAILING
SYSTEM. REFER TO SUBSHEET
C-107, TYP.
ISOMETRIC VIEW GENERAL NOTES
1. BOARDWALK TO TRAIL BRIDGE APPROACH
NOT SHOWN FOR CLARITY.
2. FOUNDATION SHAFTS NOT SHOWN FOR
CLARITY.
3. ALL GLULAM STRINGERS NOT SHOWN FOR
CLARITY.
FURNISH, PLACE, AND COMPACT
6" MIN. DEPTH OF AGGREGATE
BASE GRADING C
3"X8" MIN. DECK PLANKS
(3"X12" SHOWN). REFER
TO SUBSHEET C-107
2"X8" MIN. RUNNING PLANKS
(2"X12" SHOWN). REFER TO
SUBSHEET C-107.
REGION 8
SOUTHERN REGION
SHEET 9 OF 21
C-106DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
BOARDWALK
STRUCTURAL
NOTES
M.P. 2.18 PROPOSED TRAIL BOARDWALK
ISOMETRIC VIEW
GENERAL NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN
ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF TRAILS AND TRAILS BRIDGES ON FEDERAL PROJECTS.
TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE
REQUIREMENTS OF THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE
SPECIFIED BELOW. GLULAM MEMBERS SHALL CONFORM TO THE AMERICAN NATIONAL
STANDARD, STANDARD SPECIFICATIONS FOR STRUCTURAL GLUED LAMINATED TIMBER OF
SOFTWOOD SPECIES (ANSI 117) FOR THE COMBINATION, SPECIES, USE, AND APPEARANCE
SPECIFIED BELOW.
GLULAM STRINGERS
- COMBINATION SYMBOL 24F-V3, SPECIES - SP/SP DRY CONDITION USE AND
ARCHITECTURAL APPEARANCE
CURB MEMBERS, SILLS, AND BACKING PLANKS
- COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.1 GRADE, GRADING
RULES AGENCY - WWPA, WCLIB
RAILS, DECKING, STRINGERS, HEADERS, & POSTS (SEE PROJECT CRITERIA)
PRESSURE TREATED
O REDWOOD, S4S, NO.1 GRADE GRADING RULES AGENCY - RIS
O WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY
- WWPA, WCLIB
TREATED
O HEM - FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY - WWPA, WCLIB
O SOUTHERN PINE, S4S, NO.1 GRADE GRADING RULES AGENCY
TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR
TREATMENT TYPE. PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE
CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE
TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE
REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE
(WWPI) “BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC
ENVIRONMENTS”.
GLULAM STRINGER
- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND -
EXPOSED (UC3B)
- ANY NON-PENTACHLOROPHENAL TREATMENT
DECKING, RUNNING PLANKS, & RAILING SYSTEM,
- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND -
EXPOSED (UC3B)
- MICRONIZED COPPER AZOLE
SILLS, BACKING PLANKS, CRIBS, TIMER WALLS, IF TREATED
- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND CONTACT -
HEAVY DUTY (UC4B)
- MICRONIZED COPPER AZOLE
FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED BY THE
CONTRACTOR FOR FIELD TREATING OF LUMBER MATERIAL. ALL ABRASIONS AND FIELD CUTS
APPROVED BY THE CO AND/OR COR SHALL BE CAREFULLY TRIMMED AND GIVEN THREE (3)
BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF
BOLTS OR NAILS AS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO
INSERTING THE FASTENERS.
HARDWARE AND STRUCTURAL STEEL: SEE PROJECT DESIGN CRITERIA FOR STEEL
HARDWARE FINISH. GALVANIZED OR UNFINISHED HARDWARE SHALL MEET THE
REQUIREMENTS OF AASHTO M270, GRADE 36, WITH NUTS AND BOLTS AASHTO M270, GRADE
50W, WITH BOLTS AND NUTS CONFORMING TO ASTM A325, TYPE 3. USE MALLEABLE IRON
WASHERS AGAINST WOOD UNLESS OTHERWISE NOTED.
WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN
ACCORDANCE WITH AWS D1.1 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND
INTENDED USE OR SERVICE. ALL HARDWARE TO BE GALVANIZED ZINC, OR OTHERWISE
COATED TO INCLUDE W8X31.
CONCRETE:
1. ALL CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,500 PSI
2. REINFORCING STEEL SHALL BE AS FOLLOWS:
2.1. STIRRUPS AND TIES.............ASTM A615 GRADE 60
2.2. ALL OTHER REINFORCING........ASTM A615 GRADE 60
2.3. WELDED WIRE FABRIC............ASTM A185
3. PROVIDE BAR SUPPORTS AND SPACERS IN ACCORDANCE WITH ACI DETAILING MANUAL. ALL
BAR SUPPORTS IN AREA WHERE CONCRETE WILL BE EXPOSED SHALL HAVE PLASTIC FEET.
4. DETAILING, FABRICATION AND PLACING OF REINFORCING SHALL CONFORM TO APPLICABLE
PROVISIONS OF ACI 315 AND ACI 318.
5. FOOTINGS SHALL HAVE NO HORIZONTAL JOINTS. ANY STOP IN CONCRETE WORK MUST BE
MADE WITH VERTICAL KEYED BULK- HEADS. ALL REINFORCEMENT SHALL CONTINUE
THROUGH JOINTS.
6. BEFORE PLACING CONCRETE, THE CONTRACTOR SHALL NOTIFY ALL SUBCONTRACTORS TO
BE SURE ALL SLEEVES, CONDUIT, CHASES, ETC., ARE PROPERLY INSTALLED. THE
CONTRACTOR SHALL NOTIFY THE CO AND/OR COR AS SOON AS PRACTICAL, BUT AT LEAST 72
HOURS PRIOR TO PLACING CONCRETE TO ALLOW INSPECTION OF REINFORCING AND
EMBEDDED ITEMS.
7. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF. WITH THE FINDINGS AND
RECOMMENDATIONS OF THE GEOTECHINCAL REPORT AND SHALL PERFORM ALL EARTHWORK
OPERATIONS IN ACCORDANCE WITH THESE RECOMMENDATIONS. .
8. FOOTING CONCRETE SHALL BE PLACED THE SAME DAY. EXCAVATIONS ARE OPENED. IF THIS
IS IMPOSSIBLE, STEPS SHALL BE TAKEN TO ADEQUATELY PROTECT THE OPEN EXCAVATION.
9. MATERIAL SHALL COMPLY WITH REQUIREMENTS OF DESIGNATED SPECIFICATIONS OF
AMERICAN SOCIETY FOR TESTING AND MATERIALS.
10. CONSTRUCTION PROCEDURES SHALL COMPLY WITH RECOMMENDATIONS SET FORTH IN
DESIGNATED STANDARDS OF AMERICAN CONCRETE INSTITUTE
11. ADMIXTURE OTHER THAN AIR-ENTRAINING ADMIXTURE SHALL NOT BE USED WITHOUT THE
APPROVAL OF THE ARCHITECT/ENGINEER. AIR-ENTRAINING ADMIXTURES SHALL CONFORM
TO ASTM C260
12. CURING COMPOUND SHALL CONFORM TO FEDERAL SPECIFICATION 19. TT-C800A AND ASTM
C309
13. REINFORCEMENT SHALL BE PLACED AND SECURED PRIOR TO POURING CONCRETE
14. AFTER THE CO AND/OR COR HAS INSPECTED AND ACCEPTED THE SURFACE FINISH OF ALL
CONCRETE WORK, CLEAN THE SURFACES OF DUST, FOREIGN MATTER, AND FORM OIL AND
APPLY A CONCRETE STAIN OF THE COLOR PREFERRED BY THE USDA FORESTRY SERVICE,
THE STAIN SHALL BE APPLIED TO ALL EXPOSED SURFACES AND 6 INCHES BELOW GROUND
SURFACE.
