This is a Statement of Work (SOW) for construction services related to plumbing repairs at the USDA APHIS Phoenix Rearing Facility (PRF) in Phoenix, Arizona. The 69,000-square-foot facility, constructed in 1973 and renovated in 1994, currently operates the Sterile Insect Technique (SIT) program to control navel orange worms affecting American agriculture. The contractor shall furnish all labor, equipment, and materials necessary to repair and upgrade the existing plumbing system, including removal and replacement of waste pipe and vents with associated concrete slab and wall repair, remodeling of the south restroom to meet ABA compliance, minor plumbing fixture replacement in the north restroom, and installation of floor drains, drainpipes, J-traps, branch drain lines, soil stacks, ventilation, clean-outs, main drain line connections to the sewer, and all applicable components as specified in construction documents. Current facility issues include a backed-up sink in the south men's restroom, frequent urinal backups in the north men's restroom, recurring clogs in the maintenance shop sink, mechanical room, outdoor drains and vents, and persistent odors in the QC clean lab sink area.
The contractor shall submit manufacturers' catalogs, cut-sheets, and shop drawings for Design of Record approval, prepare a phasing plan and project schedule to minimize disruption to operational services, and hire a third-party independent testing and inspection agency subject to Government approval. Prior to initiating any activity, the contractor must receive a Notice to Proceed (NTP) from the Contracting Officer. The contractor shall comply with national codes, EPA regulations, federal, state, and local laws, and shall submit a Quality Control Schedule (QCS) and Project Safety Plan (PSP), along with As-Built Record drawings in PDF and AutoCAD formats upon completion. The Government review time for submittals is a minimum of 14 calendar days per package, with total contract performance time to be determined. Key Government contacts include Contracting Officer Jim Roloff, Engineering Project Manager Fikru Taye, and Contracting Officer's Representative Marvin Draper at the Phoenix Rearing Facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs-and-Responses.docx | DOCX document | |
| 12639526Q0197-0005.pdf | ||
| More RFIs and Responses.docx | DOCX document | |
| RFIs and Responses.docx | DOCX document | |
| Attendance_07212026 site visit.pdf | ||
| 12639526Q0197-0003.pdf | ||
| C04_12639526Q0197.docx | DOCX document | |
| 12639526Q0197-0002.pdf | ||
| 12639526Q0197-0001.pdf | ||
| C04_Atch 2_Specifications.pdf | ||
| C04_Atch 4_Federal Construction Wage Rates_Maricopa.txt | TXT text file | |
| C04_12639526Q0197.docx | DOCX document | |
| C04_Atch 3_ Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12639526Q0197, Attachment 1 Statement of Work for Construction Services July 2025
1.0 PROJECT: Phoenix Rearing Facility Plumbing Services Repair
2.0 LOCATION:
United States Department of Agriculture (USDA) Animal and Plant Health Inspection Services (APHIS) Protection and Quarantine (PPQ) Phoenix Rearing Facility (PRF) 3645 East Chipman Road Phoenix AZ 85040
3.0 PROJECT BACKGROUND:
The Phoenix Rearing Facility (PRF) focuses on the Sterile Insect Technique (SIT). The facility collaborates with farmers to decrease the number of insects that damage crops by using SIT. The PRF is part of a larger pest control project aimed at reducing the impact of navel orange worms on American agriculture.
The Phoenix Rearing Facility, owned by the California Department of Food and Agriculture, is located at 3645 East Chipman Road, Phoenix, AZ 85040. The five-acre site is bordered by East Chipman Road to the north, 38th Street to the east, and Atlanta Avenue to the south.
Constructed around 1973, the 69,000 square foot one-story building includes office areas, employee break areas, laboratories, process rooms, environmental rooms and chambers, warehouse, maintenance, and utility areas. The building was renovated for its current use in 1994.
The original construction documents are not available. However, the building's floor is constructed from cast-in-place concrete, and the substructure is anticipated to be constructed from a cast-in-place foundation wall and spread footing foundation. There is a 12-foot-deep, 600-square-foot pit under the space used for the egg prep, diet preparation, and laundry rooms floor. No specific information is available regarding the construction of this pit, which appears to have been utilized by the previous tenant for storage.
