C04_Attachment 4 Boiler 2 - Drawings Binder.pdf
PDF 14 MB Posted
- Attached to
- WRRC Boiler Upgrades Federal contract opportunity
- Solicitation number
- 1232SA26R0033
About this file
This is a design contract document for boiler upgrades at the Western Regional Research Center (WRRC) of the U.S. Department of Agriculture in Albany, California. The document contains architectural and engineering drawings, specifications, and construction details for replacing existing steam generation systems with new point-of-use steam generators.
The project is divided into a Base Bid and Bid Option #1. The Base Bid includes all civil site work, electrical site work, and electrical work except for demolition of circuits serving existing steam systems in the Service Building and feeders to new steam generators. Bid Option #1 includes demolition of existing steam system circuitry, installation of feeders from new electrical panels to new steam generators, and all mechanical work for installing four Sussman brand electric steam generators (ranging from 11.0 to 55 BHP) with associated blowdown separators, boiler feedwater pumps, and ductwork. Work sequencing requires new electrical infrastructure to be operational before any mechanical demolition or equipment shutdown. The contract specifies compliance with the Buy American Act, use of materials meeting ASTM standards, and coordination with existing campus operations to minimize autoclave downtime. The document includes detailed mechanical and electrical plans, equipment schedules, foundation specifications, and penetration details for the retrofit installation throughout the main building basement, second and third floors, and service building.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1232SA26R0033_Amd_0002.pdf | ||
| RFI-AE Responses.docx | DOCX document | |
| 33PLMs-1-20-26-4384058_R1257169.pdf | ||
| 8LEADs-1-20-26-4384048_R1257169.pdf | ||
| Sol_1232SA26R0033_Amd_0001.pdf | ||
| C04_Attachment 2 Boiler 1 - Drawings Binder.pdf | ||
| C04_Sol_1232SA26R0033.pdf | ||
| C04_Attachment 3 Boiler 2 - Specifications.pdf | ||
| C04_Attachment 5 Boiler 3 - Specifications.pdf | ||
| C04_Attachment 8 Schedule of Pricing.xlsx | XLSX spreadsheet | |
| C04_ Attachment 1 Boiler 1 - Specifications.pdf | ||
| C04_Attachment 6 Boiler 3 - Drawing Binder.pdf | ||
| C04_Attachment 7 Wage Determination CA20260018.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO SCALEVICINITY MAP
PROJECT
LOCATION
WESTERN REGIONAL RESEARCH CENTER (WRRC)
AGRICULTURAL RESEARCH SERVICE
U.S. DEPARTMENT OF AGRICULTURE
LOCATION MAP NO SCALE
ALBANY, CALIFORNIA
USDA
BOILER UPGRADES DESIGN (CONTRACT 2)
PROJECT LOCATION
BOILER UPGRADES DESIGN
WESTERN REGIONAL
RESEARCH CENTER
(WRRC)
U
D A
S
Dustin Caruso WRRC Contract 2
DRAWING NO.
INDEX OF DRAWINGS
SHEET NO. TITLE
LEGEND AND SYMBOLS
SHEET SHOWN ON
PLAN, DETAIL OR SECTION NUMBER
PLAN, DETAIL OR SECTION TITLE
PLAN, DETAIL OR SECTION NUMBER
SHEET SHOWN ON
PLAN, DETAIL OR SECTION SCALE
ROOM MARK
ROOM NUMBER
DETAIL MARK
DRAWING TITLE
GENERAL
T-100
T-101
TITLE SHEET
DRAWING INDEX AND LEGEND
M-001
MD101
MD102
MD103
M-101
M-102
M-103
M-401
M-501
M-601
GENERAL NOTES AND ABBREVIATIONS
MAIN BUILDING BASEMENT MECHANICAL DEMOLITION PLAN
MAIN BUILDING THIRD FLOOR MECHANICAL DEMOLITION PLAN
SERVICE BUILDING MECHANICAL DEMOLITION PLAN
MAIN BUILDING BASEMENT MECHANICAL NEW WORK PLAN
MAIN BUILDING SECOND FLOOR MECHANICAL NEW WORK PLAN
MAIN BUILDING THIRD FLOOR MECHANICAL NEW WORK PLAN
MAIN BUILDING ENLARGED MECHANICAL NEW WORK PLAN
MECHANICAL DETAILS
MECHANICAL SCHEDULES
MECHANICAL
ELECTRICAL
ED-000
ED101
ED102
ED103
EDS-101
E-000
E-001
E-002
E-003
E-101
E-102
E-103
E-600
E-601
ES-101
SITE DEMOLITION RISER DIAGRAM
MAIN BUILDING BASEMENT ELECTRICAL DEMOLITION PLAN
MAIN BUILDING THIRD FLOOR ELECTRICAL DEMOLITION PLAN
SERVICE BUILDING CONTRACT 2 ELECTRICAL DEMOLITION PLAN
ELECTRICAL DEMOLITION SITE PLAN
ELECTRICAL LEGEND AND RISER DIAGRAM
ELECTRICAL DETAILS
ELECTRICAL DETAILS
ELECTRICAL DETAILS
MAIN BUILDING BASEMENT ELECTRICAL NEW WORK PLAN
MAIN BUILDING THIRD FLOOR ELECTRICAL NEW WORK PLAN
ENLARGED SWITCHGEAR PLAN
PRIMARY DISTRIBUTION SINGLE LINE DIAGRAM
PANEL SCHEDULES
ELECTRICAL SITE PLAN
DRAWING INDEX AND LEGEND
T-101
GENERAL
C-101 ENLARGED SWITCHGEAR CONCRETE PAD PLAN03 OF 28
ENVIRONMENTAL NOTES
1. CONTRACTOR MUST ASSUME THAT ALL EXISTING PAINT COATINGS CONTAIN LEAD. IT IS NOT THE INTENT
OF THIS PROJECT TO PROVIDE A COMPREHENSIVE LEAD-BASED PAINT REMEDIATION, BUT
DISTURBANCE OF SOME PAINT-COATED SURFACES WILL BE REQUIRED TO PERFORM THE WORK.
WHERE EXISTING PAINTED SURFACES ARE DISTURBED (DRILLING, CUTTING, ETC.), THE
CONTRACTOR MUST PROVIDE WORKER PROTECTION IN ACCORDANCE WITH OSHA, AND ANY LOOSE
COATINGS AND COATING DUST MUST BE DISPOSED OF AS A HAZARDOUS LEAD WASTE. PAINTED
MATERIALS THAT ARE REMOVED AND DISPOSED OF MAY BE DISPOSED AS NORMAL CONSTRUCTION
WASTE PROVIDED THE COATINGS ARE INTACT ON THE MATERIAL BEING DISPOSED.
2. THE CONTRACTOR MUST PROVIDE A DESIGN FOR THE ENVIRONMENTAL WORK AS A SUBMITTAL FOR
APPROVAL PRIOR TO PERFORMING ANY ENVIRONMENTAL WORK.
U
D A
S
WORK SEQUENCING NOTES
NEW ELECTRICAL INFRASTRUCTURE MUST BE INSTALLED AND READY FOR CONNECTION TO MECHANICAL
NEW MECHANICAL EQUIPMENT PRIOR TO THE COMMENCEMENT OF ANY MECHANICAL DEMOLITION OR
TAKING ANY EXISTING MECHANICAL EQUIPMENT OFFLINE.
ONCE NEW ELECTRICAL INFRASTRUCTURE HAS BEEN INSTALLED EXISTING STEAM SYSTEM IN THE SERVICE
BUILDING MUST BE TAKEN OFFLINE IF BID OPTION #1 IS AWARDED.
THIS WORK SHALL TAKE PLACE IF BID OPTION #1 IS AWARDED. ONCE EXISTING STEAM SYSTEM IN THE
SERVICE BUILDING IS TAKEN OFFLINE DECOUPLING OF EXISTING AUTOCLAVES FROM THE EXISTING STEAM
SYSTEM MUST TAKE PLACE ONE AUTOCLAVE ROOM AT A TIME. PRIORITY MUST BE PLACED ON INSTALLATION
OF NEW STEAM GENERATORS IS SPACES THAT DO NOT CURRENTLY HAVE A POINT OF USE STEAM
GENERATOR TO MINIMIZE AUTOCLAVE DOWNTIME. EACH NEW STEAM GENERATOR MUST BE FULLY
OPERATIONAL PRIOR TO MOVING ON TO THE NEXT AUTOCLAVE ROOM.
BIDDING NOTES
BASE BID:
BASE BID SHALL INCLUDE ALL CIVIL SITE WORK, ELECTRICAL SITE WORK, AND ELECTRICAL WORK WITH THE
EXCEPTION OF THE FOLLOWING:
· DEMOLITION OF CIRCUITS SERVING THE EXISTING SYSTEMS IN THE SERVICE BUILDING. THE EXISTING
STEAM SYSTEM SHALL REMAIN FULLY OPERATION IF ONLY THE BASE BID IS AWARDED.
· FEEDERS FROM NEW PANELS, INSTALLED AS PART OF THE BASE BID, TO THE NEW STEAM GENERATORS
THAT ARE PART OF BID OPTION #1. ALL EXISTING STEAM GENERATORS AND AUTOCLAVES SHALL REMAIN
FULLY OPERATIONAL IF ONLY THE BASE BID IS AWARDED.
BID OPTION #1:
BID OPTION #1 SHALL INCLUDE THE FOLLOWING:
· DEMOLITION OF CIRCUITS SERVING THE EXISTING SYSTEMS IN THE SERVICE BUILDING AS INDICATED IN
THE ELECTRICAL DRAWINGS.
· INSTALLATION OF FEEDERS FROM NEW ELECTRICAL PANELS TO NEW STEAM GENERATORS AS
INDICATED IN THE ELECTRICAL DRAWINGS..
· ALL WORK INDICATED IN THE MECHANICAL DRAWINGS.
ENLARGED SWITCHGEAR
CONCRETE PAD PLAN
C-101
U
D A
S
#4 BAR @ 14" O.C.E.W.
8"
VAPOR BARRIER
4" GRANULAR BASE
COMPACTED FILL 1' - 6" #4 BAR CONTINUOUS
#4 BAR @ 14" O.C.
1'
1' - 6" 2' - 6" 1' - 6"
9"
#4 BAR @ 14" O.C.E.W.
" 8"
18"
14"
#4 TIE @ 14" O.C.
VAPOR BARRIER
4" GRANULAR BASE
COMPACTED FILL
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
50'-0"
'-0
16'-8" 16'-8" 16'-8"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
6' -3
'-6
6' -3
'-6
'-6
TYP.