15. REINFORCEMENT SHALL BE PLACED AND SECURED PRIOR TO POURING CONCRETE
16. NO CONCRETE SHOULD COME IN CONTACT WITH STREAM FLOW
DEWATERING PLAN:
THE CONTRACTOR SHALL UNDERSTAND THAT ANY EXCAVATION MAY ENCOUNTER WATER. THUS,
FOUNDATIONS MAY NEED TO BE FORMED OR SLEEVED TO PROTECT THE EXCAVATION. THESE
FORMS OR SLEEVES SHALL NOT EXTEND INTO ROCK.
FOOTING CONCRETE SHALL BE PLACED THE SAME DAY EXCAVATIONS ARE OPENED. BEFORE
CONCRETE PLACEMENT FOOTINGS SHALL BE CHECKED FOR WATER INTRUSION, MUD, AND ANY
OTHER DEBRIS. ANY FOUND WILL BE PUMPED OUT AND THE EXCAVATION RECHECKED FOR
CLEANLINESS BEFORE CONCRETE PLACEMENT.
ANY WATER/MATERIAL REMOVED FROM THE EXCAVATION SHALL NOT BE PUMPED INTO THE
CREEK BUT INTO THE APPROPRIATE EROSION CONTROL/SILT DEVICE.
CONTRACTORS RESPONSIBILITIES:
1. MATERIAL, WORKMANSHIP, AND DESIGN SHALL CONFORM TO THE
REFERENCED AASHTO LRFD CODE(S).
2. COORDINATE STRUCTURAL DOCUMENTS WITH THE ARCHITECTURAL, AND
OTHER CONTRACT DOCUMENTS. ARCHITECT/STRUCTURAL ENGINEER SHALL
BE NOTIFIED OF ANY DISCREPANCY OR OMISSION.
3. VERIFY THE DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE
STARTING WORK. ANY DISCREPANCY BETWEEN SUCH DETAILS AND
DIMENSIONS AS MAY OCCUR SHALL BE REPORTED TO THE CONTRACTING
OFFICER FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. NOTIFY, IN WRITING, THE STRUCTURAL ENGINEER OF CONDITIONS
ENCOUNTERED IN THE FIELD CONTRADICTORY TO THOSE SHOWN IN THE
STRUCTURAL DOCUMENTS.
5. CONTRACTOR HAS SOLE RESPONSIBILITY FOR MEANS, METHODS,
TECHNIQUES, SEQUENCES, AND PROCESS OF CONSTRUCTION.
6. CONTRACTOR HAS SOLE RESPONSIBILITY FOR THE DESIGN, ADEQUACY, AND
SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC.
7. CONTRACTOR HAS THE SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA
SAFETY REGULATIONS.
8. CONTRACTOR IS RESPONSIBLE REPAIRING ANY DAMAGE TO TRAILS MADE BY
EQUIPMENT.
DECKING NOTE:
1. IF ALTERNATE DECKING IS USED IN LIEU OF WOOD, THE DECKING
SHALL BE CAPABLE OF SUPPORTING A 90 PSF LIVE LOAD AS
WELL AS A 6-TON POINT LOAD UTV LOADING AND SHALL BE
APPROVED BY THE CONTRACTING OFFICER (C.O.) IN ADVANCE
PRIOR TO CONTRACTOR'S ORDERING AND FIELD INSTALLATION.
COMPLETION OF THE STRUCTURE: THE CONTRACTOR IS REQUIRED TO COMPLETE THE WORK
IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. MATERIAL, LABOR, OR CONSTRUCTION
OPERATIONS, NOT OTHERWISE SPECIFIED, ARE TO BE INCLUDED IN THE BID ITEM MOST
APPROPRIATE FOR THE WORK INVOLVED AND OTHERWISE CONSIDERED INCIDENTAL TO THE
CONTRACT.
STRUCTURAL TIMBER AND LUMBER, TREATED, PEDESTRIAN BRIDGES AND BOARDWALK: THESE
ITEMS OF WORK SHALL INCLUDE ALL LUMBER, GLULAM, FITTINGS, CONNECTIONS,
DIAPHRAGMS, RAILINGS, AND ANY OTHER ITEMS ABOVE THE FOUNDATIONS.
DRILLED SHAFT, 24-INCH DIAMETER: ALL WORK TO BORE, FORM OR SLEEVE THE HOLE, INSTALL
REINFORCEMENT, CONCRETE, ANCHOR BOLTS, ECT IS INCIDENTAL TO THE RESPECTIVE
SCHEDULE OF ITEMS PAY ITEMS.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EXISTING GROUND
GRADE (FG)
DEPTH
VARIES
8'-0" MIN. AT BOARDWALK PLATFORM
MEETS TRAIL BRIDGE SECTION.
7'-0" MIN. IN ALL OTHER
LOCATIONS. (SEE NOTE #1)
3 12", TYP.
FOUNDATION DRILLED
SHAFT, TYP
℄ OF
FOUNDATION
SHAFT
1'-6 3
16" WIDE X 5 18" THICK
X 10 12" DEPTH DIAPHRAGM
30°
OF
BOARDWALK
6'-9 9 16"
CLEAR WIDTH
3"X8" MN. DECK PLANKS
(3"X12" SHOWN)
2"X8" MIN.
RUNNING PLANKS
(2"X12" SHOWN)
(2)- 34"Ø THREADED BOLT X 16" LENGTH)
W/ NUT AND (2) - MALLEABLE IRON WASHERS
2"X6" S4S RAIL, FASTEN RAILS
TO POSTS W/ (2) - #10 X 4"
WOOD SCREWS AT EACH
CONNECTION, TYP.
4"X6" POST FABRICATE
W/ TAPERED END (TOP)
AND W/ (2) - 13
16"Ø HOLES
AT BOTTOM
4"X6"X1'-2" S4S
BLOCKING, TYP.
2"
TYP.
10 34" TYP.
5' -1
" P O
ST
L
EN
G
TH3'-8"
2"X8" S4S RAIL CAP FASTEN TO
EACH POST AND TO RAIL W/ (2) -
#10 X 4" WOOD SCREWS ON 2'-0"
CENTERS
2 14"
10 12"
8"± SPACING
GLULAM STRINGER, TYP.
1'-9" TYP.
1" Ø X 30" LENGTH GALVANIZED ANCHOR BOLT
W/ A MIN. OF 6" LENGTH THREAD AT TIP. IN
ADDITION W/ NUT & WASHER. (ANCHOR BOLT
SHALL BE EMBEDDED 1'-4" INTO SHAFT), TYP..
ANCHOR SHALL BE INSTALLED FACING AWAY FROM
EDGE OF SHAFT AS SHOWN, TYP TO ALL.
2' O.C.
TYP.
5 34" WIDE X 15 18" DEPTH
GLULAM STRINGER, TYP.
C-107
REINFORCEMENT
LAYOUT
A C-107
A C-107
℄ OF
FOUNDATION
SHAFT
OF
BOARDWALK
TREATED SAWN TIMBER SILL
THREADED ANCHOR BOLT
1" Ø X 30" LENGTH GALVANIZED ANCHOR
BOLT W/ A MIN. OF 6" LENGTH THREAD AT
TIP. IN ADDITION WITH NUT AND WASHER,
TYP. (ANCHOR BOLT SHALL BE EMBEDDED
12" INTO SHAFT), TYP.
6 12" 6 12"
9'-6" LENGTH TREATED SAWN TIMBER SILL
2' DIA. TYP. 2' DIA. TYP.5'-6"
7'-6" O.C. DRILLED SHAFT SPACING
2"X8" MIN. RUNNING
PLANKS, TYP.
3"X8" MIN. DECK, TYP.
