C006483 Addendum 2.pdf
PDF 141 KB Posted
- Attached to
- Substation Radiator Replacements Phase 2
- Solicitation number
- ITB-07014
- Issued by
- Orange County, Florida
About this file
This document is an Addendum No. 2 issued by the Central Florida Tourism Oversight District for the Substation Radiator Replacements Phase 2 project, Bid #C006483. The addendum provides clarification that the contractor is responsible for supplying new fan brackets for all fans, regardless of whether a new fan is being installed or an existing fan is being re-installed. The project scope includes installing Owner-furnished radiators for specific transformers at the Epcot and Theme Park locations, performing certified lab testing of oil, replacing all radiators, and disposing of the removed radiators. The total quantity of radiators to be replaced is thirty (30).
The project is located within the state of Florida, specifically in Orange County and Lakeland City. No additional details are provided regarding pricing terms, set asides, incumbents, funding requirements and sources, or any other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006483 Addendum 1.pdf | ||
| C006483 EXHIBIT B (REVISED 11.15.23).xlsx | XLSX spreadsheet | |
| C006483 MFMP ITB Flyer.pdf | ||
| C006483 Addendum 3.pdf | ||
| C006483 ITB.pdf | ||
| C006483 EXHIBIT C (REVISED 11.15.23).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2
Issue Date: November 16, 2023
Title: Substation Radiator Replacements Phase 2
Bid #: C006483
To: All Bidders
Issued By: Central Florida Tourism Oversight District Richard Parente, Senior Procurement Analyst rparente@oversightdistrict.org
(689) 254-3539
NOTICE TO ALL BIDDERS
This addendum shall be made part of the ITB and shall be binding as if part of the original documents. Bidders should acknowledge receipt of this Addendum No. 2 in the appropriate space provided of the EXHIBIT D - Bid Submittal Affidavit.
It is the Bidder’s responsibility to identify all addendums before placing a bid.
PART B. QUESTIONS/RESPONSES
Question 1: For clarification, what brackets are the Contractor supplying as identified in the previous addendum?
Response 1: Contractor is to supply new fan brackets for all fans regardless of whether a new fan is being installed or an existing fan is being re-installed. The brackets are sold separately from the fans.