TYP.
C101
C101
SCALE:
SCALE:
SCALE: SCALE:
LEGEND
#4 BAR @ 14" O.C.E.W.
CONTROL JOINT
THICKENED SLAB BOUNDARIES
CJ CJ2
TYP.
EDGE BEYOND
1% S
LO
PE
1% S
LO
PE
1% S
LO
PE
1% S
LO
PE
RC-1 ALL CONCRETE DESIGN AND PLACEMENT SHALL BE IN STRICT ACCORDANCE WITH
THE ACI "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE," ACI 318.
RC-2 STRUCTURAL CONCRETE SHALL CONFORM TO ACI 301 SPECIFICATIONS AND SHALL
DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS.
RC-3 CHAMFER ALL EDGES OF EXPOSED CONCRETE 3/4" UNLESS NOTED OTHERWISE.
RC-4 LAP CONTINUOUS REINF. AS NOTED IN LAP SPLICE SCHEDULE. LAP CONT. BOTTOM
STEEL OVER SUPPORT AND CONT. TOP STEEL AT MIDSPAN UNLESS OTHERWISE
SPECIFIED.
RC-5 SLEEVE ALL PENETRATIONS THROUGH BEAMS INDIVIDUALLY. CORE DRILLING SHALL
NOT BE PERMITTED. SUBMIT LOCATION AND SIZE OF SLEEVES THROUGH BEAMS TO
CONTRACTING OFFICER FOR REVIEW PRIOR TO CASTING CONCRETE.
RC-6 ALL EMBEDDED ITEMS SHALL BE SECURELY TIED IN PLACE PRIOR TO CONCRETE
PLACEMENT. SWITCHGEAR ANCHOR SIZE AND SPACING PER MANUFACTURE'S
RECOMMENDATION
RC-7 ALL REINFORCEMENT SHALL BE IN ACCORDANCE WITH ASTM A775 GRADE 60 (UNO).
REINFORCED CONCRETE
PERMIT NOTES
P-1 THE CONTRACTOR SHALL APPLY FOR, OBTAIN AND COMPLY WITH ALL NECESSARY PERMITS.
P-2 COPIES OF ALL PERMITS SHALL BE MAINTAINED ON SITE. HARD COPIES OF ALL PERMITS SHALL BE PROVIDED TO THE CONTRACTING OFFICER.
CONTRACTOR NOTES
CN-1 THE CONTRACTOR SHALL PROVIDE SUPERVISION AS REQUIRED TO DIRECT THE WORK REQUIRED.
CN-2 THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED TO COMPLETE THE WORK.
CN-3 THE CONTRACTOR SHALL PERFORM ALL WORK AS SHOWN OR IMPLIED IN COMPLIANCE WITH ALL STATE OF CALIFORNIA AND FEDERAL CODES, RULES, AND REGULATIONS.
FOUNDATION NOTES
FN-1 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE GROSS BEARING PRESSURE OF 2200 PSF. FOR FOOTING FOUNDED APPROXIMATELY 16 INCHES
BELOW FINAL GRADE, CONTRACTOR MUST VERIFY BEARING CAPACITY OF SOIL.
FN-2 THE MAXIMUM ALLOWABLE SOIL PRESSURE FOR REINFORCED CONCRETE SPREAD FOOTINGS BEARING A MINIMUM OF 18 INCHES BENEATH THE FINISH
SUBGRADE ELEVATION IS 2500 PSF.
FN-3 PROTECT PIPES & CONDUITS RUNNING THROUGH WALLS & SLABS WITH 1/2 INCH EXPANSION MATERIAL. LOWER CONTINUOUS FOOTINGS & GRADE BEAMS
PERPENDICULAR TO PIPE RUNS TO ALLOW PIPES TO PASS ABOVE THE FOOTINGS OR THROUGH THE GRADE BEAMS. ALTERNATIVELY, PROVIDE A CONCRETE JACKET IF PIPES ARE LOW ENOUGH TO BE PLACED BELOW THE FOOTINGS & GRADE BEAMS. LOWER FOOTINGS & GRADE BEAMS PARALLEL TO
PIPE RUNS TO AVOID SURCHARGE ONTO ADJACENT TRENCH EXCAVATIONS.
FN-4 MAINTAIN SUBGRADE & FILL MOISTURE CONTENT UNTIL FOUNDATIONS ARE PLACED.
FN-5 ARRANGE FOR OWNER'S INDEPENDENT TESTING AGENCY TO MONITOR CUT & FILL OPERATIONS & PERFORM FIELD DENSITY & MOISTURE CONTENT
TESTS TO VERIFY COMPACTION & APPROVE FOOTING SUBGRADES PRIOR TO PLACING CONCRETE.
FN-6 DO NOT PLACE FOOTINGS OR SLABS AGAINST SUBGRADE CONTAINING FREE WATER, FROST, OR ICE.
FN-7 MAINTAIN PROPER SITE DRAINAGE DURING CONSTRUCTION TO ENSURE SURFACE RUNOFF AWAY FROM STRUCTURES & TO PREVENT PONDING OF
SURFACE RUNOFF NEAR THE STRUCTURES.
FN-8 KEEP OPEN EXCAVATIONS AROUND BUILDING PERMETER DRY. BACK FILL AGAINST FOUNDATIONS & GRADE BEAMS AS SOON AS PRACTICAL. PUMP
WATER OUT & DRY OPEN EXCVATIONS, IF FLOODED PRIOR TO BACKFILLING.
BUILDING PAD PREPARATION NOTES
BP-1 THE AREAS TO RECEIVE SELECT FILL SHALL BE STRIPPED OF ALL VEGETATION, EXISTING FILL, & SOFT OR DISTURBED SOILS. THE EXCAVATED AREA
SHALL BE OBSERVED BY THE SOILS ENGINEER PRIOR TO PLACING DENSITY-CONTROLLED SELECT CLAYEY FILL.
BP-2 THE EXPOSED GRADE SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 8 INCHES, MOISTENED TO A CONTENT OF -2 TO +4 PERCENT OF OPTIMUM &
RECOMPACTED TO A MINIMUM OF 95% OF THE ASTM D-698.
BP-3 SELECT FILL, CONSISTING OF SOIL APPROVED BY A SOILS ENGINEER, SHALL BE PLACED IN COMPACTED LAYERS WITH SUITABLE COMPACTION
EQUIPMENT.
BP-4 ANY TRASH & DEBRIS IN THE EXISTING FILL SHALL BE REMOVED DURING GRADING.
BP-5 PLACE SUBSEQUENT LIFTS OF SELECT FILL IN THIN HORIZONTAL LAYERS NOT EXCEEDING EIGHT INCHES ON LOOSE THICKNESS & COMPACT EACH LIFT
TO AT LEAST 95% OF ASTM D-698. MAINTAIN MOISTURE WITHIN TWO PERCENT ± THE THEORETICAL OPTIMUM.
BP-6 FIELD OBSERVATION & TESTING SHALL BE PERFORMED BY THE SOILS ENGINEER DURING GRADING TO ASSIST THE CONTRACTOR IN OBTAINING THE
REQUIRED DEGREE OF COMPACTION & THE PROPER MOISTURE CONTENT. WHERE COMPACTION IS LESS THAN REQUIRED, ADDITIONAL COMPACTIVE EFFORT SHALL BE MADE WITH ADJUSTMENT OF THE MOISTURE CONTENT, AS NECESSARY, UNTIL 95% COMPACTION IS OBTAINED.
BP-7 FINE GRAINED, LOW COHESION SOILS OF THE TYPE SPECIFIED FOR SELECT FILL MAY BE COMPACTED USING RUBBER-TIRED, AND/OR PNEUMATIC, ROLLERS, & STRICT MOISTURE CONTROL.
BP-8 VEGETATION OR ASSOCIATED ROOT SYSTEM LOCATED WITHIN THE AREA TO BE GRADED SHALL BE REMOVED DURING GRADING. ANY EXISTING OR ABANDONED UTILITIES LOCATED WITHIN THE AREA SHALL BE REMOVED OR RELOCATED. ALL FILL MATERIALS & DISTURBED SOILS RESULTING FROM GRADING OPERATIONS SHOULD BE REMOVED & PROPERLY RECOMPACTED PRIOR TO FOUNDATION EXCAVATION.
BP-9 THE SOURCE OF SELECT FILL IS UNKNOWN. ALLOW AT LEAST THREE DAYS FOR PROPER TESTING OF POTENTIAL BORROW AREAS. VERIFY SUITABILITY
PRIOR TO PLACEMENT ON SITE.
GEOTECHNICAL/SITE PREPARATION
GT-SP-1 MINIMAL GRADING IS ANTICIPATED TO BE REQUIRED TO ACHIEVE A DESIGN ELEVATION COMPATIBLE WITH THE SURROUNDING IMPROVEMENTS.
GT-SP-2 POSITIVE GRADING SHALL BE MAINTAINED TO PREVENT THE MOISTURE FROM SATURATING THE SUBGRADE.
GT-SP-3 EXISTING VEGETATION AND THE ROOT MAT SHALL BE REMOVED. COMPLETE STRIPPING OF THE TOPSOIL SHALL BE PERFORMED IN THE PROPOSED
BUILDING AREAS. STRIPPED MATERIALS CONSISTING OF VEGETATION AND ORGANIC MATERIALS SHOULD BE WASTED OFF SITE OR USED TO VEGETATE
LANDSCAPED AREAS.
SUBGRADE REQUIREMENTS
GT-SR-1 RECEIVING SUBGRADE SHOULD BE SCARIFIED TO A MINIMUM DEPTH OF 8" AND COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DRY DENSITY
ESTABLISHED BY STANDARD PROCTOR (ASTM D-698)
GT-SR-2 COMPACTION TEST FREQUENCY FOR SUBGRADE SHALL BE 1 TEST PER 500 SF OF PREPARED SUBGRADE BENEATH STRUCTURE
GT-SR-3 MINIMUM OF 3 TESTS PER LIFT BENEATH STRUCTURE.
FILL MATERIAL REQUIREMENTS
GT-FMR-1 FILL MATERIALS BY ALLOWABLE USCS SOIL CLASSIFICATION TYPE AND LOCATION.
GT-FMR-2 LEAN CLAY (CL) OR CLAYEY SAND (SC) (8<PI<18) ALL LOCATIONS AND ELEVATIONS.
GT-FMR-3 MOISTURE CONTENT OF ALL SOILS SHOULD BE MAINTAINED COMPATIBLE WITH THE LABORATORY OPTIMUM.