20'-0" O.C. MAX
(BOARDWALK GLULAM STRINGERS AND FOUNDATION
SHAFTS SHALL NOT EXCEED 20'-0" O.C. ℄ SPACING)
BEARING SHOE. REFER
TO SUBSHEET S-103 & S-104,
TYP.
2"X8" S4S RAIL CAP FASTEN TO
EACH POST AND TO RAIL W/ (2) -
#10 X 4" WOOD SCREWS ON 2'-0"
CENTERS
2"X6" S4S RAIL, FASTEN RAILS
TO POSTS W/ (2) - #10 X 4"
WOOD SCREWS AT EACH
CONNECTION, TYP.
15 18" DEPTH GLULAM STRINGER
SPACED AT 20'-0" O.C. MAX
(BOARDWALK STRINGER), TYP.
REFER TO SUBSHEET
C-105 FOR BOLTS, NUTS,
& WASHERS LAYOUT
4"X6" POST FABRICATE
W/ TAPERED END (TOP)
AND W/ (2) - 13
16"Ø HOLES
AT BOTTOM
3-8"
FOUNDATION DRILLED
SHAFT, TYP
SHAFT FOUNDATION NOTES:
1. ALL FOUNDATIONS SHALL BE
EMBEDDED A MINIMUM OF 2'-0"
INTO ANY BEDROCK
ENCOUNTERED AND
ANCHORED WITH (2) - #5
DOWELS. ADHESIVE ANCHORS
A MINIMUM OF 18" DEPTH AND A
MINIMUM OF 6 12" FROM THE
EDGE OF EACH SHAFT. SEE
BOARDWALK PROFILE TABLE
FOR BOTTOM OF SHAFT
ELEVATIONS.
2. ALL FOUNDATION SHAFTS
SHALL HAVE A MIN. 28-DAYS PSI
STRENGTH OF 4,500 PSI.
3. CONTRACTOR SHALL MACHINE
PLACE RIPRAP AROUND ALL
FOUNDATION SHAFTS. REFER
TO RIPRAP DETAIL SHEET.
EXISTING GROUND GRADE
MACHINE PLACE RIPRAP
AROUND ALL FOUNDATION
SHAFTS AS IT MEETS "EG"
C-108 1
C-107
EXISTING
GROUND
GRADE, TYP.
3" CLR. TYP.
8' -0
" M
IN
. A T
BO
AR
D W
AL
K
PL
AT
FO
R
M M
EE
TS
T R
AI
L
BR
ID
G E
SE
C
TI
O
N
7' -0
" M
IN
. I N
A
LL
O
TH
ER
LO
C
AT
IO
N
S.
(S
EE
N
O
TE
1)
2" CLR.
TYP.
(8)- #8 LONGITUDINAL
(SPACED EQUALLY
AT 8 58" O.C.)
#4 REBAR TIE, SPIRAL,
OR HOOP @ 12" O.C., TYP.
4,500 PSI CONCRETE
2" CLR.
TYP.
℄ OF
FOUNDATION
SHAFT
2'-0" DIA. TYP.
1" Ø X 30" LENGTH GALVANIZED
ANCHOR BOLT W/ A MIN. OF 6" LENGTH
THREAD AT TIP. IN ADDITION WITH NUT
AND WASHER, TYP. (ANCHOR BOLT SHALL
BE EMBEDDED 1'-4" INTO SHAFT), TYP.
1'-4"
3" CLR. TYP.
8' -0
" M
IN
. A T
BO
AR
D W
AL
K
PL
AT
FO
R
M M
EE
TS
T R
AI
L
BR
ID
G E
SE
C
TI
O
N
7' -0
" M
IN
. I N
A
LL
O
TH
ER
LO
C
AT
IO
N
S.
(S
EE
N
O
TE
1)
2" CLR. TYP.
(8)- #8 LONGITUDINAL
(SPACED EQUALLY
AT 8 58" O.C.)
#4 REBAR TIE, SPIRAL,
OR HOOP @ 12" O.C., TYP.
4,500 PSI CONCRETE
2" CLR. TYP.
1'
℄ OF
FOUNDATION
SHAFT
12"X12" (NOMINAL SIZE) X 9'-6" LENGTH
TREATED SAWN TIMBER SILL, TYP.
1" Ø X 30" LENGTH GALVANIZED
ANCHOR BOLT W/ A MIN. OF 6"
LENGTH THREAD AT TIP. IN
ADDITION WITH NUT AND
WASHER (ANCHOR BOLT SHALL
BE EMBEDDED 1'-4" INTO SHAFT),
TYP.
28" MIN.
LONGITUDINAL STEEL, TYP.
TRANSVERSE STEEL, TYP.
1'-8 18" DIA. REBAR CAGE
2'-0" DIA. TYP.
15 18"
1'-8 18" DIA. REBAR CAGE
EXISTING GROUND
GRADE (EG)
5'-4" MIN. TYP.
2' DIA. TYP. 2' DIA. TYP.
2" CLR. TYP.
℄ OF
FOUNDATION
SHAFT
℄ OF
FOUNDATION
SHAFT
9'-6" LENGTH TREATED SAWN TIMBER SILL
(8)- #8 LONGITUDINAL
(SPACED EQUALLY
AT 8 58" O.C.)
#4 REBAR TIE,
SPIRAL, OR
HOOP @
12" O.C., TYP.
1 5
16" Ø HOLE
WITH A 1" Ø X
30" LENGTH
GALVANIZED
ANCHOR
BOLT.TYP.
℄ OF
TREATED
SILL
6 12"6 12"
1 5
16" Ø HOLE WITH A
1" Ø X 30" LENGTH
GALVANIZED ANCHOR
BOLT. TYP.
W / 2
W = 12"
(NOMINAL SIZE)
FOUNDATION DRILLED
SHAFT, TYP
#4 REBAR TIE, SPIRAL,
OR HOOP @ 12" O.C., TYP.
12"X12" (NOMINAL SIZE) TREATED
SAWN TIMBER SILL. REFER TO
SUBSHEET S-104
(8)- #8 LONGITUDINAL
(SPACED EQUALLY
AT 8 58" O.C.)
2" CLR. TYP.
5 9 16"
1' 5 9
16" 1'
7'-6" O.C. DRILLED SHAFT SPACING
5'-6"
BOARDWALK PLATFORM
TRAIL BRIDGE M.P.
2.18 STRINGR
4'-6" OR 54"
12" X 12" TREATED TIMBER SILL, TYP.
FINISHED GROUND
GRADE (FG)
24"Ø FOUNDATION DRILLED
SHAFT, TYP
(2)- 34"Ø THREADED BOLT X 16"
LENGTH) W/ NUT & (2) -
MALLEABLE IRON WASHERS
2"X6" S4S RAIL, FASTEN RAILS
TO POSTS W/ (2) - #10 X 4"
WOOD SCREWS AT EACH
CONNECTION, TYP.
4"X6"X1'-2" S4S
BLOCKING, TYP.
2' O.C.
TYP.
5 34" WIDE X 15 18" DEPTH
GLULAM STRINGER, TYP.
C-107
REINFORCEMENT
LAYOUT
A C-107
℄ OF
FOUNDATION
SHAFT
TREATED SAWN TIMBER SILL
THREADED ANCHOR
BOLT
10 5 16"
30°
OF
BOARDWALK
6'-9 9 16"
CLEAR WIDTH
2"X8" MIN.
