Lake Russell M.P. 2.18 Trail Bridge Replacement Project - Design Plans

This document is a comprehensive set of construction design plans for the United States Department of Agriculture Forest Service, Southern Region, covering the replacement of a trail bridge at Lake Russell (M.P. 2.18) located in Habersham County, Georgia within the Chattahoochee-Oconee National Forest. The project involves the construction of a 29-foot span trail bridge with a 6-foot-2-7/16-inch clear inside width using glulam stringers, an 86-foot span boardwalk structure, three reinforced concrete abutments, boardwalk foundation systems with drilled shafts, and associated trail approach work totaling approximately 3,063 linear feet. The project site is accessible by mechanized equipment no wider than 60 inches and is located approximately 26 miles southwest of Gainesville, Georgia.

The construction scope includes site preparation with temporary crossing using three 48-inch HDPE pipes, excavation and grading with geogrid and gabion stone material placement, installation of reinforced concrete trail bridge abutments and boardwalk foundation drilled shafts with riprap armoring, fabrication and installation of treated glulam stringer superstructures with diaphragms and bearing shoes, installation of treated timber sill connections and elastomeric pads, deck planking and running planks, handrail systems, seeding and erosion control measures including silt fence installation, and 12-inch diameter by 20-foot length culvert installation. The design incorporates design loadings of 90 PSF pedestrian live load, species SP/SP glulam with 24F-V3 combination symbol per AASHTO LRFD specifications, treated timber members throughout, standard construction details for connections and bearings, and construction stakeout coordinates for 54 survey points. General notes specify contractor responsibility for material storage 25 feet minimum from creek edges, equipment security at staging areas, replacement of damaged boardwalk components, proper water management during excavation, and compliance with silt fence inspection and maintenance requirements performed weekly and within 24 hours of precipitation events exceeding 1.2 inches.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

VICINITY MAP

United States Department of Agriculture Forest Service

TRAVEL DIRECTIONS:

FROM GAINESVILLE, GA, TRAVEL NORTH ON US-23 N FOR APPROX. 19.2 MILES AND CONTINUE ON LEVEL GROVE ROAD

FOR 3.7 MILES AND TAKE STATE ROUTE 13 TO LAKE RUSSELL ROAD MAIN ENTRANCE.

RECOMMENDED BY:

APPROVED:

TRANSPORTATION ENGINEER DATE

FOREST SUPERVISOR DATE

DISTRICT RANGER

DATEENGINEERING STAFF OFFICER

DATE

R8 SOUTHERN REGION

CHATTAHOOCHEE-OCONEE NATIONAL FOREST

CRRD LAKE RUSSELL M.P. 2.18

TRAIL BRIDGE REPLACEMENT PROJECT

HABERSHAM COUNTY, GEORGIA

LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE

MAIN ENTRANCE ACCESS ROAD

LAT:34.519117

LONG: -83.496089

INDEX

SHEET SUB SHEET SHEET TITLE

1 G-100 TITLE SHEET

2 G-101 CIVIL ABBREVIATIONS & SYMBOL LEGEND

3 G-102 GENERAL NOTES AND EST. QTY.

4 C-101 SITE PLAN

5 C-102 TRAIL BRIDGE PLAN & PROFILE

6 C-103 BOARDWALK PLAN & PROFILE

7 C-104 TRAIL BRIDGE DETAILS

8 C-105 TRAIL BRIDGE SECTION VIEW

9 C-106 BOARDWALK STRUCTURAL NOTES

10 C-107 BOARDWALK SECTIONS AND FOUNDATION DETAILS

11 C-108 BOARDWALK AND PLATFORM PLAN VIEW

12 C-109 GLULAM TO GLULAM BEARING SHOE & SILL

CONNECTION DETAILS

13 C-110 STANDALONE GLULAM BEARING SHOE & SILL

CONNECTION DETAILS

14 C-111 ABUTMENT #1 DETAILS

15 C-112 ABUTMENT #2 AND #3 DETAILS

16 C-113 TEMPORARY CROSSING PLAN

17 C-114 TRAIL PLAN & PROFILE

18 C-115 CONSTRUCTION SURVEYING AND STAKING DETAILS

19 C-116 CONSTRUCTION STAKEOUT COORDINATES

20 C-117 SILT FENCE DETAILS

21 C-118 SEEDING SCHEDULE

DESIGN BY:

ENGINEER DATE

SHEET

LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE

FOR RECONSTRUCTION PROJECT LOCATION

COORDINATES: 34.486558, -83.500314

FOREST MAP

E. WHATLEY 12/01/2025

GAINESVILLE, GA (26 MILES

SOUTHWEST OF PROJECT SITE)

LAKE RUSSELL M.P. 2.18 TRAIL BRIDGE

MAIN ENTRANCE ACCESS ROAD

LAT: 34.519117

LONG: -83.496089

FROM MAIN ENTRANCE ACCESS ROAD

TO LOCKED USFS GATE IS APPROX. 3.3 MILES

LOCKED USFS GATE LOCATION

LAT: 34.494510

LONG: -83.503957

ABBREVIATIONS

Ø DIAMETER

AB AGGREGATE BASE

ABDN ABANDONED

ACP ACRE, ASPHALT CONCRETE

ACP ASBESTOS CEMENT PIPE

ACM ASBESTOS CONTAINING MATERIAL

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

AGG AGGREGATE

ALGN ALIGNMENT

ARV AIR RELEASE VALVE

ASB AGGREGATE SUBBASE

ASPH ASPHALT

BC BEGIN CURVE

BEG BEGIN

BFP BACK FLOW PREVENTER

BLDC BUILDING CORNER

BLDG BUILDING

BMP BEST MANAGEMENT PRACTICES

BOD BOTTOM OF DOCK

BOL BOLLARD

BP BEGINNING OF PROJECT

BSW BACK OF SIDEWALK

BVC BEGIN VERTICAL CURVE

BW FINISHED GRADE AT BOTTOM OF WALL

℄ CENTERLINE

C CONCRETE OR CIVIL

CB CATCH BASIN

C&G CURB AND GUTTER

CG&SW CURB, GUTTER, & SIDEWALK

CI CAST IRON OR CURB INLET

CIP CAST IRON PIPE

CLR CLEAR

CLSM CONTROLLED LOW-STRENGTH MATERIAL

CMN COMMUNICATION

CMP CORRUGATED METAL PIPE

CO CLEAN OUT

CONC CONCRETE

CONST CONSTRUCTION OR CONSTRUCT

CONF CONFORM TO EXISTING

COR CONTRACTING OFFICER REPRESENTATIVE

CU CUBIC

CY CUBIC YARD

D DELTA (CURVE)

DCDA DOUBLE CHECK DETECTOR ASSEMBLY

DEMO DEMOLISH

DET DETAIL

DI DROP INLET, DUCTILE IRON

DIA. DIAMETER

DIP DUCTILE IRON PIPE

DOM DOMESTIC

DW DOMESTIC WATER

DWG DRAWING

E EASTING COORDINATE

EC END CURVE

EG EXISTING GRADE

ELEV ELEVATION

ELEC ELECTRICAL

EOP EDGE OF PAVEMENT

EOS EDGE OF SHOULDER

EP ENDING OF PROJECT

ETW EDGE OF TRAVELED WAY

EVA EMERGENCY VEHICLE ACCESS

EVC END VERTICAL CURVE

EXT EXISTING

FA FIRE ALARM

F/C,FC FACE OF CURB

FD FOUND

FDC FIRE DEPARTMENT CONNECTION

FF,FFE FINISHED FLOOR ELEVATION

FG FINISHED GRADE

FH FIRE HYDRANT

FIPT FEMALE IRON PIPE THREAD

FL FLOW LINE, FLANGE

FLG FLANGE

FM FLOWMETER

FOUND FOUNDATION

FRD FOREST ROAD DESIGNATION

FS FINISHED SURFACE

FT FOOT, FEET

FW FIRE WATER

G GAS, GROUND ELEVATION

GB GRADE BREAK

GI GALVANIZED IRON

GRD, G GROUND

GV GATE VALVE

HMA HOT MIX ASPHALT

HMAC HOT MIX ASPHALT CONCRETE

HORIZ HORIZONTAL

HT HEIGHT

HP HIGH POINT

I.E. INVERT ELEVATION

INST INSTALL

IRR IRRIGATION

JP JOINT POLE

JT JOINT TRENCH

L LEFT

L= LENGTH (CURVE)

LF LINEAR FEET

LAT LATERAL

LIP LIP OF GUTTER

LP LIGHT POLE, LOW POINT

LS LANDSCAPE

LSA LANDSCAPE ARCHITECT

MA MEDICAL AIR

MAX MAXIMUM

MEP MECHANICAL/ELECTRICAL/PLUMBING

MH MANHOLE

MIN. MINIMUM

MIPT MALE IRON PIPE THREAD

MJ MECHANICAL JOINT

MPVC MIDPOINT OF VERTICAL CURVE

MON MONUMENT

N NORTHING COORDINATE

(N) NEW

NFSR NATIONAL FOREST SYSTEM ROAD

NIC NOT IN CONTRACT

NO. NUMBER

NTS NOT TO SCALE

OHE OVERHEAD ELECTRIC

OVERALL HP - OVERALL HIGH POINT

OVERALL LP - OVERALL LOW POINT

(P) PROPOSED

PB PULL BOX

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE

PED PEDESTRIAN

PERF PERFORATED

PH POTHOLE

POC POINT ON CURVE

POI POINT OF INTERSECTION

PP POWER POLE

PRC POINT OF REVERSE CURVATURE

PRV PRESSURE REDUCING VALVE

PT POINT OF TANGENCY

PVC POLYVINYL CHLORIDE PIPE

PVI POINT OF VERTICAL INTERSECTION

R RIGHT

R= RADIUS (CURVE)