The building's plumbing system includes stainless steel sinks, lavatories, urinals, water closets, showers, sinks, floor drains, and cleanouts. Water distribution is handled by copper piping. The sanitary drain uses 4-inch cast iron gravity piping, which connects to the City of Phoenix sanitary waste system.
Facility‑reported issues include:
· A backed‑up sink in the south men’s restroom
· Frequent urinal backups in the north men’s restroom
· Recurring clogs in maintenance shop sink, mechanical room, outdoor drains, and vents
· Persistent odors in the QC clean lab sink area These deficiencies necessitate the plumbing system repairs and replacements described in the construction documents.
4.0 PROJECT SCOPE:
The purpose of this Statement of Work (SOW) is to procure construction services for the Phoenix Rearing Facility Plumbing Repairs as detailed in the contract documents.
The Contractor shall furnish all labor, equipment, and materials necessary to repair and upgrade the existing plumbing system for the PRF.
The Contractor shall remove and replace sections of waste pipe and vents with associated concrete slab and wall repair.
The contractor shall remodel the south restroom/showers to meet ABA compliance and carry out minor plumbing fixture replacement and finish patching in the north restroom.
The contractor shall hire and pay for services of a third-party independent testing and inspection agency, subject to Government approval.
The Contractor shall install the floor drains, drainpipes, J-traps in the pit, branch drain lines, soil stacks and ventilation, clean-outs, main drain line, connections to the sewer main drain, and all applicable components as specified in the construction documents.
The contractor shall report to the Government any instances of corrosion, cracks, fractures, breakages, odors, abnormal drain noises, or sewage backups that are not specified in the contract.
5.0 PROJECT CONTACTS
5.1 APHIS Contracting Officer (CO)
Jim Roloff
USDA, APHIS, MRPBS, AAMD
250 Marquette Avenue, Suite 410 Minneapolis, MN 55401-2329 Email: James.G.Roloff@usda.gov
5.2 APHIS Engineering Project Manager (EPM)
Fikru Taye, P.E.
USDA, APHIS, ASD, ESB
1400 Independence Ave SW | 2614-S Washington, DC 20250 Desk: (301) 851-2641 Email: Fikru.Taye@usda.gov
5.3 Contracting Officer’s Representative (COR) & Equipment Specialist Comment by Taye, Fikru - MRP-APHIS: Revise contact persons?
Marvin Draper
USDA, APHIS, PPQ, PRF
3645 East Chipman Road Phoenix AZ 85040 Tel. No.: 602-414-3904 Email: marvin.draper@usda.gov
5.4 APHIS PPQ Program Manager
Mandy Radloff
USDA, APHIS, PPQ
Email: mandy.radloff@usda.gov Mobil: 608.479.1824
5.5 State Plant Health Director (Acting) Comment by Kekela, Karla - MRP-APHIS: Added in Mr. Hennessey Michael Hennessey
USDA, APHIS, PPQ
3640 East Wier Ave Suite 1 Phoenix AZ 85040 Tel. No.: 323-855-4329 Email: Michael.Hennessey@usda.gov
5.6 Assistant Director Comment by Kekela, Karla - MRP-APHIS: Revised Title:
Supervisory PPQO Revised Address:
USDA APHIS PPQ
3640 East Wier Ave, Ste 1, Phoenix, AZ 85040 Revised Phone Number:
623-695-3788 Andrea Walton
USDA, APHIS, PPQ, PRF
3640 East Wier Ave, Ste 1 Phoenix AZ 85040 Tel. No.: 623-695-3788 Email: Andrea.b.walton@usda.gov
5.7 Budget Analyst Comment by Kekela, Karla - MRP-APHIS: Revised Title:
Budget Analyst Revised Address:
USDA APHIS PPQ
3640 East Wier Ave, Ste1, Phoenix, AZ 85040 Karla Kekela
USDA, APHIS, PPQ, PRF
3640 East Wier Ave, Ste1 Phoenix AZ 85040 Tel. No.: 602-339-1503 Email: karla.k.kekela@usda.gov
6.0 PROJECT DATA:
Project Data: If required, the following information is available for the contractors’ use.
· USDA Facilities Design Standards (2024) 242.1M-ARS 2024.pdf (usda.gov)
· USDA Directives https://www.usda.gov/directives/directives-categories
· Environmental Management https://www.usda.gov/directives/dr-5600-005 (2022)
· USDA Policies and Procedures on Biohazardous Waste Decontamination, Management, and Quality Controls at Laboratories and Technical Facilities (2009) https://www.usda.gov/directives/dr-9630-001
· Security, Suitability, and Incident Response Procedures for High and Maximum Containment Facilities (2022) https://www.usda.gov/directives/dm-9610-001
• Preferred Biobased Products (2024) BioPreferred|Product Categories
• Comprehensive Procurement Guidelines for Construction Products (2024) Comprehensive Procurement Guidelines for Construction Products | US EPA
· Sustainability and Environmental Management (2024) Sustainability and Environmental Management | GSA
· Commissioning Documents: Process, Contents, And Acceptance (2022) https://www.wbdg.org/building-commissioning/commissioning-documents
· Buy green products, services, and vehicles (Biobased and BioPreferred products, Energy efficient products, environmentally preferable products, Non-ozone depleting substances, Recycled content products, WaterSense and water efficient products)
· Occupational Safety and Health Regulations (Standards - 29 CFR) 1910 | Occupational Safety and Health Administration (osha.gov)
7.0 PROJECT REQUIREMENTS:
· Prior to construction, the contractor shall submit manufacturers’ catalogs, cut-sheets, and shop drawings for review and approval by the Design of Record. One set of shop drawings will be retained by the USDA-APHIS Engineering Branch.
· The contractor shall examine all documents and visit the site to fully understand all conditions and limitations related to the work. No subsequent cost allowance will be made for neglecting existing conditions.
· The contractor shall prepare and submit reports, bills of materials, product literature, drawings, specifications, quality control schedules, safety plans, and construction costs.
· The Contracting Officer (CO) will issue a Notice to Proceed (NTP). The Contractor is prohibited from initiating any activity prior to receipt of this notice.
· The Contractor shall submit a phasing plan and project schedule to the Government for approval. Phasing shall be designed to prevent or minimize disruption to operational services during plumbing system installation and replacement.
· The contractor shall comply with national codes, Environmental Protection Agency (EPA) regulations, and federal, state, and local laws.
· The contractor shall coordinate staging areas with security access for the delivery and storage of materials and equipment.
· The contractor shall provide competent surveyors, construction personnel, equipment, materials, tools, and supervision as needed to complete the services that meet the technical requirements of this contract.
· The contractor shall prepare and submit a Quality Control Schedule (QCS) and Project Safety Plan (PSP) to address the project. The QCS and PSP are intended to document the entire project from beginning to end.
· The contractor is responsible for safety and shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters. The contractor shall promptly report all accidents resulting in lost time, disabling injuries, or fatalities to the COR.
· The contractor shall at all times keep the work area free from the accumulation of waste materials. Upon completing construction, the contractor shall hand over the project site in a clean and orderly condition acceptable to the COR.
8.0 PROJECT SCHEDULE:
8.1 Construction schedule:
· Government review time: Minimum 14 calendar days for each submittal package.
· Contractor shall submit shop drawings and cutsheet submittals.
· Total contract performance time: [TBD]
8.2 Submittal Distribution
The construction shop drawing submittals shall be reviewed and approved by the Designer of Record. A copy of the approved shop drawings shall be submitted as follows:
| Contracting Officer | 1 copy | ||
| Program Project Manager | 1 copy | ||
| Engineering Project Manager | 6 copies |
Provide commissioning of the project, as applicable, including, but not limited to, Test Data Reports, Issues and Resolution Logs and Reports, Systems Manual, Training Documentation, and Final Commissioning Report to CO, EPM and COR.
Upon completion of construction, the Contractor shall submit a set of As-Built Record drawings in Electronic format (*.PDF file) and AutoCAD (*.dwg. file) format as follows:
| Contracting Officer | Electronic | ||
| Program Project Manager | Electronic Only | ||
| Engineering Project Manager | 1 Hard Copy and Electronic |
image1.png
File details come from the government source that posted it. Updated .