C04 Attachment 2 Sched of Items.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 127EAX26Q0069
- Issued by
-
Department of Agriculture Forest Service
About this file
This is an Independent Government Cost Estimate (IGCE) Schedule of Items for a Barillas Peak Lookout Tower Restoration project located at the USDA Forest Service Carson National Forest in Taos, New Mexico. The base bid encompasses eleven line items measured in lump sum (LS) format, including mobilization, comprehensive design services (site visits, 30/60/90/100% design submittals, NFPA780 compliance, grounding design, lightning protection, cab design, utilities, and solar power system design), lookout tower cab materials and furnishings, existing cab removal, new cab installation with existing tower repair, CMU toilet building construction, new solar power system with backup generator, utilities installation, ANT150F2 antenna communication and technology, lightning protection and grounding with inspection and testing, and miscellaneous site work including access gate and compound access road/parking area improvements. Option A addresses the Encino Vista Lookout Tower with four line items: mobilization, design services (site visits, design submittals for NFPA780, grounding design, lightning protection, and solar power system), lightning protection and grounding with inspection and testing, and a new solar power system with backup generator. The schedule requires unit pricing for each line item with subtotals for both the base bid and optional work, including tax calculations for total contract values. This acquisition is set-aside for small business concerns under the 236220 NAICS code (Commercial and Institutional Building Construction) with a size standard of $45 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX26Q0069 Amendment 00001.pdf | ||
| 127EAX26Q0069 Amendment 00001 Provisions and Clauses.docx | DOCX document | |
| C04 Attachment 3 Specifications.pdf | ||
| C04 127EAX26Q0069.pdf | ||
| C04 Attachment 1 Statement of Work.pdf | ||
| C04 Attachment 4 Fire Plan and Guidelines.docx | DOCX document | |
| C04 Attachment 6 WD NM20260026.pdf | ||
| C04 Attachment 5 WD NM20260028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
Schedule of Items
| USDA Forest Service - Carson National Forest |
| 208 Cruz Alta RD, Taos, New Mexico 87571 |
Project Name: BARILLAS PEAK LOOKOUT TOWER RESTORATION
| Item Number | Description | Method of Measurement | Pay Unit | Estimated Quantity | Unit Price | Total |
| BASE BID:BARILLAS PEAK LOOKOUT TOWER | ||||||
| 1 | Mobilization | LS | LS | 1 | N/A | |
| 2 | Design (to include: Site Visits, 30/60/90/100% Design Submitals for NFPA780, Grounding Design, Lightining Protection & Grounding, Cab, Utilities, Solar Power System | LS | LS | 1 | ||
| 3 | Lookout Tower Cab Materials (to include: cab building materials, furnishings, appliances) | LS | LS | 1 | ||
| 4 | Existing Cab Removal | LS | LS | 1 | ||
| 5 | New Cab Installation/Existing Tower Repair | LS | LS | 1 | ||
| 6 | CMU Toilet Building Construction | LS | LS | 1 | ||
| 7 | New Solar Power System: complete w/ backup generator | LS | LS | 1 | ||
| 8 | Utilities | LS | LS | 1 | ||
| 18 | Communication & Technology: ANT150F2 antenna on lookout tower | LS | LS | 1 | ||
| 10 | Lightning protection & Grounding to include Inspection & Testing | LS | LS | 1 | ||
| 11 | Miscellaneous Site Work to include access gate @ bottom of steps & improvements to compoundn access road/parking area | LS | LS | 1 | ||
| Subtotal: | ||||||
| Total Base Contract with Tax: | ||||||
| OPTION A: ENCINO VISTA LOOKOUT TOWER | ||||||
| 1 | Mobilization | LS | LS | 1 | N/A | |
| 2 | Design (to include: Site Visits, 30/60/90/100% Design Submitals for NFPA780, Grounding Design, Lightining Protection & Grounding, Solar Power System | LS | LS | 1 | ||
| 5 | Lightning protection & Grounding to include Inspection & Testing | LS | LS | 1 | ||
| 4 | New Solar Power System: complete w/ backup generator | LS | LS | 1 | ||
| Subtotal: | ||||||
| Total Base Contract with Tax: |
Total BASE and OPTION:
Pay Item Notes:
image1.png