RC RELATIVE COMPACTION

RCP REINFORCED CONCRETE PIPE

RJ RESTRAINED JOINT

RP RADIUS POINT

R/W RIGHT OF WAY

S SOUTH

SD STORM DRAIN

SHLDR SHOULDER

STA STATION

STD STANDARD

STL STEEL

S/W SIDEWALK

TW TRAVELED WAY

TYP TYPICAL

USFS - UNITED STATES FOREST SERVICE

VC - VERTICAL CURVE

CIVIL SYMBOLS LEGEND

SURVEY TOPO AND SITE IMPROVEMENTS

CO

D D

WATER TAPPING SADDLE

SEWER MANHOLE

SEWER CLEANOUT

SEWER LAMP HOLE

SEWER VENT

STORM DRAIN MANHOLE

CATCH BASIN

CURB INLET

DRAINAGE INLET

GRADE BREAK

LIMIT OF WORK/GRADING

IRRIGATION BOX

GAS METER

GAS VALVE

WATER METER

WATER VALVE

WATER METER OR BFP

FIRE HYDRANT

FIRE DEPARTMENT CONNECTION

UNDERGROUND ELECTRIC

TRENCH DRAIN

METAL BEAM GUARD RAIL

SILT FENCE

CHAIN LINK FENCE

FLOW LINE

CONTOUR ELEVATION LINE

CENTER LINE

PROPERTY LINE

MONUMENT LINE

EASEMENT LINE

FINISH GRADE

SURFACE DRAINAGE SLOPE

SPOT ELEVATION

GATE VALVE

BUTTERFLY VALVE

DEMO

NEW EXISTING

6" CURB & GUTTER

EDGE OF AC PAVEMENT

6" VERTICAL CURB

DOMESTIC WATER MAIN

ELECTRIC LINE

FIRE WATER MAIN

GAS LINE

IRRIGATION LINE

OVERHEAD WIRES

OVERHEAD ELECTRIC

OVERHEAD TELEPHONE

RECYCLED WATER

SANITARY SEWER LINE

STORM DRAIN LINE

STREET LIGHT CONDUIT

TELECOMMUNICATIONS

TELEPHONE LINE

TELEVISION LINE

WATER LINE

STORM DRAIN CLEANOUT

ELECTRIC VAULT COVER

PULL BOX

HIGH VOLTAGE ELECTRIC

TELEPHONE MANHOLE

POWER POLE

GUY WIRE & ANCHOR

JOINT POLE

STREET LIGHT

ELECTROLIER

TRAFFIC SIGNAL

TRAFFIC SIGNAL

PEDESTRIAN LIGHT

PEDESTRIAN PUSH BUTTON

CROSSWALK DETECTOR

STREET LIGHT PULLBOX

SIGN (AS NOTED)

THRUST BLOCK

CAP

FF C C

W WW W

KEYNOTE

DEMOLITION NOTE1

DETAIL NUMBER

ANNOTATION

SECTION LETTER

A C-101

SHEET NUMBER ON WHICH

SECTION APPEARS

A C-101

SHEET NUMBER ON WHICH

DETAIL APPEARS

DETAIL INDICATOR

SECTION INDICATOR

DETAIL NUMBER

A

CONTROL POINT

GENERAL SHEET NOTES

1. THIS IS A STANDARD ABBREVIATION

AND LEGEND SHEET, THEREFORE,

SOME ABBREVIATIONS AND LEGEND

SYMBOLS MAY APPEAR ON THIS SHEET

AND MAY NOT BE UTILIZED ON THIS

PROJECT.

NEW EXISTING

TELECOMMUNICATIONS MANHOLETMH TMH

GUY

REGION 8

SOUTHERN REGION

SHEET 2 OF 21

G-101DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

CIVIL

ABBREVIATIONS &

SYMBOL LEGEND

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

REGION 8

SOUTHERN REGION

SHEET 3 OF 21

G-102DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

GENERAL NOTES

AND

EST. QTY.

GENERAL NOTES

I. SPECIFICATIONS

1. CONSTRUCTION OF THIS STRUCTURE IS TO BE IN ACCORDANCE WITH "AASHTO 2017 LRFD

BRIDGE DESIGN SPECIFICATIONS OR LATEST EDITION" AND "THE STANDARD SPECIFICATIONS

FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14" AND

"FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)".

II. DESIGN LOADING

1. THIS STRUCTURE WAS ANALYZED AND DESIGNED FOR A REINFORCED CONCRETE TRAIL

BRIDGE ABUTMENT WALL AND FOUNDATION WITH A LIVE LOAD SURCHARGE (TRAFFIC).

2. THE HEADWALL WAS CHECKED FOR STRENGTH 1 LIMIT STATE (11.5.3) AND SERVICE I LIMIT

STATE (11.5.2) FOR SLIDING STABILITY, OVERTURNING STABILITY, ECCENTRICITY LIMIT, AND

BEARING RESISTANCE.

III. EXCAVATION AND EXCAVATION SAFETY

1. STRUCTURAL EXCAVATION SHALL BE TO THE ELEVATIONS SHOWN ON THE DRAWINGS.

REGARDLESS OF MATERIAL ENCOUNTERED, UNLESS BEDROCK.

2. THE WALLS FOR THE STRUCTURE EXCAVATION SHALL BE SHORED OR SHIELDED, OR LAID

BACK, IN ACCORDANCE WITH "CONSTRUCTION STANDARDS FOR EXCAVATION", AS REQUIRED

BY OSHA 29 CFR, PART 1926, 650-652.

IV. SITE MAINTENANCE

1. ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE SHAPED TO FINAL GRADE, AS SHOWN ON THE DRAWINGS, AND/OR AS NEEDED (AS DETERMINED BY THE CONTRACTING

OFFICER). FINAL GRADING AND CLEAN-UP IS REQUIRED BEFORE APPROVAL OF FINAL

INVOICING.

2. SITE DISTURBANCE AND CLEARING SHALL BE LIMITED TO THE AREAS AS SHOWN IN THE

PLANSET DRAWINGS, AND WHERE CONSTRUCTION EQUIPMENT WILL BE STORED OR USED.

ANY TREES TO BE REMOVED AND CLEARED THAT'S NOT SHOWN IN THE PLANSET DRAWINGS

SHALL BE APPROVED BY THE C.O. PRIOR TO THE CONTRACTOR CUTTING OR REMOVING.

3. THE CONTRACTOR SHALL PREVENT ANY EXCAVATED MATERIAL FROM ENTERING INTO THE

CREEK AT ALL TIMES. ALL MATERIAL EXCAVATED SHALL BE PLACED AWAY FROM THE CREEK

A MINIMUM OF 25 FEET FROM THE EDGE OF THE CREEK, AND UTILIZE WEED-FREE CERTIFIED

STRAW WATTLES AROUND PERIMETER OF STOCKPILED MATERIAL.

4. INSPECT ALL EROSION CONTROL DEVICES AT THE START OF WORK, EACH DAY, OR AFTER

RAINFALL EVENTS GREATER THAN 0.5 INCHES. DAMAGED EROSION CONTROL DEVICES SHALL

BE REPAIRED IMMEDIATELY.

5. USE SEED-MIX OR EROSION CONTROL BLANKETS, AS INDICATED IN THE CONTRACT, TO

HAND-BROADCAST OVER THE AREAS OF DISTURBANCE. APPLY WEED-FREE STRAW MULCH

TO THE DISTURBED AREA, AT A RATE OF 4,000 POUNDS PER ACRE AS COVERED IN THE

SCHEDULE OF ITEMS.

6. CONTRACTOR SHALL NOT ALLOW WATER TO POND IN CONSTRUCTION AREA DURING

CONSTRUCTION DURATION.

V. STORAGE, CONSTRUCTION, AND CLEARING NOTES

1. CONSTRUCTION EQUIPMENT SHALL BE STORED A MINIMUM OF 25 FEET AWAY FROM THE EDGE OF THE CREEK, AND ON STABLE GROUND.

CONTRACTOR'S STAGING AND STOCKPILING AREAS SHALL BE APPROVED IN WRITING BY THE C.O.

2. USE CONTAINMENT PADS UNDER EQUIPMENT IF IT WILL BE STORED OVERNIGHT NEAR THE WORK SITE TO REDUCE POTENTIAL CONTAMINATION.

3. CONTRACTOR IS SOLELY RESPONSIBLE FOR REPLACING ANY BOARDWALK COMPONENTS THAT ARE DAMAGED, STOLEN, OR LOST DURING THE

COURSE OF THIS PROJECT. SECURITY AT ALL DESIGNATED AND APPROVED STAGING AREAS SHALL BE THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

4. CONTRACTOR SHALL PLACE EXCESS EXCAVATION AT AN AREA DESIGNATED BY THE C.O. AND HAUL ALL UNSUITABLE EXCAVATION TO AN APPROVED

LANDFILL OFF GOVT. LANDS.

5. CONTRACTOR SHALL IDENTIFY TREE OR SNAGS TO BE CUT PRIOR TO WORK THAT'S NOT IDENTIFIED IN PLANS. OBTAIN APPROVAL FROM THE C.O.

PRIOR TO CUTTING. CUT AND BULK FELLED TREES IN AN APPROVED AREA AS DESIGNATED BY THE C.O...

6. THE CONTRACTOR SHALL CONFINE ALL OPERATION AND ACTIVITIES TO IDENTIFIED CLEARING LIMITS UNLESS OTHERWISE SHOWN ON DRAWINGS.

7. IN THE EVENT THAT PREVIOUSLY UNDISCOVERED CULTURAL RESOURCES ARE ENCOUNTERED DURING THE COURSE OF THE PROJECT, ALL

GROUND-DISTURBING ACTIVITIES WILL BE HALTED UNTIL EVALUATED BY THE GOVERNMENT. IF NECESSARY, THE PROJECT MAY BE MODIFIED IN

ORDER TO PROTECT RESOURCES BEFORE WORK CONTINUES.

VI. SURVEY CONTROLS

1. ALL SURVEY DATA WAS RECORDED AND OBTAINED BY AEI FIRM.

2. CONTROLS AND BENCHMARKS COORDINATES ARE INCLUDED IN THE PLANSET DRAWINGS. CONTROLS ARE SET USING SPIKE NAILS AND PK NAILS.

3. THE CONTRACTOR SHALL FIELD VERIFY ALL SURVEY CONTROLS PRIOR TO THE START OF CONSTRUCTION.

4. FIELD SURVEY DATA WAS COLLECTED ON MARCH 19TH, 2024.

5. COORDINATE SYSTEM: NAD83 PUERTO RICO AND VIRGIN ISLANDS, US SURVEY FOOT

6. COORDINATE SYSTEM CODE: PR83F

7. DATUM: NAD83

8. ALL DISTANCE AND ELEVATIONS ARE INDICATED IN US SURVEY FEET.

VII. HYDROLOGY

1. DRAINAGE AREA = N/A

2. Q100 PEAK FLOOD FLOW = N/A

3. FREEBOARD = N/A

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

LAKE RUSSELL

POOL ELEV: 991.30'

LAKE RUSSELL

TRAIL

.0

960.000

970.000

980.000

990.000

0.

960.000

0.

0.

950.000

960.000

950.000

950.000

950.000

950.000

950.000

950.000

940.000

0.

0.

CONCRETE

SPILLWAY

10001

CONTROL POINT COORDINATES

POINT #

NORTHING

1632469.522

1632631.481

1632497.378

1632723.322

1632500.940

1632435.740

EASTING

2497607.669

2497467.023

2497231.084

2497448.307

2497438.309

2497379.773

ELEVATION

1005.590

1005.690

952.080

995.858

976.616

957.207

DESCRIPTION

CP234

CP236

CP237

CP238

CP239

CP240

INTERSECTION

OF TRAIL

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF TRAIL HORIZONTAL

ALIGNMENT

CONTRACTOR SHALL REPAIR

30 L.F. OF THIS AREA FOR ACCESS.

(REFER TO DETAIL 1 OF THIS

SUBSHEET C-101)

CUT EXISTING 14"Ø DEAD TREE

AND SCATTER ON SITE

PERPENDICULAR TO DOWNHILL

SLOPE

TOP OF SLOPE, TYP.

TOE OF SLOPE, TYP.

DO NOT DAMAGE OR DISTURB

EXISTING 32" Ø TREE

EXISTING ℄ OF TRAIL

(DO NOT DISTURB)

BEGIN APPROACH TO TRAIL BRIDGE

℄ OF EXISTING DITCHLINE, TYP.

℄ OF EXISTING DITCHLINE, TYP.

INSTALL NEW HDPE CULVERT

86'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM STRINGER

TRAIL BRIDGE

3+63

-0+00

1+

2+00

3+00

8'

BEGINNING OF EXISTING

DROP DOWN STONE STEPS

(DO NOT DISTURB DURING

EXCAVATION)

ABUTMENT #3

ABUTMENT #2

ABUTMENT #1

29'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM

STRINGER TRAIL BRIDGE

BOARDWALK

PLATFORM DECK

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF PROPOSED

BOARDWALK

ALIGNMENT

EXISTING CONCRETE DAM SURFACE

FOR CONTRACTOR'S ACCESS TO TRAIL

BRIDGE SITE

C-110

C-110

C-109

C-101

5'-0" TOTAL ACCESS WIDTH

6" COMPACTED AGGREGATE BASE

GRADING C. COMPACT IN NTE 6" LIFTS

(COVERED IN LAKE RUSSELL M.P. 2.18

PAY ITEM 30104.J)

COMPACTED GABION STONE MATERIAL

OR RAILROAD BALLAST MATERIAL.

COMPACT IN NTE 6" LIFTS

TYPE B4 BIAXIAL GEOGRID A MINIMUM

OF 100% OF TRAIL EXCAVATION WIDTH

BETWEEN THE EXISTING EARTH

MATERIAL AND THE PROPOSED GABION

STONE MATERIAL WHEN INSTALLED.

(GEOGRID COVERED IN LAKE RUSSELL

M.P. 2.18 PAY ITEM 20701.H)

1' DEPTH OF COMPACTED

GABION STONE MATERIAL, OR

RAILROAD BALLAST MATERIAL

(COVERED IN LAKE RUSSELL M.P. 2.18

PAY ITEM 30104.I)

NATURAL EARTH MATERIAL

EXISTING TRAIL GRADE

EXCAVATE DOWN 6"

OF THE EXISTING TRAIL

AND INSTALL GEOGRID AND

GABION ROCK PLACEMENT

EXISTING TRAIL GRADE

6"

1'-6"

REGION 8

SOUTHERN REGION

SHEET 4 OF 21

C-101DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

SITE

PLAN

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

LAKE RUSSELL M.P. TRAIL BRIDGE M.P. 2.18

PLAN VIEW

BEGIN ACCESS TO M.P.

2.18 TRAIL BRIDGE

SITE GENERAL NOTES:

1. THE PROJECT SITE IS MISSING THE EXISTING TRAIL BRIDGE.

2. THE PROJECT SITE IS ACCESSIBLE BY MECHANIZED EQUIPMENT (NTE 60-INCHES WIDE).

3. TREES SHALL NOT BE DISTURBED OR CUT, UNLESS SPECIFIED INSIDE THIS SET OF DRAWINGS

AND/OR APPROVED BY THE C.O. IN WRITING. ANY DISTURBED AREAS SHALL BE REGRADED

AND SEEDED BY THE CONTRACTOR.

4. THE CONTRACTOR SHALL KEEP EQUIPMENT OUT OF THE CREEK AND MAINTAIN TRAIL ACCESS

AS MUCH AS POSSIBLE.

5. CONTRACTOR SHALL REMOVE ALL TRACK AND TIRE MARKS FROM THE TRAIL SURFACE

BEFORE GOVERNMENT FINAL ACCEPTANCE OF THE PROJECT IN ITS ENTIRETY WHICH SHALL

BE INCIDENTAL TO THE CONTRACTOR'S PROPOSAL.

6. BEYOND SURVEY LIMITS, THE CONTRACTOR SHALL TAPER THE FINISHED TRAIL EMBANKMENT

UNTIL DAYLIGHT TO EXISTING GROUND GRADE.

ACCESS TRAIL REPAIR SECTION VIEW1

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EL

EV

AT

IO

N (F

EE

T)

1+96 2+00 2+20 2+40 2+50 2+60 2+80 3+00 3+20 3+40 3+50 3+60 3+63

C/L OF BEARING

STAT: 2+35.30

ELEV 959.37

THALWEG

100 YR FLOOD

ELEV: 957.37

3' FREEBORAD

C/L OF TOP OF BACKWALL

ELEV: 965.21

C/L OF TOP OF BRIDGE SEAT

STAT: 3+20.30

ELEV 959.37

BOTTOM OF FOOTING

STA 2+39.30

ELEV 949.66

BOTTOM OF FOOTING

STA 3+16.30

ELEV 949.66

TOP OF FOOTING

STA 3+31.05

ELEV: 951.16

C/L OF TOP OF BACKWALL

ELEV: 965.21

BOTTOM OF FOOTING

STA 3+31.05

ELEV 949.66

TAPER

APPROACH

1'

OF

BEARING

OF

BEARING

OF

BEARING

OF

BEARING

BEGINNING OF EXISTING

DROP DOWN STONE STEPS

(DO NOT DISTURB DURING

EXCAVATION)

29' SPAN (OUT-TO-OUT)

BY 4'-6" OR 54" STRINGER DEPTH

4'-6" OR 54"

STRINGER DEPTH, TYP.

OF

BEARING

OF

BEARING

1'-6" TYP.

TOP OF FOOTING

STA 2+39.30

ELEV: 951.16

ABUTMENT #2

3' STEM WALL

OF

BEARING

OF

BEARING

OF

BEARING

OF

BEARING

8.25' HEEL

3'-6" TOE, TYP.

ABUTMENT #3

1'-6"

WATER SURFACE

ELEV: 948.85'

AS OF 11/06/25

3' STEM WALL

8.25' HEEL

BOTTOM OF FOOTING

STA 2+08.80

ELEV 955.37

1'-6"

2' STEM WALL

C/L OF TOP OF BRIDGE SEAT

STAT: 2+05.30

ELEV 959.37

C/L OF TOP OF BRIDGE SEAT

STAT: 3+22.30

ELEV 961.57

12" X 12" X 8' TREATED TIMBER SILL, TYP.12" X 12" X 8' TREATED TIMBER SILL, TYP.12" X 12" X 8' TREATED TIMBER SILL

C/L OF TOP OF BRIDGE SEAT

STAT: 2+33.30

ELEV 959.37

C/L OF TOP OF BACKWALL

ELEV: 965.21

4'-6" HEEL

3' TOE

14.75'

14.75'

86' SPAN (OUT-TO-OUT)

86' (CENTERLINE OF BEARING TO CENTERLINE OF BEARING)

STA 2+34.30

ELEV 965.21

9'-6"

ABUTMENT #1

3'-6"

13'-5 12" C/L OF TOP OF BOARDWALK

FINISHED GRADE DECK

ELEV 965.21

8' MIN. DRILLED DEPTH

AT THE BOARWALK

PLATFORM

LAKE RUSSELL

0.

960.000

0.

0.

950.000

960.000

950.000

950.000

950.000

950.000

940.000

0.

0.

10001

INTERSECTION

OF TRAIL

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF TRAIL HORIZONTAL

ALIGNMENT

CUT EXISTING 14"Ø DEAD TREE

AND SCATTER ON SITE

PERPENDICULAR TO DOWNHILL

SLOPE

TOP OF SLOPE, TYP.

TOE OF SLOPE, TYP.

DO NOT DAMAGE OR DISTURB

EXISTING 32" Ø TREE

EXISTING ℄ OF TRAIL

(DO NOT DISTURB)

BEGIN APPROACH TO TRAIL BRIDGE

℄ OF EXISTING DITCHLINE, TYP.

℄ OF EXISTING DITCHLINE, TYP.

INSTALL NEW HDPE CULVERT

86'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM STRINGER

TRAIL BRIDGE

3+63

-0+00

1+

2+00

3+00

8'

BEGINNING OF EXISTING

DROP DOWN STONE STEPS

(DO NOT DISTURB DURING

EXCAVATION)

ABUTMENT #3

ABUTMENT #2

ABUTMENT #1

29'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM

STRINGER TRAIL BRIDGE

BOARDWALK

PLATFORM DECK

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF PROPOSED

BOARDWALK

ALIGNMENT

C-110

C-110

C-109

REGION 8

SOUTHERN REGION

SHEET 5 OF 21

C-102DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

TRAIL BRIDGE

PLAN AND PROFILE

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

TRAIL BRIDGE VERTICAL PROFILE

(NTS)

SITE PLAN

(NTS)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

0+13 0+20 0+40 0+50 0+60 0+80 0+86

CONSTRUCT 3"X12"

BACKWALL (BACKING

PLANKS)

1V:6H

20'

20'

15'

BOTTOM OF SHAFT

ELEV 948.91

BOTTOM OF SHAFT

ELEV 948.52

BOTTOM OF SHAFT

ELEV 947.78

OF

BEARING

OF

BEARING ℄

OF

BEARING

TOP OF FINISHED

BOARDWALK DECK

C/L OF BEARING

OF BOARDWALK

STA 0+68.77

C/L OF BEARING

OF BOARDWALK

STA 0+34.13

BEGIN BOARDWALK

FINISHED DECK GRADE

STAT: 0+14.57

ELEV 965.21

15'-10"

FURNISH, PLACE, AND COMPACT

AGGREGATE BASE GRADING C, IN

NTE 6" COMPACTED LIFTS FOR FULL

WIDTH TO BOARDWALL FINISHED

SURFACE GRADE

C/L OF BEARING

OF BOARDWALK

STA 0+53.92

5 34" WIDE X 15 18" DEPTH

GLULAM STRINGER, TYP.

5 34" WIDE X 15 18" DEPTH

GLULAM STRINGER, TYP.

END BOARDWALK

FINISHED DECK GRADE

STAT: 0+69.81

ELEV 957.17

℄ OF 13'-5 12" WIDE

TIMBER SAWN SILL

LAKE RUSSELL

0.

960.000

0.

0.

950.000

960.000

950.000

950.000

950.000

950.000

940.000

0.

0.

10001

INTERSECTION

OF TRAIL

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF TRAIL HORIZONTAL

ALIGNMENT

CUT EXISTING 14"Ø DEAD TREE

AND SCATTER ON SITE

PERPENDICULAR TO DOWNHILL

SLOPE

TOP OF SLOPE, TYP.

TOE OF SLOPE, TYP.

DO NOT DAMAGE OR DISTURB

EXISTING 32" Ø TREE

EXISTING ℄ OF TRAIL

(DO NOT DISTURB)

BEGIN APPROACH TO TRAIL BRIDGE

℄ OF EXISTING DITCHLINE, TYP.

℄ OF EXISTING DITCHLINE, TYP.

INSTALL NEW HDPE CULVERT

86'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM STRINGER

TRAIL BRIDGE

3+63

-0+00

1+

2+00

3+00

8'

BEGINNING OF EXISTING

DROP DOWN STONE STEPS

(DO NOT DISTURB DURING

EXCAVATION)

ABUTMENT #3

ABUTMENT #2

ABUTMENT #1

29'-0" SPAN X 6'-2 7

16" INSIDE

CLEAR WIDTH GLULAM

STRINGER TRAIL BRIDGE

BOARDWALK

PLATFORM DECK

℄ OF TRAIL HORIZONTAL

ALIGNMENT

℄ OF PROPOSED

BOARDWALK

ALIGNMENT

C-110

C-110

C-109

REGION 8

SOUTHERN REGION

SHEET 6 OF 21

C-103DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

BOARDWALK

PLAN AND PROFILE

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

BOARDWALK VERTICAL PROFILE

(NTS)

SITE PLAN

(NTS)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

GENERAL NOTES:

1. ALL STRINGERS SHALL HAVE A "CAMBER" BASED ON A 900-FT RADIUS.

2. RUNNING PLANKS NOT SHOWN IN THE ABOVE FOR CLARITY.

3. CONTRACTOR SHALL FASTEN DECK PLANKS TO STRINGERS WITH TWO ROWS

60d (6-INCH) RING SHANK NAILS PER PLANK AT EACH STRINGER, OR SCREWS.

ALTERNATE CENTERS.

4. CONTRACTOR SHALL FASTEN RUNNING PLANKS TO DECK WITH 40d (5-INCH

RING SHANK) NAILS OR SCREWS AT 24-INCHES SPACING. ALTERNATE

CENTERS WITH TWO AT EACH END.

5. THE CONTRACTOR SHALL SPLICE RAILS AT POSTS. RAILS SHALL BE

CONTINUOUS FOR TWO POST SPACES. DO NOT LOCATE MORE THAN ONERAIL

SPLICE AT ANY ONE POST.

STRINGER SPAN (℄ BEARING - ℄ BEARING)

STRINGER TOTAL LENGTH (OUT-TO-OUT)

3" x 8" (NOMINAL SIZE) MINIMUM DECK PLANKS. MAINTAIN 3/8"± GAP BETWEEN PLANKS

BACKWALL

WIDTH

(VARIES)

VARIES

2'-6"

MAXIMUM

POSTS @ 5'-0" MAXIMUM

VARIES

2'-6"

MAXIMUM

THE CONTRACTOR SHALL INSTALL DIAPHRAGMS AT THIRD POINTS OF SPAN AND WITHIN A DISTANCE OF THE

DEPTH FROM THE ABUTMENTS

12"X12"X8' TREATED

TIMBER SILL (CUBE),

TYP. TO BOTH ABUTMENTS

BACKWALL HEIGHT

(VARIES)

6"

HANDRAIL CAP (SHOWN

AS DASHED LINE)

6" RING SHANKS NAILS

2"

5" RINGSHANK NAILS

(SEE NOTE FOR SPACING)

3" X 6" BACKING PLANK STIFFENER

ATTACH W/(2)-1/2"Ø BOLTS W/(2)-

MALLEABLE IRON WASHERS PER

BACKING PLANK SPACED

DIAGONALLY FROM EACH OTHER

ADJUST DIAPHRAGM LOCATION

AS REQUIRED TO AVOID POST BOLTS

℄ OF BRIDGE

℄ OF

ABUTMENT

℄ OF

ABUTMENT

ALL STRINGERS SHALL

HAVE A "CAMBER"

BASED ON A 900-FT

RADIUS

HANDRAIL (TRAIL

BRIDGE SECTION VIEW)

℄ OF

ABUTMENT

℄ OF

ABUTMENT

6"

4" X 6" POST (TYP.). ALL POSTS

SHALL BE ERECTED PERPENDICULAR

TO THE TRAIL BRIDGE CENTERLINE AT 90°

GLULAM STRINGER

PER TABLE 1-D3 18" X DEPTH VARIES GLULAM

DIAPHRAGM. SEE SUBSHEET

D-103 FOR DETAILS AND TABLE

1D ABOVE FOR DIAPHRAGM SPACINGS

2" X 6" X 4'-6"

VERTICAL END SUPPORT

FOR RAILS (TYP) (2)-16d

NAILS INTO EACH RAIL

W/(2)-3/8"Ø X 3 1/2" LAG

SCREWS AT BASE

*TABLE-1D: GLULAM STRINGER SIZE REQUIREMENTS - PER AASHTO LRFD SPECIFICATIONS

** STRINGER

TOTAL LENGTH

(FEET)

SITE NAME

TRAIL BRIDGE (4) - 7 12" WIDE X 54" DEPTH (GLULAM GIRDER SIZE)

90 PSF

PEDESTRIAN LIVE LOAD

DESIGN LOADING IN POUNDS PER SQUARE FOOT (PSF)

SPECIES - SP/SP, COMBINATION SYMBOL 24F - V3

C-105

C-105

(4) - 7 12" WIDE X 54" DEPTH (GLULAM GIRDER SIZE)TRAIL BRIDGE

(6) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGERBOARDWALK PLATFORM DECK

(8) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGERBOARDWALK DECK

(4) - 5 34" WIDE X 15 18" DEPTH GLULAM STRINGER15'-10" SPAN LENGTHBOARDWALK DECK

20'-0" SPAN LENGTH

14'-0" SPAN LENGTH

29'-0" SPAN LENGTH

86'-0" SPAN LENGTH

REGION 8

SOUTHERN REGION

SHEET 7 OF 21

C-104DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

TRAIL BRIDGE

DETAILS

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

TRAIL BRIDGE SIDE (ELEVATION) VIEW2

TRAIL BRIDGE PLAN VIEW1

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1'-2" TYP.

TO BOTH SIDES

(NOMINAL SIZE SHOWN)

3 12" TYP. TO BOTH SIDES

(ACTUAL SIZE SHOWN)

6'-2 7

16" INSIDE CLEAR WIDTH

3'-8" TYP.

REFER TO BEARING SHOE DETAIL 2 ON SUBSHEET

C-110. TYP TO ALL TRAIL BRIDGE ONLY BEARING SHOES

12" X 12" X 8' TREATED

TIMBER SILL, TYP.

(NOMINAL SIZE SHOWN)

10 34", TYP.

9 58", TYP.

2"

10 12" O.C. TYP.

TO BOTH SIDES

5'-1" POST FULL

LENGTH (TYP.

TO BOTH SIDES)

℄ OF TRAIL

BRIDGE

6'-5 12"

7'-4 12" TOTAL WIDTH

2" X 8" S4SRAIL CAP FASTEN TO EACH

POST AND TOP RAIL W/(2)-#10 X 4"

WOOD SCREWS ON 2'-0" CENTERS

8' SILL TOTAL WIDTH

7 12", TYP.

4"X6" (NOMINAL) X

1'-2" HEIGHT S4S

BLOCKING, TYP.

2" TYP.

4"X6" POST FABRICATE W/

TAPERED END (TOP) AND

W/ (2) - 13

16"Ø HOLES AT BOTTOM

(ACTUAL SIZE SHOWN), TYP. TO

BOTH SIDES

10 34", TYP.

9 58", TYP.

3/4"Ø BOLT X 18 12" LENGTH (MIN.)

ALL THREAD WITH NUT AND

(2)- MALLEABLE IRON WASHERS.

TYP. TO BOTH SIDES

2" X 6" S4SRAIL, FASTEN RAILS

TO POSTS W/(2)- #10 X 4" WOOD

SCREWS AT EACH CONNECTION.

(TYP. TO BOTH SIDES)

2 12"

30°

4'-6" OR 54"

STRINGER DEPTH, TYP.

1'-9"

O.C. SPACING TYP.

3'-1 34"

DIAPHRAGM

1'-1 7

16" WIDE X 5 18" THICK

DIAPHRAGM. SEE THIS

SUBSHEET C-105 FOR

DETAILS. EACH DIAPHRAGM

DEPTH SHALL BE 3'-1 34"

WHICH IS 70% OF THE

STRINGER DEPTH

18"

FOOTING

THICKNESS, TYP.

REINFORCED CONCRETE

ABUTMENT #1, #2, AND #3

HEIGHT VARIES

(REFER TO SUBSHEET

C-111 & C-112)

2x8 RUNNING PLANKS

(SHOWN IS ACTUAL SIZE)

3x8 DECKING (SHOWN

IS THE ACTUAL SIZE)

REINFORCED CONCRETE

ABUTMENT #1, #2, AND #3

DURING DIAPHRAGM INSTALLATION,

EACH DIAPHRAGM SHALL NOT

EXCEED 8'-0" ON CENTER

SPACING FOR FULL LENGTH

OF TRAIL BRIDGE SPAN. THEREFORE

34 TO 36 DIAPHRAGMS ARE REQUIRED

FOR THIS TRAIL BRIDGE

(5) - 1" Ø X 30" LENGTH GALVANIZED

ANCHOR BOLT W/ A MIN. OF 6"

LENGTH THREAD AT TIP WITH

NUT & WASHERS. TYP.

12"

8'

4" 4"

1'-10 78" 1'-10 78"1'-9"1'-9"

SIMPSON HU5.25/12TF MOUNT

HANGER THAT'S G90 GALVANIZED

(OR EQUAL). TYP. FOR ALL DIAPHRAGMS.

B

B

STRINGER DEPTH VARIES

(INCLUDES BRIDGE & BOARDWALK)

STRINGER

WIDTH

MALLEABLE IRON

WASHERS (TYP.)

5 18" WIDE GLULAM

DIAPHRAGM, TYP.

DIAPHRAGM (LENGTH VARIES)

GLULAM STRINGER O.C. SPACING

STRINGER3

4"Ø TIE RODS (FULL

LENGTH AS SHOWN) TYP.

4"

DIAPHRAGM

DEPTH

2 12"

2 12"

6"

OFFSET DIAPHRAGMS AT

INTERIOR STRINGER

1 12"

4"

1 12"

5 18" WIDE GLULAM

DIAPHRAGM, TYP.

1" SQUARE PLY ROUTE

AT TOP & BOTTOM

REGION 8

SOUTHERN REGION

SHEET 8 OF 21

C-105DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

TRAIL BRIDGE

SECTION VIEW

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

TRAIL BRIDGE SECTION VIEW1

DIAPHRAGM SECTION VIEW DIAPHRAGM SECTION B-B

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

20'-0" O .C. M

AX.

(BOARDWALK GLULAM STRINGERS AND FOUNDATION

SHAFTS SHALL NOT EXCEED 20'-0" O

.C. ℄ SPACING)

6'-9 9

16" CLEAR WIDTH

2"X8" S4S RAIL CAP

(NON-TREATED) TYP..

REFER TO SUBSHEET

C-107

4"X6" POST FABRICATED W/

TAPERED END (TOP) & WITH

(2) - 13"/16"Ø HOLES AT BOTTOM,

TYP.REFER TO SUBSHEET C-107

4"Ø BOLT X 16" LENGTH

W/ NUT AND (2)-MALLEABLE

IRON WASHERS, TYP. REFER

TO SUBSHEET C-107

DIAPHRAGM, TYP.

5 34" WIDE X 15 18" DEPTH GLULAM

STRINGER EACH, SPACED AT 20'-0"

O.C. MAX (BOARDWALK STRINGER), TYP

3"X8" MIN. DECK PLANKS

(3"X12" SHOWN). REFER

TO SUBSHEET C-107

2"X8" MIN. RUNNING PLANKS

(2"X12" SHOWN). REFER TO

SUBSHEET C-107

TREATED TIMBER SILL.

REFER TO SUBSHEET

C-107, C-108, C-109, AND

C-110, TYP.

BEARING SHOE. REFER TO

SUBSHEET C-109 & C-110, TYP.

TWO (2) GLULAM SHOWN FOR

CLARITY. REFER TO SUBSHEET

C-107 & C-108 FOR ACTUAL HOW

MANY GLULAM STRINGERS ARE

REQUIRED, TYP.

5 34" EACH,

TYP.

3"X12" BACKWALL

(BACKING PLANKS),

REFER TO SUBSHEET

C-103, TYP.

℄ OF TRAIL HORIZONTAL

ALIGNMENT

APPROACH FILL

FILL SLOPE

CATCHPOINT

END OF BOARDWALK.

REFER TO SUBSHEET

C-103

TRAIL BOARDWALK RAILING

SYSTEM. REFER TO SUBSHEET

C-107, TYP.

ISOMETRIC VIEW GENERAL NOTES

1. BOARDWALK TO TRAIL BRIDGE APPROACH

NOT SHOWN FOR CLARITY.

2. FOUNDATION SHAFTS NOT SHOWN FOR

CLARITY.

3. ALL GLULAM STRINGERS NOT SHOWN FOR

CLARITY.

FURNISH, PLACE, AND COMPACT

6" MIN. DEPTH OF AGGREGATE

BASE GRADING C

3"X8" MIN. DECK PLANKS

(3"X12" SHOWN). REFER

TO SUBSHEET C-107

2"X8" MIN. RUNNING PLANKS

(2"X12" SHOWN). REFER TO

SUBSHEET C-107.

REGION 8

SOUTHERN REGION

SHEET 9 OF 21

C-106DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

BOARDWALK

STRUCTURAL

NOTES

M.P. 2.18 PROPOSED TRAIL BOARDWALK

ISOMETRIC VIEW

GENERAL NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN

ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD SPECIFICATIONS FOR

CONSTRUCTION OF TRAILS AND TRAILS BRIDGES ON FEDERAL PROJECTS.

TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE

REQUIREMENTS OF THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE

SPECIFIED BELOW. GLULAM MEMBERS SHALL CONFORM TO THE AMERICAN NATIONAL

STANDARD, STANDARD SPECIFICATIONS FOR STRUCTURAL GLUED LAMINATED TIMBER OF

SOFTWOOD SPECIES (ANSI 117) FOR THE COMBINATION, SPECIES, USE, AND APPEARANCE

SPECIFIED BELOW.

GLULAM STRINGERS

- COMBINATION SYMBOL 24F-V3, SPECIES - SP/SP DRY CONDITION USE AND

ARCHITECTURAL APPEARANCE

CURB MEMBERS, SILLS, AND BACKING PLANKS

- COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.1 GRADE, GRADING

RULES AGENCY - WWPA, WCLIB

RAILS, DECKING, STRINGERS, HEADERS, & POSTS (SEE PROJECT CRITERIA)

PRESSURE TREATED

O REDWOOD, S4S, NO.1 GRADE GRADING RULES AGENCY - RIS

O WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY

- WWPA, WCLIB

TREATED

O HEM - FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY - WWPA, WCLIB

O SOUTHERN PINE, S4S, NO.1 GRADE GRADING RULES AGENCY

TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR

TREATMENT TYPE. PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE

CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE

TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE

REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE

(WWPI) “BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC

ENVIRONMENTS”.

GLULAM STRINGER

- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND -

EXPOSED (UC3B)

- ANY NON-PENTACHLOROPHENAL TREATMENT

DECKING, RUNNING PLANKS, & RAILING SYSTEM,

- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND -

EXPOSED (UC3B)

- MICRONIZED COPPER AZOLE

SILLS, BACKING PLANKS, CRIBS, TIMER WALLS, IF TREATED

- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND CONTACT -

HEAVY DUTY (UC4B)

- MICRONIZED COPPER AZOLE

FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED BY THE

CONTRACTOR FOR FIELD TREATING OF LUMBER MATERIAL. ALL ABRASIONS AND FIELD CUTS

APPROVED BY THE CO AND/OR COR SHALL BE CAREFULLY TRIMMED AND GIVEN THREE (3)

BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF

BOLTS OR NAILS AS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO

INSERTING THE FASTENERS.

HARDWARE AND STRUCTURAL STEEL: SEE PROJECT DESIGN CRITERIA FOR STEEL

HARDWARE FINISH. GALVANIZED OR UNFINISHED HARDWARE SHALL MEET THE

REQUIREMENTS OF AASHTO M270, GRADE 36, WITH NUTS AND BOLTS AASHTO M270, GRADE

50W, WITH BOLTS AND NUTS CONFORMING TO ASTM A325, TYPE 3. USE MALLEABLE IRON

WASHERS AGAINST WOOD UNLESS OTHERWISE NOTED.

WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN

ACCORDANCE WITH AWS D1.1 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND

INTENDED USE OR SERVICE. ALL HARDWARE TO BE GALVANIZED ZINC, OR OTHERWISE

COATED TO INCLUDE W8X31.

CONCRETE:

1. ALL CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,500 PSI

2. REINFORCING STEEL SHALL BE AS FOLLOWS:

2.1. STIRRUPS AND TIES.............ASTM A615 GRADE 60

2.2. ALL OTHER REINFORCING........ASTM A615 GRADE 60

2.3. WELDED WIRE FABRIC............ASTM A185

3. PROVIDE BAR SUPPORTS AND SPACERS IN ACCORDANCE WITH ACI DETAILING MANUAL. ALL

BAR SUPPORTS IN AREA WHERE CONCRETE WILL BE EXPOSED SHALL HAVE PLASTIC FEET.

4. DETAILING, FABRICATION AND PLACING OF REINFORCING SHALL CONFORM TO APPLICABLE

PROVISIONS OF ACI 315 AND ACI 318.

5. FOOTINGS SHALL HAVE NO HORIZONTAL JOINTS. ANY STOP IN CONCRETE WORK MUST BE

MADE WITH VERTICAL KEYED BULK- HEADS. ALL REINFORCEMENT SHALL CONTINUE

THROUGH JOINTS.

6. BEFORE PLACING CONCRETE, THE CONTRACTOR SHALL NOTIFY ALL SUBCONTRACTORS TO

BE SURE ALL SLEEVES, CONDUIT, CHASES, ETC., ARE PROPERLY INSTALLED. THE

CONTRACTOR SHALL NOTIFY THE CO AND/OR COR AS SOON AS PRACTICAL, BUT AT LEAST 72

HOURS PRIOR TO PLACING CONCRETE TO ALLOW INSPECTION OF REINFORCING AND

EMBEDDED ITEMS.

7. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF. WITH THE FINDINGS AND

RECOMMENDATIONS OF THE GEOTECHINCAL REPORT AND SHALL PERFORM ALL EARTHWORK

OPERATIONS IN ACCORDANCE WITH THESE RECOMMENDATIONS. .

8. FOOTING CONCRETE SHALL BE PLACED THE SAME DAY. EXCAVATIONS ARE OPENED. IF THIS

IS IMPOSSIBLE, STEPS SHALL BE TAKEN TO ADEQUATELY PROTECT THE OPEN EXCAVATION.

9. MATERIAL SHALL COMPLY WITH REQUIREMENTS OF DESIGNATED SPECIFICATIONS OF

AMERICAN SOCIETY FOR TESTING AND MATERIALS.

10. CONSTRUCTION PROCEDURES SHALL COMPLY WITH RECOMMENDATIONS SET FORTH IN

DESIGNATED STANDARDS OF AMERICAN CONCRETE INSTITUTE

11. ADMIXTURE OTHER THAN AIR-ENTRAINING ADMIXTURE SHALL NOT BE USED WITHOUT THE

APPROVAL OF THE ARCHITECT/ENGINEER. AIR-ENTRAINING ADMIXTURES SHALL CONFORM

TO ASTM C260

12. CURING COMPOUND SHALL CONFORM TO FEDERAL SPECIFICATION 19. TT-C800A AND ASTM

C309

13. REINFORCEMENT SHALL BE PLACED AND SECURED PRIOR TO POURING CONCRETE

14. AFTER THE CO AND/OR COR HAS INSPECTED AND ACCEPTED THE SURFACE FINISH OF ALL

CONCRETE WORK, CLEAN THE SURFACES OF DUST, FOREIGN MATTER, AND FORM OIL AND

APPLY A CONCRETE STAIN OF THE COLOR PREFERRED BY THE USDA FORESTRY SERVICE,

THE STAIN SHALL BE APPLIED TO ALL EXPOSED SURFACES AND 6 INCHES BELOW GROUND

SURFACE.

15. REINFORCEMENT SHALL BE PLACED AND SECURED PRIOR TO POURING CONCRETE

16. NO CONCRETE SHOULD COME IN CONTACT WITH STREAM FLOW

DEWATERING PLAN:

THE CONTRACTOR SHALL UNDERSTAND THAT ANY EXCAVATION MAY ENCOUNTER WATER. THUS,

FOUNDATIONS MAY NEED TO BE FORMED OR SLEEVED TO PROTECT THE EXCAVATION. THESE

FORMS OR SLEEVES SHALL NOT EXTEND INTO ROCK.

FOOTING CONCRETE SHALL BE PLACED THE SAME DAY EXCAVATIONS ARE OPENED. BEFORE

CONCRETE PLACEMENT FOOTINGS SHALL BE CHECKED FOR WATER INTRUSION, MUD, AND ANY

OTHER DEBRIS. ANY FOUND WILL BE PUMPED OUT AND THE EXCAVATION RECHECKED FOR

CLEANLINESS BEFORE CONCRETE PLACEMENT.

ANY WATER/MATERIAL REMOVED FROM THE EXCAVATION SHALL NOT BE PUMPED INTO THE

CREEK BUT INTO THE APPROPRIATE EROSION CONTROL/SILT DEVICE.

CONTRACTORS RESPONSIBILITIES:

1. MATERIAL, WORKMANSHIP, AND DESIGN SHALL CONFORM TO THE

REFERENCED AASHTO LRFD CODE(S).

2. COORDINATE STRUCTURAL DOCUMENTS WITH THE ARCHITECTURAL, AND

OTHER CONTRACT DOCUMENTS. ARCHITECT/STRUCTURAL ENGINEER SHALL

BE NOTIFIED OF ANY DISCREPANCY OR OMISSION.

3. VERIFY THE DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE

STARTING WORK. ANY DISCREPANCY BETWEEN SUCH DETAILS AND

DIMENSIONS AS MAY OCCUR SHALL BE REPORTED TO THE CONTRACTING

OFFICER FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.

4. NOTIFY, IN WRITING, THE STRUCTURAL ENGINEER OF CONDITIONS

ENCOUNTERED IN THE FIELD CONTRADICTORY TO THOSE SHOWN IN THE

STRUCTURAL DOCUMENTS.

5. CONTRACTOR HAS SOLE RESPONSIBILITY FOR MEANS, METHODS,

TECHNIQUES, SEQUENCES, AND PROCESS OF CONSTRUCTION.

6. CONTRACTOR HAS SOLE RESPONSIBILITY FOR THE DESIGN, ADEQUACY, AND

SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC.

7. CONTRACTOR HAS THE SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA

SAFETY REGULATIONS.

8. CONTRACTOR IS RESPONSIBLE REPAIRING ANY DAMAGE TO TRAILS MADE BY

EQUIPMENT.

DECKING NOTE:

1. IF ALTERNATE DECKING IS USED IN LIEU OF WOOD, THE DECKING

SHALL BE CAPABLE OF SUPPORTING A 90 PSF LIVE LOAD AS

WELL AS A 6-TON POINT LOAD UTV LOADING AND SHALL BE

APPROVED BY THE CONTRACTING OFFICER (C.O.) IN ADVANCE

PRIOR TO CONTRACTOR'S ORDERING AND FIELD INSTALLATION.

COMPLETION OF THE STRUCTURE: THE CONTRACTOR IS REQUIRED TO COMPLETE THE WORK

IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. MATERIAL, LABOR, OR CONSTRUCTION

OPERATIONS, NOT OTHERWISE SPECIFIED, ARE TO BE INCLUDED IN THE BID ITEM MOST

APPROPRIATE FOR THE WORK INVOLVED AND OTHERWISE CONSIDERED INCIDENTAL TO THE

CONTRACT.

STRUCTURAL TIMBER AND LUMBER, TREATED, PEDESTRIAN BRIDGES AND BOARDWALK: THESE

ITEMS OF WORK SHALL INCLUDE ALL LUMBER, GLULAM, FITTINGS, CONNECTIONS,

DIAPHRAGMS, RAILINGS, AND ANY OTHER ITEMS ABOVE THE FOUNDATIONS.

DRILLED SHAFT, 24-INCH DIAMETER: ALL WORK TO BORE, FORM OR SLEEVE THE HOLE, INSTALL

REINFORCEMENT, CONCRETE, ANCHOR BOLTS, ECT IS INCIDENTAL TO THE RESPECTIVE

SCHEDULE OF ITEMS PAY ITEMS.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EXISTING GROUND

GRADE (FG)

DEPTH

VARIES

8'-0" MIN. AT BOARDWALK PLATFORM

MEETS TRAIL BRIDGE SECTION.

7'-0" MIN. IN ALL OTHER

LOCATIONS. (SEE NOTE #1)

3 12", TYP.

FOUNDATION DRILLED

SHAFT, TYP

℄ OF

FOUNDATION

SHAFT

1'-6 3

16" WIDE X 5 18" THICK

X 10 12" DEPTH DIAPHRAGM

30°

OF

BOARDWALK

6'-9 9 16"

CLEAR WIDTH

3"X8" MN. DECK PLANKS

(3"X12" SHOWN)

2"X8" MIN.

RUNNING PLANKS

(2"X12" SHOWN)

(2)- 34"Ø THREADED BOLT X 16" LENGTH)

W/ NUT AND (2) - MALLEABLE IRON WASHERS

2"X6" S4S RAIL, FASTEN RAILS

TO POSTS W/ (2) - #10 X 4"

WOOD SCREWS AT EACH

CONNECTION, TYP.

4"X6" POST FABRICATE

W/ TAPERED END (TOP)

AND W/ (2) - 13

16"Ø HOLES

AT BOTTOM

4"X6"X1'-2" S4S

BLOCKING, TYP.

2"

TYP.

10 34" TYP.

5' -1

" P O

ST

L

EN

G

TH3'-8"

2"X8" S4S RAIL CAP FASTEN TO

EACH POST AND TO RAIL W/ (2) -

#10 X 4" WOOD SCREWS ON 2'-0"

CENTERS

2 14"

10 12"

8"± SPACING

GLULAM STRINGER, TYP.

1'-9" TYP.

1" Ø X 30" LENGTH GALVANIZED ANCHOR BOLT

W/ A MIN. OF 6" LENGTH THREAD AT TIP. IN

ADDITION W/ NUT & WASHER. (ANCHOR BOLT

SHALL BE EMBEDDED 1'-4" INTO SHAFT), TYP..

ANCHOR SHALL BE INSTALLED FACING AWAY FROM

EDGE OF SHAFT AS SHOWN, TYP TO ALL.

2' O.C.

TYP.

5 34" WIDE X 15 18" DEPTH

GLULAM STRINGER, TYP.

C-107

REINFORCEMENT

LAYOUT

A C-107

A C-107

℄ OF

FOUNDATION

SHAFT

OF

BOARDWALK

TREATED SAWN TIMBER SILL

THREADED ANCHOR BOLT

1" Ø X 30" LENGTH GALVANIZED ANCHOR

BOLT W/ A MIN. OF 6" LENGTH THREAD AT

TIP. IN ADDITION WITH NUT AND WASHER,

TYP. (ANCHOR BOLT SHALL BE EMBEDDED

12" INTO SHAFT), TYP.

6 12" 6 12"

9'-6" LENGTH TREATED SAWN TIMBER SILL

2' DIA. TYP. 2' DIA. TYP.5'-6"

7'-6" O.C. DRILLED SHAFT SPACING

2"X8" MIN. RUNNING

PLANKS, TYP.

3"X8" MIN. DECK, TYP.

20'-0" O.C. MAX

(BOARDWALK GLULAM STRINGERS AND FOUNDATION

SHAFTS SHALL NOT EXCEED 20'-0" O.C. ℄ SPACING)

BEARING SHOE. REFER

TO SUBSHEET S-103 & S-104,

TYP.

2"X8" S4S RAIL CAP FASTEN TO

EACH POST AND TO RAIL W/ (2) -

#10 X 4" WOOD SCREWS ON 2'-0"

CENTERS

2"X6" S4S RAIL, FASTEN RAILS

TO POSTS W/ (2) - #10 X 4"

WOOD SCREWS AT EACH

CONNECTION, TYP.

15 18" DEPTH GLULAM STRINGER

SPACED AT 20'-0" O.C. MAX

(BOARDWALK STRINGER), TYP.

REFER TO SUBSHEET

C-105 FOR BOLTS, NUTS,

& WASHERS LAYOUT

4"X6" POST FABRICATE

W/ TAPERED END (TOP)

AND W/ (2) - 13

16"Ø HOLES

AT BOTTOM

3-8"

FOUNDATION DRILLED

SHAFT, TYP

SHAFT FOUNDATION NOTES:

1. ALL FOUNDATIONS SHALL BE

EMBEDDED A MINIMUM OF 2'-0"

INTO ANY BEDROCK

ENCOUNTERED AND

ANCHORED WITH (2) - #5

DOWELS. ADHESIVE ANCHORS

A MINIMUM OF 18" DEPTH AND A

MINIMUM OF 6 12" FROM THE

EDGE OF EACH SHAFT. SEE

BOARDWALK PROFILE TABLE

FOR BOTTOM OF SHAFT

ELEVATIONS.

2. ALL FOUNDATION SHAFTS

SHALL HAVE A MIN. 28-DAYS PSI

STRENGTH OF 4,500 PSI.

3. CONTRACTOR SHALL MACHINE

PLACE RIPRAP AROUND ALL

FOUNDATION SHAFTS. REFER

TO RIPRAP DETAIL SHEET.

EXISTING GROUND GRADE

MACHINE PLACE RIPRAP

AROUND ALL FOUNDATION

SHAFTS AS IT MEETS "EG"

C-108 1

C-107

EXISTING

GROUND

GRADE, TYP.

3" CLR. TYP.

8' -0

" M

IN

. A T

BO

AR

D W

AL

K

PL

AT

FO

R

M M

EE

TS

T R

AI

L

BR

ID

G E

SE

C

TI

O

N

7' -0

" M

IN

. I N

A

LL

O

TH

ER

LO

C

AT

IO

N

S.

(S

EE

N

O

TE

1)

2" CLR.

TYP.

(8)- #8 LONGITUDINAL

(SPACED EQUALLY

AT 8 58" O.C.)

#4 REBAR TIE, SPIRAL,

OR HOOP @ 12" O.C., TYP.

4,500 PSI CONCRETE

2" CLR.

TYP.

℄ OF

FOUNDATION

SHAFT

2'-0" DIA. TYP.

1" Ø X 30" LENGTH GALVANIZED

ANCHOR BOLT W/ A MIN. OF 6" LENGTH

THREAD AT TIP. IN ADDITION WITH NUT

AND WASHER, TYP. (ANCHOR BOLT SHALL

BE EMBEDDED 1'-4" INTO SHAFT), TYP.

1'-4"

3" CLR. TYP.

8' -0

" M

IN

. A T

BO

AR

D W

AL

K

PL

AT

FO

R

M M

EE

TS

T R

AI

L

BR

ID

G E

SE

C

TI

O

N

7' -0

" M

IN

. I N

A

LL

O

TH

ER

LO

C

AT

IO

N

S.

(S

EE

N

O

TE

1)

2" CLR. TYP.

(8)- #8 LONGITUDINAL

(SPACED EQUALLY

AT 8 58" O.C.)

#4 REBAR TIE, SPIRAL,

OR HOOP @ 12" O.C., TYP.

4,500 PSI CONCRETE

2" CLR. TYP.

1'

℄ OF

FOUNDATION

SHAFT

12"X12" (NOMINAL SIZE) X 9'-6" LENGTH

TREATED SAWN TIMBER SILL, TYP.

1" Ø X 30" LENGTH GALVANIZED

ANCHOR BOLT W/ A MIN. OF 6"

LENGTH THREAD AT TIP. IN

ADDITION WITH NUT AND

WASHER (ANCHOR BOLT SHALL

BE EMBEDDED 1'-4" INTO SHAFT),

TYP.

28" MIN.

LONGITUDINAL STEEL, TYP.

TRANSVERSE STEEL, TYP.

1'-8 18" DIA. REBAR CAGE

2'-0" DIA. TYP.

15 18"

1'-8 18" DIA. REBAR CAGE

EXISTING GROUND

GRADE (EG)

5'-4" MIN. TYP.

2' DIA. TYP. 2' DIA. TYP.

2" CLR. TYP.

℄ OF

FOUNDATION

SHAFT

℄ OF

FOUNDATION

SHAFT

9'-6" LENGTH TREATED SAWN TIMBER SILL

(8)- #8 LONGITUDINAL

(SPACED EQUALLY

AT 8 58" O.C.)

#4 REBAR TIE,

SPIRAL, OR

HOOP @

12" O.C., TYP.

1 5

16" Ø HOLE

WITH A 1" Ø X

30" LENGTH

GALVANIZED

ANCHOR

BOLT.TYP.

℄ OF

TREATED

SILL

6 12"6 12"

1 5

16" Ø HOLE WITH A

1" Ø X 30" LENGTH

GALVANIZED ANCHOR

BOLT. TYP.

W / 2

W = 12"

(NOMINAL SIZE)

FOUNDATION DRILLED

SHAFT, TYP

#4 REBAR TIE, SPIRAL,

OR HOOP @ 12" O.C., TYP.

12"X12" (NOMINAL SIZE) TREATED

SAWN TIMBER SILL. REFER TO

SUBSHEET S-104

(8)- #8 LONGITUDINAL

(SPACED EQUALLY

AT 8 58" O.C.)

2" CLR. TYP.

5 9 16"

1' 5 9

16" 1'

7'-6" O.C. DRILLED SHAFT SPACING

5'-6"

BOARDWALK PLATFORM

TRAIL BRIDGE M.P.

2.18 STRINGR

4'-6" OR 54"

12" X 12" TREATED TIMBER SILL, TYP.

FINISHED GROUND

GRADE (FG)

24"Ø FOUNDATION DRILLED

SHAFT, TYP

(2)- 34"Ø THREADED BOLT X 16"

LENGTH) W/ NUT & (2) -

MALLEABLE IRON WASHERS

2"X6" S4S RAIL, FASTEN RAILS

TO POSTS W/ (2) - #10 X 4"

WOOD SCREWS AT EACH

CONNECTION, TYP.

4"X6"X1'-2" S4S

BLOCKING, TYP.

2' O.C.

TYP.

5 34" WIDE X 15 18" DEPTH

GLULAM STRINGER, TYP.

C-107

REINFORCEMENT

LAYOUT

A C-107

℄ OF

FOUNDATION

SHAFT

TREATED SAWN TIMBER SILL

THREADED ANCHOR

BOLT

10 5 16"

30°

OF

BOARDWALK

6'-9 9 16"

CLEAR WIDTH

2"X8" MIN.

RUNNING PLANKS

3'-9"

8"± SPACING

6 12"

M.P. 2.18 TRAIL BRIDGE

(EDGE OF 86'-SPAN STRINGER)

13'-5 12" LENGTH TREATED SAWN TIMBER SILL (OUT-TO-OUT)

12'-8 14" BOARDWALK PLATFORM

1' WIDE REINFORCED

CONCRETE BACKWALL

4"X6" POST FABRICATE W/

TAPERED END (TOP) AND

W/ (2) - 13

16"Ø HOLES AT BOTTOM

(ACTUAL SIZE SHOWN), TYP. TO

BOTH SIDES

1" Ø X 30" LENGTH GALVANIZED

ANCHOR BOLT W/ A MIN. OF 6"

LENGTH THREAD AT TIP. IN

ADDITION W/ NUT & WASHER.

(ANCHOR BOLT SHALL BE

EMBEDDED 1'-4" INTO SHAFT),

TYP.. ANCHOR SHALL BE

INSTALLED FACING AWAY FROM

EDGE OF SHAFT AS SHOWN,

TYP TO ALL.

6 12"

10'-5 7 16"

FINISHED GROUND

GRADE (FG)

3"X8" MIN. DECK PLANKS

9" 2' O.C.

TYP.

1'-9"

BEARING SHOE 2' O.C.

TYP.

EXTEND RAILING

IN THIS LOCATION

BOARDWALK PLATFORM

(FRONT VIEW)

TRAIL BRIDGE

(SIDE VIEW)

ABUTMENT #3

REGION 8

SOUTHERN REGION

SHEET 10 OF 21

C-107DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

BOARDWALK

SECTIONS AND

FOUNDATION

DETAILS

BOARDWALK TYPICAL ELEVATED SECTION

ELEVATION VIEW

BOARDWALK PLATFORM MEETS TRAIL BRIDGE SECTION3

BOARDWALK PROFILE

SIDE VIEW (NTS)

- SECTION A-A (DRILLED SHAFT)

SHAFT TO SILL ANCHOR BOLT NOTES:

1. ANCHOR BOLT SHALL MEET THE

REQUIREMENTS OF ASTM F1554

GRADE 55.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

℄ O F

BO

AR

D W

AL

K

2"X6" S4S RAIL, FASTEN RAILS

TO POSTS W/ (2) - #10 X 4"

WOOD SCREWS AT EACH

CONNECTION, TYP.

5'-0" O.C.

TYP

4"X6" POST FABRICATE

W/ TAPERED END (TOP)

AND W/ (2) - 13

16"Ø HOLES

AT BOTTOM

6' -9

9 16

C

LE

AR

W

ID

TH

2"X8" MIN.

RUNNING PLANKS

(2"X12" SHOWN)

8"± SPACING

3"X8" MIN. DECK, TYP.

1 12", TYP.

5" RINGSHANK NAILS

(SEE GENERAL NOTES)

6" RING SHANK NAILS

OF

BOARDWALK

9' -6

" L

EN

G

TH

T R

EA

TE

D S

AW

N

T

IM

BE

R

S

IL

L

OF

ABUTMENT

FOUNDATION DRILLED

SHAFT, TYP

3"X6" BACKING PLANK STIFFENER ATTACH

W/ (2)-1/2"Ø BOLTS W/ (2)-MALLEABLE IRON

WASHERS PER BACKING PLANK SPACED

DIAGONALLY FROM EACH OTHER, TYP. 4"X6" POST, TYP.

CONSTRUCT AT:

BEGINNING OF

BOARDWALK

BEARING SHOE, TYP.

14' ℄ OF BEARING TO ℄ OF BEARING

13'-5 12" LENGTH TREATED SAWN

TIMBER SILL (OUT-TO-OUT)

C/L OF TOP OF REINFORCED

CONCRETE BACKWALL.

STATIONING: 3+21.30

ELEV: 965.21'

24"Ø FOUNDATION

DRILLED SHAFT, TYP

24"Ø FOUNDATION

DRILLED SHAFT, TYP

15'

15' LENGTH TREATED SAWN

TIMBER SILL (OUT-TO-OUT)

TRAIL BRIDGE REINFORCED

CONCRETE FOUNDATION

13'-5 12" LENGTH TREATED SAWN

TIMBER SILL (OUT-TO-OUT)

THE 13'-5 12" LENGTH TREATED

SAWN SILL WILL MOUNT ON TOP

OF THE 15'-0" LENGTH SILL IN THIS

LOCATION

REFER TO SUBSHEET

C-109 FOR BEARING

SHOE DETAIL, TYP.

BEG

IN

BO

AR

D W

ALK

D

IR

EC

TIO

N

6'-9 9 16"

CLEAR WIDTH

℄O F

BO

AR

D W

ALK

5'-0" O.C.

TYP

ABUTMENT #3

8' LENGTH TREATED SAWN

TIMBER SILL (OUT-TO-OUT)

ABUTMENT #3

3'-6" TOE

8'-3" HEEL

13'1' 1'

14'-0" LENGTH X 5 34" WIDE X 15 18" DEPTH

GLULAM LAMINATED GIRDERS, TYP.

THE 13'-5 12" LENGTH TREATED

SAWN SILL WILL MOUNT ON TOP

OF THE 15'-0" LENGTH SILL IN THIS

LOCATION

20'-0" LENGTH X 5 34" WIDE X 15 18" DEPTH

GLULAM LAMINATED GIRDERS, TYP.

THE 13'-5 12" LENGTH TREATED SAWN SILL

WILL MOUNT ON TOP OF THE DRILLED

SHAFT IN THIS LOCATION

THE 13'-5 12" LENGTH TREATED SAWN SILL

WILL MOUNT ON TOP OF THE DRILLED

SHAFT IN THIS LOCATION

2"X6" S4S RAIL, FASTEN RAILS

TO POSTS W/ (2) - #10 X 4"

WOOD SCREWS AT EACH

CONNECTION, TYP.

10"

1' BACKWALL

ABUTMENT #3

8'-0" WIDE

REFER TO DETAIL 1 ON SUBSHEET C-110

FOR BOARDWALK AND BOARDWALK PLATFORM

ONLY BEARING SHOE DETAIL, TYP.

SHAFT O.C. SPACING, TYP

5'-3" TYP.

FOUNDATION

DRILLED

SHAFT (TYP.)

5'-3" TYP. 5'-3" TYP.

EDGE OF RIPRAP, TYP. PLACE GEOTEXTILE

BENEATH ALL RIPRAP. ALL GEOTEXTILE SHALL

BE "SEPARATION-STABILIZATION GEOTEXTILE,

CLASS 2, TYPE B. ALL GEOTEXTILE SHALL

OVERLAP A MIN. OF 2'-0"

5'-3" TYP.

5'-3" TYP.

PLACE GEOTEXTILE AND MACHINE

PLACE CLASS 4 RIPRAP AROUND ALL

SHAFT FOUNDATIONS, TYP.

CLASS 4 RIPRAP (14" MIN. TO 28"Ø MAX. GRADATION -

85% SHALL BE RETAINED WITHIN THE 19" TO

28"Ø SIEVE RANGE.) ALL RIPRAP SHALL CONFORM

TO THE REQUIREMENTS OF FP-14 TABLE 705-1, TYP.

FOUNDATION DRILLED SHAFT,

CONCRETE CAISSONS, OR EQUAL,

TYP

FOUNDATION

DRILLED

SHAFT (TYP.)

REGION 8

SOUTHERN REGION

SHEET 11 OF 21

C-108DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

United States Department of Agriculture Forest Service

CHECKED

CHATTAHOOCHEE-OCONEE

NATIONAL FOREST

LAKE RUSSELL

M.P. 2.18 TRAIL

BRIDGE

REPLACEMENT

PROJECT

BOARDWALK AND

PLATFORM PLAN

VIEW

BOARDWALK TYPICAL SECTION

PLAN VIEW (NTS)

BOARDWALK PLATFORM MEETS TRAIL BRIDGE SECTION

PLAN VIEW (NTS)

FOUNDATION SHAFTS RIPRAP ARMORING DETAIL

PLAN VIEW (NTS)