C006483 EXHIBIT C (REVISED 11.15.23).xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Substation Radiator Replacements Phase 2
- Solicitation number
- ITB-07014
- Issued by
- Orange County, Florida
About this file
This document is an exhibit for a state and local government contract opportunity in Florida, specifically in Orange County and Lakeland City. The project involves the installation of owner-furnished radiators for various transformers at Epcot "A", Epcot "B", U110, and U169 Theme Park locations. The scope includes the installation of a total of 30 radiators, performing certified lab testing of oil, replacing all radiators on each transformer, and disposing of removed radiators.
The document also includes schedules of unit prices for approved additional work, as well as schedules of wage and equipment rates. The unit prices and rates provided will be used as the basis for adjustments to the contract sum for any additions or deletions to the contract work. Pricing must be submitted as part of the bid package by the due date. The contract term is not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006483 Addendum 2.pdf | ||
| C006483 MFMP ITB Flyer.pdf | ||
| C006483 Addendum 1.pdf | ||
| C006483 EXHIBIT B (REVISED 11.15.23).xlsx | XLSX spreadsheet | |
| C006483 Addendum 3.pdf | ||
| C006483 ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
EXHIBIT C - Schedule of Unit Prices for Approved Additional Work
(REVISED 11/15/2023)
| Bid # | C006483 |
| Project: | Substation Radiator Replacements Phase 2 |
| SECTION 1. SCHEDULE OF UNIT PRICES | |||
| 1.1 These Unit Prices will be used for labor/materials outside of the scope of service that are mutually agreed upon during the contract term. | |||
| 1.2 Bidder shall complete the Schedule of Unit Prices listed below. Pricing must be included as part of the bid submittal package by the bid due date. | |||
| Fill In All Pink Areas. | |||
| ITEM | DESCRIPTION | UNIT OF MEAURE | UNIT COST |
| 1 | Transformer Valve Leak Repair | EA | |
| 2 | Mineral Oil | GA | |
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 | |||
| 13 | |||
| 14 | |||
| 15 | |||
| 16 | |||
| 17 | |||
| 18 | |||
| 19 | |||
| 20 |
ITB # C006483 Page 2 of 2
SECTION 2. SCHEDULES OF WAGE & EQUIPMENT RATES
| 2.1 The following is an integral portion to the aforementioned Schedule of Unit Prices, and together with the Unit Prices, may be utilized as the basis for adjustments to the Contract Sum for additions to and deletions from the Contract Work, as the Owner’s Representative may direct, in accordance with Article 12 of the General Conditions of the Contract for Construction. All Hourly Rates (labor wages and equipment rates) are inclusive of Contractor’s overhead, profit and cost of all employee burdens, benefits, insurance and Workers’ Compensation coverage. Overtime rates are applicable to a five (5) day workweek for hours worked in excess of forty (40) hours per week, excluding weekends and holidays. | ||
| 2.2 The Bidder shall list each category applicable to the performance of the Contract Work and provide the corresponding wage rates for each in the table below. | ||
| 2.3 Bidder shall complete the Schedules of Wage & Equipment Rates listed below. Pricing must be included as part of the bid submittal package by the bid due date. | ||
| Fill In All Pink Areas. | ||
| LABOR CATEGORY | HOURLY WAGE RATE | OVERTIME WAGE RATE |
| 2.4 Contractor-owned Equipment Rates: |
| The table below lists each type of Contractor-owned equipment to be utilized in the performance of the Work and the hourly, daily, weekly and monthly rate corresponding to each. Each and every equipment rate shall remain in effect for the duration of the Contract and shall apply for the purpose of calculating changes to the amount of the Contract Sum attributable to both additions to and deletions from the Work (collectively, changes to the Work). The rates applied in such computations shall be strictly applied in the following manner: the hourly rate shall be applied when the equipment is utilized for less than one (1) eight-hour day; the daily rate shall be applied when the equipment is utilized for more than one (1) but less than five (5) consecutive days; the weekly rate shall be applied when the equipment is utilized for more than five (5) consecutive days but less than four (4) consecutive weeks; and, the monthly rate shall be applied when the equipment is utilized for four (4) or more consecutive weeks, including any net portions thereof, which shall be applied on a prorated basis. The equipment rates set forth below are exclusive of the cost of Labor, if any, that is necessary to operate the equipment. The equipment rates included in the list below do not apply to rented equipment, the costs for which are subject to the corresponding provisions set forth in Article 12 of the General Conditions of the Contract for Construction. |
The Bidder shall list each type of Contractor-owned equipment applicable to the performance of the Contract Work and provide the corresponding daily, weekly and monthly rate for each in the table below.
| Note: Fill In All Pink Areas. | ||
| EQUIPMENT TYPE | HOURY | |
| RATE | DAILY | |
| RATE | WEEKLY | |
| RATE | MONTHLY |
RATE
&"Times New Roman,Regular"V.2 (November 15, 2023) image1.png
File details come from the government source that posted it. Updated .