RUNNING PLANKS
3'-9"
8"± SPACING
6 12"
M.P. 2.18 TRAIL BRIDGE
(EDGE OF 86'-SPAN STRINGER)
13'-5 12" LENGTH TREATED SAWN TIMBER SILL (OUT-TO-OUT)
12'-8 14" BOARDWALK PLATFORM
1' WIDE REINFORCED
CONCRETE BACKWALL
4"X6" POST FABRICATE W/
TAPERED END (TOP) AND
W/ (2) - 13
16"Ø HOLES AT BOTTOM
(ACTUAL SIZE SHOWN), TYP. TO
BOTH SIDES
1" Ø X 30" LENGTH GALVANIZED
ANCHOR BOLT W/ A MIN. OF 6"
LENGTH THREAD AT TIP. IN
ADDITION W/ NUT & WASHER.
(ANCHOR BOLT SHALL BE
EMBEDDED 1'-4" INTO SHAFT),
TYP.. ANCHOR SHALL BE
INSTALLED FACING AWAY FROM
EDGE OF SHAFT AS SHOWN,
TYP TO ALL.
6 12"
10'-5 7 16"
FINISHED GROUND
GRADE (FG)
3"X8" MIN. DECK PLANKS
9" 2' O.C.
TYP.
1'-9"
BEARING SHOE 2' O.C.
TYP.
EXTEND RAILING
IN THIS LOCATION
BOARDWALK PLATFORM
(FRONT VIEW)
TRAIL BRIDGE
(SIDE VIEW)
ABUTMENT #3
REGION 8
SOUTHERN REGION
SHEET 10 OF 21
C-107DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
BOARDWALK
SECTIONS AND
FOUNDATION
DETAILS
BOARDWALK TYPICAL ELEVATED SECTION
ELEVATION VIEW
BOARDWALK PLATFORM MEETS TRAIL BRIDGE SECTION3
BOARDWALK PROFILE
SIDE VIEW (NTS)
- SECTION A-A (DRILLED SHAFT)
SHAFT TO SILL ANCHOR BOLT NOTES:
1. ANCHOR BOLT SHALL MEET THE
REQUIREMENTS OF ASTM F1554
GRADE 55.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
℄ O F
BO
AR
D W
AL
K
2"X6" S4S RAIL, FASTEN RAILS
TO POSTS W/ (2) - #10 X 4"
WOOD SCREWS AT EACH
CONNECTION, TYP.
5'-0" O.C.
TYP
4"X6" POST FABRICATE
W/ TAPERED END (TOP)
AND W/ (2) - 13
16"Ø HOLES
AT BOTTOM
6' -9
9 16
C
LE
AR
W
ID
TH
2"X8" MIN.
RUNNING PLANKS
(2"X12" SHOWN)
8"± SPACING
3"X8" MIN. DECK, TYP.
1 12", TYP.
5" RINGSHANK NAILS
(SEE GENERAL NOTES)
6" RING SHANK NAILS
OF
BOARDWALK
9' -6
" L
EN
G
TH
T R
EA
TE
D S
AW
N
T
IM
BE
R
S
IL
L
OF
ABUTMENT
FOUNDATION DRILLED
SHAFT, TYP
3"X6" BACKING PLANK STIFFENER ATTACH
W/ (2)-1/2"Ø BOLTS W/ (2)-MALLEABLE IRON
WASHERS PER BACKING PLANK SPACED
DIAGONALLY FROM EACH OTHER, TYP. 4"X6" POST, TYP.
CONSTRUCT AT:
BEGINNING OF
BOARDWALK
BEARING SHOE, TYP.
14' ℄ OF BEARING TO ℄ OF BEARING
13'-5 12" LENGTH TREATED SAWN
TIMBER SILL (OUT-TO-OUT)
C/L OF TOP OF REINFORCED
CONCRETE BACKWALL.
STATIONING: 3+21.30
ELEV: 965.21'
24"Ø FOUNDATION
DRILLED SHAFT, TYP
24"Ø FOUNDATION
DRILLED SHAFT, TYP
15'
15' LENGTH TREATED SAWN
TIMBER SILL (OUT-TO-OUT)
TRAIL BRIDGE REINFORCED
CONCRETE FOUNDATION
13'-5 12" LENGTH TREATED SAWN
TIMBER SILL (OUT-TO-OUT)
THE 13'-5 12" LENGTH TREATED
SAWN SILL WILL MOUNT ON TOP
OF THE 15'-0" LENGTH SILL IN THIS
LOCATION
REFER TO SUBSHEET
C-109 FOR BEARING
SHOE DETAIL, TYP.
BEG
IN
BO
AR
D W
ALK
D
IR
EC
TIO
N
6'-9 9 16"
CLEAR WIDTH
℄O F
BO
AR
D W
ALK
5'-0" O.C.
TYP
ABUTMENT #3
8' LENGTH TREATED SAWN
TIMBER SILL (OUT-TO-OUT)
ABUTMENT #3
3'-6" TOE
8'-3" HEEL
13'1' 1'
14'-0" LENGTH X 5 34" WIDE X 15 18" DEPTH
GLULAM LAMINATED GIRDERS, TYP.
THE 13'-5 12" LENGTH TREATED
SAWN SILL WILL MOUNT ON TOP
OF THE 15'-0" LENGTH SILL IN THIS
LOCATION
20'-0" LENGTH X 5 34" WIDE X 15 18" DEPTH
GLULAM LAMINATED GIRDERS, TYP.
THE 13'-5 12" LENGTH TREATED SAWN SILL
WILL MOUNT ON TOP OF THE DRILLED
SHAFT IN THIS LOCATION
THE 13'-5 12" LENGTH TREATED SAWN SILL
WILL MOUNT ON TOP OF THE DRILLED
SHAFT IN THIS LOCATION
2"X6" S4S RAIL, FASTEN RAILS
TO POSTS W/ (2) - #10 X 4"
WOOD SCREWS AT EACH
CONNECTION, TYP.
10"
1' BACKWALL
ABUTMENT #3
8'-0" WIDE
REFER TO DETAIL 1 ON SUBSHEET C-110
FOR BOARDWALK AND BOARDWALK PLATFORM
ONLY BEARING SHOE DETAIL, TYP.
SHAFT O.C. SPACING, TYP
5'-3" TYP.
FOUNDATION
DRILLED
SHAFT (TYP.)
5'-3" TYP. 5'-3" TYP.
EDGE OF RIPRAP, TYP. PLACE GEOTEXTILE
BENEATH ALL RIPRAP. ALL GEOTEXTILE SHALL
BE "SEPARATION-STABILIZATION GEOTEXTILE,
CLASS 2, TYPE B. ALL GEOTEXTILE SHALL
OVERLAP A MIN. OF 2'-0"
5'-3" TYP.
5'-3" TYP.
PLACE GEOTEXTILE AND MACHINE
PLACE CLASS 4 RIPRAP AROUND ALL
SHAFT FOUNDATIONS, TYP.
CLASS 4 RIPRAP (14" MIN. TO 28"Ø MAX. GRADATION -
85% SHALL BE RETAINED WITHIN THE 19" TO
28"Ø SIEVE RANGE.) ALL RIPRAP SHALL CONFORM
TO THE REQUIREMENTS OF FP-14 TABLE 705-1, TYP.
FOUNDATION DRILLED SHAFT,
CONCRETE CAISSONS, OR EQUAL,
TYP
FOUNDATION
DRILLED
SHAFT (TYP.)
REGION 8
SOUTHERN REGION
SHEET 11 OF 21
C-108DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
CHECKED
CHATTAHOOCHEE-OCONEE
NATIONAL FOREST
LAKE RUSSELL
M.P. 2.18 TRAIL
BRIDGE
REPLACEMENT
PROJECT
BOARDWALK AND
PLATFORM PLAN
VIEW
BOARDWALK TYPICAL SECTION
PLAN VIEW (NTS)
BOARDWALK PLATFORM MEETS TRAIL BRIDGE SECTION
PLAN VIEW (NTS)
FOUNDATION SHAFTS RIPRAP ARMORING DETAIL
PLAN VIEW (NTS)
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .