C006483 EXHIBIT B (REVISED 11.15.23).xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Substation Radiator Replacements Phase 2
- Solicitation number
- ITB-07014
- Issued by
- Orange County, Florida
About this file
The document is a bid pricing form (EXHIBIT B - REVISED 11.15.23) for the Substation Radiator Replacements Phase 2 project (Bid # C006483) issued by the state of Florida, Orange County, and Lakeland City. The scope of work includes the installation of 30 owner-furnished radiators for transformers at Epcot "A", Epcot "B", Theme Park U110, and Theme Park U169, including new mounting hardware, certified lab testing of oil, and disposal of removed radiators. The bid form lists the required quantities and unit prices for items such as mineral oil drums, gaskets, and laboratory testing, as well as the lump sum prices for radiator replacements at each location.
The pricing sheet indicates this is a revision dated November 15, 2023. No information is provided regarding response due dates, site visits, bidder's conferences, award dates, or contract term and renewal options. Pricing terms, funding requirements, and other salient details are not included in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006483 Addendum 2.pdf | ||
| C006483 MFMP ITB Flyer.pdf | ||
| C006483 Addendum 1.pdf | ||
| C006483 Addendum 3.pdf | ||
| C006483 ITB.pdf | ||
| C006483 EXHIBIT C (REVISED 11.15.23).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT B – Bid Pricing Form (REVISED 11/15/2023) | |
| Bid # | C006483 |
| Project: | Substation Radiator Replacements Phase 2 |
| Bidder: |
| Fill In All Pink Areas And Totals Should Automatically Tabulate. | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 1 | Provide 55-Gallon Drums of Mineral Oil | 4 | EA | $ - 0 | $ - 0 |
| 2 | Furnish Gaskets (2 EA per Radiator) | 60 | EA | $ - 0 | $ - 0 |
| 3 | Testing and Analysis of Oil (Laboratory Cost) | 4 | Tests | $ - 0 | $ - 0 |
| 4 | Replace Owner-Furnished Radiators at EPCOT "A" (8 EA)* | 1 | LS | $ - 0 | $ - 0 |
| 5 | Replace Owner-Furnished Radiators at EPCOT "B" (8 EA)* | 1 | LS | $ - 0 | $ - 0 |
| 6 | Replace Owner-Furnished Radiators at Theme Park U110 (5 EA)* | 1 | LS | $ - 0 | $ - 0 |
| 7 | Replace Owner-Furnished Radiators at Theme Park U169 (5 EA)* | 1 | LS | $ - 0 | $ - 0 |
| GRAND TOTAL | $ - 0 | ||||
| *All labor, incidental materials (not listed), equipment, tools, testing (not listed) and reports for complete radiator replacements shall be included. |
V.2 (November 15, 2023) image1.png