GT-FMR-4 RIVER SAND (SP, SM-SP (NOTE THAT FINES DEFINED AS RIVER SAND PERCENT PASSING THE NO. 200 SIEVE SHALL BE LESS THAN 10 PERCENT)) ALL
LOCATIONS AND ELEVATIONS.
FILL COMPACTION REQUIREMENTS
GT-FCR-1 RELOCATED OR IMPORTED SOILS SHOULD BE PLACED IN MAXIMUM LOOSE LIFTS OF 8" COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DRY DENSITY
ESTABLISHED BY STANDARD PROCTOR (ASTM D-698)
GT-FCR-2 4" LIFTS IN LOOSE THICKNESS WHEN HAND GUIDED EQUIPMENT (I.E. JUMPING JACK OR PLATE COMPACTOR) IS USED.
GT-FCR-3 COMPACTION TEST FREQUENCY FOR SUBGRADE SHALL BE 1 TEST PER 500 SF PER 8" LOOSE LIFT OF RELOCATED OR IMPORTED FILL BENEATH
STRUCTURE
GT-FCR-4 MINIMUM OF 3 TESTS PER LIFT BENEATH STRUCTURE.
SCALE: SCALE:
SEPARATING TAPE
LIQUID JOINT
SEALANT
#4 BAR @ 14" O.C.E.W.
3/8"
5/ 8"
3/
/1 6"
1/
4"
1. PROVIDE POSITIVE DRAINAGE AWAY FROM SLAB AT 5% FOR
THE FIRST 10 FEET, THEN TRANSITION TO A 4:1 SLOPE BEYOND.
2. COORDINATE SWITCHGEAR ANCHORING PLACEMENT AND
COMPONENTS WITH EQUIPMENT MANUFACTURER.
TYP.
NOTE:
29176
AutoCAD SHX Text
AutoCAD SHX Text
PPM
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Agricultural
AutoCAD SHX Text Service
AutoCAD SHX Text Research
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE
AutoCAD SHX Text c
AutoCAD SHX Text P.A.
AutoCAD SHX Text
FIRM
AutoCAD SHX Text
NO.
AutoCAD SHX Text
EPM
AutoCAD SHX Text
SAFETY & HEALTH
AutoCAD SHX Text
REAL PROPERTY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
USDA
AutoCAD SHX Text
BY
AutoCAD SHX Text
AGRICULTURAL RESEARCH SERVICE
AutoCAD SHX Text
OF
AutoCAD SHX Text
THE
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
JOB #
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
A-E FIRM
AutoCAD SHX Text
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
AutoCAD SHX Text Johnson M Adams
AutoCAD SHX Text
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
AutoCAD SHX Text
USDA AGRICULTURAL RESEARCH SERVICE
AutoCAD SHX Text
BOILER UPGRADES FOR ALBANY CAMPUS
AutoCAD SHX Text
WESTERN REGIONAL RESEARCH CENTER (WRRC)
AutoCAD SHX Text
ALBANY, CA
AutoCAD SHX Text
AutoCAD SHX Text 04/16/26
AutoCAD SHX Text
AEJ
AutoCAD SHX Text
AEJ
AutoCAD SHX Text
DRL
AutoCAD SHX Text
USDA/ARS, PA
AutoCAD SHX Text
800 BUCHANNAN STREET
AutoCAD SHX Text
ALBANY, CA
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AutoCAD SHX Text
TG
AutoCAD SHX Text
XXX
AutoCAD SHX Text
KC
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text
CONCRETE PAD PLAN
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text
CONCRETE PAD SECTION
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
EDGE DETAIL
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
THICKENED SLAB DETAIL
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
CONTROL JOINT DETAIL(CJ)
AutoCAD SHX Text
NONE
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text B
AutoCAD SHX Text C101
AutoCAD SHX Text
DETAIL "B"
AutoCAD SHX Text
NONE
AutoCAD SHX Text B
AutoCAD SHX Text C101
AutoCAD SHX Text
* FIRST SAWCUT FIRST SAWCUT ** SECOND SAWCUTSECOND SAWCUT
GENERAL NOTES AND
ABBREVIATIONS
M-001
U
D A
S
1. INSTALLATION OF HVAC WORK SHALL BE COORDINATED WITH OTHER TRADES BEFORE ANY WORK IS PERFORMED. DUCTWORK SHOWN ON PLANS IS SCHEMATIC. DUCTWORK SHALL BE INSTALLED TIGHT TO STRUCTURE. PROVIDE ALL TRANSITIONS, ELBOWS, ETC. REQUIRED TO AVOID CONFLICTS & MAXIMIZE CEILING HEIGHTS. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH OTHER TRADES SHALL BE RELOCATED AS REQUIRED AT NO
ADDITIONAL COST TO THE OWNER.
2. COORDINATE MECHANICAL AND ELECTRICAL SUCH THAT MECHANICAL PIPING, AND EQUIPMENT IS NOT LOCATED OVER OR ABOVE ANY ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT.
3. AT START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE SUPPLIED REQUIRING ELECTRICAL WORK, AND SEND LISTS TO THE
ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.
4. EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE AND INTERNATIONAL BUILDING CODE / INTERNATIONAL
MECHANICAL CODE.
5. INSTALLATION OF EQUIPMENT SHALL PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT NECESSITATING REMOVAL OR MODIFICATION
TO OTHER PIPING, WIRING, OR EQUIPMENT.
6. CEILING-MOUNTED EQUIPMENT SHALL BE INSTALLED IN SUCH A MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC., DO NOT BLOCK ACCESS TO EQUIPMENT
AND RELATED ACCESSORIES.
7. COORDINATE WALL, FLOOR, AND ROOF PENETRATIONS WITH THE CONTRACTOR OFFICER.
8. SUPPLEMENTAL STEEL MEMBERS REQUIRED TO SUPPORT PIPING AND EQUIPMENT FROM MAIN STRUCTURE SHALL BE PROVIDED BY THE HVAC
CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.
9. PROVIDE ACCESS PANELS TO ACCESS DAMPERS, EQUIPMENT, AND VALVES LOCATED ABOVE HARD CEILINGS OR IN WALLS. ACTUAL LOCATIONS SHALL BE
FIELD DETERMINED.
10. PROVIDE SUPPORTS FOR PIPING AND DUCTWORK IN ACCORDANCE WITH SPECIFICATIONS.
11. FOR WALL, FLOOR, AND SLAB PENETRATIONS, SEAL AND PATCH ALL UNUSED PENETRATION SPACE TO MATCH EXISTING CONSTRUCTION/FINISH OR AS SHOWN ON MECHANICAL DETAILS SHEET. PROVIDE FIRE STOPPING FOR RATED WALLS AND FLOORS.
12. INSTALL CONTROL WIRING IN GREEN CONDUIT. SEE DIVISION 26 SPECIFICATIONS FOR REQUIREMENTS.
13. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
14. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE
THE SPECIFICATION HAS OPTIONS.
15. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED LITERATURE.
16. ALL EQUIPMENT INSTALLED IN THIS PROJECT SHALL COMPLY WITH THE "BUY AMERICAN ACT". BASIS OF DESIGN SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE.
17. CONTROLS CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE DEVICES, CONDUCTORS, CONDUIT AND PATHWAYS IN ACCORDANCE WITH THE
REQUIREMENTS OF 26 20 00.
18. NOT ALL ABBREVIATIONS AND LEGEND ITEMS WILL BE USED.
GENERAL MECHANICAL NOTES: ABBREVIATIONS:
@ AT
& AND
AHU AIR HANDLING UNIT
ARCH ARCHITECT, ARCHITECTURAL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING,
AND AIR CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
BD BALANCING DAMPER
BDD BACKDRAFT DAMPER
BLDG BUILDING
BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CLG COOLING
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CO2 CARBON DIOXIDE
CONC CONCRETE
COND STEAM CONDENSATE
CONN CONNECT, CONNECTING, CONNECTION
CON CONTINUED
COV STEAM CONVERTER
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER'S (OWNER'S)
REPRESENTATIVE
CT COOLING TOWER
CU CONDENSING UNIT
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DEPTH
DB, Tdb DRY BULB (TEMPERATURE) dBA DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG. F (°F) DEGREES FAHRENHEIT
DF DESTRATIFICATION FAN
DFCU DUCTLESS FAN COIL UNIT
DH DEHUMIDIFIER
DIA, Ø DIAMETER
DIV DIVISION
DN DOWN
DP, PD DIFFERENTIAL PRESSURE,
PRESSURE DROP
DSCU DUCTLESS SPLIT CONDENSING UNIT
DSHP DUCTLESS SPLIT HEAT PUMP
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEC ELECTRICAL
EMCS ENERGY MONITORING AND CONTROLS
SYSTEM
ERU ENERGY RECOVERY UNIT
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EXT EXTERIOR
EXH EXHAUST
EXIST. EXISTING
FCU FAN COIL UNIT
FD FIRE DAMPER
FFE FINISHED FLOOR ELEVATION
FLA FULL LOAD AMPS
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPM FEET PER MINUTE
FSD FIRE SMOKE DAMPER
FT FOOT, FEET
FT WG FEET WATER GAUGE
FV FLUE VENT
GA GAGE
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GWH GAS WATER HEATER
H HEIGHT
HPS HIGH PRESSURE STEAM
HR HOUR
HTG HEATING
HTR HEATER
HTW HEATING WATER
HWR HEATING WATER RETURN
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HX HEAT EXCHANGER
HZ HERTZ
ICW INDUSTRIAL COLD WATER
IMC INTERNATIONAL MECHANICAL CODE
IN INCH, INCHES
IN WC INCHES WATER COLUMN
IN WG INCHES WATER GAUGE
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATTS
L LENGTH, LOUVER (WALL)
LAT LEAVING AIR TEMPERATURE
LBD LINEAR BAR DIFFUSER
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPACITY
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE
MFCR, MFG MANUFACTURER, MANUFACTURING
MIN MINIMUM
MOCP, MOP MAXIMUM OVER CURRENT PROTECTION
MTWR MEDIUM TEMPERATURE WATER RETURN
MTWS MEDIUM TEMPERATURE WATER SUPPLY
MXB MIXING BOX
N.C. NORMALLY CLOSED
NC NOISE CRITERIA
NG NATURAL GAS
NO. NUMBER
N.C. NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DAMPER
PCHWR PLANT CHILLED WATER RETURN
PCHWS PLANT CHILLED WATER SUPPLY
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PMTWR PLANT MEDIUM TEMPERATURE
WATER RETURN
PMTWS PLANT MEDIUM TEMPERATURE
WATER SUPPLY
PPM PARTS PER MILLION
PRV PRESSURE RELIEF VALVE
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RA RETURN AIR
RAG RETURN AIR GRILLE
RH RELATIVE HUMIDITY, ROOF HOOD
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAG SUPPLY AIR GRILLE
SD SMOKE DAMPER, SMOKE DETECTOR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SUPPLY FAN
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTOR'S NATIONAL ASSOCIATION
SP STATIC PRESSURE
STM STEAM
SS STAINLESS STEEL
TEMP TEMPERATURE
TSTAT THERMOSTAT
TYP TYPICAL
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UMCS UTILITY MONITORING AND CONTROL
SYSTEM
V VOLTAGE, VOLTS
VAV VARIABLE AIR VOLUME TERMINAL UNIT
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VVS VARIABLE VOLUME SUPPLY TERMINAL
UNIT
VVLE VARIABLE VOLUME EXHAUST TERMINAL
UNIT
WB, Twb WET BULB (TEMPERATURE)
A
J
SD
SP
F
CO
T
VFD
T
H
TH
H
DP
C
AQ
PS
FS
X
MISCELLANEOUS LEGEND:
A
J
SD
SP
F
CO
DUCT SMOKE DETECTOR
CARBON MONOXIDE SENSOR
OVAL OR FLAT OVAL
CONTROL WIRING
STATIC PRESSURE SENSOR
ROUND OR DIAMETER
FIRESTAT
TEMPERATURE SENSORT
120 VOLT STAND BY POWER JUNCTION
BOX PROVIDED BY THE ELECTRICAL
CONTRACTOR. JUNCTION BOX IS
DEDICATED FOR USE BY THE
CONTROLS CONTRACTOR.
VARIABLE FREQUENCY DRIVEVFD
RETURN AIR GRILLE
SUPPLY AIR DIFFUSER
FLOW ARROWS INDICATE AIR PATTERN.
NO FLOW ARROWS SHOWN INDICATES
4-WAY PATTERN.
EXHAUST AIR GRILLE
SERVICE CLEARANCE
T THERMOSTAT
H HUMIDISTAT
$ START/ STOP SWITCH
TH THERMOSTAT/ HUMIDISTAT
HUMIDITY SENSORH
DP DIFFERENTIAL PRESSURE SENSOR
C CARBON DIOXIDE SENSOR
AQ AIR QUALITY SENSOR
POINT OF RECONNECTION OR
EXTENT OF DEMOLITION
PIPING LEGEND:
FLEXIBLE CONNECTION
THERMOMETER
PRESSURE REDUCING VALVE
MANUAL AIR VENT
PRESSURE/TEMPERATURE TAP WITH
BALL VALVE
PRESSURE SWITCH
PLUG VALVE
FLOW SWITCH
T&P RELIEF VALVE
AUTOMATIC AIR VENT
PRESSURE GAUGE WITH GAUGE COCK
PS
FS
BUTTERFLY VALVE
STRAINER WITH BLOWDOWN VALVE,
CAP, AND CHAIN
FLOW MEASURING/BALANCING/SHUT-
OFF VALVE
GATE VALVE
CHECK VALVE
BALL VALVE
CONCENTRIC REDUCER
DIRECTION OF FLOW
ECCENTRIC REDUCER
PIPE FLANGE
PIPE CAP
PIPE GUIDE (PG)
PIPE ANCHOR (PA) X
UNION
TEE OUTLET UP
BRANCH BOTTOM CONNECTION
BRANCH TOP CONNECTION
ELBOW UP
ELBOW DOWN
RISE OR DROP
TEE OUTLET DOWN
GLOBE VALVE
WALK-IN
COLD ROOMS
ROOM
ELECTRO-MECH.
LAB
CORRIDOR
CORRIDOR
POD
LABORATORY
ANTEROOM
POD
LABORATORY OFFICE OFFICE
ROOM
MECH. EQP'T
OFFICE OFFICE
POD
ANTEROOM
LABORATORY
POD
CORRIDOR
LABORATORY
OFFICE OFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
MEN'S
RESTROOM
CORRIDOR
OFFICEOFFICE
OFFICEOFFICE
CORRIDOR
COLD ROOMS
WALK-IN
COLD ROOMS
WALK-IN
ROOM
ELECT. EQP'T
POD
LABORATORY
ANTEROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
RESEARCH EQP'T
ROOM
AUTOCLAVE
ROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
ANTEROOM
UP
UP.
ME
N'
S
TO
ILE
T
EL
EC
STAIR A
PUMP ROOM
SWITCHBOARD
ROOM
TRANSFORMER
ROOM
SUMP PIT
CORRIDOR
EQUIPMENT ROOM
REPRODUCTION
EXIT
FIRE ALARM
FIRST AID
ROOM
WOMEN'S
TOILET
STORAGE
OFFICE
PROJECT OFFICE
LUNCH ROOM
ELECT. RM
IS IDP
ROOM
STAIR B
OFFICE
OFFICE
0002A
0002B
LAB/STORAGE
COMPUTER TRAINING/
UP
CL
OS
ET
MECH ROOM
UP
UP
RECEIVING
FREEZERS
FOYER
CORRIDOR
UP
ELECTRICAL
ROOM
AUTOCLAVE RM
MAIL ROOM
SHIPPING/
RECEIVING
SHIPPING/
LABORATORY POD
GROWTH CHAMBER
ROOM
LABORATORY POD
LABORATORY POD
TRANSFORMER
VAULT
LABORATORY POD
MECH RM.
MEDIA CENTER
O&M CONTRACTOR
ELECTRICAL
SWITCHGEAR
OFFICE/WORKSPACE
ST
OR
AG
E
CORRIDOR
LABORATORY
PODOFFICEOFFICE
LABORATORY
POD
UP
DN
UP
DN
UN
IS
TR
UT
W
AL
L
LARGE SWITCHGEAR
ELEVATOR
FREIGHT
ELEV.
CORRIDOR
COLD BOX COLD BOX COLD BOX COLD BOX
COLD BOX ROOMROOMMECH. ROOM
ROOM
0112A0114A
0104 0102A 0102B0110/10A
0113/15
0123A 0119A 0127/29
0137A 0133A
0136A 0132A
0128A 0124A 0124 0122
0122A 0118A
ANTEROOM
0102ANTEROOM
FI
RE
E
STOCKROOM
SWITCHBOARD
TELEPHONE
SUMP PIT
EL
EC
CL
OS
ET
SUPPLIES
MEN
JANITOR
WOMEN
SCALE:
MAIN BUILDING BASEMENT MECHANICAL DEMOLITION PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
MD101
MAIN BUILDING BASEMENT
MECHANICAL DEMOLITION PLAN
AC-1
AC-2AC-3
GW-2
GW-1AC-4
AC-5
AC-6
AC-7
1. DEMOLISH EXISTING STEAM GENERATOR AND ALL
APPURTENANCES. DEMOLISH EXISTING STEAM PIPING
FROM STEAM GENERATOR TO EXISTING AUTOCLAVE.
DEMOLISH EXISTING DOMESTIC WATER SUPPLY
PIPING BACK TO ISOLATION VALVES. COORDINATE THE
RETURN OF THE STEAM GENERATOR TO THE
GOVERNMENT WITH THE CONTRACTING OFFICER.
2. EXISTING AUTOCLAVE TO REMAIN. DISCONNECT
EXISTING AUTOCLAVE FROM HOUSE STEAM.
DEMOLISH EXISTING HOUSE STEAM AND CONDENSATE
PIPING BACK TO ABOVE CEILING AND CAP.
3. EXISTING AUTOCLAVE TO REMAIN. DISCONNECT
EXISTING AUTOCLAVE FROM HOUSE STEAM.
DEMOLISH EXISTING HOUSE STEAM AND CONDENSATE
PIPING SERVING AUTOCLAVES BACK TO OVERHEAD
MAINS AND CAP.
4. EXISTING GLASSWARE WASHER TO REMAIN.
DISCONNECT EXISTING GLASSWARE WASHER FROM
HOUSE STEAM. DEMOLISH EXISTING HOUSE STEAM
AND CONDENSATE PIPING SERVING GLASSWASHER
BACK TO OVERHEAD MAINS AND CAP.
5. EXISTING GLASSWARE WASHER TO REMAIN. GLASS
WASHER IS SERVED BY DOMESTIC WATER SYSTEM
AND DOES NOT REQUIRE STEAM CONNECTION.
1. THE DEMOLITION PLAN AND EXISTING CONDITIONS
ARE APPROXIMATE. ITEMS TO BE REMOVED ARE
DESIGNATED BY HATCHING AND DASHED LINES.
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE
UNLESS NOTED OTHERWISE.
EXIST. STEAM GENERATOR
AC-12
AC-13
AC-14
EXIST. STEAM GENERATOR
EXIST. STEAM GENERATOR1
3 3
U
D A
S
WORK STATION
OFFICE OFFICE
LABORATORY
POD
ANTEROOM
LABORATORY
PODOFFICE OFFICE
CORRIDORCORRIDOR
ANTEROOM
OFFICE OFFICE
ANTEROOM
POD
LABORATORY
POD
LABORATORY
OFFICE OFFICE
ANTEROOM
OFFICE OFFICE
ANTEROOM
LABORATORY
POD
CORRIDOR
OFFICE OFFICE
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
MEN'S
RESTROOM
ELEV.
CORRIDOR
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
OFFICEOFFICE
CORRIDOR
WOMEN'S
TOILET
JANITOR'S CLOSET
DN.
UP.
UP.
DN.
MEN'S TOILET
NO °1
JANITOR'S CLOSET
CORRIDOR
OFFICE
SERVICES OFFICE
ROOM 5
PWA ISCOMPUTER
STORAGE
STOR.
CONFERENCE
OFFICE OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
WRRC IS
OFFICE
CONFERENCE
ROOM 3
CONFERENCE
ROOM 2
CONFERENCE
ROOM 4
SERVICE
STAIR A
STAIR B
CORRIDOR
PHORESIS
ELECTRO
MECH. CLO.
GROW ROOM
MP & C RM.
MECH. CLO. MECH. CLO.
INSTRUMENTATION LS & SS
MECH. CLO.
ELEC. CLO.
ELEC. CLO.
LS & SS
MECH. CLO.
CENTRIFUGES
ELEC. CLO.
ELEC. CLO.
CORRIDOR
MECH. CLO.OFFICE
MECH. CLO.CC W/ILAB
OFFICE
MECH. CLO.
UP
DN
COMPUTER
SERVICES
COMPUTER
ROOM
OFFICE
OFFICE
BREAKROOM
EIW OFFICE
WRRC QAS
OFFICE
OFFICE
WRRC
COMPUTER
ROOM
WRRC
COMPUTER
ROOM
WRRC
WRRC FE
WBSC INFORMATION
PWA STAT
BCE RL
CIU RLGGD RLPFR RL
STORAGE
STORAGE
OFFICEOFFICE
LABORATORY PODCORRIDOR
LABORATORY
POD
ELEVATOR
FREIGHT
ELEV.
OPEN TO FLOOR BELOW
OPEN TO FLOOR BELOW
ANTEROOM
OPEN TO FLOOR BELOW
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
OFFICE OFFICE
LABORATORY POD
LABORATORY POD LABORATORY POD
WORK AREA
CORRIDOR
CORRIDOR
OFFICE
CORRIDORCORRIDOR
EQUIPMENT SUPPORT
ROOM
METAL GARDE FLOOR
PLASTIC SHEETHINGOFFICE / WORK AREA
EQUIPMENTS
SCALE:
MAIN BUILDING THIRD FLOOR MECHANICAL DEMOLITION PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
MD102
MAIN BUILDING THIRD FLOOR
MECHANICAL DEMOLITION PLAN
1. THE DEMOLITION PLAN AND EXISTING CONDITIONS
ARE APPROXIMATE. ITEMS TO BE REMOVED ARE
DESIGNATED BY HATCHING AND DASHED LINES.
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE
UNLESS NOTED OTHERWISE.
AC-8
AC-10
AC-11
1. EXISTING AUTOCLAVE TO REMAIN. DISCONNECT
EXISTING AUTOCLAVE FROM HOUSE STEAM.
DEMOLISH EXISTING HOUSE STEAM AND CONDENSATE
PIPING LOCATED BEHIND EXISTING AUTOCLAVES AND
CAP.
1 AC-10
U
D A
S
GYP
SCALE:
SERVICE BUILDING MECHANICAL DEMOLITION PLAN
3/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
0 4' 8' 16'
SCALE: 3/16"= 1'-0"
2'
SERVICE BUILDING
MECHANICAL DEMOLITION PLAN
MD103
1. DEMOLISH SECTION OF EXISTING NATURAL GAS
PIPING SERVING PARKER BOILERS. PROVIDE BLIND
FLANGE ON EACH END OF PIPING.
2. DEMOLISH SECTION OF EXISTING FEEDWATER PIPING
SERVING PARKER BOILERS. PROVIDE BLIND FLANGE
ON EACH END OF PIPING.
3. DEMOLISH SECTION OF EXISTING STEAM SUPPLY
PIPING FROM PARKER BOILERS. PROVIDE BLIND
FLANGE ON EACH END OF PIPING.
4. LOCK OUT AND TAG OUT VALVES SERVING EXISTING
PARKER BOILERS FEEDWATER SYSTEM, CONDENSATE
SYSTEM, FUEL SUPPLY SYSTEM AND ALL OTHER
APPURTENANCES OF THE EXISTING PARKER BOILER
SYSTEM.
5. DEMOLISH SECTION OF EXISTING NATURAL GAS
PIPING SERVING CLEAVER BROOKS BOILER. PROVIDE
BLIND FLANGE ON EACH END OF PIPING.
6. DEMOLISH SECTION OF EXISTING FEEDWATER PIPING
SERVING CLEAVER BROOKS BOILER. PROVIDE BLIND
FLANGE ON EACH END OF PIPING.
7. DEMOLISH SECTION OF EXISTING STEAM SUPPLY
PIPING FROM CLEAVER BROOKS BOILER. PROVIDE
BLIND FLANGE ON EACH END OF PIPING.
8. LOCK OUT AND TAG OUT VALVES SERVING EXISTING
CLEAVER BROOKS BOILER FEEDWATER SYSTEM,
CONDENSATE SYSTEM, FUEL SUPPLY SYSTEM, AND
ALL OTHER APPURTENANCES OF THE EXISTING
CLEVER BROOKS BOILER SYSTEM.
1. THE DEMOLITION PLAN AND EXISTING CONDITIONS
ARE APPROXIMATE. ITEMS TO BE REMOVED ARE
DESIGNATED BY HATCHING AND DASHED LINES.
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE
UNLESS NOTED OTHERWISE.
U
D A
S
5 5
7 8
ROOM
ELECTRO-MECH.
LAB
CORRIDOR
CORRIDOR
POD
LABORATORY
ANTEROOM
POD
LABORATORY OFFICE OFFICE
ROOM
MECH. EQP'T
OFFICE OFFICE
POD
ANTEROOM
LABORATORY
POD
CORRIDOR
LABORATORY
OFFICE OFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
MEN'S
RESTROOM
CORRIDOR
OFFICEOFFICE
OFFICEOFFICE
CORRIDOR
COLD ROOMS
WALK-IN
COLD ROOMS
WALK-IN
ROOM
ELECT. EQP'T
POD
LABORATORY
ANTEROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
RESEARCH EQP'T
ROOM
AUTOCLAVE
ROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
ANTEROOM
UP
UP.
ME
N'
S
TO
ILE
T
EL
EC
STAIR A
PUMP ROOM
SWITCHBOARD
ROOM
TRANSFORMER
ROOM
SUMP PIT
CORRIDOR
EQUIPMENT ROOM
REPRODUCTION
EXIT
FIRE ALARM
FIRST AID
ROOM
WOMEN'S
TOILET
STORAGE
OFFICE
PROJECT OFFICE
LUNCH ROOM
ELECT. RM
IS IDP
ROOM
STAIR B
OFFICE
OFFICE
0002A
0002B
LAB/STORAGE
COMPUTER TRAINING/
UP
CL
OS
ET
MECH ROOM
UP
UP
RECEIVING
FREEZERS
FOYER
CORRIDOR
UP
ELECTRICAL
ROOM
AUTOCLAVE RM
MAIL ROOM
SHIPPING/
RECEIVING
SHIPPING/
LABORATORY POD
GROWTH CHAMBER
ROOM
LABORATORY POD
LABORATORY POD
TRANSFORMER
VAULT
LABORATORY POD
MECH RM.
MEDIA CENTER
O&M CONTRACTOR
ELECTRICAL
SWITCHGEAR
OFFICE/WORKSPACE
ST
OR
AG
E
CORRIDOR
LABORATORY
PODOFFICEOFFICE
LABORATORY
POD
UP
DN
UP
DN
UN
IS
TR
UT
W
AL
L
LARGE SWITCHGEAR
ELEVATOR
FREIGHT
ELEV.
CORRIDOR
COLD BOX COLD BOX COLD BOX COLD BOX
COLD BOX ROOMROOMMECH. ROOM
ROOM
0112A0114A
0104 0102A 0102B0110/10A
0113/15
0123A 0119A 0127/29
0137A 0133A
0136A 0132A
0128A 0124A 0124 0122
0122A 0118A
ANTEROOM
0102ANTEROOM
FI
RE
E
STOCKROOM
SWITCHBOARD
TELEPHONE
SUMP PIT
EL
EC
CL
OS
ET
SUPPLIES
MEN
JANITOR
WOMEN
SCALE:
MAIN BUILDING BASEMENT HVAC PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
M-101
MAIN BUILDING BASEMENT
MECHANICAL NEW WORK PLAN
1. MECHANICAL SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
U
D A
S
LABORATORY
POD
CROP IMPROVEMENTS
LABORATORY
PODOFFICE OFFICE
LABORATORY
POD
CROP BIOTECHNOLOGY
LABORATORY
PODOFFICE OFFICE
CORRIDORCORRIDOR
POD
LABORATORY
ANTEROOM
POD
LABORATORY OFFICE OFFICE
ANTEROOM
POD
LABORATORY
POD
LABORATORY OFFICE OFFICE
ANTEROOM
OFFICE OFFICE
LABORATORY
POD
LABORATORY
POD
RESEARCH EQP'T
ROOM
CORRIDOR
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
WOMEN'S
RESTROOM
ELEV.
CORRIDOR
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
LABORATORY
PODOFFICEOFFICEPOD
LABORATORY
CORRIDOR
OFFICE OFFICE OFFICE
JANITOR'S CLOSET
ELEC. CLOS.
CORRIDOR
JANITOR'S CLOSET
CLOSET
WOMEN'S
TOILET
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
OFFICE
OFFICE
OFFICE
OFFICECONF. RMOFFICEOFFICE
SERVICES
OFFICE
OFFICER
PWA PROCUREMENT
UP
DN
UP
DN
OFFICECONF. RM
SERVICES
OFFICER
ELECTRIC
CORRIDOR
PHORESIS
ELECTRO
MECH. CLO.
CENTRIFUGES
MP & C RM.
MECH. CLO. MECH. CLO.
INSTRUMENTATION
LS & SS
MECH. CLO.
MECH. CLO.MECH. CLO.MECH. CLO.
CC W/I
SUPPORT
HR
MECH. CLO.
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD OFFICE
OFFICE
OFFICE
EIW RL
OFFICE
PMR RL WRRC DIR.
LAO
PWA BUDGET
STORAGE
WRRC
HR
PWA
PWA PROC.
PWA ENGR
AND
PWA EH
STORAGE
PWA FA MGR
PWA ASSOC. AD
PWA
PWA
PWA PWA DIR.PWA ASST. ADPWAPWA EEO
COPY RM
LABORATORY POD
LABORATORY POD
LABORATORY POD
ELEC. CLO.
ELEC. CLO.
ELEC. CLO.
ELEC. CLO.
ELEVATOR
FREIGHT
ELEV.
MEN'S TOILET
NO.1
STAIR A
STAIR B
CORRIDOR
& SMGR
PWA ADMIN.
SERVICES
PWA ADMIN.
LOCATION
SERVICES
SUPPORT
LOCATION
LABORATORY POD
OFFICE
ANTEROOM
ANTEROOM
WORK AREA
BREAK ROOM
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR
WALK-IN
COOLER
OPEN TO ABOVE
OPEN TO ABOVE
OFFICE
EXTRUSION LAB
ELEV.
OPEN TO BELOW OPEN TO ABOVE
SCALE:
MAIN BUILDING SECOND FLOOR HVAC PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
M-102
MAIN BUILDING SECOND FLOOR
MECHANICAL NEW WORK PLAN
BLANCHER
DRUM
DRYER
STEAM
DRYER
EXISTING STEAM
GENERATOR
1. DISCONNECT BLANCHER FROM HOUSE STEAM
SYSTEM AND CONNECT TO EXISTING FULTON FB-050-L
STEAM GENERATOR SERVING DRUM DRYER AND
STEAM DRYER. CONNECT NEW 1/2" HIGH PRESSURE
STEAM PIPING TO STEAM GENERATOR SUPPLY PIPING
AND ROUTE TO BLANCHER. PROVIDE PRESSURE
REDUCING STATION AT BLANCHER PER
MANUFACTURER'S REQUIREMENTS.
1. MECHANICAL SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
U
D A
S
1/2" HPS
LABORATORY
POD
ANTEROOM
LABORATORY
PODOFFICE OFFICE
CORRIDORCORRIDOR
ANTEROOM
OFFICE OFFICE
ANTEROOM
POD
LABORATORY
POD
LABORATORY
OFFICE OFFICE
ANTEROOM
OFFICE OFFICE
ANTEROOM
LABORATORY
POD
CORRIDOR
OFFICE OFFICE
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
MEN'S
RESTROOM
ELEV.
CORRIDOR
LABORATORY
POD
LABORATORY
PODOFFICEOFFICE
OFFICEOFFICE
CORRIDOR
WOMEN'S
TOILET
JANITOR'S CLOSET
DN.
UP.
UP.
DN.
MEN'S TOILET
NO °1
JANITOR'S CLOSET
CORRIDOR
OFFICE
SERVICES OFFICE
ROOM 5
PWA ISCOMPUTER
STORAGE
STOR.
CONFERENCE
OFFICE OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
WRRC IS
OFFICE
CONFERENCE
ROOM 3
CONFERENCE
ROOM 2
CONFERENCE
ROOM 4
SERVICE
STAIR A
STAIR B
CORRIDOR
PHORESIS
ELECTRO
MECH. CLO.
GROW ROOM
MP & C RM.
MECH. CLO. MECH. CLO.
INSTRUMENTATION LS & SS
MECH. CLO.
ELEC. CLO.
ELEC. CLO.
LS & SS
MECH. CLO.
CENTRIFUGES
ELEC. CLO.
ELEC. CLO.
CORRIDOR
MECH. CLO.OFFICE
MECH. CLO.CC W/ILAB
OFFICE
MECH. CLO.
UP
DN
COMPUTER
SERVICES
COMPUTER
ROOM
OFFICE
OFFICE
BREAKROOM
EIW OFFICE
WRRC QAS
OFFICE
OFFICE
WRRC
COMPUTER
ROOM
WRRC
COMPUTER
ROOM
WRRC
WRRC FE
WBSC INFORMATION
PWA STAT
BCE RL
CIU RLGGD RLPFR RL
STORAGE
STORAGE
OFFICEOFFICE
LABORATORY PODCORRIDOR
LABORATORY
POD
ELEVATOR
FREIGHT
ELEV.
OPEN TO FLOOR BELOW
OPEN TO FLOOR BELOW
ANTEROOM
OPEN TO FLOOR BELOW
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
OFFICE OFFICE
LABORATORY POD
LABORATORY POD LABORATORY POD
WORK AREA
CORRIDOR
CORRIDOR
OFFICE
CORRIDORCORRIDOR
EQUIPMENT SUPPORT
ROOM
METAL GARDE FLOOR
PLASTIC SHEETHINGOFFICE / WORK AREA
EQUIPMENTS
SCALE:
MAIN BUILDING THIRD FLOOR HVAC PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
M-103
MAIN BUILDING THIRD FLOOR
MECHANICAL NEW WORK PLAN
1. MECHANICAL SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
U
D A
S
EQUIPMENTS
RESEARCH EQP'T
ROOM
AUTOCLAVE
ROOM
0127/29
FSIS AUTOCLAVE ROOM
AUTOCLAVE RM
EL
EC
CL
OS
ET
SCALE:
SG-1 ENGLARGED MECHANICAL NEW WORK PLAN
3/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
M-401
MAIN BUILDING ENLARGED
MECHANICAL NEW WORK PLAN
AC-11
SG-4
1. MECHANICAL SYSTEMS AND EQUIPMENT SHOWN ON THIS DRAWING ARE
APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
SCALE:
SG-2 ENLARGED MECHANICAL NEW WORK PLAN
3/16" = 1'-0" SCALE:
SG-3 ENLARGED MECHANICAL NEW WORK PLAN
3/16" = 1'-0"
SCALE:
SG-4 ENLARGED MECHANICAL NEW WORK PLAN
3/16" = 1'-0"
0 4' 8' 16'
SCALE: 3/16"= 1'-0"
2'
AC-105 AC-9 5 AC-8 5
AC-1AC-3
GW-1
AC-4
AC-5
AC-6
AC-7
AC-12
AC-13
AC-14
SG-1 1
SG-31
4 4
SG-21
AC-2 4
1. PROVIDE POINT OF USE STEAM GENERATOR. INSTALL PER MANUFACTURER'S
PUBLISHED INSTALLATION INSTRUCTIONS. CONNECT PRESSURE RELIEF VALVE PIPING
FOR STEAM GENERATOR TO BLOWDOWN RECEIVER. INSTALL ON HOUSEKEEPING PAD.
2. CONNECT STEAM SERVICE PROVIDED BY POINT OF USE STEAM GENERATOR (SG-1) TO
EXISTING AUTOCLAVES IN SPACE. MAKE CONNECTION PER AUTOCLAVE
MANUFACTURER'S REQUIREMENTS.
3. CONNECT STEAM SERVICE PROVIDED BY POINT OF USE STEAM GENERATOR (SG-2) TO
EXISTING AUTOCLAVES AND GLASS WASHER IN SPACE. MAKE CONNECTION PER
AUTOCLAVE MANUFACTURER'S REQUIREMENTS.
4. CONNECT STEAM SERVICE PROVIDED BY POINT OF USE STEAM GENERATOR (SG-3) TO
EXISTING AUTOCLAVES IN SPACE. MAKE CONNECTION PER AUTOCLAVE
MANUFACTURER'S REQUIREMENTS.
5. CONNECT STEAM SERVICE PROVIDED BY POINT OF USE STEAM GENERATOR (SG-4) TO
EXISTING AUTOCLAVES IN SPACE. MAKE CONNECTION PER AUTOCLAVE
MANUFACTURER'S REQUIREMENTS.
6. PROVIDE BLOWDOWN RECEIVER/COOLER FOR STEAM GENERATOR. PROVIDE
DOMESTIC WATER CONNECTION FOR BLOWDOWN RECEIVER/COOLER. ROUTE
DISCHARGE FROM BLOWDOWN RECEIVER TO EXISTING FLOOR DRAIN/FLOOR SINK.
SIZE AND INSTALL PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL.
7. ROUTE VENT FROM BLOWDOWN RECEIVER ABOVE CEILING TO THE EXTERIOR OF THE
FACILITY. PENETRATE EXISTING WALL LOUVER. INSTALL AND TERMINATE VENT PIPING
PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL. STEAM VENT PIPING MUST
BE SAME CONSTRUCTION AS HIGH PRESSURE STEAM PIPING. PROVIDE ALUMINUM
JACKETING TO PROTECT INSULATION ON EXTERIOR PORTION OF PIPING.
8. PROVIDE BOILER FEEDWATER PUMP FOR STEAM GENERATOR. CONNECT TO EXISTING
DOMESTIC WATER PIPING. INSTALL PER MANUFACTURER'S PUBLISHED INSTALLATION
MANUAL.
9. CONNECT 1" DCW PIPING TO EXISTING 2" DCW PIPING LOCATED ABOVE CEILING
UTILIZING HOT TAP CONNECTION. ROUTE 1" DCW ABOVE CEILING TO BOILER
FEEDWATER PUMP AND BLOWDOWN COOLER. CONNECT TO BOILER FEEDWATER
PUMP AND BLOWDOWN COOLER PER MANUFACTURER'S PUBLISHED INSTALLATION
MANUAL. PROVIDE ISOLATION VALVE ON STEAM GENERATOR WATER SUPPLY AT
CONNECTION TO EXISTING DCW PIPING.
10. ROUTE VENT FROM BLOWDOWN RECEIVER TO THE EXTERIOR OF THE FACILITY.
PENETRATE EXISTING METAL PANEL. INSTALL AND TERMINATE VENT PIPING PER
MANUFACTURER'S PUBLISHED INSTALLATION MANUAL. STEAM VENT PIPING MUST BE
SAME CONSTRUCTION AS HIGH PRESSURE STEAM PIPING. PROVIDE ALUMINUM
JACKETING TO PROTECT INSULATION ON EXTERIOR PORTION OF PIPING.
11. CONNECT 3/4" DCW PIPING TO EXISTING 1-1/2" ICW PIPING LOCATED ABOVE CEILING
UTILIZING HOT TAP CONNECTION. ROUTE 3/4" DCW OVERHEAD TO BOILER FEEDWATER
PUMP AND BLOWDOWN COOLER. CONNECT TO BOILER FEEDWATER PUMP AND
BLOWDOWN COOLER PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL.
PROVIDE ISOLATION VALVE ON STEAM GENERATOR WATER SUPPLY AT CONNECTION
TO EXISTING DCW PIPING.
12. CONNECT 3/4" DCW PIPING TO EXISTING 2" DCW PIPING LOCATED ABOVE CEILING
UTILIZING HOT TAP CONNECTION. ROUTE 3/4" DCW OVERHEAD TO BOILER FEEDWATER
PUMP AND BLOWDOWN COOLER. CONNECT TO BOILER FEEDWATER PUMP AND
BLOWDOWN COOLER PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL.
PROVIDE ISOLATION VALVE ON STEAM GENERATOR WATER SUPPLY AT CONNECTION
TO EXISTING DCW PIPING.
13. ROUTE VENT FROM BLOWDOWN RECEIVER TO THE EXTERIOR OF THE FACILITY.
PENETRATE EXISTING EXTERIOR WALL ABOVE WINDOW. INSTALL AND TERMINATE
VENT PIPING PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL. STEAM VENT
PIPING MUST BE SAME CONSTRUCTION AS HIGH PRESSURE STEAM PIPING. PROVIDE
ALUMINUM JACKETING TO PROTECT INSULATION ON EXTERIOR PORTION OF PIPING.
14. CONNECT 3/4" DCW PIPING TO EXISTING 1-1/4" DCW AT FLOOR PENETRATION UTILIZING
HOT TAP CONNECTION. ROUTE 3/4" DCW OVERHEAD TO BOILER FEEDWATER PUMP
AND BLOWDOWN COOLER. CONNECT TO BOILER FEEDWATER PUMP AND BLOWDOWN
COOLER PER MANUFACTURER'S PUBLISHED INSTALLATION MANUAL. PROVIDE
ISOLATION VALVE ON STEAM GENERATOR WATER SUPPLY AT CONNECTION TO
EXISTING DCW PIPING.
U
D A
S
STEAM PIPING
(TYP.)
1-1/2" HPS
BLOWDOWN SEPARATOR
BOILER FEEDWATER PUMP
2" HPS
1" HPS
1-1/2" HPS
1" HPS
2" HPS
3" INSULATED BLOWDOWN
SEPARATOR VENT 7
BLOWDOWN SEPARATOR
BOILER FEEDWATER PUMP
2-1/2" INSULATED BLOWDOWN
SEPARATOR VENT 13
1-1/2" HPS
1-1/4" HPS
1" HPS
BLOWDOWN SEPARATOR
BOILER FEEDWATER PUMP
2-1/2" INSULATED BLOWDOWN
SEPARATOR VENT 10
1-1/4" HPS
1" HPS 3/4" HPS
BLOWDOWN SEPARATOR
BOILER FEEDWATER PUMP
2-1/2" INSULATED BLOWDOWN
SEPARATOR VENT 13
1-1/2" HPS 1-1/4" HPS 1" HPS
1" DCW 9EXIST. 2" DCW
HOUSEKEEPING PAD EXIST.
FLOOR DRAIN
EXIST.
FLOOR SINK
EXIST. 1-1/2 ICW PIPING
HOUSEKEEPING PAD
3/4" DCW
EXIST. FLOOR
SINK 6
EXIST. 2" DCW
3/4" DCW
EXIT. FLOOR DRAIN6
HOUSEKEEPING PAD
HOUSEKEEPING
PAD
EXIST. 1-1/4" DCW
3/4" DCW
EXIST. FLOOR
SINK 6
M-501
MECHANICAL DETAILS
U
D A
S
HOUSEKEEPING PADS MUST EXTEND A
MINIMUM OF 6" BEYOND ALL SIDES OF
SUPPORTED EQUIPMENT UNLESS
OTHERWISE INDICATED. PADS MUST BE
A MINIMUM OF 4" THICK
PROVIDE 4000 PSI CONCRETE
HOUSEKEEPING PADS FOR ALL
GROUND AND/OR FLOOR
MOUNTED EQUIPMENT
EDGE OF SUPPORTED
EQUIPMENT
CHAMFERED
EDGED ALL SIDES
FLOOR
ALL PADS INSTALLED ON CONCRETE FLOORS
ARE TO BE PROVIDED WITH #4 REBAR DOWEL
RODS PENETRATING A MINIMUM OF 2" INTO
BOTH THE PAD AND THE SUPPORTING FLOOR.
PROVIDE A MINIMUM OF FOUR (4) DOWEL RODS
PER PAD, WITH SPACING OF DOWEL RODS AT 18"
ON CENTER MAXIMUM BOTH WAYS.
SCALE:
HOUSEKEEPING PAD DETAIL
NOT TO SCALE
#4 REINFORCEMENT MAX 4"
ON CENTER EACH WAY
CONT.BEAD OF SEALANT ALONG PERIMETER
FLASHING PANEL AND EXISTING METAL PANEL
CONT. BEAD OF SEALANT ALONG PERIMETER FLASHING
PANEL AND EXISTING METAL PANEL
0.25"-13 X 1" STAINLESS STUD WELDED TO STAINLESS STEEL PIPE
SLEEVE WITH STAINLESS STEEL WASHER AND SELF-LOCKING NUT
0.125" THICK STAINLESS STEEL
COMPRESSION PLATE; SET IN A
CONT. BED OF SEALANT
PROVIDE 4-INCH-WIDE 25-MIL EPDM UNCURED PRESSURE
SENSITIVE FLASHING TAPE ALONG ENTIRE CIRCUMFERENCE
OF PIPE SLEEVE AND PIPE TO SEAL PENETRATION; POSITION
SEAM AT UNDERSIDE OF PIPE AND OVERLAP 6" MIN.
EXISTING METAL WALL PANEL; NEATLY CUT
OPENING FOR PIPE PENETRATION FLASHING
PANEL
CONT. HEMMED EDGE ALONG BOTTOM
OF PIPE PENETRATION FLASHING
PLATE TO PROVIDE A CONT. DRIP EDGE
PROVIDE 18-GA STAINLESS STEEL PIPE PENETRATION FLASHING PANEL
THROUGH EXISTING METAL PANEL; SLOPE TOP FOR DRAINAGE
CONT.BEAD OF SEALANT ALONG
PERIMETER FLASHING PANEL AND
EXISTING METAL PANEL
**2 1/2"
3" 3"
1/2
CONT.HEMMED EDGE
POP RIVET FLASHING PANEL TO TO EXISTING
METAL PANEL; EQUALLY SPACE RIVETS
(APPROX. 3" O.C.); SEE ELEVATION FOR
ADDITIONAL INFORMATION
0.125" THICK STAINLESS STEEL PIPE SLEEVE;
SET IN A CONT. BED OF SEALANT AT INSIDE
FACE OF FLASHING PANEL
2"
2"
INSULATED STEAM VENT PIPING PER
MECHANICAL PLANS
BEAD OF SEALANT ALONG
PERIMETER OF PIPE SLEEVE
2"
2"
CONT.HEMMED EDGE
INTERIOREXTERIOR
SCALE:
PIPE PENETRATION DETAIL @ METAL PANEL
NOT TO SCALE SCALE:
PIPE PENETRATION DETAIL @ METAL PANEL
1-1/2" = 1'-0"
PROVIDE 18-GA STAINLESS STEEL PIPE
PENETRATION FLASHING PANEL
THROUGH EXISTING METAL PANEL
1-1/2" WIDE X 0.125" THICK STAINLESS
STEEL COMPRESSION PLATE; SET IN
A CONT. BED OF SEALANT
(8) 0.25"-13 X 1" STAINLESS STUD
WELDED TO STAINLESS STEEL PIPE
SLEEVE WITH STAINLESS STEEL
WASHER AND SELF-LOCKING NUT
INSULATED STEAM VENT PIPING PER
MECHANICAL PLANS
EDGE OF FLASHING PANEL
FLANGE AT INSIDE FACE OF WALL
POP RIVET FLASHING PANEL TO TO EXISTING
METAL PANEL; EQUALLY SPACE RIVETS
(APPROX. 3" O.C.)
EXISTING METAL PANEL; NEATLY CUT
OPENING FOR PIPE PENETRATION
FLASHING PANEL
CONT. BEAD OF SEALANT ALONG
PERIMETER FLASHING PANEL AND
EXISTING METAL PANEL
SCALE:
CLEVIS HANGER DETAIL
NOT TO SCALE
ALL THREAD ROD
NUT (TOP & BOTTOM)
WASHER (TOP & BOTTOM)
CLEVIS HANGER
INSULATION
PIPE
INSULATION PROTECTIVE
SHEET METAL SHIELD
12" MIN
12" MIN
SINGLE PIPE CLEVIS HANGER
SCALE:
PIPE HANGER DETAILS
NOT TO SCALE
U-CLAMP OR
CONDUIT CLAMP
GALVANIZED IRON
TRAPEZE OR
UNISTRUT
16 GAUGE GALVANIZED
SHEET SHIELD
WRAPPED FULLY
AROUND INSULATION
INSULATION
PIPE
PROVIDE A SECTION OF HIGH
COMPRESSION STRENGTH
INSULATION AT EACH HANGER
POINT. INSULATION SHALL BE HALF
ROUND AND EXTEND 2" BEYOND
GALVANIZED SHIELD EACH WAY.
16 GAUGE GALVANIZED
SHEET SHIELD
WRAPPED FULLY
AROUND INSULATION
INSULATION
PIPE
CONCRETE. IN AREAS WHERE EXTERIOR
FINISHES ARE DAMAGED FINISHES MUST
BE REPAIRED IN KIND.
BACKING MATERIAL AS REQUIRED. BY SEALANT
MFG.
INSULATED STEAM VENT PIPE
SST HDI THREADED ANCHOR EQUAL TO HILTI #336430 WITH 1/4-20X7/8" SST FLAT HEAD
COUNTERSUNK BOLT EQUAL TO MCMASTER-CARR 92210A541
STAINLESS STEEL WALL SLEEVE
6" M
IN
1/4" STAINLESS STEEL ROUND PLATE.
ALL SHARP EDGES SHALL BE
REMOVED FROM PLATE.
PROVIDE A CONTINUOUS BEAD OF
SEALANT ALONG FULL PERIMETER OF
STAINLESS STEEL PLATE.
EXIST. REINFORCED CONCRETE MASONRY
WALL
NON SHRINK GROUT. APPLY TO SPACE BETWEEN
CORE AND WALL SLEEVE AND TO EXTERIOR FACE
OF WALL PENETRATION (TYP.)
BUILDING INTERIORBUILDING EXTERIOR
CONTINUOUSLY WELD STAINLESS STEEL SLEEVE TO
STAINLESS STEEL WALL FLANGE (TYP.)
CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING
WALL IN KIND WHERE DAMAGED BY INSTALLATION OF
PIPE PENETRATION
SCALE:
EXTERIOR WALL PENETRATION DETAIL
NOT TO SCALE
PROVIDE A CONTINUOUS BEAD OF
SEALANT ALONG FULL PERIMETER OF
PIPE SLEEVE AND ALUMINUM JACKETING
M-601
MECHANICAL SCHEDULES
MAKE/MODEL # LOCATION
AC-1 TUTTNAUER 5596-1RSP AUTOCLAVE ROOM 0036
MARK
EXISTING AUTOCLAVE AND
GLASSWASHER SCHEDULE
AC-2
AC-3
AC-4 STERIS AMSCO 250LS FSIS AUTOCLAVE ROOM 0208
AC-5 STERIS AMSCO CENTURY
AC-6
AC-7 STERIS AMSCO LAB 250
AC-8 CONSOLIDATED STERILIZER SYSTEMS
X1 SSR-3A-S-V
AC-9
AC-10 EQUIPMENTS I-302
AC-11
AC-12 AMSCO LAB 250 AUTOCLAVE ROOM 125
AC-13
AC-14
GW-1 STERIS RELIANCE 500XLS
GW-2 LANCER 1400 LXP
TUTTNAUER 5596-1RSP
TUTTNAUER 5596-1RSP
STERIS AMSCO CENTURY
TUTTNAUER 5596-1RSP
TUTTNAUER 5596-1RSP
CONSOLIDATED STERILIZER SYSTEMS
X1 SSR-3A-RB
AMSCO LAB 250
AMSCO LAB 250
AUTOCLAVE ROOM 0036
AUTOCLAVE ROOM 0036
EQUIPMENTS I-302
EQUIPMENTS I-302
EQUIPMENTS I-302
AUTOCLAVE ROOM 125
AUTOCLAVE ROOM 125
BASIS OF DESIGN TYPE SERVES FUEL TYPE INPUT (KW)
STEAM
OUTPUT
(LB/HR) VOLTS/PH
OPER.
WEIGHT
(LBS)
MCA
(A)
REMARKS
ELECTRICAL DATA HEATING DATA
MARK
1. PROVIDE WITH SINGLE POINT POWER CONNECTION.
2. PROVIDE WITH BLOWDOWN SEPERATOR ASME TANK, EQUIVALENT TO SUSSMAN BDT-ASME. PROVIDE WITH TEMPERATURE GAUGE, PRESSURE GAUGE, GAUGE GLASS, AND GAUGE GLASS ASSEMBLY. SYSTEM
MUST BE POWERED BY THE STEAM GENERATOR.
3. PROVIDE WITH BLOWDOWN COOLER. PROVIDE WITH AUTOMATIC BLOWDOWN SYSTEM WITH TIME CLOCK. SYSTEM MUST BE POWERED BY THE STEAM GENERATOR.
4. PROVIDE WITH MULTISTAGE LOAD PROGRESSIVE SEQUENCER.
5. THE BLOWDOWN SEPERATOR, BLOWDOWN COOLER, BLOWDOWN SYSTEM, SEQUENCER, AND ALL COMPONENTS SHALL BE SUPPLIED BY THE SAME MANUFACTURER AS THE STEAM GENERATORS AND BE
PROVIDED AS A COMPLETE PACKAGE.
6. EQUIPMENT SHALL COMPLY "BUY AMERICAN ACT". EQUIPMENT SHOWN IN SCHEDULE TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT BY OTHER MANUFACTURER'S
SHALL BE ACCEPTABLE.
7. PROVIDE STEAM GENERATORS WITH 100 PSI TRIM. SET STEAM GENERATOR OUTLET STEAM PRESSURE TO 70PSI.
8. PROVIDE WITH FEEDWATER PUMP FROM THE STEAM GENERATOR MANUFACTURER. PUMP MUST BE POWERED BY THE STEAM GENERATOR. PROVIDE PRESSURE GAUGE ON DISCHARGE SIDE OF FEEDWATER
PUMP.
9. CONTRACTOR MUST CONDUCT WATER QUALITY TEST IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION MANUAL.
STEAM GENERATOR SCHEDULE
BHP RATING
SG-1 SUSSMAN ES-180 CARBON STEEL AC-12, AC-13,
AC-14 ELECTRIC 180 542 480/3/60 750 217 SEE NOTES18.4
NOTES:
SG-2 SUSSMAN SVS-550 CARBON STEEL
AC-4, AC-5,
AC-6, AC-7,
GW-1, GW-2
ELECTRIC 540 1656 480/3/60 2020 650 SEE NOTES55
SG-3 SUSSMAN ES-100 CARBON STEEL AC-1, AC-2,
AC-3 ELECTRIC 108 325 480/3/60 730 130 SEE NOTES11.0
SG-4 SUSSMAN ES-180 CARBON STEEL AC-8, AC-9,
AC-10, AC-11 ELECTRIC 180 542 480/3/60 750 217 SEE NOTES18.4
U
D A
S
FSIS AUTOCLAVE ROOM 0208
FSIS AUTOCLAVE ROOM 0208
FSIS AUTOCLAVE ROOM 0208
FSIS AUTOCLAVE ROOM 0208
FSIS AUTOCLAVE ROOM 0208
SCALE:
SITE DEMOLITION RISER DIAGRAM
NOT TO SCALE
GENERAL NOTES
GRAPHIC SCALE
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
ED-000
SITE DEMOLITION RISER
DIAGRAM
1. THE DEMOLITION PLAN AND EXISTING CONDITIONS ARE
BASED ON THE BEST INFORMATION AT THE TIME OF
DESIGN AND MUST BE FIELD VERIFIED. EQUIPMENT AND
CIRCUITRY NOT EXPRESSLY LISTED FOR DEMOLITION
SHALL BE EXISTING-TO-REMAIN.
2. DEMOLISH EXISTING CIRCUITRY WHERE SHOWN. RETAIN
RACEWAYS TO EXTENT PRACTICAL.
3. UNLESS EXPRESSLY NOTED OTHERWISE, ALL WORK IS
PROVIDED UNDER THE BASE BID.
T
SERVICE
BUILDING (ETR)
EMH-3 (ETR)
EMH-2
(ETR)
EMH-4 (ETR)
T
WEST ANNEX
BUILDING (ETR)
SOUTH WING UNIT
SUBSTATION (ETR)
S
S
T
M
EMH-1 (ETR)
3#4/03#4/0
ADMINISTRATIVE BUILDING VAULT
3#4/0
3#4/0
3#4/0 3#4/0
3#4/0
3#4/0
3#4/0
3#4/0
TO GREENHOUSES
U
D A
S
T
NORTH WING
TRANSFORMER (ETR)
EXISTING FUSED CUT-OUTS
EXISTING OVERHEAD
UTILITY PRIMARY
EXISTING TO REMAIN
(ETR)
(ETR)
(ETR)
PHASING PLAN
1. PROVIDE NEW SERVICE FROM PG&E UTILITY WHILE
MAINTAINING EXISTING SERVICE.
2. INSTALL AND FEED NEW SWITCHGEAR FROM THE NEW
SERVICE.
3. RUN NEW PRIMARY CONDUCTORS TO EACH
TRANSFORMER AND SWAP PRIMARY CONDUCTORS OF
EACH TRANSFORMER INDIVIDUALLY. SCHEDULE ALL
OUTAGES WITH OWNER 14 DAYS PRIOR TO OUTAGE.
4. UPON COMPLETION OF THE NEW WORK, DEMOLISH
EXISTING DISTRIBUTION CONDUCTORS AND EQUIPMENT
AS INDICATED.
LEGEND
T E
S EXISTING ELECTRICAL SWITCH TO REMAIN
EXISTING ELECTRICAL MANHOLE TO REMAIN
EXISTING TRANSFORMER TO REMAIN
M EXISTING ELECTRICAL METER TO
BE DEMOLISHED
(ETR)
(ETR)
(ETR)
ROOM
ELECTRO-MECH.
LAB
CORRIDOR
CORRIDOR
POD
LABORATORY
ANTEROOM
POD
LABORATORY OFFICE OFFICE
ROOM
MECH. EQP'T
OFFICE OFFICE
POD
ANTEROOM
LABORATORY
POD
CORRIDOR
LABORATORY
OFFICE OFFICE
OFFICEOFFICE
CORRIDOR
STAIRWELL
WALK-IN
COLD ROOM
MEN'S
RESTROOM
CORRIDOR
OFFICEOFFICE
OFFICEOFFICE
CORRIDOR
COLD ROOMS
WALK-IN
COLD ROOMS
WALK-IN
ROOM
ELECT. EQP'T
POD
LABORATORY
ANTEROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
RESEARCH EQP'T
ROOM
AUTOCLAVE
ROOM
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
LABORATORY
POD
ANTEROOM
UP
UP.
ME
N'
S
TO
ILE
T
EL
EC
STAIR A
PUMP ROOM
SWITCHBOARD
ROOM
TRANSFORMER
ROOM
SUMP PIT
CORRIDOR
EQUIPMENT ROOM
REPRODUCTION
EXIT
FIRE ALARM
FIRST AID
ROOM
WOMEN'S
TOILET
STORAGE
OFFICE
PROJECT OFFICE
LUNCH ROOM
ELECT. RM
IS IDP
ROOM
STAIR B
OFFICE
OFFICE
0002A
0002B
LAB/STORAGE
COMPUTER TRAINING/
UP
CL
OS
ET
MECH ROOM
UP
UP
RECEIVING
FREEZERS
FOYER
CORRIDOR
UP
ELECTRICAL
ROOM
AUTOCLAVE RM
MAIL ROOM
SHIPPING/
RECEIVING
SHIPPING/
LABORATORY POD
GROWTH CHAMBER
ROOM
LABORATORY POD
LABORATORY POD
TRANSFORMER
VAULT
LABORATORY POD
MECH RM.
MEDIA CENTER
O&M CONTRACTOR
ELECTRICAL
SWITCHGEAR
OFFICE/WORKSPACE
ST
OR
AG
E
CORRIDOR
LABORATORY
PODOFFICEOFFICE
LABORATORY
POD
UP
DN
UP
DN
UN
IS
TR
UT
W
AL
L
LARGE SWITCHGEAR
ELEVATOR
FREIGHT
ELEV.
CORRIDOR
COLD BOX COLD BOX COLD BOX COLD BOX
COLD BOX ROOMROOMMECH. ROOM
ROOM
0112A0114A
0104 0102A 0102B0110/10A
0113/15
0123A 0119A 0127/29
0137A 0133A
0136A 0132A
0128A 0124A 0124 0122
0122A 0118A
ANTEROOM
0102ANTEROOM
FI
RE
E
STOCKROOM
SWITCHBOARD
TELEPHONE
SUMP PIT
EL
EC
CL
OS
ET
SUPPLIES
MEN
JANITOR
WOMEN
0106/06A0108/08A
EXISTING TO REMAIN
200/3/1
1-1/4"C.
400/3/1
TWO RUNS OF 1-1/4"C.
SCALE:
MAIN BUILDING BASEMENT ELECTRICAL DEMOLITION PLAN
1/16" = 1'-0"
GENERAL NOTES
GRAPHIC SCALE
KEYED NOTESX
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
ED101
MAIN BUILDING BASEMENT
ELECTRICAL DEMOLITION PLAN
AC-1
AC-2AC-3
GW-2
GW-1AC-4
AC-5
AC-6
AC-7
1. UNDER BID OPTION #1, DEMOLISH ELECTRICAL
CONNECTION TO EXISTING STEAM GENERATOR.
DEMOLISH ALL ASSOCIATED DISCONNECTS,
CIRCUITRY, & RACEWAYS.
2. EXISTING AUTOCLAVE TO REMAIN.
3. EXISTING GLASSWASHER TO REMAIN.
A. THE DEMOLITION PLAN AND EXISTING CONDITIONS
ARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .